SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL

Similar documents
PRAJWAL KHADGI Department of Industrial and Systems Engineering Northern Illinois University DeKalb, Illinois, USA

Flight Arrival Simulation

SIMAIR: A STOCHASTIC MODEL OF AIRLINE OPERATIONS

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SIMULATION S ROLE IN BAGGAGE SCREENING AT THE AIRPORTS: A CASE STUDY. Suna Hafizogullari Gloria Bender Cenk Tunasar

APPENDIX D MSP Airfield Simulation Analysis

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module

Abstract. Introduction

Evaluation of Quality of Service in airport Terminals

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

TAV INVESTMENT HOLDING CO.

Airport Simulation Technology in Airport Planning, Design and Operating Management

Passenger movement simulation in intermodal air-rail terminal

ADVANTAGES OF SIMULATION

A Multi-Agent Microsimulation Model of Toronto Pearson International Airport

Optimizing process of check-in and security check at airport terminals

Passenger Building Design Prof. Richard de Neufville

Simulation of Departure Terminal in Soekarno-Hatta International Airport

A DSS Based on Simulation to Make Decisions for the Cuban Cruise Industry

A New Way to Work in the ERCOT Market

12 th Facilitation Division

SIMULATION OF AN AIRPORT PASSENGER SECURITY SYSTEM. David R. Pendergraft Craig V. Robertson Shelly Shrader

ultimate traffic Live User Guide

Assignment 3: Route Fleet Assignment Michael D. Wittman

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

Assignment 2: Route Profitability Evalua8on Michael D. Wi?man

SIAMOS Put your airport ahead through innovation. Siemens AG All rights reserved.

Forecast and Overview

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Overview of Boeing Planning Tools Alex Heiter

PERFORMANCE MEASUREMENT

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Analysis of Air Transportation Systems. Airport Capacity

FORECASTING FUTURE ACTIVITY

Airport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka

Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds.

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

THIRTEENTH AIR NAVIGATION CONFERENCE

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

A 3D simulation case study of airport air traffic handling

Estimating Operations and Airport-Specific Landing & Take-off Cycles at GA Airports

The Improvement of Baggage Handling System

Security Queue Management Plan

Evaluation of Strategic and Tactical Runway Balancing*

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

Aircraft Arrival Sequencing: Creating order from disorder

Crosswind-based wake avoidance system approved by the FAA for operational use. Clark Lunsford (MITRE) & Dr. Edward Johnson May 15-16, 2013

Impact of Landing Fee Policy on Airlines Service Decisions, Financial Performance and Airport Congestion

AVOIDING THE BLUES FOR AIRLINE TRAVELERS. Soad El-Taji

3. ICAO Supporting Tools - Publicly available

CAPAN Methodology Sector Capacity Assessment

DRAFT. Airport Master Plan Update Sensitivity Analysis

SAN JOSÉ INTERNATIONAL AIRPORT

Todsanai Chumwatana, and Ichayaporn Chuaychoo Rangsit University, Thailand, {todsanai.c;

YOUR GLOBAL AVSEC SOLUTION PARTNER.

Planning, Development and Environment Committee

DART. Duty & Recreation Travel STAFF TRAVEL SIMPLIFIED. Straightforward, easy to use staff travel management system for the airline industry

Atennea Air. The most comprehensive ERP software for operating & financial management of your airline

Wake Turbulence Research Modeling

Queuing analysis using Viswalk for check-in counter: Case study of Lombok Praya International Airport

UC Berkeley Working Papers

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Aviation Economics & Finance

ATC Simulators. The manufacturer of

Digital twin for life predictions in civil aerospace

ASPASIA Project. ASPASIA Overall Summary. ASPASIA Project

Corporate Productivity Case Study

Chapter 8.0 Implementation Plan

Overview of Congestion Management Issues and Alternatives

STRC. STRC 8 th Swiss Transport Research Conference. Analysis of Depeaking Effects for Zurich Airport s Ground Handler

Istanbul Technical University Air Transportation Management, M.Sc. Program Aviation Economics and Financial Analysis Module November 2014

APPLICATION OF SIMULATION MODELS IN AIRPORT FACILITY DESIGN

Advanced Flight Control System Failure States Airworthiness Requirements and Verification

A Simulation Approach to Airline Cost Benefit Analysis

BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS

SATELLITE CAPACITY DIMENSIONING FOR IN-FLIGHT INTERNET SERVICES IN THE NORTH ATLANTIC REGION

Study on Self Bag Drop System for Airport Baggage Handling System Simulation

Unmanned Aircraft System Loss of Link Procedure Evaluation Methodology

A-CDM FOR REGIONAL AIRPORTS CONCEPT VALIDATION DOCUMENTO PÚBLICO

SIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006

American Airlines Next Top Model

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Computer Simulation for Evaluating Visitor Conflicts

The Computerized Analysis of ATC Tracking Data for an Operational Evaluation of CDTI/ADS-B Technology

SIMULATION TECHNOLOGY FOR FREE FLIGHT SYSTEM PERFORMANCE AND SURVIVABILITY ANALYSIS

Runway Length Analysis Prescott Municipal Airport

Investigation of Logistics Advantages of a Regular Container Service in the Port of Guaymas

ICAO Young Aviation Professionals Programme

Advanced operational analytics

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

A-CDM AT HONG KONG INTERNATIONAL AIRPORT (HKIA)

Analysis of ATM Performance during Equipment Outages

Flight Dynamics Analysis of a Medium Range Box Wing Aircraft

Route Planning and Profit Evaluation Dr. Peter Belobaba

Airfield Capacity Prof. Amedeo Odoni

solutions Amadeus for ground handlers

Total Airport Management Solution DELIVERING THE NEXT GENERATION AIRPORT

HIGH PERFORMING AIRPORTS CASE ZURICH AIRPORT. Geert Boosten ASDA CATO Delft 21 July 2015

Transcription:

Proceedings of the 2000 Winter Simulation Conference J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, eds. SIMULATION MODELING AND ANALYSIS OF A NEW INTERNATIONAL TERMINAL Ali S. Kiran Tekin Cetinkaya Kiran Consulting Group 4411 Morena Blvd., Ste. 105 San Diego, CA 92117, U.S.A. Serafettin Og Tepe Akfen-Vie (TAV) Ataturk International Airport Istanbul, TURKEY ABSTRACT This paper describes a recently completed project involving the development of simulation models for the new international terminal at Istanbul Ataturk Airport, Istanbul, Turkey. The simulation models helped evaluate the passenger and aircraft flow from the terminal entrance to boarding; identify the system bottlenecks as well as the system capacities. The models have also been used for operations planning, training and the demonstration of terminal activities. Since the overall objective of the project was to validation of the terminal design, the models included major passenger, aircraft, and baggage flow activities. The following project steps were conducted to achieve the overall goals: 1. Developed a dynamic-stochastic simulation model and an Excel Driven User Interface to analyze the new International Terminal at Istanbul Ataturk Airport and identify the service bottlenecks. (The model was developed using ProModel). 2. Conducted experiments with the model in order to understand and evaluate the system performance. 3. Identified the system bottlenecks and recommended solutions to eliminate those bottlenecks and increase airport capacity and service levels. 4. Conducted training sessions for the TAV staff for continuous use of the models. The results showed that the new terminal is capable of serving the planned passenger capacity per year. The new terminal has more than enough capacity for the peak hours of the day and/or peak days of the year. The analysis also demonstrated that the daily flight schedule and gate-allocations are very important in maximizing the system performance. 1 INTRODUCTION Before completion of the major expansion of the international Airport, airport authorities and the general contractor for construction wanted to use simulation as a design validation and visualization tool. Kiran Consulting Group (KCG) was chosen to perform the simulation analysis of the international terminal of the airport and recommend changes to ensure: 1. Smooth and efficient operations of the airport terminal facilities including the; a. Parking Operations b. Check-In and Departing Passenger flow activities c. Baggage Operations d. Passenger Service operations e. Arriving Passenger flow 2. Validity of the Income Projections KCG s hierarchical simulation modeling approach was used to develop an overall model and a small set of reusable simulation models, which feeds the overall model. All of the models were developed to interact with an Excel driven User Interface for data and parameter input as well as output. The models were developed using ProModel. After the initial experimentation and analysis, a final model encompassing the all-important components of the entire airport was also developed. This model also interacts with an Excel interface and was used for experimentation with the final design options. The experimentation and analysis highlighted the areas, which needed further fine-tuning to insure passenger service quality. Partly because of the simulation efforts, the airport was open for service earlier than its expected completion time. The simulation study also improved the overall passenger service experience measured by the waiting time statistics. 1168

2 THE MODELING APPROACH A ProModel simulation model and an Excel driven interface were developed for the new international terminal activities. The model includes passenger activities from entrance to boarding. Model Data Flow The following graphic illustrates the Model Data Flow. MS Excel Input Sheets: Flight Schedule Aircraft Information Process/Resource Info General Parameters Control Options 2.1 Model Overview Runtime Controls Process Specifications Model Parameters Simulation Software Simulation Model Output Charts and Graphs ProModel simulation models of Istanbul Ataturk Airport from Passenger Arrival to Departure were developed. The models also include the Parking Structures and Parking. The models developed address the passenger and aircraft activities and include: Passenger Arrivals Passenger Activities in the Terminal Luggage Services Passengers Leaving the Terminal Aircraft Services A final model was developed for a final analysis of the design and for experimentation with alternatives. The model characteristics are similar. Hence, in the remainder of this section, the term model will be used to represent the final model. 2.2 The Final Model Objectives and Characteristics The objectives of the model were to identify the bottlenecks and evaluate the airport system alternatives during peak operations. The model was developed as a flexible model allowing the user to modify the different parameters of the system easily through the use of an Excel spreadsheet. The model was also used to evaluate the system performance under what if scenarios. The model consists of a User Interface Module (i.e. Excel front end with Visual Basic code). The simulation model was developed using ProModel. The User Interface Module integrates the simulation model with the data input. The User Interface Module creates the Arrival File and input parameters automatically to ProModel and runs the simulation model. Upon reading the data and the model parameters, the simulation program executes and prepares the result data file. The model also assumes certain operational conditions and data. The important model assumptions and data are summarized below for the final model: There is no air traffic problem for landing and take-off. There is no traffic problem outside the terminal. Passengers come to the airport based on a Check- In start time (3 hours prior to departure), and the following distribution every half an hour. Table 1: Transporter Distribution Half Hour % of Cars (Transporters) 1 5 2 20 3 35 4 30 5 8 6 2 The number of passengers per car/van is based on the following distribution. Table 2: Number of Passengers per Transporter # of Passengers % of Chance 1 33 2 46 3 10 4 6 8 3 10 2 The number of baggage pieces per passenger is based on the following distribution: Table 3: Number of Baggage per Passenger # of % of Chance Baggage 1 30 2 50 3 20 The Airline and Check-In desk dedications are based 60% for THY (i.e. Turkish Airlines) and 40% for the other airlines per flight schedule. All the personnel such as security, check-in agents, passport control officers and others are available. 1169

There are enough queue spaces for all the checkin counters, passport control stations and security checkpoints. Aircraft services are done before or during boarding. All the system process times are based on design documents and/or interviews with TAV personal. The actual flight schedule is used for the daily flight schedule. 3 MODEL VALIDATION The Model Validation was a two-step procedure. The first step involved verification of the model to make sure that the model reflected the provided data accurately. The second step involved validation of the model. Validation insures that the simulation model accurately represents the system being modeled. Model validation included a structured walk through to verify the model logic and compared the model output with the actual system key performances. The process flow, rules and data including assumptions were discussed with airport authorities from Operations to the Security and Design team. Each section of the model was validated with the proper personnel. Comparison of the model results with the actual system shows that the model accurately represents the actual system. The bottleneck sequences and maximum system capacities were also determined using the model.! Avg. # of Passport Control Stations Needed for Departures! Avg. # of Passport Control Stations Needed for Arrivals! Maximum queue size for Check-In! Average Waiting Time in the queue per passenger! Average Passenger Time in the terminal! Expected Daily Revenue! Maximum number of passengers in the waiting rooms The following selected graphs show the simulation results for the Scenario 1. Figure 1: Distribution of Check-In Counter Queue Sizes during the Day 4 EXPERIMENTS AND SELECTED RESULTS Two selected experiments were run to analyze the system. First, a typical day, which is the peak day of the week, was selected for the daily flight schedule. Second, for the maximum throughputs, assuming all 18 gates are occupied for the same departure time. The key results are summarized as follows: 4.1 Scenario 1: Based on the Flight Schedule for a Typical Day There is no system-related bottleneck. As can be seen from the simulation results graphics, in the Figures 1 to 4, there are two peak-time periods in a day. One is in the morning between 7 am and 10 am and the other is in the afternoon between 3 PM and 6 PM, especially for Arrivals. The expected performance measures were established and a list of them are given as follows:! Expected Number of Passengers / Year! Expected Utilization of Check-In Desks! Expected Utilization of Passport Control Stations Figure 2: Distribution of the Number of Passengers at the Duty Free Shop and Restaurants during the Day Figure 3: Distribution of the Number of Passengers per hour at the Security Check, Check- In and Passport Control during the Day 1170

Figure 4: Distribution of How Many Passport Control Stations are Used during the Day 4.2 Scenario 2: Based on the Maximum Throughput (Peak Hour) The Check-In process and/or number of Check-In counters are the bottlenecks. The same expected performance measures were established as mentioned above. The following selected graphs, in the figures 5 to 7, show the simulation results for Scenario 2. Figure 5: Distribution of the Number of Passengers at the Duty Free Shop and Restaurants during the Peak Hours Figure 7: Distribution of How Many Passport Control Stations are Used during Peak Hours 5 CONCLUSIONS AND RECOMMENDATIONS Analysis of the new international terminal passenger and aircraft flow showed that the new terminal is capable of serving the targeted number of passengers per year. During peak hours and/or season, dedication of check-in desks for the airlines should be flexible. The system capacity for the departing and arriving passengers was also separately evaluated and found satisfactory. For the Departures Level, bottleneck resource sequences for the peak hours were found to be in the order of the check-in process/desks, passport control process/counters, gate-allocations and/or boarding process. For the Arrivals Level, bottleneck resource sequences for the peak hours were found to be in the order of the Visa process/officers, passport control process/counters. There is no need to open all of the check-in counters or passport control stations during the off-peak hours. This simulation model can be used for daily resource planning and capacity planning purposes. Based on expected passenger spending at the terminal, the expected revenue per day will be over the targeted level in U.S. dollars. AUTHOR BIOGRAPHIES Figure 6: Distribution of the Number of Passengers per hour at the Security Check, Check- In and Passport Control during Peak Hours ALI S. KIRAN is President of Kiran Consulting Group, Inc and is an internationally recognized authority in Systems Simulation and Scheduling. He and his group actively consult to companies here and abroad in these areas. He is also co-author of the Mixed Model Scheduler (MMS ) and the KCG - Advanced Planning and Scheduling System. He previously taught Industrial Engineering at the University of Southern California, Texas Tech University and Istanbul Technical University. He holds a M.S. degree in Mechanical Engineering and a Ph.D. in Industrial 1171

Engineering. He is a member of APICS, IIE, SME, and INFORMS. His email and web addresses are <ali@ kiran.com> and <www.kiran.com>. TEKIN CETINKAYA is currently a Senior Consultant with Kiran Consulting Group (KCG). He holds a B.S. and M.Sc. in Industrial Engineering. Before joining KCG, Mr. Cetinkaya worked as a Senior IE at companies in the Aerospace and Computer industries. His focus areas are System Simulation and Lean Manufacturing. Since joining KCG he worked with numerous companies including Avery Dennison, Columbia Sportswear, Check Solutions, Delta Design, NASSCO, Motorola, Ingram Micro, Toshiba, Ross Stores, Mitsubishi, Ismeca, Disneyland, and TAV. His email and web addresses are <tekin@ kiran.com> and <www.kiran.com>. SERAFETTIN OG is the manager of system integration at TAV, Istanbul. He holds a B.S. in electrical engineering and has over 30 years of experience in the related areas. His email and web addresses are <seref@tav. com.tr> and <www.tav.com.tr>. 1172