Preliminary Site Evaluation

Similar documents
Town of Oakfield Agricultural and Farmland Protection Plan

2.0 Physical Characteristics

Northeast Quadrant Distinctive Features

RACER Properties in Saginaw Area

I-24 PARK BUILD TO SUIT. Paducah, McCracken County, Kentucky N W. I-24 Park (Build to Suit) Paducah Economic Development

Road Scholar Gopher Science Olympiad Invitational January 6, Team #: Team Name: Names: Score:

SOUTH INTERCHANGE AREA

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

Version Isolated & Non-Waters Only 1 of 3

3.0 EXISTING PARK & RECREATION SPACE

Table 1: Margarita (SDSU) Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

Flood History. Floodplain Descriptions

MORGAN CREEK GREENWAY Final Report APPENDICES

FEASIBILITY STUDY. holdings SEPTEMBER 13, prepared for: prepared by:

PLANNING CONSIDERATIONS

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

MiSP Topographic Maps Worksheet #1a SLOPE AND TOPOGRAPHIC CONTOURS

BRIDGEPORT. Metro Atlanta s Mega-Site. Pope & Land Enterprises, Inc Cumberland Boulevard Suite 400 Atlanta, GA

Figure 1 shows the evaluation area around Tailings Basin Cells 2E/1E. Two areas were evaluated for potential wetland impacts including:

Appendix F Environmental Data for Alternative Route Evaluation

UAV Flight Services Company. What We Do. What Sets us Apart

(Short Listing) DUPUYER ACREAGE, ROCKY MOUNTAN FRONT

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

--DRAFT INTRODUCTION. Transportation Land Development Environmental S e r v i c e s

BACKGROUND DECISION. Decision Memo Page 1 of 6

MiSP Topographic Maps Worksheet #1a L2

Trail Assessment Report

US 35 & Old US th Anniversary US 35 & Old US 35 Jefferson, Ohio. Development Opportunity

The Island. Johnson Ave. Grand St. Fair St. Knower Ave. Main St. Brookside Pl. Furman Dr ,000 2,000 Feet

Table 1: Avocado Flats Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

Table 1: Iron Mountain Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

GILLESPIE STREET SITE SITE DATA SHEET

Article 11 Airport District

Segment 2: La Crescent to Miller s Corner

RAILS WITH TRAILS ALBANY TO CORVALLIS PEDESTRIAN AND BICYCLE PATH FEASIBILITY STUDY

ALTA/ACSM LAND TITLE SURVEY Parts of Augusta Heights, First Section (Plat Book 20, Page 5), Augusta Heights, Second Section (Plat Book 19, Page 25),

PARK SITE MASTER PLANS WEST PARK

the zoning sought for the tract to be rezoned is I1/FF/FW, Light Industrial District with Floodway Fringe and Floodway Overlay Districts; and

THE ALBERTA GAZETTE, SEPTEMBER

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

BRICKYARD SITE Acres

OCEANVIEW 230 KV TRANSMISSION LINE REINFORCEMENT PROJECT ROUTE SELECTION STUDY REPORT

Table 1: Paradise Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

MSK HIGHWAY 80 & DEAN FOREST RD PRICING: $649,000. Commercial Parcel. Chuck Mitchell (912)

Airport Master Plan Update June 15, 2017

Rockin River Ranch State Park

MARTINSBURG, WEST VIRGINIA

Roduner Ranch FOR SALE. 5,878± Acres Potential Development Land. Merced County, California. Offices Serving The Central Valley

Springettsbury Township. Road Improvement Projects

Access to the site is obtainable from the paved driveway leading to the MWD facility.

MINUTES FILED WITH TOWN CLERK

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

PCBS DELINEATION WORK PLAN

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

Clackamas County Development Agency

Knoxville-Oak Ridge Innovation Valley Region: Industrial Land Inventory and Comparative Study - Report of Results J U LY 1 5,

Trail Feasibility Study

Minutes of the Town of Perinton Conservation Board Meeting of. January 15, 2008

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

F O R S A L E Citrus St. E a s t v a l e, C A. House South Lawn Looking West to Lennar Homes

LANDER COUNTY RAIL ASSESSMENT NOVEMBER 2006

Table 1: Santiago Peak Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

M I N U T E S OKLAHOMA COUNTY PLANNING COMMISSION

GSO Architects represented by Lisa Swift NE Collins & I-30 Partners, LLC., represented by Jay Grogan

8. Agricultural, Natural and Cultural Resources

Treaty Oaks Ranch 323+/- Acres Hood County, Texas $1,776,500

Appendix E. System Issues

FISCHLER PROPERTY COMPANY LLC 1605 HENDRY STREET FORT MYERS, FL

Site Location. Site Location. Renville. Renville County. County. Sacred Heart Township. Chippewa. Kandiyohi. Yellow Medicine.

Airport Master Plan Update June 15, 2017

BROCHURE Pilot Hill Meadows Acres Pilot Hill, California. Presented by Jim Copeland

BUSINESS OFFERING MEMORANDUM

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

BAsin. - Ranch - Offered at $11,500,000.

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

Atlantic Surveying, P.A. Professional Land Surveyors

SEA LEVEL RISE IN THE FLORIDA KEYS

ROYAL VIEW DEVELOPMENT

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

BROCHURE Sierra Foothills Ranch 55 Acres Pilot Hill, California. Presented by Jim Copeland

1) AMENDMENTS TO THE ROCKINGHAM ZONING BYLAW MAPS:

Introduction to Topographic Maps

MARCUS ENTERPRISES LLC 741 E Washington Street. Charles Town, WV D.B PG. 77 ZONING: USE: GYM SWM AREA

APPENDIX F List of Commitments

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

BUCKHANNON, WEST VIRGINIA

Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT

Prepared by Bergmann Associates in association with Steinmetz Planning and Razak Associates

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

County of Riverside - PSEC Project General Habitat Assessment Appendix A

PROPOSED ALTERATION AND EXPANSION OF THE MOUNT PEARL MUNICIPAL BOUNDARY TO INCLUDE THE AREA OF THE FORMER PEARL ESTATE LANDS & ENVIRONS

Topo Map Explorer. Adapted from: An original Creek Connections activity. Creek Connections, Box E, Allegheny College, Meadville, Pennsylvania, 16335

RIO VISTA MUNICIPAL AIRPORT

Table 1: Black Eagle Communication Site. Latitude 1 Longitude 1 Elev 2 Address T/R/S 3 APN 4 USGS Quadrangle

Transcription:

Preliminary Site Evaluation 100 Acre Site, US 72 Piperton, Tennessee Power Distributor: Chickasaw Electric Cooperative August 2010

SITE DATA SHEET PIPERTON US 72 SITE (100 ACRES): LOCATION & GENERAL DESCRIPTION This site is located approximately 3 miles south of the City of Piperton in Fayette County, Tennessee. It consists of a single parcel encompassing approximately 100 acres and is located approximately 0.4 miles northwest of the Tennessee/Mississippi state line on US 72. The site is bounded by US 72 to the north and the state line to the south. It is located approximately 2.4 miles southeast of the intersection of State Route 385 and US 72. It is located approximately 3.2 miles south of the Piperton central business district via State Route 196, which intersects US 72 approximately 600 feet southeast of the site. TRANSPORTATION & SITE ACCESS Interstate Access... To the north, the site will eventually have access to I-40 East and the proposed north-south I-69 via State Route 385 /I- 269, which is currently under construction and scheduled for completion in late 2013. I-40 West and I-55 can also be accessed via State Route 385 and I-240 to the northwest. Highway Access:... Site is immediately adjacent to US 72 to the north, which connects Memphis with Chattanooga Local Road Access None Railroad Access:... None Airport:... Site is located approximately 25 miles from the Memphis International Airport (KMEM) via State Route 385 and I-240.

TOPOGRAPHY USGS maps:... 7.5 Quad map: Collierville (35089A6), 1983 Byhalia NW (34089G6), 1971 Elevation Range:... Approximately 375 feet to 410 feet (from USGS contours) Approximate Slopes:... +/-95% of the site is less than or equal to 5% slope +/-5% of the site is between 5% and 10% slope Predominant Terrain:... Level, approximately 15% wooded. Floodplain:... FEMA Flood Insurance Rate Map Number 47047C0395C (Effective date 11/5/08) shows that this site contains no... FEMA flood hazard areas (Zone A). Wetlands:... NWI maps indicate the presence of a small area of linear wetlands along one of the blue line streams in the southern portion of the site, although most of these are actually located in Mississippi, well clear of this site. A single nonlinear wetland area of approximately 0.3 acres, classified as PUBHx, covers an area occupied by a farm pond. TOTAL AND UNUSABLE AREAS The total area of each parcel is taken from tax records and was provided by the requestor. These acreages are noted on the aerial maps. Areas of more than 10% natural ground slope are normally classified as unusable for the purposes of these evaluations. On this site, however, there are no such areas. In addition, areas containing wetlands as listed on the National Wetlands Inventory (NWI) maps are considered to be undevelopable, with some exceptions. Finally, areas designated as official FEMA flood hazard areas (floodway or 100-year flood fringe area) have also been classified as undevelopable. These acreages are noted on the topographic maps.

UTILITIES Water The Water Master Plan for Piperton was prepared in 2007 by Mid-South Engineering Consultants. (See Exhibits) This plan indicates the planned future construction of a 12 inch water line along the south side of US 72 on the north end of the site. Also shown is a proposed 10 inch water line along the west side of the site that turns and connects to an existing line in the Piperton Business Park, approximately 1 mile west of the site. Wastewater The Sewer (Wastewater) Master Plan for Piperton was prepared in 2009 by Mid- South Engineering Consultants. (See Exhibits) This plan indicates a planned future east-west gravity sewer approximately 500 feet north of the state line that ties into the existing sanitary sewer system that serves the Piperton Business Park. Electric Power The site is located within the service area of and is served by the Chickasaw Electric Cooperative. The closest TVA power line is a north-south 161 kv line located approximately 0.5 miles to the east. The nearest existing Chickasaw Electric Cooperative substation is located in near Rossville, TN, approximately 5 miles northeast of the site. Natural Gas The natural gas provider in this area is the Hardeman-Fayette Utility District, based in Moscow, TN. A 6 inch gas line runs along the north side of US 72 back towards the Shelby County line. Another 6 inch line crossing to the south side of US 72 was installed as part of the widening project. This crossing is believed to be within a few hundred feet of the site, and in any event, Hardeman-Fayette feels that they would have no problem in serving almost any type of development at this site.

EXHIBITS The following map exhibits are provided for the site reviewed: Aerial Imagery - (Prepared by TVA Economic Development) USGS Topographic / NWI Wetlands Map TVA Economic Development FEMA Flood Maps TVA Economic Development USDA Soils Map TVA Economic Development Piperton Sewer Master Plan 2009 Mid-South Engineering Consultants Piperton Water Master Plan 2007 Mid-South Engineering Consultants FACTORS FAVORING THIS SITE The following factors are considered to be positives for this site: Excellent topography prevails here; steep slopes are almost non-existent. Road infrastructure is excellent, with four-lane access to Interstate system CHALLENGES PRESENTED BY THIS SITE The following factors are not considered to be positives for this site: Usable area is somewhat limited by streams to south.