GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES

Similar documents
GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS ON-CALL AVIATION PLANNING SERVICES

Port of Friday Harbor

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

City of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator

JOHNSTON COUNTY AIRPORT AUTHORITY

FBO Request for Proposal Lake Cumberland Regional Airport

L1408 S1, RUNWAY INCURSION MITIGATION STUDY AND COMPREHENSIVE AIRFIELD

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

CHAPTER 1 INTRODUCTION AND BACKGROUND

RFP 1-12-C069 ELECTONIC SECURITY SYSTEM (ESS) MAINTENANCE & REPAIR SERVICES AT WASHINGTON DULLES INTERNATIONAL & RONALD REAGAN WASHINGTON

The City of Chico REQUEST FOR PROPOSAL FOR THE MANAGEMENT, OPERATION, DEVELOPMENT AND MAINTENANCE OF THE CHICO MUNICIPAL AIRPORT

GROUND TRANSPORTATION RULES AND REGULATIONS MONTROSE REGIONAL AIRPORT. Montrose, Colorado

The Airport. p a g e 2

INVITATION FOR BID VENDOR: BID OPENING:

FY16 18 CONSTRUCTION ESCORT SUPPORT

Rodrigues Regional Assembly Chief Commissioner s Office

Passenger Facility Charge Application #1

BUY AMERICAN PREFERENCE A1.1 SOURCE A1.2 APPLICABILITY. Title 49 USC 50101

Memorandum of Understanding

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

CHAPTER 3 ALTERNATIVES CONSIDERED

Request for Proposal (RFP) Fixed Wing Aircraft Transportation Services. For Matawa First Nations

AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012

CITY OF NEWPORT AND PORT OF ASTORIA REQUEST FOR PROPOSALS -- SCHEDULED AIRLINE SERVICE BASIC INFORMATION

AIRPORT NOISE AND CAPACITY ACT OF 1990

4. DEFINITIONS: OFFICE OF HUMAN CAPITAL. TSA MANAGEMENT DIRECTIVE No HIRING PRIVATE SCREENERS FOR FEDERAL TSO POSITIONS

SECTION 2 - GENERAL REGULATIONS

AMENDMENT OF SOLICITATION

AGREEMENT APPLICATION PACKET

COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019

PROCUREMENT DEPARTMENT 2 MONTGOMERY STREET, 3 RD FL. JERSEY CITY, NJ 07302

Air Operator Certification

BOARD OF AIRPORT COMMISSIONERS

SAN JOSE CAPITAL OF SILICON VALLEY

Town of Canandaigua 5440 Routes 5 & 20 West Canandaigua, NY (585) Established 1789

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

VoIP RADIO CONSOLE SYSTEM FOR MACON COUNTY EMERGENCY MANAGEMENT

COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018

It s The Law. Fly America - More Than Just A Name by Mike Cannon. Federal Assistance Law Division INTRODUCTION

Mandatory Pre-Proposal Meeting

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

SPRINGFIELD-BRANSON NATIONAL AIRPORT. Irregular Operations (IROPS) Contingency Plan STANDARD OPERATING PROCEDURES

Request for Proposals

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Issued by the Department of Transportation on the 12 th day of February, 2016 FINAL ORDER ISSUING INTERSTATE CERTIFICATE

GENERAL AVIATION AIRPORT AGREEMENTS

TABLE OF CONTENTS 1.0 INTRODUCTION...

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

ORDER REQUESTING PROPOSALS

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Session 6 Airport Finance 101 Funding Sources for Airports

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

RAPID CITY REGIONAL AIRPORT

RESOLUTION NO

MINIMUM STANDARDS AND GUIDELINES FOR COMMERCIAL SERVICES. April 1998

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

ALASKA AIRLINES AND VIRGIN AMERICA AVIATION SAFETY ACTION PROGRAM (ASAP) FOR FLIGHT ATTENDANTS MEMORANDUM OF UNDERSTANDING

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2015-SW-014-AD; Amendment ; AD ]

SERVICE AGREEMENT. The Parties agree as follows: 1. SERVICE AGREEMENT:

Applicant: EUROWINGS LUFTVERKEHRS AG (Eurowings) Date Filed: July 16, 2014

FORECASTING FUTURE ACTIVITY

Request for Proposals

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS

SouthwestFloridaInternational Airport

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

OFFICIAL D.O.T. EMERGENCY CONTINGENCY PLAN

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

Appendix A - Definitions

ASIP2 AIR SERVICE INCENTIVE PROGRAM

2. CANCELLATION. AC 39-7B, Airworthiness Directives, dated April 8, 1987, is canceled.

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

REQUEST FOR COMPETITIVE SEALED PROPOSALS AIRPORT MANAGEMENT SERVICES MARV SKIE/LINCOLN COUNTY AIRPORT

Request for Proposals. Aviation Service Providers At Tri-Cities Airport

WHEREAS, the City operates and manages Rapid City Regional Airport (RAP); and

MATERIALS AND PROCUREMENT DEPARTMENT 1900 YONGE STREET PAGE 1 OF 1 TORONTO, ONTARIO M4S 1Z2

C. Sponsor Certification. The sponsor hereby assures and certifies, with respect to this grant that:

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Airport Finance 101 Session 3 - Capital Funding

Addendum No. 1 Acknowledgement of Receipt

MANASSAS REGIONAL AIRPORT

Alternatives. Introduction. Range of Alternatives

Ordinance No Amendments to Airport Ordinance 87-8

Beaufort County. Hilton Head Island Airport fhxdi, Hilton Head. SC.

Route Support Cork Airport Route Support Scheme ( RSS ) Short-Haul Operations Valid from 1st January Introduction

Grant Assurance Compliance

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

[Docket No. FAA ; Product Identifier 2016-NM-208-AD; Amendment ; AD ]

VARIOUS RESTRICTED CATEGORY HELICOPTERS

Advisory Circular. Aircraft Certification Authority Based on Foreign Qualifications

Aircraft Maintenance Organisations - Certification. Contents

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering

Transcription:

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES The County of Montrose, Colorado is accepting Statements of Qualifications from qualified firms to provide On-Call Aviation Engineering Services in accordance with the terms, conditions and specifications contained in these documents. The County plans to award a five-year contract for engineering services for any and all aviation planning projects subject to Federal assistance from the Federal Aviation Administration, as provided under Title 49, U.S.C. Section 47104, or other funding sources as applicable, in addition to non-federal projects at the Montrose Regional Airport and Hopkins Field Airport (Nucla, CO). Each firm shall become fully informed of the extent and character of work required. All questions must be submitted via email to Engineeringquestions@montrosecounty.net, subject line Engineering Services RFQ, no later than 2:00 PM, our clock, on Tuesday, October 9, 2018. Questions received after the deadline shall not be answered. Answers to questions of general interest will be posted to the Montrose County website (www.montrosecounty.net) no later than 2:00 PM on Friday, October 12, 2018. Click the I Want To tab, then View Bids, and On-Call Aviation Engineering Services to locate the Addendum. Other addenda, if issued, will be posted at any time up to 7 days prior to submission deadline. Respondents are responsible for checking the website to ensure they have all addenda, as failing to acknowledge receipt of any addenda may result in rejection of the Statement of Qualifications. Responses must be submitted in a sealed envelope bearing the name of the firm. In the lower left hand corner, the sealed envelope must be marked On-Call Aviation Engineering Services, Due 10/24/18 2:00 PM. Sealed submissions must be delivered to Lloyd D. Arnold, C.M., Director of Aviation, Montrose Regional Airport, 2100 Airport Road, Montrose, Colorado 81401 no later than 2:00 PM, our clock, on Wednesday, October 24, 2018. The Respondent has sole responsibility to ensure the submission is received before the deadline and shall bear all risks associated with delays in the U.S. mail or delivery service. Guaranteed overnight delivery to Montrose Regional Airport may not be available from overnight carriers. Submissions received after the deadline shall not be considered. All Statements of Qualifications become the property of Montrose County and shall not be returned. Any proprietary information must be clearly identified for non-disclosure purposes. This project is solicited in accordance with the County of Montrose Purchasing Policy and Federal statutes, regulations and policies, including FAA Advisory Circular 150/5100-14E, Architectural, Engineering and Planning Consultant Services for Airport Grant Projects and 49 CFR Part 18. Page 1 of 6

MONTROSE COUNTY REQUEST FOR STATEMENTS OF QUALIFICATIONS ON-CALL AVIATION ENGINEERING SERVICES A. INTENT The County of Montrose, Colorado (Sponsor), owner and operator of the Montrose Regional Airport (Montrose, CO) and Hopkins Field (Nucla, CO), is requesting Statements of Qualifications for On-Call Aviation Engineering Services from firms (Respondents) qualified and experienced in aviation engineering. The Sponsor plans to award a five-year contract for aviation engineering services on an as-needed basis for any and all projects subject to Federal assistance from the Federal Aviation Administration, as provided under Title 49, U.S.C. Section 47104, or other funding sources as applicable, in addition to non-federal projects at the Montrose Regional Airport and Hopkins Field Airport, Nucla, Colorado. The Sponsor s proposed federal projects are dependent upon Federal funding; therefore it shall be understood that some of the services related to the proposed projects may be deleted or modified. B. BACKGROUND Montrose County operates two airports. Montrose Regional Airport is located in Southwest Colorado, 1 mile north of the City of Montrose on approximately 1,125 acres. The airport enplanes approximately 123,000 passengers annually and is the air gateway to Black Canyon of the Gunnison National Park, Telluride and Crested Butte ski resorts, and the greater Montrose County region. Presently the commercial air service tenants at the airport consist of four airlines: United Airlines, American Airlines, Delta Airlines, and Allegiant Travel Co. Other tenants include one (1) fixed base operator (Atlantic Aviation, nine (9) rental car companies, thirteen (13) ground transportation companies and assorted terminal concessions. The Montrose Regional Airport is certificated by FAA under 14 CFR Part 139, Certification of Airports, to serve air carrier passenger operations as Class I airport required to comply with ARFF Index B requirements. The airport design category is C- IV. The airport has one 10,000 x 150 asphalt runway and one 7,500 x 100 asphalt runway with approximately 34,000 operations per year. NAVAIDs include an ILS, Terminal VOR/DME, ACTVT High Intensity Runway Lighting, MALSR RY 17, REIL s RY 13-31 and 35, VASI S, PAPI s and ASOS. There is no airport traffic control tower. Hopkins Field Airport is located in Southwest Colorado, 3 miles Southwest of Nucla, Colorado. The airport provides access to the Western portion of Montrose County and Eastern Utah border. Hopkins Field is a General Aviation (GA) airfield, with a design category of B-II. It has one 5,009 x 75 asphalt runway and one 4,000 x 80 turf Page 2 of 6

runway with approximately 1,600 operations per year. NAVAIDs include Medium Intensity Runway Lighting, AWOS, REIL s, PAPI s and Lighted Wind Indicator. There is a 2,900 sq. ft. general aviation terminal. C. SCOPE OF WORK On-call aviation engineering services may include, but are not limited to the following projects and are anticipated to be Federally-funded: Montrose Regional Airport 1. Airport Rescue Fire Fighting (ARFF) Filtration System 2. Runway Guard Lights/Ruts 3. Expand Terminal Building 4. Expand Commercial Apron, Rehabilitate Concrete Slabs, Repair Spalls and Expand Joint Sealing 5. Improve Airport Access Road 6. Acquire Land Hopkins Field Airport 1. Wildlife Perimeter Fencing 2. Taxiway A & B Reconstruction The projects listed above may require performance of the following, or additional activities: Design study to establish framework and detailed work program Data collection Requirements determination Development schedule and cost estimate Financial planning and cost benefit analysis Participation in public information/community involvement program and/or public hearing Environmental assessment and other study in compliance with FAA Orders 5050.4 and 1050.1 Respondents shall understand that the proposed projects are subject to availability of Federal funds and may be deleted or modified accordingly. All Federally-funded projects will comply with all Federal statutes and FAA regulation, policies, guidance and advisory circulars. D. STATEMENT OF QUALIFICATIONS - CONTENTS Submittals should be 30 pages or less, exclusive of cover letter or letter of transmittal containing introductory language, and shall include: 1. Cover letter, to include the firm s understanding of Sponsor requirements Page 3 of 6

2. Description of how the firm will accomplish all or most aspects of the Sponsor s proposed projects 3. General description of the firm, including organizational structure, size, recent experience in comparable airport/aviation projects, and experience with projects funded by Federal Aviation Administration AIP grants 4. List of firm s anticipated projects and those already in progress 5. Representative list of previous clients/projects comparable to the Sponsor s projects listed in Section C. Provide project name/description, airport name, contact person, and phone number(s). 6. Resumes of key individuals to be involved in the Sponsor s proposed projects, identifying their qualifications, backgrounds, experience and specific responsibilities 7. Evidence of the Respondent s ability to meet schedules and deadlines, without delays, cost escalations, overruns and contractor claims 8. Evidence of general liability and professional liability insurance 9. Respondent s sample proposed aviation engineering agreement 10. Name, address, and daytime phone number of firm s representative(s) to contact for clarification or additional information E. ADDITIONAL INSTRUCTIONS 1. Respondents must submit five (5) copies of the Statement of Qualifications in paper form, and one (1) copy in electronic form (CD or flash drive). 2. All submissions must be produced on recyclable paper that, where possible, meets the 30% post consumer recycled material standard. 3. Submissions shall be bound by staple or binder clip and shall consist of paper only. All binders, plastic separators, non-recyclable materials, etc. are prohibited. Submittals will not be evaluated on the aesthetics of the package. 4. Submissions shall be addressed to Lloyd D. Arnold, C.M., Director of Aviation, Montrose Regional Airport, 2100 Airport Road, Montrose, Colorado 81401. 5. All required copies must be submitted in a sealed envelope bearing the name of the firm and marked with the project name, due date/time in the lower left hand corner. Page 4 of 6

6. Following award, all submissions shall be open to the public, except for items deemed proprietary by the Director of Aviation. F. SELECTION PROCESS 1. The selection process will be in strict accordance with Federal Aviation Advisory Circular 150/5100-14E, Architectural, Engineering and Planning Consultant Services for Airport Grant Projects and 49 CFR 18. 2. The Selection Committee may consist of the Director of Aviation, the County Manager, and the Manager of Planning & Development. 3. Direct contact with County elected officials or County staff, other than as expressly authorized by the RFQ documents, is strictly prohibited and may result in disqualification from the solicitation and award process. 4. The County of Montrose hereby notifies all Respondents that small and disadvantaged business enterprises (DBE) will be afforded full opportunity and will not be discriminated against on the grounds of race, religion, color, sex, age or national origin in consideration for award. The contract awarded to the successful consultant/engineer is subject to the provisions of Executive Order 11246, as amended (Affirmative Action to Ensure Equal Employment Opportunity) and to the provisions of Department of Transportation regulations 49 CFR Part 26 (Disadvantaged Business Enterprise Participation) and to foreign trade restrictions. Qualified DBE firms are encouraged to participate. 5. Based on selection criteria listed in Section VII below, a maximum of three firms may be invited to make formal presentations to the Selection Committee. The firm most qualified to provide aviation engineering services will be selected. G. SELECTION CRITERIA Selection of consultant will be based on the following criteria, all weighted equally: 1. Capability to perform all or most aspects of the proposed projects, whether utilizing home office personnel independently and/or supported by branch office and/or outside consultants 2. Recent experience in projects comparable to Sponsor s list 3. Key personnel qualifications, experience, competence, availability, reputation, integrity, and knowledge of FAA regulations, policies, and procedures Page 5 of 6

4. Quality of engineering projects previously undertaken that are comparable to Sponsor s proposed projects; quality defined as timely, satisfactory completion of projects without major cost escalations or overruns 5. Demonstrated understanding of the project s potential problems and the Sponsor s concerns 6. Current workload and demonstrated ability to meet schedules and deadlines H. AWARD OF CONTRACT It is the intent of the Sponsor to enter into a contract with the selected firm no later than November 7, 2018. The term of the contract shall be for a period of five (5) years. The firm most qualified to perform engineering services for the proposed projects will be selected and consulting fees for each project will be negotiated in accordance with FAA regulations. Page 6 of 6