PROCESS FOR DEVELOPING RP2 IN RESPECT OF THE UK Workshop

Similar documents
The SES Performance Scheme. ICAO Regional Performance Framework Workshop Bishkek, Kyrgyzstan May 2013

European Performance Scheme

ANNEX ANNEX. to the. Commission Implementing Regulation (EU).../...

Prospect ATCOs Branch & ATSS Branch response to CAP Terminal Air Navigation Services (TANS) contestability in the UK: Call for evidence

State Aviation Administration of Ukraine

SES Performance Scheme

Public Hearing on Single European Sky II: «Make or Break Time» Views of the European Commission

ICAO EUR Region Performance Framework

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Customer Relations Programme

Terms of Reference: Introduction

(Non-legislative acts) REGULATIONS

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

EUROCONTROL General Presentation

Performance Indicator Horizontal Flight Efficiency

OVERVIEW OF THE STAKEHOLDER CONSULTATION PERFORMED FOR THE SES2+ IMPACT ASSESSMENT

LAMP 2 - FASI(S) Network

1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI)

ATM in Europe It s all about Performance

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector

Single European Sky Benefits for the airline industry. Warsaw, 28 November 2011

STANSTED AIRPORT CONSULTATIVE COMMITTEE

Economic regulation: A review of Gatwick Airport Limited s commitments framework

EUROCONTROL and the Airport Package

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Network Management, building on our experience of flow management and network planning.

Seminario internacional sobre gestiόn privada de aeropuertos

COMMISSION IMPLEMENTING REGULATION (EU)

Airlines UK 24 May 2018: Speech by Richard Moriarty

Noise Action Plan Summary

(Non-legislative acts) REGULATIONS

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

NEFAB Annual Report 2016

Recommendations on Consultation and Transparency

NERL Oceanic Charges: Proposals for a charge cap

easyjet response to CAA Q6 Gatwick final proposals

Enhanced Engagement Terms of Reference:

ICAO EUR REGION APPROACH TO THE DEFINITION OF A PERFORMANCE FRAMEWORK

Network Manager Adding value to the Network 29 September 2011

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

Single European Sky II

Performance Review Body 18

Decision Strategic Plan Commission Paper 5/ th May 2017

Review of current KPIs and proposal for new ones

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT INFORMATION TECHNOLOGY AND COMMUNICATIONS DIRECTORATE GENERAL CIVIL AVIATION ADMINISTRATION

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Review of current KPIs and proposal for new ones

Single European Sky. Anforderungen und Entwicklungschancen für nationale Flugsicherungen. Sven Halle DG TREN Air Transport Unit (F2)

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

UK Implementation of PBN

The Strategic Commercial and Procurement Manager

Response to CAA Consultation on Strategic Themes for the Review of Heathrow Airport Limited Charges (H7)

The Single European Sky & the SESAR programme

Euromed Civil Aviation II project

Performance monitoring report for 2014/15

Indicator development: how could we improve existing indicators and which new ones do we need?

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

MAXIMUM LEVELS OF AVIATION TERMINAL SERVICE CHARGES that may be imposed by the Irish Aviation Authority ISSUE PAPER CP3/2010 COMMENTS OF AER LINGUS

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

GATWICK AIRPORT LIMITED

EUROCONTROL / Central Route Charges Office. The significance of Economic Regulation with regard to air navigation services charges

FUTURE AIRSPACE CHANGE

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

Efficiency and Environment KPAs

Grow Transfer Incentive Scheme ( GTIS ) ( the Scheme )

HELLENIC AIR NAVIGATION SUPERVISORY AUTHORITY NATIONAL PERFORMANCE PLAN GREECE RP

CAA response to Transport Select Committee airspace management and modernisation inquiry CAP 1532

Re: CAP 1541 Consultation on core elements of the regulatory framework to support capacity expansion at Heathrow

SEAMLESS SKY IN EUROPE. Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009

ROMANIA NATIONAL PERFORMANCE PLAN. Ministry of Transports and Infrastructure. for Air Navigation Services

Economic regulation at Gatwick from April 2014: Notice granting the licence

SUBMISSION BY. TO THE TRANSPORT AND INFRASTRUCTURE SELECT COMMITTEE ON THE COMMERCE AMENDMENT BILL

ECONOMIC REGULATION OF THE NEW RUNWAY AND CAPACITY EXPANSION AT HEATHROW AIRPORT: CONSULTATION ON CAA PRIORITIES AND TIMETABLE CAP 1510

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

DETAILS AND PRINCIPLES REGARDING PROPOSED REVISED SERVICE CHARGES OCTOBER 1, 2000

DRAFT AGREEMENT BETWEEN THE EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION (EUROCONTROL) AND THE KINGDOM OF MOROCCO

Master Plan edition 2

U.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009

ICAO EUR Region Performance Framework. (ICAO EUR Doc 030)

The Airport Charges Regulations 2011

Peter Forsyth, Monash University Conference on Airports Competition Barcelona 19 Nov 2012

RP3 Customer Consultation Working Group. Report of the Co-Chairs

Civil Aviation Agency of Latvia

Efficiency and Automation

EUROPEAN AIR TRAFFIC MANAGEMENT AND SINGLE EUROPEAN SKY (SES)

EUR/SAM corridor airspace concept

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

Criteria for an application for and grant of, or variation to, an ATOL: Financial

1.2 Notwithstanding the provision in 1.1 this BL applies to the airport in Denmark with the most passenger movements.

Monarch airlines response to the CAA s review on Gatwick s commitment framework

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

Submission to NSW Koala Strategy Consultation Process. March 2017

RMT.0464 ATS Requirements The NPA

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport

Dublin Route Support Scheme ( RSS ) Long-Haul Operations (the Scheme )

ACI EUROPE POSITION PAPER

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Transcription:

PROCESS FOR DEVELOPING RP2 IN RESPECT OF THE UK Workshop 15 October 2012 Richard Moriarty Mike Goodliffe Matt Claydon Slide 1

OBJECTIVE To discuss the CAA s consultation document and the responses to it; with a view to further develop a realistic process and timetable which meets European requirements while allowing a level of consultation which stakeholders want and can resource. Slide 2

AGENDA 14:00 Welcome and introductions 14:10 Overview 14:30 FAB dimension: Introduction Discussion 14:50 Terminal: Introduction Discussion 15:20 Refreshment Break 15:30 NERL: Introduction Discussion 16:45 Conclusions 17:00 Close Slide 3

OVERVIEW Slide 4

Overview Introduction Reference Period 1 Reference Period 2 PRB Proposed RP2 Schedule CAA: Process Consultation - Where we are Themes from the consultation Discussion Slide 5

Introduction Under Single European Skies (SES) Performance Scheme: National Supervisory Authorities (NSAs) required to draw up Local Performance Plans for 3 or 5 year reference periods. Required to set binding targets for Key Performance Indicators (KPIs) - Safety - Environment - Capacity - Cost effectiveness Need to be consistent with and make an adequate contribution to EU wide targets adopted by the EC. Slide 6

Reference Period 1 (RP1) Reference Period 1 (RP1) For 3 years (2012-2015) rather than 5 Focused on only a subset of Key Performance Areas Limited application to terminal services Mainly focused at National rather than FAB level Slide 7

Reference Period 2 (RP2) Exact requirements of RP2 not finalised Draft legislation to make changes to the Performance and Charging regulations. Before Single Sky Committee today for discussion. Expected to be voted on in early December Targets for EU as a whole expected to be: But Proposed by PRB for consultation no later than September 2013. Finalised by vote of the Single Sky Committee no later than December 2013. The Local Performance Plans need to be adopted by the States and communicated to the EC no later than 30June 2014. Leaving consultation until after the EC finalises EU wide targets would leave very limited opportunity for consultation on the detail of the plan. Slide 8

PRB Proposed RP2 Schedule Source: PRB PRB will base initial proposals for EU-wide targets informed by submission of cost data by States/ANSPs at end May 2013. Slide 9

CAA: Process Consultation Where we are: Challenge is to design a process which aligns with European timetable but allows the level of consultation that stakeholders want. CAA consulted on Process in July 2012 Consultation closed 28 September Responses received from: BAA, BA, GAL, IATA, NATS, NATS Trade Unions, and Ryanair. The CAA also received a consolidated FAB Europe Central Position on the RP2 regulatory approach as contribution to the workshop. All responses published on CAA website. Slide 10

Themes from the consultation responses (1) AIRLINES AIRPORTS Disappointment at outcome of RP1. CAA should align with EC processes- not get ahead of them. Suspicion about using concept Total Economic Value (TEV) strong preference for downward pressure on charges BAA: Keen to be involved in stakeholder workshops on airport ANS. and in process for en route because of interrelationships; Airport performance measures less mature; Root causes of behaviours need to be understood; GAL- Need to ensure we do not prevent the further development of airport or ANSP competition. Slide 11

Themes from the consultation responses (2) NATS NTUS Looks forward to engaging constructively with airlines from March 2013. Looking for objective, economic and evidence led approach. Targets should represent an appropriate balance between challenging and achievable. (NERL view -2%,-3.5%,-5% p.a. is challenging.) Some joint FAB targets may be appropriate. But: Only where clear tangible benefits; Should not apply to cost effectiveness Oceanic airspace should continue to be subject to economic regulation with a strong emphasis on a simple and proportionate design. Safety, capacity and environmental targets are most appropriately applied on a bottom up rather than top down basis. An overly ambitious approach to RP2 will be damaging to ATM service delivery. Slide 12

DISCUSSION Slide 13

FUNCTIONAL AIRSPACE BLOCK DIMENSION Matt Claydon Slide 14

FAB dimension RP1 UK & IE National Plans + Aggregation of targets RP2 Proposal to focus on FAB Plans Initial discussion of EC proposed amendments at SSC today Proposals include: Capacity & Environment targets at FAB level Safety targets at national level Cost-efficiency targets at charging zone level Where targets set at FAB level, need to clearly articulate accountabilities Where no FAB target, need to demonstrate contribution of FAB to improved performance at national/charging zone level Slide 15

DISCUSSION Slide 16

TERMINAL Mike Goodliffe Slide 17

Terminal Introduction Scope Market Conditions Test (Contestability Study) Terminal ANS KPIs Process Discussion Slide 18

Introduction RP2 further extends performance scheme to Terminal ANSP. Airport contracts with ANSPs or self-supply unusual in rest of EU. Implicit in the performance and Charging regulations: direct charges from the airport ANSP to airlines and service Based on weight based standardised Service Units. standards set through regulation rather than contractual negotiations. UK airports are not part of the UK-Ireland FAB. Slide 19

Scope KPIs or PIs Safety/Environment/Capacity All airports >50,000 Commercial Air Transport Movements p.a. (Proposal to change test to IFR Air Transport Movements) Any other fully slot co-ordinated airports. (All UK co-ordinated >50k) KPI for Cost efficiency All airports >50,000 unless member State has established that terminal air navigation services are subject to market conditions at least 19 months before the start of the RP2. Various other Performance Indicators (PIs) proposed for RP2. (Not subject to targets but for monitoring, benchmarking and reviewing). Slide 20

Market Conditions Test (Contestability Study) DfT commissioned CAA to consider ANS at airports against the criteria in the Charging Regulation. To report in November 2012. European Commission proposing changes to the criteria. Being discussed by Single Sky Committee today. Vote expected early December. Test would need to be completed at east 19 months before start of RP2 (end may 2013). Slide 21

Terminal ANS KPIs Subject to EC revision of Performance and Charges Regulations: KPA Safety (at national level) Environment Capacity (at national level with monitoring at airport level) Cost Effectiveness (at charging zone level) KPI (Latest Proposals) (a) Level of effectiveness of safety management. (b) Application of the severity classification based on the Risk Analysis Tool (RAT) methodology. (Minimum: Separation Minima Infringements, Runway Incursions and ATM-specific technical events.). (c) The level of presence and corresponding level of absence of just culture. (Only PIs?) Average ATFM delay per inbound IFR flight. (Over calendar year including all causes, including weather and exceptional events.) Subject to financial incentives? The determined unit cost(s) (DUC), defined as: - ratio between the determined costs and the forecast traffic, expressed in terminal service units; - expressed in real terms and in national currency; - provided for each year of the reference period. Slide 22

Process Local Performance Plan needs targets for each KPI. CAA to consult with ANSPs, airports, users and other interested parties during 2013 to inform targets. CAA considering most efficient approach to avoid duplication across c.16 airports, e.g. a common consultation across all airports perhaps involving consultation workshops. What is best approach to interact with development of business plans for ANSPs at airports (as required by SES Regulation for Common Requirements)? Slide 23

DISCUSSION Slide 24

NERL 15 October 2012 Mike Goodliffe Slide 25

NERL Introduction Aligning NERL s economic regulation with the performance scheme Stakeholder Scrutiny Scope of SES En Route Performance Scheme Incentives Oceanic Setting Charge Condition in the NERL licence Baseline Process Process and Timetable Options Slide 26

Introduction Broad alignment between aims of Europe and UK regulation. Sustainable development of Air Transport by improving: Safety, environment, capacity and cost-efficiency. But some differences including UK Transport Act requires CAA to regulate in a manner best calculated to secure that licence holders will not find it unduly difficult to finance their licensed functions. Unlike other en route ANSPs, NERL is commercially financed. The CAA considers duties under the Act can be made to stand alongside EU requirements with close working between the CAA and PRB to assess the reasonableness of targets for NERL. If conflict arises between the formal legal requirements, the CAA would expect EU legislation to take precedence. Slide 27

Aligning Economic Regulation of NERL with the Performance Scheme EC expects: significant downward pressure on costs from EU-targets well below the average for RP1. CAA considers that for RP2 there should be a new approach that complements bottom-up with top down; ACC has asked that NERL develop a draft business plan for March 2013 with real unit rate reductions of -2%, 3.5% and 5% p.a ANSPs return on equity should reflect the real risks faced by the business and is expecting to commission a study of this issue. CAA would like to contribute fully to this study and have regard to its findings in its work-plan for RP2. Member States relative contribution towards the attainment of EUwide targets in RP1 should be taken into account when it sets EUwide targets and assesses LPPs for RP2. The CAA will take into account the level of costs revealed in RP1 but does not currently believe that any claw-back would be consistent with the incentive properties of fixed term price regimes. Slide 28

Stakeholder Scrutiny Important that NERL is transparent about its future plans with its customers. The CAA would expect to test and challenge NERL s analysis and expose it to scrutiny from users who are best placed to advise on the NERL related service propositions that meet their commercial requirements in terms of price, capacity and other outputs. The CAA expects to commission expert consultants to assist it in this regard. The CAA will need to fully understand how NERL s investment strategy will contribute to SESAR, FAS and LAMP. Slide 29

Scope of SES En Route Performance Scheme KPA Safety (at National level) Environment (at FAB level) Capacity (at FAB level) Cost Effectiveness (at Charging Zone level) KPI (Latest Proposal) (a) Level of effectiveness of safety management. (b) Application of the severity classification based on the Risk Analysis Tool (RAT) methodology. (Minimum: Separation Minima Infringements, Runway Incursions and ATM-specific technical events.). (c) The level of presence and corresponding level of absence of just culture. The difference between the length of the actual trajectory and the achieved distance, summed over all flights considered, and expressed as a percentage of achieved distance. The average minutes of en route ATFM delay per flight from all ATFM delay causes; the flights considered are all IFR (Instrumental Flight Rules) flights traversing the local airspace. The determined unit cost (DUC) for en route air navigation services, defined as the ratio between the determined costs and the forecast traffic in the charging zone, expressed in en route service units; - the indicator is expressed in real terms and in national currency; - The indicator is provided for each year of the reference period. Slide 30

Incentives The regulations currently allow for bonuses and penalties. The cost efficiency targets are embodied in the DC fixed for the reference period and the traffic risk sharing Incentives on NERL in RP1 Capacity Flight Efficiency 3 Measures with financial incentives based on ATFM delay attributable to NERL: annual average ATFM delay per flight. Impact Score (placing greater weight on long delays and departures in the morning and the evening peaks). Daily Excess Delay Score based on weighted delays exceeding pre-determined thresholds on a daily basis. A target based on a combination of horizontal and vertical inefficiency with target values and bonuses and penalties. Are stakeholders users happy with the current incentives? Changes to regulations may require fundamental change. What process required to make sure it meets the needs of users. Slide 31

Oceanic UK has joint responsibility with Ireland airspace in the NE Atlantic. annual turnover of NERL s Oceanic service c. 27 million. Regulated but current emphasis on simplicity. limit on the average charge per flight based on (RPI-X). No traffic sharing mechanism or service quality incentives (e.g. delay, flight efficiency, etc). Is there a continuing need to regulate this service? If so on what basis? Given it: is an institutional monopoly with no immediate prospect of competition for the market or within the market. CAA currently sees merit in continuing to regulate it but doing so in a way that continues to be proportionate to the scale of the activities involved. Slide 32

Setting Charge Condition in the NERL licence Criticism of CAA for setting price cap for CP3 before the end of the RP1 process. Formal mechanism for giving effect to price control is through modifications to NERL s licence granted under the Act. Current price control licence conditions expire on 31 December 2014. For RP2 the CAA will not finalise price conditions in licence until as late as possible before the expiry of the present conditions. It Expects to issue proposals for modifications in October 2014 before making a formal decision in December 2014. To mitigate the process risk that LPP not approved by the EC before the expiry of the licence conditions the CAA can either: modify the NERL licence for one year only; or modify the licence for the full RP2 period but make it clear that this is contingent on European Commission approval and the licence may be subject to further modification if such approval is not secured. Slide 33

Baseline Process Process Proposed By PRB End March 2013 End May 2013 PRB consults on initial proposals for July 2013 EU-wide targets. EC proposes EU-wide targets. September 2013 Early Sep 2013 October 2013 Proposed Complementary Local Process NERL publishes draft IBP & NERL/User customer consultation begins. State/ANSP submits cost information by Charging Zone. NERL/User customer consultation ends. NERL issues revised business plan. EC adopts EU-wide targets. December 2013 NSAs publish initial draft LPP for consultation. April 2014 NSAs submit revised LPP to States. States submit plans to EC/PRB. May/June 2014 States submit plans to EC/PRB. EC assesses plans and notifies States. September 2014 [Late November] October 2014 December 2014 Proposed formal changes to licence. CAA publishes formal decision. Slide 34

Process and Timetable Options (2) Base proposal allows substantive bilateral engagement between NERL and customers but does this provide the best value to stakeholders and fit with the EU process. Options: (a) Short NERL customer consultation after PRB publishes draft EU wide targets. (b) CAA could publish initial proposals in July with consultation July October. (c) No customer consultation other than NSA-led stakeholder consultation in early 2014 on the draft LPP. Any of these options could be supplemented by a short intensive workshop based consultation in April 2013 to consider the NERL IBP before the States/ANSP submission. Slide 35

DISCUSSION Slide 36

CONCLUSIONS Slide 37