FY TRANSPORTATION IMPROVEMENT PROGRAM. Authority Projects FY

Similar documents
Governor s Mobility Plan. Corridors, Segments and Projects. Allied Junction Corridor 10/12/89

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike FAMECO

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City):

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike

V. DATA COLLECTION PROGRAM

Office Units Available

OFFICE SUITES AVAILABLE

OFFICE SUITES AVAILABLE

OFFICE SUITES AVAILABLE

The Port of New York & New Jersey A Leading Indicator of Globalization Transportation Research Forum Plenary Session March 23, 2006

This quarterly brochure is compiled by the New York Metropolitan Transportation Council. Data Monitoring and Analysis Unit

SITUATION REPORT # 11 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 31, 2012, 8:00 a.m.

ELIZABETH PUBLIC LIBRARY NEW JERSEY CENSUS MICROFILM INVENTORY

NJ GLOUCESTER B(N/S) 4 NEW JERSEY TURNPIKE WOOLWICH TWP. B INTERCHANGE 2 & B(N/S)

Philadelphia Regional Port Authority. Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy

South Jersey Port Corporation

NJ TRANSIT ANNOUNCES ALTERNATE SERVICE PLAN FOR POSSIBLE RAIL STOPPAGE

THE RESTAURANT OPPORTUNITIES AT

Score. Category. Access Aesthetics Community Resources

Oak Creek Assembly of God FOR YOUR SAFETY

Wichita Falls MPO - MTP Project List 1 of 6

2015%Ironbound%Spring%Warmup% Directions!

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

New Jersey Turnpike Authority 2018 Capital Project & Investment Plan

Student Information for NY Times Square

Getting to The Juilliard School

A. CONCLUSIONS OF THE FGEIS

State Route 8 Corridor. Northern Summit County s Path to Success

SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

PROGRESS PARK CONNECTOR

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Road Construction Ahead January-April 2015 NORTHWEST REGION

Guide to. Road Construction Projects

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Transportation TRANSPORTATION PROJECTS

College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Note: From New Jersey Turnpike (North or South) NOTE:

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

PennDOT Interstate Work next week March 30-April 3:

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PRIME HOTEL GROUND LEASE SITE AVAILABLE TO BUILD 172 Rooms Focused Service Hotel

The Transportation Corridor Overlay District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Whittier Bridge Project

Transportation Supporting Dulles Airport

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

Projected Advertisement Date

8. Community Facilities

State Project Reconstruction I-84

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Local Information. Below you will find travel tips and estimated costs for travel both to and from the airport and around town.

PFC Quarterly Status Report September 30, 2016

5.1 Traffic and Transportation

Hospital Link Project Project Update September 2015

THE RICHMOND REGION Transportation Priority Projects

Southern Beltway Projects Summary

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

I-66 Inside the Beltway Feasibility Study

SAN RAFAEL City Council January 20, 2015

CONTACT: Michelle T. Holland

LG ELECTRONICS U.S.A., INC., AIR-CONDITIONING ACADEMY VISITORS INFORMATION

RW Bruhn Bridge and Approaches Project

Public Informational Meeting

Dufferin Jog Elimination Project

Carlisle Connectivity Projects Communication Plan and Project Status

A New Trans-Hudson Passenger Rail Tunnel

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017

Important Lane Closures, April 3 9, 2011

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017

Public Information Center August 12, 2010

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

AVAILABLE: 153 HALSEY ST STREETSCAPE 153 HALSEY ST STREETSCAPE

Palm Beach County Traffic Report July 13 through July 20, 2012

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

100 KIMBALL DRIVE ONE JEFFERSON ROAD

H U D S O N P A L I S A D E S

PROGRESS CONTINUES ON FEDERALLY-MANDATED PTC; SERVICE ADJUSTMENTS REQUIRED EFFECTIVE OCTOBER 14, 2018

DOT 0200 HR ROAD CLOSURE REPORT

Awards of Excellence for 2016 Presented January 26, 2017 in Baltimore, Maryland

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

Route 29 Solutions Projects

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Springettsbury Township. Road Improvement Projects

AVAILABLE: Hartz Mountain Industries, Inc. Leasing Department Phone: Fax: HALSEY ST STREETSCAPE

Guide to Public Transportation. Funded by:

Guide to Public Transportation

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Northern Branch Corridor DEIS December Appendix H: Historic Properties and Resources

Hospital Link Project Project Update Winter 2018

1963 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

1964 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

Transcription:

Brewster Road Widening and North Avenue Bridge PA04009 This project will provide for the widening of Brewster Road at the south end of the airport as well as the replacement and realignment of the North Avenue Bridge. The project cost is estimated to be $12.2 million. Essex Corbin Street Roadway Realignment PA003 This project will improve traffic patterns into and out of the new Maher Terminal entrance and exit gate complex. Total project cost is $7.5 million. Page 1

E-Z Go Toll Plaza Program PA04005 This project would provide for the redesign of the toll plaza to create an open road free flowing plaza at Bayonne Bridge for EZ Pass customers. The project cost is estimated to be $8.2 million. Hudson Goethals Bridge Deck Rehabilitation PA04007 This project will provide for the deck rehabilitation of the existing Goethals Bridge. The project cost is estimated to be $66.5 million. Page 2

Goethals Bridge Modernization PA04006 This project will provide for the construction of a new parellel structure south of the existing bridge. The project cost is estimated to be $788.7 million. Hoboken Permanent Ferry Terminal PA04003 The project will provide for design and construction of a permanent ferry facility at Hoboken within the Hoboken Train Terminal Building. The project cost is estimated to be $313.8 million. Hudson Page 3

McLester Street Dual Lead Track PA008 The project will provide for the construction of a second lead track that parallels the McLester Street grade separation. The work provides an opportunity to handle forecasted cargo growth. Total project cost is estimated at $30.4 million. New Expressrail Facility PA016 This project will provide for the construction of a new Expressrail site. The site will be located on approximately 70 acres of land between the Maher and APM terminals. Project cost is estimated to be $23.2 million. Page 4

New Jersey Turnpike Exit 14 Ingress and Egress PA007 The project consists of a connector road from Exit 14 to the Port area. The subject project has been changed (NJ Exit 14 Access and Egress) and is now part of a "Comprehensive Roadway Improvement Plan," which calls for looking at the entire structure of the Port to improve access and egress from Exit 14, as well as within the Port facilities. The project/plan is now tied into the PA's security efforts for emergency evacuation. The municipalities include Elizabeth and Port Newark. This is a $15-16 million project that is expected to start in 2003 and be completed in 2005. Essex Outerbridge Crossing Deck Rehabilitation PA009 This project will provide for the Outerbridge Crossing deck rehabilitation. The entire concrete deck will be rehabilitated including structural steel supports and replacement of truss span sidewalks. The project cost is estimated to be $63.9 million. Hudson Page 5

Palisades Interstate Parkway Connector Ramp PA019 This project will provide a connection between the lower level of the George Washington Bridge and the Palisades Interstate Parkway. Project cost is estimated to be $92.5 million. Bergen PATH Exchange Place Improvements PA04002 This project will provide rock tunneling and installation of crossover tracks east of the station to enable trains to turn around. This would allow earlier service to Exchange Place before completion of the WTC. The project cost is estimated to be $160.0 million. Hudson Page 6

PATH Extension to Newark Liberty International Airport Study PA04001 A study will be conducted as to the feasibility of extending the PATH system from Newark Penn Station South Yard to EWR monorail station. This proposed extension would include new east/west trackage, stations, power supply and 40 cars. The project cost is estimated to be $31.0 million. Essex Port Newark Intermodal Terminal PA015 This project will expand the intermodal rail capacity by opening an interim rail terminal to handle international container traffic. Project cost is estimated to be $22.4 million. Essex Page 7

Rehabilitation of 14th Street and Jersey Avenue PA04004 This project will provide for the removal of traffic islands, relocation of signs and signals, and improvements to signaling and lighting to increase the traffic flow and mobility on 14th Street. The project cost is estimated to be $24.6 million. Hudson Page 8