Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Similar documents
4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

CONTROLLED AIRSPACE CONTAINMENT POLICY

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

ATC PROCEDURES WORKING GROUP. Transition Level

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

FLIGHT OPERATIONS PANEL (FLTOPSP)

Safety and Airspace Regulation Group

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

LAMP 2 - FASI(S) Network

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

CAP 1616: Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements

ALTIMETER SETTING PROCEDURES

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

UK Performance-based Navigation (PBN) Implementation Status

Contents. Subpart A General 91.1 Purpose... 7

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

Safety and Airspace Regulation Group

CAA MINDED TO REJECT EDINBURGH AIRSPACE CHANGE PROPOSAL

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

Safety and Airspace Regulation Group

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

NDS Subject to NOTAM: No

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

IRELAND SAFETY REGULATION DIVISION

LETTER OF AGREEMENT. Between. and RELATING TO

Phases of a departure

GENERAL INFO NOTICE 1. BACKGROUND

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

CAT E Subject to NOTAM: No

Airspace Structure Changes and ATC Operational Procedure Changes. Stuart Lindsey Airspace Regulation

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original

MODULE 4: SIDs and STARs. Slide <#> of

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace

ENR 1.7 ALTIMETER SETTING PROCEDURES

Aerodrome Surveys. Airside Operational Instruction 17 CONTENT:- 1. INTRODUCTION 2. PROCEDURES 3. TREATMENT OF OBSTACLES APPENDIX 2

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

PBN Implementation in the UK

SERA AND CAP694 (THE UK FLIGHT PLANNING GUIDE) - GUIDANCE. Correct to 1 May This document is for guidance only and is subject to change.

Meeting Ref: Project Title/No:

Advisory Circular. File No.: Z U Issue No.: 01

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport

Air Operator Certification

CLEARANCE INSTRUCTION READ BACK

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

IRELAND SAFETY REGULATION DIVISION IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel Fax AFTN EIDWYOYX

APAC PBN UPDATE Slide 1 of xx

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

Flight Operations Inspector Manual

OPS General Rules for Operations Manuals

RNP AR APCH Approvals: An Operator s Perspective

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB

Draft airspace design guidance consultation

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

AIP PORTUGAL ENR NOV-2007

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Part 172 Air Traffic Service Organisations Certification, Amendment 2. Contents

Official Journal of the European Union L 186/27

The NAT OPS Bulletin Checklist is available at & NAT Documents, NAT Documents, then NAT Ops Bulletins.

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

Summary of Public Submissions Received on

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

European Aviation Safety Agency

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

CHAPTER 5 SEPARATION METHODS AND MINIMA

UK Implementation of PBN

ATM 4 Airspace & Procedure Design

AERODROME LICENCE APPLICATION PROCESS

CHANGE CONTROL PROCEDURE

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Validation & Implementation Considerations Module 14 Activities 11 to 17

Cayman Islands Aviation Circular

Policy and Guidance for the Design and Operation of Departure Procedures in UK Airspace

Transition Altitude (TA) Consultation Commonly Asked Questions & Answers

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

SECTION 4 - APPROACH CONTROL PROCEDURES

Optimization of Airspace and Procedures in the Metroplex

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

-and- CIVIL AVIATION AUTHORITY. -and- (1) SECRETARY OF STATE FOR TRANSPORT (2) GATWICK AIRPORT LIMITED (3) NATS EN ROUTE PLC Interested Parties

AIRPROX REPORT No Date/Time: 7 Dec Z (Saturday)

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)

Transcription:

Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation Service Providers (ANSPs) on action required to truncate existing conventional and certain RNAV1 Standard Instrument Departure (SID) procedures where an ANSP determines environmental benefits (flight plan enabled fuel benefits) can be achieved by reducing the length of a SID without change to the existing track over the ground or SID vertical profiles. This should alleviate aircraft operators flight planning for unnecessary fuel uplift when departing airports with current lengthy SIDs. 1.2 SID truncations requiring a new ATS route designator should have a saving of at least 10NM to justify the acquisition/utilisation of a new route designator or 5LNC and the time taken to process the application. 1.3 Changes to SIDs are conducted in accordance with the Airspace Change Process and its supporting guidance (CAP 1616: Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements). Specific technical requirements for SID truncation are contained in this policy document and should be used in conjunction with the process described in CAP 1616. 2 Background 2.1 Many SIDs within the UK FIR are lengthy in their design and terminate at a typically low altitude. It is believed the establishment of SIDs has previously been associated with a variety of reasons including ATC tactical planning, reduced workload on the RT, and direct routings to significant waypoints on departure routes. 2.2 Fuel uplift planning has become more critical in recent years, and whilst continuing to comply with operating rules 1 it has become clear that some airline operators consider the full length and final end altitude of a SID whilst others do not. This results in unnecessary fuel carriage when aircraft are routinely climbed to a FL well above the SID (e.g. a SID of 70 NM ending at 5000ft). Except for recent new SID designs constrained by existing ATM tactical requirements, SIDs have been designed like this from their inception and were no doubt predicated upon the performance profiles of the aircraft in operation at the time and ATM requirements of the ANSP. 3 Policy Applicability 3.1 This policy applies when it is proposed that: the end segment of a SID is replaced by a new RNAV ATS route; or 1 See Regulation (EU) 965/2012 paragraphs CAT.OP.MPA.150, CAT.OP.MPA.151 and associated Acceptable Means of Compliance. 31 May 2018 Page 1 of 3

where the end segment of a SID is already aligned with an existing ATS route; and there is no change to the track over the ground or vertical profiles; and the SID is truncated at, or after, the final altitude/level attainment point is first reached and terrain clearance remains assured with the establishment of any ATS routes incorporated to replace the truncated section. 3.2 If sponsors wish to truncate a SID prior to the final end altitude, or when a truncation would affect the lateral profile, a full SID re-design is required. In this case, standard procedures for SID designs in CAP 778 and CAP 785 apply. 4 CAP 1616 - Scalability of SID Truncation Proposals 4.1 CAP 1616 sets out the specific requirements for airspace change proposals, scaled to the appropriate level of the change. As a SID truncation involves no changes to aircraft track over the ground and vertical profile, and results in replacing the end of a SID with an ATS route segment, the application of CAP 1616 will be scaled to the appropriate level, normally 2C. The template at Appendix 1 to Annex A has therefore been tailored to suit the nature of a Level 2C change and comply with CAP 1616. 5 SID Truncation Proposal Submission 5.1 SID truncation proposals should adhere to the requirements set out in Annex A. Notification of a proposal must be submitted to the CAA via a DAP 1916 in accordance with CAP 1616. Following the Assessment Meeting, details of the proposed SID Truncation Request should be submitted to SARG Airspace (airspace@caa.co.uk) in accordance with Annex A. 6 CAP 778 Requirements 6.1 There are no changes to CAP 778 requirements 6.2 The use of 5LNCs should be limited to the essential required as 5LNC resource is scarce. Consideration should be given to the possibility of cancelling extant 5LNCs to offset the establishment of new points. 7 CAP 785 Requirements 7.1 There is no need for a formal design proposal to be submitted by an Approved Procedure Designer providing the truncation only results in the removal of straight line segments at the end section of a SID which, other than the truncation, does not involve any change in design of the SID or replacement ATS routes. Any new waypoints and track and distance between waypoints must be checked for navigation infrastructure coverage 2 and be verified by SARG prior to formal approval. Notwithstanding the above, sponsors should also provide confirmation that the retained portion of the truncated SID remains fit for purpose. If this is not the case, further action is to be determined on a case by case basis. 8 Impact on NPRs 8.1 Sponsors must confirm there is no impact to NPRs. Where changes to SID designators require a textual amendment, i.e. a name change to Aerodrome Noise Abatement procedures, these details are to be included in the draft AIP amendments. 8.2 When proposals involve SID truncations to any airports designated by the Secretary of State, the CAA Case Officer is to advise the DfT of the SID designator change and that the 2 DEMETR is appropriate for DME/DME procedures. 31 May 2018 Page 2 of 3

proposal is nothing more in practice than a nomenclature change, with confirmation from the CAA that tracks or the shape and size of the NPR are not being affected in any way. 9 Impact on Adjacent SIDs 9.1 Sponsors must confirm that truncating a SID will have no impact on the vertical profile of adjacent SIDs from other airports. 10 Environmental Analysis Requirements for a SID Truncation Request 10.1 Details of the estimated enabled flight planned fuel saving and CO2 are the only environmental requirement to be included 11 Consultation 11.1 A SID truncation proposal must include evidence to indicate that the appropriate airport operator, the airport ANSP and appropriate Area Control Centre (ACC) have agreed to the change and that appropriate adaptation and flight planning requirements have been considered and changes can be accommodated on the AIRAC date required. Annex: A. SID Truncation Submission Process. 31 May 2018 Page 3 of 3

Annex A SID TRUNCATION SUBMISSION REQUESTS - GUIDANCE ON APPLICATION PROCESS 1. The sponsor must submit the DAP 1916 by e-mail to SARG Airspace (airspace@caa.co.uk) with a Statement of Need. 2. SARG Airspace will acknowledge the DAP 1916 and confirm that the application falls under the requirements of CAP 1616 and this policy. Once a Case Officer has been assigned to the task, the proposal as outlined in Appendix 1 is to be submitted directly to airspace@caa.co.uk which is to include the details as described below. 3. Proposals to truncate SIDs must have joint sponsorship from the ANSP and the Airport associated with the SID. 4. Sponsor to complete Appendix 1 NEW SID DESIGNATOR AND 5LNC REQUESTS 5. A request for a new SID designator, any new associated 5-Letter Name Codes (5LNCs) and ATS route designators (if applicable), are to be included with this request (5LNCs should be reserved beforehand using the normal ICARD process). CAA policy statement Significant Point Name Codes (5LNC) and ATS Route Designators 3 Section 2 provides further details concerning the reservation of ATS Route Designators via the ICAO EUR/NAT Region coordinator in Paris. 3 http://publicapps.caa.co.uk/modalapplication.aspx?catid=1&pagetype=65&appid=11&mode=detail&id=5335 31 May 2018 Page A1 of 10

APPENDIX 1 INSTRUCTIONS FOR COMPLETION. 1. Stage 1. 1.1 In Appendix 1 paragraph 1, the sponsor is to complete the details as shown. 2. Stage 2. 2.1 In Appendix 1 paragraph 2, the sponsor is to state if any other options were considered and whether they were discounted and why. As options for SID truncations are merely limited to the position where the SID may be truncated an options appraisal is likewise limited. 2.2 In the SID truncation proposal analysis, the Case Officer will confirm the option appraisal (including any safety assessment) and design principles which are constrained by the nature of the proposal, are appropriate and will confirm the appropriate scaling level of the proposal. 3. Stage 3. 3.1 Consultation may be limited to the appropriate airport operator. Evidence is required to be submitted that the appropriate airport operator and ANSPs have agreed to the change. In Appendix 1 paragraph 3.1 a statement to confirm that consultation has been conducted with the relevant aerodrome authority is to be provided, together with the aerodrome s agreement to the proposal. 3.2 No consultation material is required. 3.3 The final options appraisal and safety assessment must be included with the submission as shown in Appendix 1. 3.4 In the SID truncation analysis, the Case Officer will confirm the options and safety assessment, and consultation with the appropriate airport authority has been completed. 4. Stage 4. 4.1 In paragraph 4.1 of Appendix 1, the following details are required for the revised truncated SID: The specific SID Truncation details together with co-ordinate and ATS route details in an accompanying WGS 84 spreadsheet and the draft AIP amendment as attachments to the Appendix. Revised SID designator (see CAA policy statement The Designation of Standard Instrument Departures (SIDs) and Standard Approach Procedures (STARs) in the UK Flight Information Regions 4. The position at which the SID will be truncated. This should also be indicated on the existing SID Chart and attached as an Attachment for subsequent UK AIP amendment (clearly annotated PDF copies of existing charts are acceptable). Note: If approved, SARG will advise the sponsor to submit this chart to AIS using the Formal Change Request to the UK AIP. 4 http://publicapps.caa.co.uk/modalapplication.aspx?catid=1&pagetype=65&appid=11&mode=detail&id=5300 31 May 2018 Page A2 of 10

When a new waypoint is required, a validation check of co-ordinates is required in accordance with CAA policy statement Significant Point Name Codes (5LNC) and ATS Route Designators 5. This validation request is to be submitted in the WGS84 spreadsheet to be provided with the SID Truncation application. If the truncation is at a newly established position, the new 5LNC of the truncation point or, if appropriate, the established position at the truncation point, will become the new SID designator. The SID designator is to be confirmed with SARG. Changes to associated distance to truncation point from previous waypoint; details are to be indicated on the AIP chart to be amended (comments in Adobe PDFs are acceptable). Note: sponsors must confirm appropriate navaid infrastructure is available to support the revised SID termination position. The remaining portion of the existing SID subjected to truncation (from the truncation position) to the original termination position will become the new ATS route if there is no existing ATS route established. 4.2 A safety assessment is to be provided which is to cover the following details: Confirmation that any interacting ATS routes / procedures are not affected. Confirmation that extant RCF procedures have been examined and that either the current RCF procedures remain suitable and do not require revision, or if required, a revised RCF procedure is proposed. In the event of the latter, the proposed draft revision to RCF for the relevant UK AIP Aerodrome s AD 2.22 Flight Procedures entry is to be included. The following action is specifically required for the SID Truncation submission prior to submitting the request. The sponsor is to ensure that the extant RCF procedure is reviewed and that the impact of truncating a SID is assessed with regard to the extant RCF procedure in order to determine whether change to the RCF may be required. This is to ensure that aircraft experiencing RCF would not commence a climb to the flight planned cruising levels earlier than desirable, given the potential to cause a conflict with other interacting procedures which, as a result of the SID truncation, could otherwise potentially occur earlier compared to the extant SID (this is entirely dependent on the RCF procedures described in the UK AIP Aerodrome AD 2.22 section and when a climb to flight planned cruising level is initiated either as described in the relevant AD 2.22 section or in accordance with the national procedures). Confirmation that the SID truncation will be contained within controlled airspace. Adaption and Flight Planning Implications. Proposals are additionally to demonstrate that appropriate adaptation and flight planning requirements have been considered and changes can be effected on the AIRAC date required. Confirmation there is no change to NPRs. Details of any name changes to details in NPR tables; where applicable the detail are to be provided with the draft AIP amendment. 5 http://publicapps.caa.co.uk/modalapplication.aspx?catid=1&pagetype=65&appid=11&mode=detail&id=5335 31 May 2018 Page A3 of 10

Changes to SID chart should be shown in an attached AIP chart detailing all the relevant changes. 4.3 In paragraph 4.2, the following details are required for a new ATS Route: An appropriate ATS Route designator assigned to the route (note above requirement to reserve the route designator). New or revised ATS route details are to be provided in the WGS84 spreadsheet format (i.e. the complete AIP amendment) and are to be attached to the submission request. 4.4 Final Options Appraisal The sponsor must include a Final Options Appraisal including the details listed at CAP 1616 Table E2 of the environmental impacts including CO2 emission and fuel burn see P161 CAP 1616 and controller interactions. 5. Stage 5. 5.1 The Case Officer will complete a full analysis of the proposal as soon as possible after it is received and will present a recommendation to the Gateway Panel at the first available gateway meeting. Given the nature of the proposal, the CAA is prepared to permit a SID Truncation Proposal to be sequentially assessed under more than one Gateway in the same Gateway Meeting. 5.2 On receipt of the truncation submission proposal, SARG Airspace will verify truncation position co-ordinates (if not at existing waypoint), verify remaining track and distance associated with the new ATS route and check navaid infrastructure. 6 Stage 6. 6.1 Once verification is complete, the Case Officer will confirm approval of the SID truncation proposal to the sponsor and will authorise that the appropriate AIP amendments and AIS change request may be submitted to AIS. This will include a copy of the completed application form. 6.2. The sponsor is to copy the AIS change request to the appropriate SARG Case Officer. 7 Stage 7. 7.1 As the SID Truncation proposals result in no changes to track over the ground or vertical profile, as this is a nomenclature change, there are no Post Implementation Requirements to be met, therefore no post implementation action is required. 31 May 2018 Page A4 of 10

Appendix 1 to Annex A SID TRUNCATION REQUEST SUBMISSION DATE: (INSERT DATE) Existing SID: Airport ICAO identifier plus SID designator: Proposed SID: Airport ICAO identifier plus SID designator: SID Truncation Sponsor Details: Unit EN-ROUTE ANSP Unit AIRPORT ANSP Name Name Contact details Phone: E mail: Contact details Phone: E mail: 1. Stage 1 1.1 Statement of Need For completeness and ease of reference, insert details from DAP 1916. 1.2 Date of Assessment Meeting/Teleconference/E mail Confirmation that proposal may be submitted (insert date). 1.3 Design Principles. The SID Truncation Design Principles are listed below. Design Principles: 31 May 2018 Page A5 of 10

2. Stage 2 2.1 Options Appraisal. The option proposed and options discounted (where applicable) are detailed below. Options: Options proposed and why: Options discounted and why: 3. Stage 3 3.1 Consultation and Sponsor Confirmation Statement This proposal has been submitted following consultation with the aerodrome authority. As sponsor/co-sponsor we confirm that that there is no change to track over the ground, no change to vertical profiles, no change to NPRs and no effect on adjacent SIDs. NERL Aerodrome Name Name 4. Stage 4 4.1 SID Truncation Change Submission Details Requirements Details To Be Submitted by Sponsor New SID Designator (To be Co-ordinated with SARG) New 5LNC(s) (if applicable) Truncation Position Co-ordinates of Truncation Position (include validation request see Annex A paragraph 10) 31 May 2018 Page A6 of 10

Revised Track / Distance to Truncation Position To be provided on proposed SID chart amendment. Include any amended radials and distances from appropriate navaids. Navaid coverage (to ensure position is definable) Safety Assessment Details Confirmation interacting ATS Routes/SIDs not affected. RCF Implications: (1) Describe impacts of proposed change on extant RCF procedures (confirmation that they have been examined and remain fit for purpose, or (2) If revised RCF procedures are required, state why, and provide the proposed details with the draft AIP amendment. Airspace Containment confirmation. Adaptation and AIRAC implementation confirmation provide confirmation that changes have been co-ordinated with the aerodrome for the date proposed. AIP Amendments Confirmation there is no impact to NPRs. Name change to NPR tables in Aerodrome AD 2.21 Where applicable, change is detailed in the draft AIP amendment. SID Chart Amendments Revisions to chart Include as Attachment 1. 31 May 2018 Page A7 of 10

Any other amendments to SID Chart (include PDF copy of chart showing changes required) 4.2. ATS Route Details Submit details for New ATS Route in AIP Format at Attachment 2. Brief details of route to be included here i.e.: Route designator. Start and end position. Note: Change sponsor to provide the draft AIP amendment in the WGS84 Excel Spreadsheet format with the change submission. 5. Options Appraisal Insert details. When complete, please return with safety assessment and supporting maps attached to airspace@caa.co.uk. 31 May 2018 Page A8 of 10

SARG Airspace Regulatory Approval use only. Serial Design Check Design Approved / Not Approved Verified By 1a SID revised track and distance. 1b 1c Co-ordinates verified. If errors evident, SID revised track and distance entered below. 2a ATS Route track and distance. 2b ATS Route terrain clearance assured. 2c If errors evident, ATS Route revised track and distance entered below. 3 Navaid infrastructure (adequate coverage for new termination point). 4 RCF procedures. 5 Interacting procedures. 6 Airspace Containment. 7 SID chart proposed changes. 8 SID chart proof from AIS. 9 Final Options Appraisal. 10 Safety Assessment. 11 NPR Tables proposed changes (if applicable). 12 SID truncation proposal confirmed as a Level Zero change. 13 DfT advised if changes made to SIDs at designated airports. (following approval) 31 May 2018 Page A9 of 10

Change recommended by: Name... Date... Change referred back to sponsor for the following reason (insert details) Change approved by: Name... Appointment Date... 31 May 2018 Page A10 of 10