Region of Waterloo Transportation and Environmental Services Transit Services

Similar documents
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

2018 Service Implementation Plan Executive Summary

II. Terminology and Basic

Juneau Comprehensive Operations Analysis and Transit Development Plan DRAFT RECOMMENDATIONS January 2014

MUSKEGON AREA TRANSIT SYSTEM PROPOSAL FOR FARE AND SERVICE ADJUSTMENTS TO BE PHASED IN BEGINNING JANUARY 1, 2018

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

Getting to The Family Centre

General Issues Committee Item Transit Operating Budget Ten Year Local Transit Strategy

Ridership Growth Strategy (RGS) Status Update

Waterloo Hwy 401 Service

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

2 YORK REGION TRANSIT MOBILITY PLUS 2004 SYSTEM PERFORMANCE REVIEW

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

SAN LUIS OBISPO TRANSIT + SAN LUIS OBISPO RTA JOINT SHORT RANGE TRANSIT PLANS: SERVICE STRATEGIES. Presented by: Gordon Shaw, PE, AICP; Principal

2018 Service Changes Ada County

Like many transit service providers, the Port Authority of Allegheny County (Port Authority) uses a set of service level guidelines to determine

Construction Staging Adelaide Street West

PROPOSED FOR IMPLEMENTATION

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

SRTA Year End Fixed Route Ridership Analysis: FY 2018

Summary of Proposed NH 120 Service

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

Memorandum. DATE: May 9, Board of Directors. Jim Derwinski, CEO/Executive Director. Fare Structure Study Fare Pilot Program

Bus Corridor Service Options

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead

Transit in Toronto. Chair Adam Giambrone Sunday, October

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

Kingston Transportation Master Plan Draft Report Transit Forecasting 1

2017/2018 Q3 Performance Measures Report. Revised March 22, 2018 Average Daily Boardings Comparison Chart, Page 11 Q3 Boardings figures revised

Capacity Improvements on Bus and Subway Services

TORONTO TRANSIT COMMISSION REPORT NO.

Caroline County / King George County Transit Studies. Meeting November 1, 2017

ENVIRONMENT, TRANSPORTATION & PUBLIC SAFETY STANDING COMMITTEE CONSOLIDATED AGENDA

RACINE COUNTY PUBLIC TRANSIT PLAN:

TERMINAL DEVELOPMENT PLAN

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

This report recommends two new TTC transit services in southwest Toronto.

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

2017/ Q1 Performance Measures Report

395 Express Lanes Project Update

Service Summary. Winter Service Change Highlights WINTER 2019 CHANGES TRIP LEVEL DETAIL. Victoria Regional Transit Commission

Date: 11/6/15. Total Passengers

TRAINS + BUSES: GO TRANSIT

Transit System Performance Update

Municipal Heritage Register Disclaimer

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

TORONTO TRANSIT COMMISSION REPORT NO.

New free City connector bus service

Improving Transit Service to Major Music Festivals

KING STREET TRANSIT PILOT

CHERRIOTS 2018 SERVICE PLAN 1

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Update on the development of the Regional Real Time Passenger Information (RTPI) System

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

Figure 1: Route 56B Hazelwood

Improving Directional Signage for TTC Services at Pearson Airport

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CobbLinc Forward Service Package

Washington Metropolitan Area Transit Authority Services Utilization Study

Silver Line Operating Plan

Att. A, AI 46, 11/9/17

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

14 YORK REGION TRANSIT (YRT/VIVA) SOUTHWEST DIVISION OPERATIONS AND MAINTENANCE CONTRACT EXTENSION

LOS ANGELES WORLD AIRPORTS LAX AIRPORT OPERATIONS

Written evidence submitted by National Express West Midlands (BSB 15)

Master Plan & Noise Compatibility Study Update

LOS ANGELES COUNTY CONGESTION REDUCTION DEMONSTRATION INITIATIVE

Airport Planning Area

Aviation, Rail, & Trucking 6-1

Metrolinx Board of Directors. President, Union Pearson Express Date: September 22, 2015 UP Express Quarterly Board Report

TORONTO TRANSIT COMMISSION REPORT NO.

Why we re here: For educational purposes only

Fare Policy Discussion Background and History

Madison Metro Transit System

Perth Noise Abatement Procedures - Change to Preferred Runways

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013

Union Station Queens Quay Transit Link Study

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

Approval of August 2019 Service Changes

Call for Public Hearing August 2019 Service Changes

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of

Ministry of Transportation

Ozaukee County Transit Development Plan

New System. New Routes. New Way. May 20, 2014

All Door Boarding Title VI Service Fare Analysis. Appendix P.3

To provide the best possible service during the Thameslink construction work at London Bridge;

Réseau électrique métropolitain (REM)

DEMOGRAPHICS AND EXISTING SERVICE

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Chapter 3. Burke & Company

Service Change Plan Cowichan Valley Regional Transit System July 2018 Expansion. Prepared by

Toronto Pearson Master Plan Greater Toronto Airports Authority October 4, 2017

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

SCTA TRANSPORTATION DEVELOPMENT PLAN UPDATE DRAFT RECOMMENDATIONS

Transcription:

Region of Waterloo Transportation and Environmental Services Transit Services To: Chair Tom Galloway and Members of the Planning and Works Committee Date: File Code: T19-50 Subject: Transit Services ION Construction Detour Planning Recommendation: That the Regional Municipality of Waterloo approve the introduction of summer service hours on two GRT bus routes, the 7 Mainline and the 200 ixpress effective April 27 th, 2015 rather than June 22, 2015. Summary: This report outlines a plan to implement a temporary transit detour program to respond to the extensive road closures planned for downtown Kitchener and uptown Waterloo during the ION construction and recommends the summer service transit schedule be introduced two months earlier on two bus routes. The early start of summer service hours will create more flexibility to manage the service level that will be required while the detours are in place. It will also allow GRT staff to better assess what service level is required in September, better aligns with when GRT usually changes service and when staff are assigned through a sign up process to the various routes. This option may also generate some savings that can be used to improve service in the fall. Report: In reviewing the recently finalized schedule for ION construction and the number of road closures planned in downtown Kitchener and uptown Waterloo, it was determined that the impact on Route 7 - Mainline and Route 200 - ixpress, which both service the city centres, is expected to be significant. Combined these two routes have an average daily ridership of between 20 to 25 thousand customer trips, depending on the time of year. Doc# 1795962 Page 1 of 6

The following is a list of roads to be closed or partially closed during construction. King St between the Waterloo Spur and Francis St Charles St between Victoria St and Ottawa St Caroline St between Erb St and Allen St Duke St between Francis St and Frederick St Victoria St between Charles St and King St Frederick St between Charles St and Duke St Temporary Transit Detour Plan To preserve service reliability and provide route consistency to transit customers during construction, a detour plan was developed for each of these routes (Map 1&2 attached). These detour routes will remain in effect until these two routes can return to their regular routings following construction. Once operation of ION starts these routes will largely be replaced by ION but some local service will remain. The proposed detour routing for Route 7 Mainline is described below: Between the Charles St transit terminal and Uptown Waterloo, the proposed detour routing would use Joseph St, Victoria St, Park St, William St and Regina St, rather than Charles St, Gaukel St and King St. The proposed detour routing for Route 200 - ixpress is described below: Between Fairview Park Mall and Charles St transit terminal, the detour routing would use Weber St between Montgomery Rd and Frederick St rather than King St/Charles St with the existing routing. Between the Charles St transit terminal and Uptown Waterloo, the detour routing would use Water St, Weber St, and Bridgeport Rd or Erb St. in the reverse direction, rather than Charles St, Francis St and King St. The Route 7 - Mainline will continue to operate as a local service adjacent to its original routing on King St. The Route 200 - ixpress will continue to operate as an express route from the Ainslie St. terminal in Cambridge to the Conestoga Mall in Waterloo, but will experience the temporary relocation of three stops and the closing of one stop while on the Weber St. detour route as outlined below. The Charles/Ottawa stop will be temporarily relocated near Weber/Ottawa The King/Victoria stop will be temporarily relocated near Water/King The Grand River Hospital stop will temporarily be closed and service available on Route 7 on Park Street Uptown Waterloo will be temporarily located near King at Bridgeport/Erb Navigating through the detours will add distance and therefore more time to these two routes, this is in addition to the extra time needed to operate within slower traffic, which is also expected in the downtown areas during the construction period. Doc# 1795962 Page 2 of 6

Currently the peak period frequency of Route 7 is every 5 minutes between the Charles St. Terminal and King & University in Waterloo, with three extensions (7C, 7D, 7E), operating on a 15 minute frequency. Route 200 - ixpress operates on a 10 minute frequency all day. The frequency of these routes is based on GRT s current winter service schedule, which remains in effect until April 27 th, when the spring service schedule begins. GRT has varying levels of service throughout the year; fluctuating to meet ridership demand. The fall and winter service schedules are designed to accommodate the highest ridership demand and as a result operate at greater frequency to ensure there is enough capacity on the buses for all customers. Funding the Temporary Detour Plan At this time it is difficult to forecast travel times and the associated actual resource needs to maintain transit service quality during construction. Maintaining the current service frequency and rider capacity could require as much as 12,000 additional service hours in 2015 and 10,000 more hours in 2016, with an estimated additional cost of $1,068,700 and $855,000 respectively. This increase is caused by the longer route and potential traffic related delays. Capacity requirements also fluctuate throughout the year. Over the next couple of months staff will gain a much better understanding of the actual transit service hours needed to meet customer demand, since the road closures for ION construction are expected to commence in March 2015. The plan is to then maintain the winter service schedule by supplementing transit services with extra buses until the spring service schedule begins on April 27 th, 2015. Since GRT s current winter service schedule is the same as the fall schedule, staff can monitor ridership demands, service delays and missed transfer connections associated with the detours, to better determine the amount of extra service needed to meet the ridership demands for the fall service. An additional report will be presented to Regional Council in June 2015, to outline transit service needs for September 2015, and the associated costs and funding options. A plan has been developed to introduce the summer service schedule on the detour routes two months early on April 27 th, 2015. Starting summer service earlier provides additional flexibility to match service with demand by adding extra buses, if required and aligns better with GRT s bus drivers sign up process. With ridership generally starting to decline in late April / early May it is anticipated that the impact of the detours can be minimized. Starting summer service earlier also creates operating savings to assist with the additional cost to supplement transit services in the fall. This change will result in a reduction of 3,200 service hours which will translate into an estimated cost savings of $280,000. This service change will reduce the Route 7 frequency on the King St. corridor in the peak periods to 7 minutes rather than 5 minutes, and also translates into operating one of the three extensions (7D) on a 30 minute frequency instead of 15 minutes. The Route 200 - ixpress will operate on a 15 minute frequency instead of the current ten minute interval, which matches the summer service. Doc# 1795962 Page 3 of 6

Corporate Strategic Plan: Strategic Objective 5.3: Ensure Regional programs and services are efficient and effective and demonstrate accountability to the public. Financial Implications: The cost to implement the detour routes for Route 7- Mainline and Route 200 ixpress, based on the service frequency of the current winter service schedule, is estimated at $1,068,700. However, once ION construction begins in March 2015, staff will monitor the impacts of the detour routings on the winter service schedule and determine what extra service is needed to preserve service quality and capacity for transit customers. This approach will help to determine how much additional service is required to meet customer demand for the fall service schedule as well. A report will be presented to Regional Council in June 2015, to outline the transit service needs for September 2015, and the associated costs and funding options. Commencing summer service on April 27, 2015 is estimated to generate operating savings of $280,000. These savings would be used in the fall of 2015 to supplement Route 7 Mainline and 200 ixpress winter service as required. Other Department Consultations/Concurrence: Finance has been consulted in preparation of this report. Attachments Map 1 & Map 2 Proposed Detour Routes Prepared By: Eric Gillespie, Director, Transit Services Approved By: Thomas Schmidt, Commissioner, Transportation and Environmental Services Doc# 1795962 Page 4 of 6

Map 1: Proposed 200 ixpress Detour routing Doc# 1795962 Page 5 of 6

Map 2: Proposed Route 7 Detour Routing Doc# 1795962 Page 6 of 6