Connecticut Statewide Airport System Plan. Introduction

Similar documents
Connecticut Statewide Airport System Plan Final Report May 2016

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

FORECASTING FUTURE ACTIVITY

Chapter 1 Introduction and Project Overview

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Westover Metropolitan Airport Master Plan Update

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

Lake Tahoe Airport Master Plan

AIRPORT BUSINESS PLAN Waterbury-Oxford Airport

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

SASP Advisory Committee Meeting #2

Chapter 1 Introduction and Project Overview

Tulsa Airports Improvement Trust Strategic Plan Update

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Chapter 2 FINDINGS & CONCLUSIONS

Introduction DRAFT March 9, 2017

Airport Finance 101 Session 3 - Capital Funding

Chapter 8.0 Implementation Plan

THE CAA STRATEGIC PLAN

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

CHAPTER 1 EXECUTIVE SUMMARY

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Forecast and Overview

SouthwestFloridaInternational Airport

STUDY WORK GROUP MEETING No. 3. November 29, 2016

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Agenda: SASP SAC Meeting 3

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

Annual Airport Finance and Administration Conference Innovative Funding Strategies. March 4, 2013 Destin, Florida Bonnie Deger Ossege

CHAPTER 1: INTRODUCTION

Ted Stevens Anchorage International Airport

Ted Stevens Anchorage International Airport

Why are the underground fuel tanks being removed and replaced with above ground tanks?

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Sunshine Coast Airport Master Plan September 2007

2017 Accomplishments

BNA Master Plan Update Public Meeting No. 2


ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions

Recommended Performance Measures

FIRST PUBLIC WORKSHOP

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

PHASE I CONCLUSIONS AND OBSERVATIONS

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

Dallas Executive Airport Marketing Plan

Forecast of Aviation Activity

2018 Accomplishments

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

Norfolk International Airport

MassDOT Aeronautics Division Capital Improvements Presentation

Element 640 State of Rhode Island Airport System Plan - Overview

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Gerry Laderman SVP Finance, Procurement and Treasurer

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

STUDY WORK GROUP MEETING No. 4. July 12, 2017

Yakima Air Terminal/McAllister Field Airport Master Plan Update

ACTION TRANSMITTAL

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

Birmingham Airport 2033

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning


COMOX VALLEY AIRPORT. Strategic Plan Summary. October 2010

AIRPORT BUSINESS PLAN Danielson Airport

The Corporation of the City of Kawartha Lakes Council Report

Welcome to the Boise Airport Master Plan Update Open House

Merritt Island Airport

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

Finance and Implementation

AIRPORT WITH NO RUNWAYS IS A MALL

Ministry of Land, Infrastructure, Transport and Tourism Airport Forum. Jetstar Presentation 8 March 2011

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

RESOLUTION NO

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

Thank you for participating in the financial results for fiscal 2014.

Transcription:

Introduction The 2016 (CSASP) examines aviation infrastructure, activity, and trends from a statewide perspective for the purposes of allocating resources and guiding policy decisions. This plan is intended to be an update to the 2006 plan, which will serve as a baseline, and is not intended to be a comprehensive reinvestigation. As such, the update was developed as a top-down research effort compiling available reports and industry experience to form the basis of the plan recommendations. The planning included collaboration with a Study Advisory Committee of regional planners and aviation practitioners. The primary objective is to identify and address critical issues influencing aviation s contribution to the statewide economy and to prioritize and align resources accordingly. While this system plan update identifies specific projects that would support this overall objective, such inclusion is not to be interpreted as an endorsement to proceed with a project and does not represent funding availability or commitment by any party. Detailed project assessments are typically documented in an airport s master plan and subsequent environmental reports. This study focuses primarily on 20 public-use airports within the state excluding heliports, seaports, military facilities, and private-use airports. Those 20 focus airports vary by ownership and functional classification. 20 STUDY AIRPORTS 6 5 9 CAA-OWNED MUNICIPALLY- OWNED PRIVATELY-OWNED, PUBLIC USE Significant change and directional shifts have occurred since 2006 that necessitated a reassessment of the planning outlook. Nationally, the economic conditions have varied significantly and the industry has seen the mergers of major carriers to produce mega-carriers. Major trends associated with general aviation (GA) have continued with growth limited to business jets and turbo-props, while airport infrastructure funding has continued to decline in real terms. At the state level, the State of Connecticut transferred its transportation oversight of aviation to the Connecticut Airport Authority (CAA) in 2011, which has the added responsibilities of operating state-owned airports and facilitating economic growth. Meanwhile, aviation development within Connecticut has been hampered by regulatory and environmental restrictions, community resistance, ownership/operating struggles, and cost sharing. Two airports have closed and the pressure to retain and attract business has increased considerably. GOALS OF THE CONNECTICUT STATEWIDE AIRPORT SYSTEM PLAN (CSASP) Identify changes since 2006 that have impacted Connecticut airports. Gain an understanding of the current aviation system and identify the major trends and influences that should guide policy and resource allocations. Evaluate the role and future of the four Part 139 airports. Identify strategies for CAA to better serve residents and businesses, and that support statewide efforts to enhance economic growth and vitality. Executive Summary viii May 2016

The Connecticut Airport System By Ownership Executive Summary ix May 2016

The Connecticut Airport System By NPIAS Classification Executive Summary x May 2016

Statewide Forecasts Aviation forecasts included in the CSASP Update represent a compilation of existing published forecasts in lieu of an independent analysis. The primary forecasting source is the Federal Aviation Administration (FAA) Terminal Area Forecast (TAF, February 2014), which is an annual 20-year projection of aviation activity for passenger enplanements (passenger boardings), aircraft operations, and based aircraft. In cases where an airport recently completed a master plan where aviation forecasts were approved by the FAA, those projections were interpolated and extended to be consistent with this system plan s 20-year outlook and used in place of the TAF. The compiled forecasts reveal an expectation for moderate growth. STATEWIDE FORECAST FINDINGS Total operations are forecast to grow from 604,743 in 2015 to 683,822 in 2035 for an Average Annual Growth Rate of 0.62%. Total passenger enplanements are forecast to grow from 3,081,347 in 2015 to 4,316,218 in 2035 for an Average Annual Growth Rate of 1.70%. Total based aircraft are forecast to grow from 1,452 in 2015 to 1,781 in 2035 for an Average Annual Growth Rate of 1.03%. The preparation of a comprehensive plan for the public-use airports in the Connecticut airport system requires a general understanding of recent and forecast trends in the aviation industry as a whole. National, regional, and statewide trends provide insights into the development of the aviation demand forecasts for the public-use airports in the Connecticut airport system. A review of the industry trends for the commercial service and general aviation are of primary importance for the Connecticut airport system. Industry trends and factors affecting future demand at Connecticut airports include the following: Economic conditions, employment/unemployment, and income/debt levels Changes in population Changes in air service patterns due to consolidation Aviation fuel prices Changes in airline and general aviation fleets Competing services in nearby states Fares and the cost of inputs Corporate profits The graphs on the following page show the statewide forecast findings for operations, passenger enplanements, and based aircraft. Executive Summary xi May 2016

Forecast Operations 700,000 600,000 500,000 400,000 300,000 200,000 100,000 0 604,743 623,392 642,575 663,066 683,822 303,064 197,707 318,427 200,993 334,187 204,416 351,109 207,985 368,122 211,728 2015 2020 2025 2030 2035 CAA-Owned Municipally-Owned Private-Owned Public Use Statewide Total Forecast Passenger Enplanements 6,000,000 4,000,000 2,000,000 0 3,081,347 3,415,418 3,699,871 3,996,795 4,316,218 2015 2020 2025 2030 2035 Forecast Based Aircraft 1,800 1,600 1,400 1,200 1,000 800 600 400 200 0 1,452 1,530 1,616 1,698 1,781 558 590 590 636 626 686 658 736 691 786 2015 2020 2025 2030 2035 CAA-Owned Municipally-Owned Private-Owned Public Use Statewide Total Executive Summary xii May 2016

System Challenges & Needs Assessment The CSASP identifies four distinctly different groups of influences. These groups were assessed within the context of the CAA s chartered goal of proactively fostering in-state economic growth that is consistent with statewide strategy. It is also understood that challenges and needs pertaining to aviation safety, compliance with design standards, and ongoing maintenance receive primary focus related to CAA s chartered goals transferred from the Connecticut Department of Transportation, which are continuous rather than strategic. In this update, it is expected that changes to the design standards affecting taxiway geometry will receive significant focus from the FAA and the individual airports. Primary enhancements needed to maintain the system s effectiveness as both a coordinated aviation system and an economic driver are identified, while challenges that cause constraints to the system are addressed as well. SYSTEM NEEDS Air Service Market Coordination Strategy BDL, HVN, BDR, and GON Increased runway length HVN, GON, BDR, and HFD Prepare contingency plans HVN, BDR, and GON (Air Service and GA) Passenger terminal evaluation and improvements HVN Improved roadway access HVN Phased implementation of future terminal BDL Customs processing services and facilities BDL and OXC High-end GA hangar facilities OXC, HFD, BDL, HVN, BDR, and GON OTHER ISSUES Obstruction clearance NAVAIDs Compliance with FAA standards Streamline environmental permitting (esp. Coastal Zone) Zoning guidelines Resolve governance / cost structures Evaluation of funding Executive Summary xiii May 2016

Funding CT AIRPORT FUNDING SOURCES Airport Name Airport Improvement Program (AIP) Grants AIP State Apportionment Passenger Facility Charge (PFC) State & Local Grants Earnings Retained by the Airport 2 CAA-Owned Airports Bradley International (BDL) X - X - X Groton-New London (GON) X X - X X Hartford-Brainard (HFD) X X - X X Waterbury-Oxford (OXC) X X - X X Windham (IJD) X X - X X Danielson (LZD) X X - X X Municipally-Owned Airports Tweed-New Haven (HVN) X - X X 1 X Igor I. Sikorsky Memorial (BDR) X X - X X Danbury Municipal (DXR) X X - X X Robertson Field (4B8) X X - X X Meriden-Markham Municipal (MMK) X X - X X Privately-Owned Airports Open for Public Use Chester (SNC) - - - X X Simsbury (4B9) - - - X X Goodspeed Airport and Seaplane Base (42B) - - - X X Ellington (7B9) - - - X X Skylark Airpark (7B6) - - - X X Waterbury-Plymouth (N41) - - - X X Toutant (C44) - - - X X Candlelight Farms (11N) - - - X X Salmon River Airfield (9B8) - - - X X 1 As part of the State s annual General Fund appropriations, HVN has received an Airport Grant of $1,500,000 each fiscal year to subsidize operating costs for the airport. 2 Includes revenue from fees, rentals, parking, fuel sales, concessions, etc. FUNDING PRIORITIES & CHALLENGES Continued focus on BDL to serve all commercial service needs of CT and western MA Facility improvements associated with retaining and expanding air service at HVN and attracting high-end business operators. Improve in-state passenger and revenue retention through statewide coordination, intermodal surface enhancements, and passenger convenience enhancements. Concentrated support at facilities capable to support high-end business aircraft Market research and business development enhancements Improve education and outreach efforts at state level to inform legislative actions and at local level to improve community support for High End airport activity and development Executive Summary xiv May 2016

State of the Airport System in Connecticut BDL Primary commercial service airport for CT Significant catchment area overlap both in and out of state Comparable service offerings with PVD and HPN Constant attention and innovation required to maintain and extend market capture STRATEGY: New city markets, international service and facilities Improved in-state connectivity to reduce leakage Statewide market coordination to improve leverage and extend overall in-state capture and air service availability Continued convenience improvements and expansion preparation GA AIRPORTS Provide aircraft storage, facilities, and services for high-end aircraft Focus high-end support at OXC, HFD, BDL, HVD, GON, and BDR Enhance legislative, environmental, promotional, land use, and community support Seek opportunities to enhance and diversify revenue Anticipate airport closures and related shift in based aircraft Discontinue Part 139 certification at GON and BDR if a coordinated air service niche cannot be identified and service re-acquired HVN Challenging airline market conditions Airline challenges complicated by conversion to larger, more demanding aircraft Larger airline aircraft will increase pressure on runway length and terminal building facilities STRATEGY: Focus on maintaining scheduled service Increased airline communications Develop and provide airline with market information Pursue runway length improvements Increased coordination with CAA Enhanced community, agency, and regulatory communications Develop contingency plan for airline service disruption/cessation Eliminate policy restrictions on activity Assess potential terminal and access enhancements BDL, HVN, BDR, & GON OUTLOOK Coordinated air service platform to maximize air service and reduce out of state leakage Identify potentially supportable markets for each; avoid in-state service overlap Coordinate efforts to market new airline service Identify improvements to airfield, runways, terminal, and landside facilities Executive Summary xv May 2016

Recommendations COMMERCIAL AIR SERVICE Improve in-state passenger retention. Coordinate services to increase negotiating leverage and identify optimal service by airport: BDL, HVN, BDR, and GON Maintain low cost and high traveler convenience Enhance in-state intermodal connectivity Improve marketing and community understanding Continued work to meet FAA standards, ideal runway length, terminal building upgrades, and landside access PART 139 AIRPORTS Consider reduction or elimination of Part 139 Certification if air service cannot be attained at BDR and GON. BDL and HVN required to maintain Part 139 certification as commercial service airports BDR and GON not required to maintain Part 139 certification, but continue to maintain while coordinated airline discussions are under consideration or are ongoing. GENERAL AVIATION Attract the high-end operator growth market that help to drive economic development and enhance the State s competitive position. Undertake long-term efforts to reduce airport development constraints: legislative, environmental, physical, and community Support development and expansion of economic incentive zones near airports and establish airport land use compatibility guidelines Pursue runway extensions to achieve more than 5,000 feet takeoff length Prepare hangar and service development areas at target high-end airports Undertake pavement and improvements to comply with FAA design standards Advocacy and aviation technical contribution Executive Summary xvi May 2016