Acting Commissioner Basil Seggos NYS Department of Environmental Conservation 625 Broadway, 14th Floor Albany, NY 12233

Similar documents
Hon. Basil Seggos Acting Commissioner NYS Department of Environmental Conservation 325 Broadway Albany, NY 12233

January 31, Sherman Craig, Chairman NYS Adirondack Park Agency PO Box 99 Ray Brook, NY 12977

Snowmobile Connectors Are Disconnected

Josh Clague, Natural Resources Planner NYS DEC 625 Broadway, 5th Floor Albany, NY Via

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

16 June Conservation. Education

PROTECT Outlines Vision for Forest Preserve Classification of 69,000 Acres of former Finch/TNC Lands to be Purchased by the State

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Permeable RECREATIONAL TRAILS

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

May 2, Kathleen D. Regan Deputy Director, Planning Adirondack Park Agency P.O. Box State Route 86 Ray Brook, NY 12977

Daniel Mecklenburg 107 Old Wawbeek Road Tupper Lake, NY 12986

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

Bear Creek Habitat Improvement Project

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Understanding user expectations And planning for long term sustainability 1

MORGAN CREEK GREENWAY Final Report APPENDICES

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

June 6, 2013 BOARD MATTER D - 5 CONSIDER AMENDMENT OF SPECIAL USE LEASE NO. SU-639 AND REQUEST FOR PUBLIC USE RESTRICTION TO MOTORIZED VEHICULAR USE

Chapter 4.0 Alternatives Analysis

Proposed Backcountry Area Definition and Guidelines

Plaintiff-Petitioner. Defendants-Respondents.

Property access tracks

Form for Project Descriptions - December 2013 version! 1. Stone Valley Cooperative Recreation Area (SVCRA) Project Description

Snowmobile GUIDELINES FOR TRAIL SIGNING

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

Crew Chief: Start Date: Completion Date: T & A Code:

Boreas Ponds And A Bigger Adirondack High Peaks Wilderness

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

Respondents. Petitioners, Adirondack Mountain Club, Inc., Residents. Committee to Protect the Adirondacks, Inc., The Adirondack

General Rules for Use of Lands Managed by the. Middle Peninsula Chesapeake Bay Public Access Authority

Specification for Grip blocking using Peat Dams

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

American Conservation Experience

Mt. Hood National Forest

The Galveston Seawall

Project Planning, Compliance, and Funding

Trail Assessment Report

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

5.0 OUTDOOR RECREATION OPPORTUNITIES AND MANAGEMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Snowmobiling's Endless Winter:

Thank you for the opportunity to comment on the proposed action to add trails and trailheads to the Red Rock District trail system.

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park

Superintendent David Uberuaga June 27, 2011 Grand Canyon National Park P.O. Box 129 Grand Canyon, AZ 86023

Accessibility Guidelines for Outdoor Recreation and Trails

Wilderness Research. in Alaska s National Parks. Scientists: Heading to the Alaska Wilderness? Introduction

Aspen Skiing Company Policy for Use of Other Power-Driven Mobility Devices And Service Animals

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

BAYFIELD COUNTY FOREST COMPREHENSIVE LAND USE PLAN TABLE OF CONTENTS CHAPTER 700 ACCESS MANAGEMENT ROADS AND TRAILS

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Attendance Presentation

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Ordinance Number Snowmobiles and ATVs. Replaces pages See also Section County ATV Ordinance.

Becker County Trail Routing Feasibility Study

RESPONSE TO REVISED DRAFT, ADUR LOCAL DEVELOPMENT PLAN 2013

AMENDMENT NO. 03 TO THE OFFICIAL PLAN FOR THE TOWNSHIP OF ADJALA-TOSORONTIO OAK RIDGES MORAINE CONSERVATION PLAN

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

Chambers of Commerce and Lake Groups advertised this NCWRPC created online survey that was : Opened: August 22, 2012; and Closed: October 4, 2012.

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Using Managed Retreat to Address Coastal Erosion in Brewster

Southern Shenandoah Valley Chapter

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Walking Track Classification System Parks and Wildlife Service

Crew Chief: Start Date: Completion Date: T & A Code:

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

2. STAKEHOLDER FEEDBACK // What We Heard

TOWPATH MOWING GUIDELINES

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

State Project Reconstruction I-84

Appendix I Case-Studies in Wilderness Management

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

Volunteer Project Trip Report Yosemite National Park May 16-20, 2012

TRAILS WHERE TO FIND TRAILS IN NOVA SCOTIA

Newsletter of Protect the Adirondacks November 2012

MANAGING AMERICA S WILDERNESS ENDURING RESOURCE

Grade Crossing Regulations

Maine Policy Scholarship Memorandum 2014

Auburn Trail/Ontario Pathways Trail Connector Feasibility Study Project Advisory Group Meeting August 25, 2011 Farmington Town Hall Approved Minutes

Guidelines for Snowmobile Trail Signing and Placement STOP SLOW

Triangle Land Conservancy Conservation Area Monitoring Report Carolina North

Ontario Municipal Board Commission des affaires municipales de l Ontario

Securing Permanent Protection for Public Land

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF RECREATION AND PARKS RECREATIONAL CARRYING CAPACITY GUIDELINES

KP Lasnaya 1 River

Kit Carson-Challenger Ridge Trail Project

Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

Dryden Rail Trail Friends and Task Force Monday, January 21, :00 9:00 p.m. Dryden Town DPW 61 East Main Street, Dryden

Rural Rustic Road Program

Rocky Mountain Youth Corps Garfield County Conservation Corps Crews Final Report 2013

Transcription:

Board of Directors Charles Clusen Chair Sidney Harring Dale Jeffers Michael Wilson Vice-Chairs James Long Secretary David Quinn Treasurer Joshua Axelrod Nancy Bernstein John Caffry Dean Cook Marilyn DuBois Lorraine Duvall Robert Glennon Evelyn Greene Peter Hornbeck Mark Lawton Charles Morrison Peter O Shea Philip Terrie Peter Bauer Executive Director December 2, 2015 Hon. Lani Ulrich NYS Adirondack Park Agency PO Box 99 Ray Brook, NY 12977 Acting Commissioner Basil Seggos NYS Department of Environmental Conservation 625 Broadway, 14th Floor Albany, NY 12233 RE: Newly built class II community connector snowmobile trail to Harris Lake widely violates APA-DEC Snowmobile Trail Management Guidance, State Land Master Plan, Stormwater Pollution Prevention Plan Permit, DEC Snowmobile Bridge Construction Policy Dear Chairwoman Ulrich and Acting Commissioner Seggos, Protect the Adirondacks recently visited the newly constructed class II community connector snowmobile trail around Harris Lake. This trail was approved by the Adirondack Park Agency (APA) and Department of Environmental Conservation (DEC) in July 2015 as part of a new Newcomb to Minerva snowmobile trail connection. The trail runs just over 1 mile through parts of Forest Preserve in the Santanoni Historic Area, Vanderwhacker Mountain Wild Forest Area, and Harris Lake Intensive Use area. PROTECT found the work on this trail to consistently violate the 2009 Management Guidance: Snowmobile Trail Siting, Construction and Maintenance in Forest Preserve Lands in the Adirondack Park (Guidance), State Land Master Plan, DEC s Stormwater Pollution Prevention Plan permit issued for this project, and the DEC guidelines for snowmobile bridge construction. There may also have been wetlands violations. It s a sad commentary on the state s management of the Forest Preserve that after a number of years of building these types of trails, and a variety of state policies and Guidance documents designed to ensure proper management to protect the Forest Preserve, serious problems persist in the construction of these trails and natural resource damage is inflicted upon the Forest Preserve. Protect the Adirondacks PO Box 769, Lake George, NY 12845 518.685.3088 www.protectadks.org info@protectadks.org Like Us on facebook Follow us on Twitter

The Guidance places strong emphasis on proper trail layout in order to prevent natural resource damage and to limit the use of damaging construction methods, such as trail leveling, grading and bench cutting with heavy machinery. All of these heavy-handed activities were deployed with abundance along the Harris Lake trail, which raises questions about the decision making that saw fit to route such a trail through this part of the Forest Preserve in the first place. The Guidance requires that the construction of class II community connector trails preserve a trail-like character. The State Land Master Plan requires that snowmobile trails retain the character of a foot trail. The pictures attached show extensive natural resource damage all along the Harris Lake trail. These pictures illustrate the many ways that class II community connector trails are far more road-like than trail-like. Requirements of the Guidance and State Land Master Plan for trail-like conditions for snowmobile trails, on which high speed motorized recreation occurs, is in many ways a ferry tale. Even in the best conditions in the field and with scrupulous work by APA and DEC staff during trail planning and construction, the requirements of class II community connector snowmobile trail construction cause dramatic changes to the Forest Preserve. When this work is undertaken in challenging or unsuitable terrain on the Forest Preserve or construction work fails to comply with APA-DEC standards, the result are very poor indeed. Sadly, this is the case with the new Harris Lake trail. Protect the Adirondacks call upon the APA to investigate these abuses and launch an enforcement action for the numerous violations of existing trail construction policies and standards. This level of abuse and the flagrant violations of core Forest Preserve laws, management policies, and regulations should not be tolerated. Numerous Violations of Trail Width Standards: The Guidance set trail width standards for class II community connector trails at 9 feet in straight areas and 12 feet on curves or slopes. In many places on the Harris Lake trail the width of the trail surface is far in excess of these standards. The Guidance states Class I and II trails wider that their classification allows will be actively restored to these limits. (P. 9) The pictures at the end of the letter amply show that on the Harris Lake trail these standards were not upheld. Areas of the Harris Lake trail that exceed trail width standards should be rehabilitated. The Guidance states construction work for class II community connector trails should preserve a trail-like character. The Guidance calls for making decisions in the field to utilize the minimum requirement that will not result in a potential degradation of the wild forest setting. (P. 7-8) The pictures attached at the end of this letter show a trail that is much more road-like than trail-like. Wetland and Stormwater Violations: PROTECT s field visit found a DEC Stormwater 2

Prevention Plan (SWPPP) permit nailed to a tree at the Camp Santanoni end of the Harris Lake trail. Unfortunately, we encountered snowmobile bridges being constructed over permanent streams with heavy flows where there was disturbed and exposed soils along the stream banks with no silt fencing whatsoever. We found instances where ATVs and heavy tracked machinery were repeatedly driven through a wetland with no mats or protection for the wetland. We found snowmobile bridges being constructed within intermittent streams, with active flow, where there was disturbed and exposed soils within the stream corridor with no silt fencing. The Guidance states that Any activity in a wetland or that may impact a wetland will be undertaken with prior consultation with the APA and with recognition of Army Corp on Engineers permit requirements. (P. 12) If prior consultation was undertaken between the DEC and APA, did the APA approve construction activities that involved no use of silt fencing in stream corridors and repeated driving of various motor vehicles through a wetland? It appears that there were stormwater and wetlands violations during the construction of the Harris Lake trail. Debris Clutters Trail Corridor: The Guidance states When removed boulders and rocks are not buried, but instead set to the side of the trail, they will be dispersed with care and not left in windrows or pile next to the trial. (P. 10) The Harris Lake trail is rife with debris piles alongside the trail as shown in the attached pictures. Harris Lake Trail Area Significantly Altered by Trail Construction: The Harris Lake trail was significantly changed by construction activities, including substantial leveling, grading and bench cutting. All of these activities substantially change the character of the trail corridor and the Wild Forest atmosphere. It s important to realize that when these activities occur all trees and all forest understory are removed from the trail corridor, soils are compacted, and the complex duff layer of the forest floor is destroyed. The Guidance contemplates that such heavy-handed activities should be used sparingly. The Guidance states Limited leveling and grading may be undertaken using appropriate low-impact landscaping equipment as specified in a Work Plan. (P 10) More than half of the Harris Lake trail corridor was substantially graded. If such a high proportion of a trail requires grading to make it safe for snowmobile riding, then it would seem that that area is unsuitable for a snowmobile trail. The Guidance talks of limited leveling and grading. What we found on the Harris Lake trail was nearly continuous major leveling and grading. The sheer extent of leveling and grading on the Harris Lake trail violated the spirit and letter of the Guidance. The Guidance also states that on Class II trails Trail surfaces should generally follow the existing contours of the natural forest floor and not be graded flat. (P. 10) The Harris Lake trail was almost continuously graded flat. In addition to widespread leveling and grading on the Harris Lake trail, extensive bench 3

cuts were made. The Guidance states The need for bench cuts will be minimized through proper trail layout. The tapering of side slopes will be allowed outside the cleared trail width. (P. 11). Note that oftentimes bench cuts are 2-3 feet in width, but this distance is not considered part of the 9-12 foot trail width limit. Under the Guidance, therefore, a 15-foot or more cleared trail corridor area is permissible. On the Harris Lake trail, bench cutting was used on a very high percentage of the total trail, upwards of one-third or more. This high use of bench cuts hardly meets the Guidance requirement for proper trail layout and points to a part of the Forest Preserve unsuitable to provide a motorized recreational trail experience. Work Continued After Work Season Detailed in Guidance: The Guidance states a strong preference that work on snowmobile trails that involves motor vehicles and heavy equipment should be undertaken in August, September and October. (P 13) Such work on the Harris Lake trail went far into November. New Style of Snowmobile Bridge: The DEC has installed a new type of snowmobile bridge along the Harris Lake Trail. These bridges employ high 8-foot posts at all four corners of the bridge. This feature is not commonly used elsewhere and such posts are not featured in snowmobile bridge design documents. Shibboleth of the Multi Use Trail : The changes to the Harris Lake trail are profound and will be longstanding. The changes have made this trail corridor highly unattractive for hiking and impractical for bike riding. This trail will be ugly to walk on given the degraded state of the corridor and the extensive alteration of the trail surface makes it impossible to ride a bike on. The extensive leveling, grading, bench cutting, windrowing of rocks and boulders and debris on the trail sides, extensive tree cutting, total destruction of the forest understory, and changes to the hydrology of the trail area so that the water stands throughout the trail surface makes any other use other than wintertime snowmobiling impractical and uninviting for the general public. The APA and DEC have embraced the concept of the multi-use trail, yet the Harris Lake trail provides a good example where the Forest Preserve is so heavily disturbed with extensive terrain alterations that few will use this trail except those driving snowmobiles (and that s when there s snow, which is far less in this area than the western Adirondacks). At One Time the APA Acted Independently to Hold the DEC Accountable for Forest Preserve Management Violations: At one time the APA did hold the DEC accountable for violations of Forest Preserve laws, policies and regulations. When APA Counsel James Townsend was a Commissioner, four snowmobile trails that were heavily abused and degraded during trail construction were subject to APA enforcement actions and rehabilitation efforts were undertaken on these trails. The abuses all along the Harris Lake trail merit this type of action by the APA to hold the DEC accountable. 4

On behalf of the Board of Directors of Protect the Adirondacks, please let me extend our appreciation for the opportunity to submit these comments on this important matter. Sincerely, Peter Bauer Executive Director CC APA Board of Commissioners T. Martino J. Townsend K. Regan K. Prickett W. Linck M. Gerstman K. Moser R. Davis K. Richards P. Frank C. Ballantyne P. Walke 5

Two pictures of the construction of the class II community connector snowmobile trail around Harris Lake. These pictures show areas far in excess of the 12 foot maximum width for slopes or curves and 9 feet for straight areas. This excessive widening of the trail surface causes unnecessary natural resource damage to the Forest Preserve. 6

Two more pictures of the construction of the class II community connector snowmobile trail around Harris Lake. These pictures show areas far in excess of the 12 foot maximum width for slopes or curves and 9 feet for straight areas. This excessive widening of the trail surface causes unnecessary natural resource damage to the Forest Preserve. 7

Two more pictures of the construction of the class II community connector snowmobile trail around Harris Lake. These pictures show areas far in excess of the 12 foot maximum width for slopes or curves and 9 feet for straight areas. This excessive widening of the trail surface causes unnecessary natural resource damage to the Forest Preserve. 8

Two more pictures of the construction of the class II community connector snowmobile trail around Harris Lake. These pictures show areas far in excess of the 12 foot maximum width for slopes or curves and 9 feet for straight areas. This excessive widening of the trail surface causes unnecessary natural resource damage to the Forest Preserve. The bridge in the distance is 12.5 feet wide for reference. 9

Two more pictures of the construction of the class II community connector snowmobile trail around Harris Lake. These pictures show areas far in excess of the 12 foot maximum width for slopes or curves and 9 feet for straight areas. This excessive widening of the trail surface causes unnecessary natural resource damage to the Forest Preserve. The bridge in the bottom picture is 12.5 feet wide for reference. 10

Two pictures that show bridge construction on the Harris Lake trail over a permanent stream. Though the DEC issued itself a Stormwater Management Permit for this project it failed to use any type of silt fencing and has exposed earth that runs right to the stream. This is not acceptable natural resource protection. 11

The top pictures shows where motor vehicles repeatedly drove through a wetland during construction on the Harris Lake trail. The bottom picture shows bridge construction over an intermittent stream corridor with no silt fencing despite stream flow. This is not acceptable natural resource protection. 12

These pictures show parts of the Harris Lake trail where rocks, boulders, cut trees, and other debris have been piled alongside the trail and used as fill or to stabilize the trail. These debris piles are expressly prohibited by the APA-DEC Snowmobile Trail Management Guidance. 13

More pictures that show parts of the Harris Lake trail where rocks, boulders, cut trees, and other debris have been piled alongside the trail and used as fill or to stabilize the trail. These debris piles are expressly prohibited by the APA-DEC Snowmobile Trail Management Guidance. 14

These pictures show extensive grading and bench cutting on the Harris Lake trail. After extensive tree cutting, rock removal, filling in of hummocks, and complete destruction of the forest understory, grading and bench cutting dramatically change a trail. 15

More pictures showing extensive grading and bench cutting on the Harris Lake trail. After extensive tree cutting, rock removal, filling in of hummocks, and complete destruction of the forest understory, grading and bench cutting dramatically change a trail. Areas where the walls of the bench cut collapse widen the trail and lead to erosion. 16

These pictures show extensive grading and levelling work on the Harris Lake trail. After extensive tree cutting, rock removal, filling in of hummocks, and complete destruction of the forest understory, grading and levelling dramatically change a trail. 17

More pictures showing extensive grading and levelling work on the Harris Lake trail. After extensive tree cutting, rock removal, filling in of hummocks, and complete destruction of the forest understory, grading and levelling dramatically change a trail. 18

These pictures show damage to the Harris Lake trail from deep rutting due to heavy equipment used to build the trail. Note that the Guidance describes this heavy equipment as appropriate low impact landscaping equipment. The Guidance states that deep rutting of the trail surface is prohibited and if it occurs the trail surface should be restored. 19

More pictures pictures showing damage to the Harris Lake trail from deep rutting due to heavy equipment used to build the trail. Note that the Guidance describes this heavy equipment as appropriate low impact landscaping equipment. The Guidance states that deep rutting of the trail surface is prohibited and if it occurs the trail surface should be restored. 20

These pictures show damage to trees that were left standing within the Harris Lake trail corridor during trail construction. These trees are unlikely to survive. This type of collateral damage is particular to class II community connector snowmobile trail construction. This level of natural resource damage is unacceptable. 21

More pictures that show damage to trees that were left standing within the Harris Lake trail corridor during trail construction. These trees are unlikely to survive. This type of collateral damage is particular to class II community connector snowmobile trail construction. This level of natural resource damage is unacceptable. 22

The top picture shows a new style of snowmobile bridge being used on the Harris Lake trail with high posts at all corners. The APA-DEC snowmobile bridge policy does not allow for these types of posts, which presumably will be used to afix signs, warnings, or reflectors to manage high speed snowmobile use. The bottom picture shows what the Guidance refers to as appropriate low impact landscaping equipment used to build this trail. 23