Circuit Reliability Review

Similar documents
Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

Circuit Reliability Review

2016 SCE Reliability Review. November 27 th, 2017 Irwindale, California

LOS ANGELES COUNTY SALES TAX ALLOCATION TOTALS - 1Q COMPARISON. Agoura Hills

Voter Counts for City and City Council Districts

Aircraft Noise Comment Report

Sewage Overflow Calls During Business Hours Utilities Department (626)

ZIP Codes/Territories In Numerical Order By ZIP Code ZIP Code. ZIP Code

Norwalk H.S. Norwalk Green Line Station. Lakewood Green Line Station NORWALK. Bellflower H.S. Studebaker Rd. Cerritos College. Gahr H.S.

2007 SCHEDULED ELECTIONS (AS OF SEPTEMBER 21, 2007)

LOS ANGELES COUNTY, CALIFORNIA AND INCORPORATED AREAS

REDONDO AVE

Table of School Districts by SALARIES. $127, yrs. $105,742 in 19. $118, yrs. $96,370 in 19 posted for. $105, yrs.

c. 5~AL ~ Gulf Power Report 03/01/2019 March 1, 2019 Mr. Adam Teitzman, Commission Clerk Florida Public Service Commission

Amendments to PFC Applications C 03 LAX and C 00 LAX

Complaint Date & Time Complainant City Operator Flight No. Aircraft Response (24 Hours) Type

PARK PL APOLLO ST NASH ST ROSECRANS AVE ±66,000 CPD RARE RESTAURANT SPACE IN CONTINENTAL PARK

RANCHO DOMINGUEZ TORRANCE 6 CARSON CITY LOMITA SAN PEDRO

restaurant space for lease

Discovery Gateway Spectrum - Phase II

FOR LEASE FORMER GOLFSMITH FOR LEASE ±4,625 SF. NWC Nash St & Rosecrans Ave, El Segundo, CA. for lease ±4,625 SF 2041 ROSECRANS

POLLWORKERS IN SHORT SUPPLY THIS ELECTION Dozens of Communities Experiencing Shortages for Presidential Primaries (ATTACHMENT)

Surprised, Embarrassed, Confused, Afraid, Nervous, Angry or all of the above?

CRUISE SHIP SHORE POWER PROSPECTS. Rich Pruitt, Associate Vice President Environmental Programs Royal Caribbean Cruises, Ltd.

City Council/Water Agency Title Name Address Telephone Chapter regional group

E WASHINGTON BLVD LOS ANGELES, CA ,274 SF INDUSTRIAL BUILDING FOR SALE TEAM-CLINE.COM LOCAL EXPERTISE. INTERNATIONAL REACH. WORLD CLASS.

LIHTC Properties in California's 43rd District

NEWLY RENOVATED CAMPUS

NEWLY RENOVATED CAMPUS

PAcific center. the gateway to palos verdes

NEWLY RENOVATED CAMPUS

Law Enforcement Torch Run Central Leg UPDATED 5/5/2015

50 Largest U.S. Metropolitan Areas

31,000 SF 1123 & 1135 N STANFORD AVE LOS ANGELES, CALIFORNIA INDUSTRIAL FOR. Team-Cline.com AVE STANFORD

Transcription:

Circuit Reliability Review Hermosa Beach January 2018

Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and sustainable future that meets the needs and expectations of our customers. We are investing more than $13 billion in the power distribution grid over three years (2017-19). Our main investment goal is to increase power reliability through significant upgrades. The investments include: Upgrading cables, poles, switches and transformers Updating the grid so it can accommodate new technologies, such as smart inverters that will allow for the twoway flow of solar energy Adapting the power system to accommodate future California policy related to energy storage, electric transportation and renewable energy Providing enhanced automation and monitoring devices to allow us to better respond to changes on the grid Our investments in local communities will help ensure that customers receive safe, reliable, and affordable electricity now and in the future. Learn more at edison.com/innovation 2

Understanding Your Reliability Report As your electric utility, we want you to always have power when you need it. To get there, we constantly track and monitor electric outages across our service territory, and we measure our system reliability from this data. The two metrics we rely on are common in the electric utility industry: the System Average Interruption Duration Index (SAIDI) and the System Average Interruption Frequency Index (SAIFI). Both are described in more detail on the next page. Replacing and upgrading our infrastructure will help SCE maintain or improve SAIDI and SAIFI measurements. This report provides historical reliability data for the circuits that serve your jurisdiction and our proposed infrastructure upgrades for the current year. To view other reliability reports, visit sce.com>outage Center>Maintaining Reliable Service 3

Reliability Metrics MOMENTARY OUTAGES: OUTAGES LASTING 5 MINUTES OR LESS SUSTAINED OUTAGES: OUTAGES LASTING LONGER THAN 5 MINUTES MAIFI: o The number of times the average customer is interrupted by Momentary outages each year. SAIFI: o The number of times the average customer is interrupted by Sustained outages each year. SAIDI: o The cumulative amount of time the average customer is interrupted by Sustained outages each year. 4

Cities in the SOUTH BAY District CityList1 ALONDRA PARK DEL AIRE EL SEGUNDO GARDENA HAWTHORNE HERMOSA BEACH INGLEWOOD LADERA HEIGHTS LAWNDALE LENNOX LOMITA LOS ANGELES MANHATTAN BEACH PALOS VERDES ESTATES RANCHO PALOS VERDES REDONDO BEACH ROLLING HILLS ROLLING HILLS ESTATES TORRANCE VIEW PARK-WINDSOR HILLS WEST ATHENS WESTMONT 5

* Exclusions are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature. **In the columns showing Rank, lower numbers indicate poorer performance. 6

Overview of Hermosa Beach CircuitList1 There are 15 circuits that serve Hermosa Beach 1 Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers ADDIS(16KV) 3,131 - - - CAMINO REAL(4.16KV) 771 - - - CLEO(4.16KV) 1,073 - - - CYLINDER(16KV) 1,395 - - - EL PASEO(4.16KV) 924 - - - HERMOSA(4.16KV) 1,189 - - - HILL(4.16KV) 771 - - - KEATS(4.16KV) 160 - - - KING(16KV) 3,802 - - - MORGAN(4.16KV) 959 - - - NO BEACH(4.16KV) 800 - - - OZONE(4.16KV) 603 - - - PISTON(16KV) 4,368 - - - PULLMAN(4.16KV) 1,506 - - - SO STRAND(4.16KV) 616 - - - Grand Total 22,068 7

Reliability History of Circuits Serving Hermosa Beach (No Exclusions) BarChart 250.0 2014 2015 2016 2017 226.3 SAIDI (average minutes of sustained interruptions) 200.0 150.0 100.0 50.0 0.0 80.5 112.1 114.8 167.5 134.5 139.7 74.5 Hermosa Beach SAIFI (average frequency of sustained interruptions) MAIFI (average frequency of momentary interruptions) 2.5 2.0 1.5 1.0 0.5 0.0 2.5 2.0 1.5 1.0 0.5 0.0 0.6 0.9 1.5 1.0 0.9 1.4 1.5 1.4 2.1 0.6 1.1 1.6 1.0 2.1 1.2 1.8 SCE SYSTEMWIDE ** Exclusions are days which utilities are allowed to remove from their metrics because the outages on those days were caused by acts of nature. **Data is as of 02/20/2018, data can be slightly different due to outage data validation process 8

Causes of Repair Outages in Hermosa Beach 2017 SAIDIChart Vegetation /Animal 0.0% Weather /Fire Other 2.2% /Earthquake 5.2% Contributions to SAIDI by Outage Cause 3rd Party 0.0% Equipment Failure e.g., in-service failure of transformer, switch, or conductors Vegetation/Animal e.g., tree branch, rodent, or bird causing a short circuit between conductors Other e.g., patrolled but no cause found Operations e.g., urgent maintenance w/o 3-day notice 3 rd Party e.g., balloon, car hit pole, dig-in Operation 8.5% Equipment Failure 84.1% 3rd Party Equipment Failure Operation Other Vegetation /Animal Weather /Fire /Earthquake SAIDI = the cumulative amount of time the average customer is interrupted by sustained outages each year. 9

Causes of Repair Outages in Hermosa Beach 2017 SAIFIChart Vegetation /Animal 0.0% 3rd Party 0.0% Contributions to SAIFI by Outage Cause Equipment Failure e.g., in-service failure of transformer, switch, or conductors Vegetation/Animal e.g., tree branch, rodent, or bird causing a short circuit between conductors Other e.g., patrolled but no cause found Operations e.g., urgent maintenance w/o 3-day notice 3 rd Party e.g., balloon, car hit pole, dig-in Other 2.3% Operation 24.5% Weather /Fire /Earthquake 17.0% Equipment Failure 56.2% 3rd Party Equipment Failure Operation Other Vegetation /Animal Weather /Fire /Earthquake SAIFI = the number of times the average customer is interrupted by sustained outages each year 10

11

12

Back-up Slides Reliability Histories of Circuits Serving Hermosa Beach Updated through Dec 2017

Average Reliability of 15 Circuits Serving Hermosa Beach CitySummary 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI 15 Circuits Serving Hermosa Beach -- Total Customers: 22,068 80.5 0.6 0.9 226.3 1.5 1.5 167.5 2.1 0.6 21.9 0.5 1.5 30.8 0.2 0.3 19.2 0.2 0.1 2.6 0.1 0.2 74.5 1.0 2.1 3rd Party 1% 8% 21% 11% 20% 31% 8% 7% 22% - 33% - - 31% - - 21% - - 9% Equipment Failure 58% 30% 5% 56% 53% 15% 42% 24% 41% 63% 37% 69% 100% 100% 67% 93% 92% - 7% 1% 79% 84% 56% 65% Operation 4% 6% 5% 10% 9% - 23% 50% 5% 22% 51% - 0% 0% - 4% 3% 24% 32% 3% - 8% 24% 2% Other 10% 13% 46% 20% 18% 51% 14% 7% 16% 5% 3% 26% - - - 3% 5% 46% - - - 2% 2% 21% Vegetation/Animal Weather/Fire/Earthquake 27% 43% 22% 3% 1% 3% 13% 12% 17% 11% 9% 5% - - 61% 97% - 5% 17% 4% SCE SYSTEMWIDE 112.1 1.0 1.4 114.8 0.9 1.4 134.5 1.1 1.6 42.6 0.3 0.5 23.6 0.2 0.4 29.2 0.2 0.4 44.3 0.4 0.5 139.7 1.2 1.8 Notes: No outages are excluded from the metrics. Outage Causes: Other: e.g., patrolled but no cause could be found Operations: e.g., urgent maintenance w/o 3-day notice to customers 3 rd Party: e.g., balloons, car hit pole, dig-in Vegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductors SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by sustained (longer than 5 minutes) outages. SAIFI (interruptions) = the number of times the average customer is interrupted by sustained outages. MAIFI (interruptions) = the number of times the average customer is interrupted by momentary " (lasting 5 minutes or less) outages. 14

Reliability Histories for Individual Circuits Serving Hermosa Beach - 1 of 4 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI ADDIS(16KV) - Customers: 3,131 0.8 0.0-136.1 2.4 2.0 151.4 2.0 - - - CircuitHistory - 172.9 1.0 1.0 90.2 1.0 263.1 2.0 1.0 3rd Party - 50% - 1 - Equipment Failure - - - 100% 99% - 2% 0% 100% 100% 100% 100% 100% 100% 100% 100% Operation 100% 100% - 0% 1% - 24% 50% Other - 50% 74% 50% Vegetation/Animal Weather/Fire/Earthquake CAMINO REAL(4.16KV) - Customers: 771 - - - 3.1 0.0 2.0 41.8 1.1 3rd Party - 50% - - Equipment Failure - - - 100% 100% - 4% 1% Operation - - 96% 99% Other - 50% - - Vegetation/Animal Weather/Fire/Earthquake CLEO(4.16KV) - Customers: 1,073 3.0 0.0 4.0 149.1 0.4 3.0 55.0 2.0 2.0 - - 21.6 0.1 21.6 0.1-3rd Party Equipment Failure - - - 37% 9% 100% - 93% 80% 93% 80% - Operation - - 25% 63% 91% - 58% 51% - - - 7% 20% 7% 20% - Other Vegetation/Animal Weather/Fire/Earthquake 100% 100% 75% - - - 42% 49% 100% - - - CYLINDER(16KV) - Customers: 1,395 33.8 1.0 1.0 258.5 3.0-398.1 3.1 1.0 63.3 1.3 1.0 - - - 0.9 0.0 64.1 1.3 1.0 3rd Party - - - 5% 33% - 39% 33% Equipment Failure 9% 1% - 61% 34% - 22% 32% 97% 98% 99% 100% - 97% 98% 100% Operation - - - 35% 34% - 8% 32% - 2% 1% 100% 100% 3% 2% - Other - - 32% 3% 3% - - - Vegetation/Animal Weather/Fire/Earthquake 91% 99% 100% - 15

Reliability Histories for Individual Circuits Serving Hermosa Beach - 2 of 4 CircuitHistory 2 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI 2017 EL PASEO(4.16KV) - Customers: 924 74.2 1.0 2.0 303.4 0.7 2.0 37.2 1.0 - - 1.0 70.3 0.9 70.3 0.9 1.0 3rd Party - - 50% - - 49% 100% 100% Equipment Failure 10% 2% - 100% 100% - 13% 2% - - - 100% 100% 100% 100% - Operation - - 87% 98% Other 90% 98% 50% - - 51% - - Vegetation/Animal Weather/Fire/Earthquake HERMOSA(4.16KV) - Customers: 1,189 1.9 0.0 3.8 6.3 0.1 2.0 87.8 2.5 1.0 - - - 110.5 1.0 0.6 0.4 0.0 1.0 - - 1.0 110.9 1.0 2.6 3rd Party - - 48% - - 50% 11% 40% 100% - - - 100% - - 39% Equipment Failure 100% 100% - 100% 100% - 47% 18% 100% 100% 100% - - 100% 99% 22% Operation - - 42% 41% - - - 100% 100% 0% 1% - Other - - 52% - - 50% - - - 100% - 39% Vegetation/Animal Weather/Fire/Earthquake HILL(4.16KV) - Customers: 771 59.8 1.7 1.1 87.8 1.0 1.0 111.8 1.2 0.8 160.9 1.0 1.0 - - - 8.5 0.0 1.0 1.5 0.0-170.9 1.0 2.0 3rd Party 27% 62% - - Equipment Failure - - - 100% 100% - 14% 3% - 100% 100% 100% - - 100% 100% - 95% 97% 51% Operation 73% 38% 86% 97% 100% - - 100% 100% 100% - - - 5% 3% 49% Other - - 100% - Vegetation/Animal Weather/Fire/Earthquake - 100% - - KEATS(4.16KV) - Customers: 160 4.7 0.1 1.0 18.1 0.1 1.0 75.7 1.1 - - - 1.0 - - - 1.0 3rd Party - - 100% - Equipment Failure 74% 34% - 100% - - - 100% Operation 26% 66% - 100% 100% - 100% 100% Other Vegetation/Animal Weather/Fire/Earthquake - 100% - - 16

Reliability Histories for Individual Circuits Serving Hermosa Beach - 3 of 4 CircuitHistory 3 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI KING(16KV) - Customers: 3,802 108.8 1.0-349.5 1.8 3.9 270.4 3.7 1.0 25.1 0.4 1.6 2.6 0.0-5.0 0.1-1.9 0.0-34.6 0.5 1.6 3rd Party - - - 20% 15% 25% - - Equipment Failure 1% 0% - 4% 2% - 45% 45% 100% 100% 100% 100% 100% 100% - 100% 100% 94% 97% 100% Operation - - - 1% 1% - 14% 28% - - 100% 100% - 6% 3% - Other - - - 76% 81% 75% - - Vegetation/Animal Weather/Fire/Earthquake 99% 100% 40% 27% MORGAN(4.16KV) - Customers: 959 98.4 1.1 3.0 19.5 1.0 1.0 91.0 2.1-64.9 2.0 1.8 - - 1.0 14.3 0.3 1.0 - - - 79.2 2.3 3.8 3rd Party - - 33% - - - 100% - - 100% - 53% Equipment Failure - - - 100% 100% 100% 55% 38% - 6% 0% - - 5% 0% - Operation - - 45% 62% - 11% 50% - - 9% 44% - Other 61% 4% 67% 100% 100% 18% 11% - Vegetation/Animal Weather/Fire/Earthquake 39% 96% - - - 83% 50% 100% - 68% 44% 47% NO BEACH(4.16KV) - Customers: 800 113.7 1.0-302.3 1.1-72.6 2.0 1.0 - - 1.0 - - - 2.9 0.0-3.8 0.0-6.7 0.0 1.0 3rd Party Equipment Failure 1% 1% - 7% 4% - - 100% - - 100% 100% - 57% 9% 100% Operation - - - 93% 96% - 43% 50% - - - 100% 100% 43% 91% - Other 99% 99% - - 100% - - - Vegetation/Animal Weather/Fire/Earthquake - - 57% 50% OZONE(4.16KV) - Customers: 603 - - - 68.8 2.1 1.0 146.6 2.1 1.0 - - 1.0 - - - 1.0 3rd Party - - - 73% 95% 100% - - Equipment Failure - - - 27% 5% - 77% 51% - - - 100% - - - 100% Operation - - 23% 49% Other 100% - - - Vegetation/Animal Weather/Fire/Earthquake 17

Reliability Histories for Individual Circuits Serving Hermosa Beach - 4 of 4 CircuitHistory 4 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI PISTON(16KV) - Customers: 4,368 264.4 1.0 1.3 409.2 1.5 0.3 52.5 1.1-27.4 1.1 4.6 - - - 3.4 0.0-8.6 0.7 1.0 39.4 1.7 5.6 3rd Party - - - 0% 1% - 13% 7% Equipment Failure 100% 99% 22% 96% 94% 100% 5% 0% - - - 58% - - - 75% 32% - - - 100% 6% 0% 65% Operation - - - 3% 4% - 82% 93% - 81% 94% 25% 68% - 7% 0% - 60% 58% - Other - - 78% 1% 1% 19% 6% 42% - 13% 4% 35% Vegetation/Animal Weather/Fire/Earthquake 0% 1% 93% 100% - 20% 38% - PULLMAN(4.16KV) - Customers: 1,506 8.7 0.0-100.7 0.8-127.0 1.2 0.7-4.8 0.0-4.8 0.0-3rd Party - - - 38% 87% - 20% 6% 100% - - - Equipment Failure 7% 34% - 3% 3% - 59% 18% Operation 93% 66% 22% 76% - - 100% 100% - 100% 100% - Other Vegetation/Animal Weather/Fire/Earthquake - - - 58% 10% - - - SO STRAND(4.16KV) - Customers: 616 17.7 0.2-224.8 2.0-1063.8 3.0 1.0 - - 1.0 1.7 0.0 - - - 0.4 - - - 1.7 0.0 1.4 3rd Party - - - 100% 100% - - - Equipment Failure - - 97% 66% - - - 100% - - - 73% Operation 100% 100% 3% 34% 100% 100% - - - 100% 100% - Other 100% 100% - 27% Vegetation/Animal Weather/Fire/Earthquake - - - - - - - 18