Space Based ADS-B. NSS 2018 AUCKLAND NZ Part 2 AIREON LLC PROPRIETARY INFORMATION

Similar documents
Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

IMPLEMENTATION OF ADS-B BY NAV CANADA

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Bits to Blocks Aviation System Block Upgrades (ASBU)

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

AFI Air Navigation Services Key Performance Indicators

TWELFTH AIR NAVIGATION CONFERENCE

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

THE EXECUTIVE REFERENCE GUIDE TO SPACE-BASED ADS-B

TWELFTH AIR NAVIGATION CONFERENCE

ATC Global 2014 EUROCONTROL WORKSHOP Towards GLOBAL ATFM 18 September Ken Mclean Director SFO IATA Singapore

INTERNATIONAL CIVIL AVIATION ORGANIZATION

TWELFTH AIR NAVIGATION CONFERENCE

Remarks of CANSO Director General, Jeff Poole, at the CANSO Asia-Pacific Conference, 5-7 May 2014

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

Coordinations mechanisms between ANSPs themselves and with States: case of ASECNA. ASECNA, May 2018

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

NORTH ATLANTIC VISION

ICAO Cyber Summit & Exhibition CLOSING REMARKS. 10 April 2017

Packaging Tomorrow s Aviation System

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

ICAO AS A CATALYST FOR THE IMPLEMENTATION OF A COMMON UPPER AIRSPACE IN THE AFRICAN REGION.

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Introduction of Aireon: Value extraction from technical opportunity

Welcome to AVI AFRIQUE 2017

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

TWELFTH AIR NAVIGATION CONFERENCE

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

Enhancing capacity beyond infrastrucutre

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

ICAO provisions on data link implementation

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

Asia/Pacific Air Traffic Management Perspectives

Information Paper 2 SUMMARY

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Russian Federation ATM modernization program

TWELFTH AIR NAVIGATION CONFERENCE

The evolving air navigation system and the impact on avionics

ASSEMBLY 39TH SESSION

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

Asia/Pacific SAR Plan

Performance Based Navigation (PBN) Implementation Plan. The Gambia

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

ATFM/CDM ICAO s Perspective

ORGANISER HOST LEAD SPONSOR

ICAO s Third Remotely Piloted Aircraft Systems (RPAS/3) Symposium Chengdu, Sichuan Province, China September 2018

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

2012 Performance Framework AFI

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Accra (Ghana) March SESSION 5 - Economy and airports management and navigation services

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

Aviation System Block Upgrades Module N B0-86/PIA-3

International Civil Aviation Organization. (Presented by the Arab Civil Aviation Commission- ACAC)

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

NOVEMBER 2014 UPDATE NAT ATS SURVELLANCE AIRSPACE PHASE 2 OF THE NORTH ATLANTIC REGIONAL DATA LINK MANDATE

NextGen and ASPIRE Environmental Initiatives

Asia Pacific Initiative to Reduce Emission. Brian Bagstad Senior ATO Representative, FAA

OVERVIEW OF ADS-B COST BENEFIT STUDY

Many Nations through Civil Aviation. China Civil Aviation Development Forum Beijing June 2015

CMATS The Civil Military ATM System

TWELFTH AIR NAVIGATION CONFERENCE

From local to regional to global ATFM

NAVISAT Middle East & Africa

ORGANISER HOST LEAD SPONSOR

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

AFI COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) TWENTIETH AFI PLAN STEERING COMMITTEE MEETING

Future ATM - from Asian operator's point of view

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

Certification Procedure

Air Transportation Optimization. Information Sharing for Global Benefits

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

Aeronautical Communications: Changes Ahead - FCI

TWELFTH AIR NAVIGATION CONFERENCE

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

ASBU IMPLEMENTATION. ASBU industry consideration. Date 16/08/2017. Edson Fagundes Gomes

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Myanmar s CNS/ATM Development Master Plan

(Strasbourg, France 10 July 2018) President of the European Civil Aviation Conference, Ms. Ingrid Cherfils,

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Air Traffic Management Services Plan

Transcription:

Space Based ADS-B NSS 2018 AUCKLAND NZ Part 2 1

2

3

4

5

Sydney Lord Howe Is and Norfolk Island (Oceanic) General aviation bottom antenna only at 10,000 feet 6

Data Services Agreement Summary NAV CANADA NATS (United Kingdom) Enav (Italy) IAA (Ireland) Naviair (Denmark) DC-ANSP (Curacao) Air Traffic Navigational Services Co. Ltd (South Africa) CAAS (Singapore) SCAA (Seychelles) ISAVIA (Iceland) ASECNA (AFRICA) 7

ICAO 8 AIREON AIREON LLC LLC PROPRIETARY INFORMATION

9 Consistent with ICAO GANP harmonization The Twelfth ICAO Air Navigation Conference held in 2012 endorsed the Aviation System Block Upgrades (ASBU) to provide a framework for global harmonization and Interoperability of seamless ATM systems. Among the Block Upgrades, the Block 0 module Initial Capability for Ground Surveillance recommends States to implement ADS-B which provides an economical alternative to acquire surveillance capabilities especially for areas where it is technically infeasible or commercially unviable to install radar 9 5/22/

ICAO Separation and Airspace Safety Panel Collision Risk Modeling Operational Trials Operations 10

Why space based ADS-B? 11 AIREON AIREON LLC LLC PROPRIETARY INFORMATION

Safety & Efficiency everywhere Safety everywhere Situational awareness Safety alerts (RAM,CLAM, STCA, DAIW, MSAW) FIR boundary safety Reduced voice & data communication/ workload GADSS / better SAR Increased safety expectations in traffic growth No additional avionics beyond existing ADS-B avionics requirements Efficiency improvements Reduced separation Removed stepped climbs Improved management in adverse weather Contingency backup unaffected by weather Improved flow management Reduction in FANS1A costs (Airline & ANSP) Reduced need for some radars (backup existing surveillance network) & reduced impact of terrestrial surveillance outages Low capital cost Service based 12

Declaration of Asia Pacific Ministerial Conference on Civil Aviation 31 January 2018 Beijing 2.0 Air Navigation Services 2.1 Commit to implementation the APAC Seamless ATM Plan in 2022 including; (a) Transitioning from (AIS) to (AIM) System; (b) Performance Based Navigation (PBN) implementation; (c) Common ground/ground telecommunication infrastructure to support ANS (d) An enhanced level of civil/military cooperation; (e) Enhanced surveillance including ADS-B technology; (f) ATFM/CDM implementation for high density airports; and (g) include air navigation in National Development Plans (NDPs) 13

SAR: Less Time on Search & Faster Rescue Common Jets in INDIAN OCEAN A320 A330 A340/B77W A388 cruise speed (knots) 427 475 482 488 PIREP (30min) 491,165 607,798 625,844 641,522 Potential search area (sq km) ADS-C (15min) 122,791 151,949 156,461 160,380 14 SB ADS-B (8sec) 9.7 12.0 AIREON 12.4 LLC PROPRIETARY INFORMATION 12.7

Summary Surveillance as a Service enables rapid deployment Global ADS-B coverage over oceans, remote and terrestrial airspace will be available to all ANSPs in 2018 An increasing number of ANSPs worldwide are preparing for integration of the Aireon signal into their Air Traffic Management (ATM) system Significant economic and safety benefits will be available to aviation stakeholders EASA Certification planned for 2018 Customers will be using AIREON data operationally in 2018 15

President ICAO Dr. Olumuyiwa Benard Aliu, to CANSO s Sixth World ATM Congress 2018 Space-based ADS-B holds the promise of eradicating nearly all surveillance transitions by serving as a truly global surveillance solution. It will largely redefine the way modern ATM functions, and deliver associated efficiency and emissions-reduction advantages...icao Member States now have the option to leapfrog current and legacy surveillance technologies, moving directly to a cost- effective space-based ADS-B capability..system-wide interoperability, a quicker transition to ATFM,.advantages expected in the areas of Search and Rescue (SAR) services. It will also generate cost efficiencies due to decreased reliance on more expensive and complicated ground-based legacy infrastructure. Furthermore, No Country is Left Behind in terms of being ICAO-compliant and fully prepared to optimize the benefits of 21st century sectoral growth, the wider and more rapid adoption of space-based ABS-B can play an important part in our ultimate success. 16

Space based ADS-B will be Operational this year Questions?