THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Similar documents
ORDINANCE NO. 510 THEREFORE, BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF BEL AIRE, KANSAS:

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

1.2 Corridor History and Current Characteristics

THE ALBERTA GAZETTE, SEPTEMBER

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

INVESTMENT SUMMARY. RESIDENTIAL COMMERCIAL ** *

Mission Statement. Spur 601 Project Highlights

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

CITY COUNCIL AGENDA MEMORANDUM

Clackamas County Development Agency

Chapter 2: Entire US287 Corridor

2016 Development Cost Charges (DCC) UPDATE

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

ACTION TRANSMITTAL

Transportation TRANSPORTATION PROJECTS

The Transportation Corridor Overlay District

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

THE STATE OF GRAYSLAKE

SECTION BOULDER COUNTY ROUTINE STREAM MANAGEMENT MASTER SCHEDULE

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

Existing Transportation Facilities

2 Construction Program

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

±100 Acres. FM 359 & Settegast Ranch Road Land For Sale. Randy Wilhelm

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

GSO Architects represented by Lisa Swift NE Collins & I-30 Partners, LLC., represented by Jay Grogan

MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

A Message from the Director

Fuller/Fuller Heights Road Improvements

Sundance Square. Liberty Hill, Texas 78642

INTRODUCTION TO RIFLE AIRPARK AND GARFIELD COUNTY AIRPORT INDUSTRIAL PARK PLANNED UNIT DEVELOPMENTS

Airport Planning Area

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

CHAPTER 3.0 PROJECT DESCRIPTION

Site Location and Setting

City of Grand Island Tuesday, December 12, 2017 Council Session

November 21, 2012 Barbara Kelleher, (954)

Palm Beach County Traffic Report July 13 through July 20, 2012

PROJECT UPDATES October 26, 2017

Community Development Department Council Chambers, 7:30 PM, December 20, 2012

SOUTH INTERCHANGE AREA

CAPITAL IMPROVEMENT PLAN

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

ALTA/ACSM LAND TITLE SURVEY Parts of Augusta Heights, First Section (Plat Book 20, Page 5), Augusta Heights, Second Section (Plat Book 19, Page 25),

Lawrence Loop SWOT Analysis

Williamsburg Town Hall Meeting

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

ELECTION SIGN GUIDELINES

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

COMPANY INFORMATION DATA

Town of Rocky Mountain House

Wichita Falls MPO - MTP Project List 1 of 6

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

Northeast Quadrant Distinctive Features

COUNCIL REPORT Meeting Date: December 10, 2013

Welcome to Dayton Parkway Interchange Open House. November 26, 2018

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

DEVELOPMENT PLAN REVIEW PROCESS and APPLICANT GUIDELINES

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Capital Improvement Program Fiscal Year

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

EXECUTIVE SUMMARY FALL Introduction. Findings

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

FISCHLER PROPERTY COMPANY LLC 1605 HENDRY STREET FORT MYERS, FL

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

AGENCY NAME TRANSPORTATION

Florida Department of Transportation MIKE DEW SECRETARY

Penny for Pasco Renewal. FY2014/15 thru FY2024/25

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Progress Report for Projects of Regional Significance

Just to keep you informed, as of May 12, 2017, here is a brief synopsis of things being worked on/or accomplished in your City.

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

Completion: August 2011 LS #321 Design LS #8

Non-Motorized Transportation

IN THE CHANCERY COURT OF LAMAR COUNTY, MISSISSIPPI CIVIL ACTION NO.: CITY OF HATTIESBURG, MISSISSIPPI

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

SADDLE CREEK ENTRANCE (PRIVACY) GATE OPERATING AGREEMENT BETWEEN SADDLE CREEK COMMUNITY SERVICES DISTRICT AND CASTLE & COOKE CALIFORNIA, INC

Table of Contents TABLE OF CONTENTS. HOW THIS BY-LAW WORKS... i PART 1 - ADMINISTRATION, INTERPRETATION, ENFORCEMENT, AND DEFINITIONS

Fort Myers Downtown & Riverfront Redevelopment

PROJECT UPDATES: November 22, 2017

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Napa County Planning Commission Board Agenda Letter

CHAPTER 4: ALTERNATIVES

Springettsbury Township. Road Improvement Projects

Open Space and Mountain Parks (OSMP) Department

New Jersey Department of Transportation

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

University Region Non-Motorized Plan 2015

Resolution Ordinance Motion Discussion Only

Transcription:

THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015

INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate three-mile area surrounding the existing municipal limits of the Town. In accordance with Section 31-12-105(e), C.R.S., this plan is intended to serve as a general guide for consideration of future annexations to the Town. LAND USE The Three Mile Plan Land Use Map illustrates the existing corporate boundaries of the Town of Superior and the Town's Comprehensive Planning Area. The proposed land uses have been designated as Residential, Non-Residential Use (Commercial/Office/Retail/Light Industrial), Open Space (Developed and Natural), Mixed Use Including Residential, and Agricultural/Undesignated. The uses shown on the attached map approximate the Community Framework and Land Use Plan map in the Town of Superior Comprehensive Plan. The Comprehensive Plan should be referred to for detailed land use designations for the Town. SUPERIOR COMPREHENSIVE PLANNING AREA The land contained within the Comprehensive Plan Area Boundary is either incorporated into the Town of Superior or considered for future annexation. Some of these lands have been purchased by the Town, the City of Boulder, and Boulder County for open space. The Town prepared a Comprehensive Plan in 1989 and an update was completed in 1996. The plan was updated again and completed in 2001, and updated again in early 2006. The most recent update was completed in 2012. MUNICIPAL STREETS AND UTILITIES Streets - The following is discussion of the major existing and proposed roadways. U.S. 36 borders the Town of Superior to the north, separating the Town from the City of Louisville, except for a small portion of Louisville south of U.S. 36 to the west of Superior, where Louisville s water treatment plant is located. Access to the U.S. 36 frontage road, which is State Highway 170 (Marshall Road), and the existing Town of Superior is by way of the interchange at McCaslin Boulevard and US 36. First Phase improvements to the US- 36/McCaslin Boulevard Interchange and RTD park-n-ride were completed in 2006. Improvements included a new southwest loop and a RTD pedestrian bridge for the park-n-ride. Construction is currently underway on additional improvements to the Interchange, which will include a new Diverging Diamond Interchange and new McCaslin underpass. McCaslin Boulevard is the major north-south link between State Highway 128 (120th Avenue) and U.S. 36. Currently, the road is a major arterial financed and maintained from U.S. 36 to SH. 128 by the Town of Superior. During 2002, the Superior Metropolitan District (SMD) No. 2 transferred responsibility for this road to the Town. In 2009, a roundabout was constructed at the intersection of McCaslin Boulevard and Coalton Road. Rock Creek Parkway is a major east-west link between McCaslin Boulevard and Coalton Road. In 2005, a roundabout was constructed at the intersection of Rock Creek Parkway and 88 th St. Another major east-west link is Coalton Road, which links McCaslin Boulevard and Summit Boulevard/W. Flatiron Crossing Drive. West of McCaslin Boulevard, Coal Creek Drive is the main entrance to the Original Town of Superior. Coal Creek Drive is an existing two-lane asphalt street. Improvements to Coal Creek Drive were completed in 2006 and included: 2

underground utilities, constructing curb and gutter, traffic calming devices and installing streetscape improvements along this street. Improvements will be completed in 2015 to reconstruct Coal Creek Dr at the Coal Creek Crossing PD to include curb, gutter and sidewalks. The paved portion of Coal Creek Drive extends past County Road No. 25 (S. 76 th Street), approximately 3/4 mile to the west of McCaslin Boulevard. Other residential areas in Original Superior had pavement and drainage systems installed in 1994. In 2008 the Town completed drainage improvements to Second Avenue, Third Avenue, Depot Street and Douglas Street located in Original Superior, which included curb and gutter. The remaining streets in Original Superior do not have curb and gutter but do have concrete drainage pans. S. 76th Street is an existing two-lane asphalt roadway contained within a 60 ft. dedicated right-of-way. The road is approximately 1/2 mile long and connects Coal Creek Drive to Marshall Road. Currently, the western half of the southern portion of the road has been reconstructed to accommodate the Sagamore PD and the eastern-half of the northern portions have been reconstructed to accommodate the Superior Marketplace PD. Marshall Road, is an existing two-lane asphalt roadway within an 80 ft. dedicated right-of-way. Upon leaving the Town boundary and traveling to the west, the road parallels U.S. 36 for one mile to the northwest. From there, the road diverges from U.S. 36 toward the Boulder Valley Open Space and the Village of Marshall. Within the Town s boundary, Marshall Road has been realigned through the Superior Marketplace development and expanded to four travel lanes with additional turn lanes at the various intersections with access streets to the Superior Marketplace. In 1999, a new intersection was completed on the eastern terminus of Marshall Road with McCaslin Boulevard. All of the streets in the Town are now maintained by the Town rather than special districts. The Town of Superior may utilize improvement districts in the future to fund and maintain additional public street improvements. Current examples include the funding of public improvements in the Superior Marketplace and for the U.S. 36/McCaslin Boulevard highway interchange. First Phase improvements to the US 36/McCaslin Boulevard interchange were completed in 2006. Construction is underway on additional improvements, which will include a new Diverging Diamond Interchange and new McCaslin underpass. Future requests for annexations into the Town must address road maintenance and improvement concerns. MUNICIPAL SERVICES Water - Water is supplied to the Town through Windy Gap water agreements and though the Colorado Big Thompson water shares purchased by the Town in 2002 by Superior Metropolitan District No. 1. The leadership of this district was transferred to the Town Board during 2000. The supply system is installed and currently maintained by Superior Metropolitan District No. 1. Final expansion of the water treatment plant was completed in 2000. Sanitary Sewer - A wastewater treatment facility is located on the southeast side of Superior and serves the entire Town. This system was constructed and is maintained by Superior Metropolitan District No. 1. Original Superior was originally connected to the City of Louisville s wastewater system but is now served by Superior Metropolitan District No. 1 via a force main to the treatment plant. The lift station and force main were completed in 1998. The sewer plant expansion was completed in early 2001. Storm Sewer - Drainage improvements, primarily roadside asphalt pans with concrete trickle channels, were constructed in Original Superior in 1994. Additional storm sewer improvements were made to Coal Creek Drive in 2006, and to Depot Street, Douglas Street, Second Avenue and Third Avenue in 2008. Storm sewers for the Rock Creek Ranch Development are constructed and maintained by Superior Metropolitan District No.1 in accordance 3

with the Rock Creek Master Drainage Plan. The Town has developed a Master Drainage Plan for the Coal Creek Basin, which was approved in 2001. The Town adopted the WASH Program in December 2004. Storm sewer systems for all developments are constructed per the Superior Metropolitan District No. 1 Rules and Regulations and maintained by Superior Metropolitan District No. 1. Electricity and Natural Gas Xcel Energy Company of Colorado currently supplies and will continue to supply electricity and natural gas to the Town. Telephone - Telephone and wireless telephone service is available in Superior from various metropolitan providers. Cable TV - Cable TV service is provided to the Town by Comcast pursuant to a franchise agreement with the Town. Waste Management - Trash and recycling services are provided by the Town through a private contractor for Original Superior, and the Ridge, Calmante, and Sagamore Subdivisions. Trash service for the Rock Creek, Summit, Horizons, and Saddlebrooke subdivisions is provided by private contractor who is hired by the Home Owners Association of the subdivision. Public Safety - The Town has contracted with the Boulder County Sheriff's Office to provide law enforcement services. A law enforcement substation is located in town. Rocky Mountain Fire is responsible for fire, emergency medical, rescue and fire protection services for the Superior area. Rocky Mountain Fire follows adopted standards for the numbers and locations of fire stations and will work with the Town in planning future facilities to correspond with development activities. Station No. 3 is located on Coal Creek Drive in Original Superior. A second station (Station No. 5) is located just south of the intersection of Coalton Road and Indiana Street. Rocky Mountain Fire completed an expansion of Station No. 5 in 2012. Schools - Superior is served by Boulder Valley RE-2 School District. Superior Elementary was constructed in 1996 and is located on north Indiana Street. Eldorado K-8 was constructed in 2000 and is located on south Indiana Street and Sopris Parkway. Monarch High School serves Superior and Louisville and is located in Louisville off of 88 th Street approximately two miles from the Superior Town Hall. Monarch High School opened in the fall of 1998. Hospitals - The nearest hospital, Avista Hospital, is located on the north side of U.S. 36 on 88th Street in Louisville, approximately one and half miles from the Superior Town Hall. This facility has full health and emergency care services for residents in both communities. Special Districts - It has been the goal of the Town to eventually transfer existing SMD No. 2 and No. 3 leadership and responsibility to the Town government. This was completed in November, 2003 by popular vote. The previous SMD No. 2 and No. 3 have now been dissolved except for debt service responsibilities. All of SMD No. 2 and No. 3 responsibilities were consolidated and are now directed by the Town Board. Superior is served by and/or has formed the following special districts: 1. Boulder Valley RE-2 School District 2. Urban Drainage and Flood Control District 3. Regional Transportation District 4

4. Rocky Mountain Fire District 5. Superior Metropolitan District No. 1 6. Superior Metropolitan Districts No. 2 & No. 3 (debt service only) 7. Northern Colorado Water Conservatory District 8. Scientific and Cultural Facilities District 9. Superior/McCaslin Interchange District 10. STC Metropolitan District No. 1 11. STC Metropolitan District No. 2 12. STC Metropolitan District No. 3 As specific annexation and development activities occur, provision of services by the above listed districts will be addressed. 5