INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

Similar documents
APIRG/20. Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015

INTERNATIONAL CIVIL AVIATION ORGANIZATION

AFI/MID Workshop on Aviation System Block Upgrades (ASBUs)

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

MID Region Air Navigation Strategy

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

ATFM/CDM ICAO s Perspective

AFI Air Navigation Services Key Performance Indicators

(Presented by United States) EXECUTIVE SUMMARY

MET/SG/12-WP/05 REV2-23/11/14

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

SAMPLE TEMPLATE APPENDIX 3.5C-1

Russian Federation ATM modernization program

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

Block 0 to Block 1 Vaughn Maiolla

Packaging Tomorrow s Aviation System

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION

ICAO ASBU Implementation/ Surveillance and ATS Automation

Agenda Item 1: Use of VSAT technology in the AFI Region

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

TWELFTH AIR NAVIGATION CONFERENCE

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

7.3d VSAT Network Best Practices and AFI ATN Architecture. (Presented by ATNS)

TWELFTH AIR NAVIGATION CONFERENCE

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

INTERNATIONAL CIVIL AVIATION ORGANIZATION

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

Objective. To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives.

2012 Performance Framework AFI

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

ASBU Block 0 Implementation and Regional ANPs

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

ICAO GANP Requirements and Evolution

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

CNS/ATM Systems Interoperability and Harmonization

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools

SERVICE DEVELOPMENT ROADMAP

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES

APAC AIR NAVIGATION PLAN VOLUME III

GUATEMALA State Air Navigation Plan

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Bits to Blocks Aviation System Block Upgrades (ASBU)

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

DESCRIPTION OF THE PEER REVIEW CONCEPT

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

TWELFTH AIR NAVIGATION CONFERENCE

Global ATM System ~Interoperability and Harmonization ~


2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

TWELFTH AIR NAVIGATION CONFERENCE

Approach to implementation Process and checklist

BELIZE Air Navigation Plan

International Civil Aviation Organization (ICAO) (May 2015-April 2016) ICAO s support to the New Partnership for Africa s Development (NEPAD)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP DEVELOPMENTS RELATED TO AIR NAVIGATION CAPACITY AND EFFICIENCY IN OTHER ICAO REGIONS

IBAC Bulletin Subject: AFI Region In-Flight Broadcast Procedure (IFBP).

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF/1)

GMA Riyadh Global Ministerial Aviation Summit

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

Connecting ASBU with your State Air Navigation Plan

Welcome to AVI AFRIQUE 2017

New Barbados State Air Navigation Plan

AFI COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) TWENTIETH AFI PLAN STEERING COMMITTEE MEETING

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09)

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Coordinations mechanisms between ANSPs themselves and with States: case of ASECNA. ASECNA, May 2018

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

ASBU-Bloc0 Moroccan achievements and planned activities

ICAO Air Navigation Panels/Study Groups Work Programme

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

Global Operational Data Link Doc 10037

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

ASSEMBLY 39TH SESSION

Transcription:

1 INTERNATIONAL CIVIL AVIATION ORGANIZATION SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016) Agenda Item 4: Air Navigation Capacity and Efficiency IMPLEMENTATION OF AVIATION SYSTEM BLOCK UPGRADES (ASBU) AND AIR NAVIGATION SERVICES PERFORMANCE TARGETS (Presented by the Secretariat) SUMMARY This Working Paper presents the implementation of Aviation System Block Upgrades (ASBUs) and the Air Navigation Services Performance Targets in the AFI Region. Action by the meeting is at paragraph 3. REFRENCE(S) Doc 9702 - Report of the Seventh Africa-Indian-Ocean Regional Air Navigation (AFI/7) Doc 9930 - Report on the AFI SP AFI / RAN /08 Meeting Global Air Navigation Plan (GANP, Doc.9750) AFI Regional Air Navigation Plan (Doc. 7474) Report on APIRG 20 Meeting Related ICAO Strategic Objective(s): A: Safety; B: Air Navigation Capacity and Efficiency, D: Economic Development of Air Transport; E: Environment Protection Related ICAO ASBU Performance Improvement Areas and Block 0 Modules: All 1. INTRODUCTION 1.1. The ICAO Twelfth Air Navigation Conference (AN-Conf/12) Recommendation 6/1 Regional performance framework planning methodologies and tools, the APIRG/19 meeting adopted the AFI Regional Air Navigation System Implementation Plan aligned with the ASBU Methodology contained in the GANP, and agreed on the priorities, targets and metrics/indicators to measure implementation progress and operational improvements for all ASBU Block 0 modules applicable to the AFI Region. The following Conclusion was adopted: Conclusion 19/06: Adoption of AFI Regional Air Navigation System Implementation Plan aligned with the ICAO ASBUs That: a) AFI States adopt the Regional Air Navigation System Implementation Plan aligned with the 18 Block 0 Modules of the ICAO Aviation System Block Upgrades (ASBUs) Methodology, as provided at Appendix 3.0A to the APIRG/19 report; b) That AFI States implement the adopted modules based on their operational needs, the categorization and the prioritization defined in the Action Plan; c) The Secretariat finalize the implementation targets established for the adopted ASBU Block 0 Modules, and ensure that these targets are aligned with existing regional programmes aimed at enhancing air navigation capacity and efficiency and aviation safety; d) The APIRG and the ICAO Regional Offices coordinate the implementation of the ASBU Block 0 Modules related to Safety Key Performance Area with regional aviation safety mechanisms (RASG- AFI, AFI Plan) and other relevant safety initiatives for the AFI Region; e) ICAO continually provide capacity building through workshops and seminars to AFI States and regional stakeholders as the needs arise in the different levels of ASBUs; and

2 f) The African Civil Aviation Commission (AFCAC), Regional Economic Communities and Financial institutions to provide their support and assist States the implementation of the AFI Regional Air Navigation System Implementation Action Plan. 1.2. The categorization and prioritization of ASBU Block 0 modules is provided as Appendix A to this working paper. The Group also recognized the importance of providing capacity building through workshops and seminars to AFI States and regional stakeholders as the needs arise at different levels of ASBUs. 1.3. Subsequently, the Group agreed to review its working methods and organizational structure, using project management principles and other methodologies as and when necessary, and consider making adjustments to better support the ICAO performance framework in the planning and implementation of its ASBU related activities (Decision APIRG 19/48). As a result, a revised structure of the APIRG was developed and adopted by the APIRG Extraordinary meeting held in Lusaka, Zambia in 2014 (Decision APIRG EO/01), taking due account of best practices/benchmarking, established regional targets and priorities, and the need for synergies between similar or complementary activities. 1.4 In noting the adoption of the Regional Air Navigation System Implementation Action Plan aligned with the ASBU Methodology, the DGCA/5 meeting requested States to develop their national plans based on their operational needs and taking into account the prioritization and categorization of the ASBU modules as defined in the Action Plan. The DGCAs also agreed that the implementation of ASBU Block 0 safety related modules needs to be coordinated and addressed through regional aviation safety mechanisms (RASG-AFI, AFI Plan) and other relevant safety initiatives for the AFI Region; and that the implementation of ASBU Block 0 would require financial support from Regional Economic Communities. 2. DISCUSSION ICAO Aviation System Block Upgrades (ASBUs) 2.1. Mindful of the new structure and methods of work of the APIRG, the APIRG/20 meeting (Yamoussoukro, Cote d Ivoire, 30 November 2 December 2015) identified and prioritized an initial set of projects, based on the ICAO Aviation System Block Upgrades (ASBUs) Block 0 Modules and the regional performance objectives adopted by APIRG, and accordingly adopted the following conclusion: Conclusion 20/49: Projects Identification and Implementation issues That: a) The initial set of projects identified by APIRG Sub-groups as shown at Appendix 4.3.8A through Appendices 4.3.8B, 4.3.8C, 4.3.8D1, 4.3.8D2, 4.3.8D3, 4.3.8E1, 4.3.8E2 and 4.3.8E3 to the APIRG/20 report are adopted; b) The Secretariat develop a consolidated catalogue of all identified projects, using a standard format, to be endorsed by the APCC. In doing so, projects should be structured according to applicable areas of routing; c) The APIRG through its APCC explore assistance and funding mechanisms in cooperation with regional and sub-regional organizations such as the African Union, the African Civil Aviation Commission (AFCAC), Regional Economic Communities (RECs) and financial institutions; and d) The ICAO Regional Offices, AFCAC and AFRAA pursue interregional coordination to achieve harmonization and interoperability of air navigation systems, as well as seamless air transport operations across the regions. 2.2 These projects include the following Air Navigation Plan (ANP) areas: air traffic management (ATM), search and rescue (SAR), communications, navigation and surveillance (CNS), aeronautical information management (AIM), aeronautical meteorology (MET) and aerodromes and ground aids (AGA). An overview of the projects is provided below.

2.2.1 ATM/SAR Projects 2.2.1.1 APIRG/20 meeting identified and prioritized thirteen (13) Air Traffic Management /Search and Rescue (ATM/SAR) projects. 2.2.1.2 Implementation in the area of Performance Based Navigation (PBN) has been carried in four focus areas, all aimed at achieving the global goals provided in Assembly Resolution A37-11, to which the regional goals are aligned: a) Development of PBN implementation plans which were to be developed by 2009. b) En-route phase, which requires significant coordination by APIRG and Regional Offices c) Terminal environment, which links the approach/departure phases of flight to the en-route through Standard Instrument Departures (SIDs) and Standard Arrival Routes (STARs); and d) Approach, which is characterized by instrument approach procedures. 2.2.1.3 The development of PBN implementation plans has been one of the major challenges, although templates were developed within the framework of APIRG for use by States. Training was also provided by the ICAO Regional Offices, AFCAC and the AFPP in 2014 and 2015. As of September 2016, only 19 of the 48 States in the AFI area of Air Navigation Plan had completed and submitted National PBN Implementation Plans to ICAO. Of the 19 only four States, Kenya, Nigeria, Seychelles, South Africa, had developed plans considered to be robust and able to facilitate implementation. 2.2.1.4 In the en-route phase, primary work in the review of the AFI ATS route network was completed in 2015. As a result, AFI ATS route lengths have been reduced by about 4797 nautical miles, representing a reduction of an estimated 144 million metric tons of CO 2 emissions; and fifty eight (58) iflex tracks have been created to provide access to the Atlantic Ocean Random Routing Area (AORRA). 2.2.2 CNS Projects 2.2.2.1 APIRG/20 identified and prioritized thirteen (13) projects covering aeronautical Communications, Navigation, Surveillance, and Frequency Spectrum, based on the status of implementation in the region which is summarized as follows: a) Ground/ground communications: the AFI Air Navigation Plan requirements for Aeronautical Fixed Service (AFS) have been implemented in most cases, except for some links which need to be activated. Efforts are being made by State Air Navigation Service Providers (ANSPs) to implement, operate, maintain and upgrade of the satellite based VSAT networks (AFISNET, CAFSAT, NAFISAT and SADC VSAT 2). Implementation activities related to the Aeronautical Telecommunication Network (ATN) ground components such as the ATS Message Handling System (AMHS) are underway and will facilitate interoperability of ATM systems within the AFI Region and neighboring regions (e.g. EUR, MID and SAM regions). The implementation of ATS Inter facilities Data Communications (AIDC) has also started, with successful trials that have been conducted within the region. b) Air/ground communications: the extension of VHF radio coverage has been improved as well as the implementation of Controller Pilot Data Link Communications (CPDLC), thus enabling ATS communications in oceanic and the remote continental airspaces. c) Radionavigation: the implementation of conventional navigational aids is ongoing. APIRG has adopted a strategy for implementation of GNSS services, and called for a region-wide meeting of stakeholders to address related issues. d) Aeronautical surveillance: the level of implementation of the AFI regional surveillance plan has significantly improved with an increase in the number of Secondary Surveillance Radars (SSRs) in States, which are Mode S compatible, thus enhancing surveillance capabilities in the region. SSRs are supplemented by Automatic Dependent Surveillance Contract (ADS-C) in most AFI ACCs in remote continental and oceanic airspaces. Sharing of surveillance data should be facilitated by VSAT networks to achieve a seamless aeronautical surveillance. 2.2.3 AIM Projects 2.2.3.1 APIRG/20 identified and prioritized three (3) AIM related Projects: a) Transition from AIS to AIM in the AFI region; 3

b) Implementation of WGS-84 and e-tod in the AFI region; and c) Service improvement through Digital AIM. 2.2.3.2 Initiatives have been taken to implement these projects. In particular tangible progress has been made in the transition from AIS to AIM in the AFI Region thanks to initiatives by ANSPs. However efforts remain to be made in order to fulfill the regional goals in the timeframe of the ICAO ASBU Block 0. 2.2.4 MET Projects 2.2.4.1 APIRG/20 meeting identified and prioritized two (2) MET related projects with the following objectives: a) To assist concerned AFI States to improve the issuance and distribution of SIGMETs, increase the number of certified QMS/MET States in the region, assist States to implement the AFI transition plan to the future System Wide Information Management (SWIM)-enabled environment protection and implement action plans to remove long lasting air navigation deficiencies in the MET field. b) To provide States with adequate capabilities to implement aerodromes warnings (AD WRNG) and wind shear warnings (WS WRNG), increase availability of OPMET through the AFI Meteorological Bulletins Exchange (AMBEX), and enhance availability of volcanic ash clouds and tropical cyclones information thought the World Area Forecast System (WAFS). 2.2.5 AGA Projects 2.2.5.1 APIRG/20 meeting identified and prioritized nine (9) AGA related projects as follows: a) Training and qualification of Technical staff (Regulators and Airport operators); b) Aerodrome Rescue and Firefighting Services (RFFS); c) Aerodrome Emergency Planning (AEP), including Public Health emergencies; d) Aerodrome data management (determination, reliability and publication); e) Wildlife/ Environmental/ Land use Management/ obstacle control; f) Implementation of Runway safety programmes at Aerodromes; g) Aerodrome Maintenance and Runway conditions reporting; h) Establishment and implementation of A-CDM; and i) Aerodrome Certification (SMS, regulatory framework, procedures and manuals, etc.). APIRG Project Catalogue 2.3 The Secretariat is in the process of developing a consolidated catalogue of all identified projects, using a standard format and structured according to applicable areas of routing. The AFI areas of routing are provided as Appendix B to this working paper. AFI Key ANS Performance Indicators, Targets and Monitoring 2.4 The DGCA meeting will recall a recommendation made by the AFI Plan Steering Committee concerning the development and adoption by the APIRG of a subset of ANS performance indicators and targets, which would to be accorded the same status as the Abuja safety targets of July 2012, endorsed, by the African Union Assembly of Heads of State and Government in January 2013. Accordingly, the APIRG/20 meeting reviewed and adopted the ANS Key Performance Indicators and targets at Appendix C to this working paper. In view of the challenge in monitoring and collecting information on the implementation of ASBU modules, States were urged to provide information on the status of implementation on a regular basis (at least twice in a year). Need for DGCAs support 2.5 The DGCAs may wish to note that, in the application of Project Management Principles, cost, time, and quality are co-dependent, and that mobilization of resources has always been a major challenge in the implementation of air navigation facilities and services in the AFI Region. Accordingly, in order to support implementation of a sustainable air navigation system, the DGCAs should explore assistance and funding using their national planning framework, bilateral/multilateral cooperation, and mechanisms such as the ICAO No Country Left Behind initiative, as well as those established through regional and sub-regional organizations including the African Union (AU), the African Civil Aviation Commission (AFCAC), Regional Economic Communities (RECs), and financial institutions. 4

5 3. ACTION BY THE MEETING 3.1 The DGCAs are invited to: a) Note the information provide in this working paper; b) Ensure that, if not yet done so, national PBN plans and ASBU plans are developed for their respective States, and submitted to ICAO; c) Champion the implementation of APIRG Projects and AFI ANS Key Performance Targets at national and regional level, through their national planning framework, bilateral/multilateral cooperation, the ICAO No Country Left Behind initiative, the AU, the AFCAC, RECs and financial institutions; and d) Provide the information on the status of implementation concerning their States to ICAO, APIRG and RASG-AFI Secretariat on a regular basis, and as required by regional studies or surveys./-

6 Appendix A Implementation of ASBU Block 0 modules and AFI Regional Performance Objectives The categories of the 18 adopted Block 0 Modules are as follows: Essential (E): These are the ASBU modules that provide substantial contribution towards global interoperability, safety or regularity. The nine (9) Modules for all States of AFI Region are FICE, DATM, ACAS, FRTO, APTA, CDO, CCO, AMET and ACDM. Desirable (D): These are the ASBU modules that, because of their strong business and/or safety case, are recommended for implementation almost everywhere. The four (4) Modules for all States of AFI region are NOPS, ASUR, SNET, and TBO. Specific (S): These are the ASBU modules that are recommended for implementation to address a particular operational environment in specific countries of AFI region (for example South Africa). The three (3) Modules are OPFL, ASEP and WAKE (elements and targets are yet to be developed by APIRG). Optional (O): These are the ASBU modules that address particular operational requirements in specific countries of AFI region and provide additional benefits that may not be common everywhere. The two (2) Modules are SURF and RSEQ. The priorities of the 18 adopted Block 0 Modules are as follows: Priority 1 : Immediate Implementation Priority 2 : Recommended Implementation Categorization and prioritization of Block 0 Modules for the AFI Region PIA Module Description Module Cat Priority PIA1 Improve Traffic flow through Runway Sequencing B0-RSEQ O 2 (AMAN/DMAN) Optimization of Approach Procedures including vertical guidance B0-APTA E 1 Increased Runway Throughput through optimized Wake B0-WAKE S 2 Turbulence Separation Safety and Efficiency of Surface Operations B0-SURF O 2 Improved Airport Operations through Airport-CDM B0-ACDM E 1 PIA2 Increased Interoperability, Efficiency and Capacity through B0-FICE E 1 Ground-Ground Integration Service Improvement through Digital Aeronautical Information B0-DAIM E 1 Management Meteorological information supporting enhanced operational B0-AMET E 1 efficiency and safety PIA3 Improved Operations through Enhanced En-Route Trajectories B0-FRTO E 1 Improved Flow Performance through Planning based on a B0-NOPS D 2 Network-Wide view Initial capability for ground surveillance B0-ASUR D 2 Air Traffic Situational Awareness(ATSA) B0- ASEP S 2 Improved access to Optimum Flight Levels through Climb/Descent B0- OPFL S 2 Procedures using ADS-B ACAS Improvements B0-ACAS E 1 Increased Effectiveness of Ground-Based Safety Nets B0-SNET D 2 PIA4 Improved Flexibility and Efficiency in Descent Profiles (CDO) B0-CDO E 1 Improved Safety and Efficiency through the initial application of Data Link En-Route B0-TBO D 2 Improved Flexibility and Efficiency Departure Profiles - B0-CCO E 1 Continuous Climb Operations (CCO)

7 Areas of routing (AR) Appendix B AFI Major Traffic Flows/Routing Areas Traffic Flows Areas involved Type of area covered Remarks AR1 Europe South America (EUR/SAM) (oceanic) AR2 Atlantic Ocean interface between the AFI, NAT and SAM Regions AR3 Europe Eastern Africa routes including the area of the Indian Ocean AR4 AR5 AR6 Europe to Southern Africa Continental Western Africa including coastal areas Trans-Indian Ocean Africa-Indian Ocean (AFI) Region Atlantico 1, Canarias 1, Casablanca 1, Dakar Oceanic, Sal Oceanic Accra, Dakar, Johannesburg, Luanda, Sal Addis Ababa, Antananarivo, Asmara, Cairo 1, Dar es- Salaam, Entebbe, Khartoum 1, Mauritius, Mogadishu, Nairobi, Seychelles, Tripoli 1 Algiers 1, Beira, Brazzaville, Cape Town, Gaborone, Harare, Johannesburg, Kano, Kinshasa, Lilongwe, Luanda, Lusaka, N Djamena, Niamey, Tripoli 1, Tunis, Windhoek Accra, Addis Ababa, Brazzaville, Dakar, Dar-es- Salaam, Entebbe, Kano, Khartoum 1, Kinshasa, Nairobi, Ndjamena, Niamey, Roberts Antananarivo, Mumbai 1, Johannesburg, Male 1, Mauritius, Melbourne 1, Seychelles Oceanic en route low density in southern part and oceanic high density in Northern part Oceanic en route low density Continental en route/ oceanic low density Continental en route low density Continental/oceanic low density Oceanic high density Major traffic flow EUR/SAM Homogeneous ATM area AFI/NAT/SAM Major traffic flow AFI/EUR Major traffic flow AFI/EUR Homogeneous area AFI (this is a growing traffic, developing into major traffic flow) Homogeneous ATM area AFI/ASIA/PAC

8 Appendix C Air Navigation Services (ANS) Key Performance Indicators and Targets adopted by APIRG/20 Meeting OPERATIONAL TARGETS BY 31 DECEMBER 2020 1. Reduce the number of loss of separation occurrences due to ANS infrastructure deficiencies by 50% 2. Reduce the number of aircraft accidents related to ATM safety by 50% 3. Reduce the number of uncoordinated flights by 50% INSTITUTIONAL TARGETS 100% BY 31 DECEMBER 2018 At national level 4. Implement ICAO Aviation System Block Upgrades (ASBUs) Implement Priority ASBU Block-0 Modules by 2018 Establish and update national PBN plans by 2016 Implement all applicable elements of PBN by 2018 Implement Continuous Descent Operations/Continuous Climb Operations (CDO/CCO) by 2018 5. Reduce CO2 Emissions Establish CO2 emissions reduction action plans by December 2016 Implement mitigation measures 6. Assess and manage risks Establish effective and operational Search and Rescue (SAR) organization by 31 December 2016 Establish aerodrome emergency plans Establish wildlife management systems Establish ANS human resource management system At regional level 7. Integrate ANS systems by 31 December 2018 Implement digital ATS coordination Implement en-route data link applications Implement ANS Quality Management Systems (QMS) 8. Increase harmonization between ANS operations and regulations by 31 December 2016 Implement seamless ANS along Air Traffic Flows (AFI Single Sky) -END-