JOHNSTOWN AREA PUBLIC SERVICE COORDINATION MEETING September 22, 2004; 11:30 a.m.

Similar documents
Johnstown Area Public Service Coordination Meeting December 16, 2010


Bedford County 2015 Construction Projects

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

MEMORANDUM VILLAGE OF NORTHBROOK

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

Projected Advertisement Date

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION

Recycling Technical Assistance Project # 581. Cambria County. Recycling System Routing FINAL REPORT

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

FORKS TOWNSHIP PLANNING COMMISSION

FIRE Equipment Fire Training Equipment 105, , Total of Equipment 105, ,

Teltow Contracting, Inc.

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE

July 5, Re: Contract ID Plan, & Proposal July 11, 2017 Letting. The Contractor is hereby advised of modifications to the bid documents.

TENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Blount County

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

CHARTIERS TOWNSHIP BOARD OF SUPERVISORS August 2, 2011

Delaware County Engineer

Second Street Improvements Project Project Update Archive

Springettsbury Township. Road Improvement Projects

WINDSOR TOWNSHIP BOARD OF SUPERVISORS November 19, 2018

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum:

Palm Beach County Traffic Report July 13 through July 20, 2012

PROJECT UPDATES: March 15, th Street Water Tower Painting Project:

PROJECT UPDATES February 1, 2018

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Fiscal Year 2015 Council Budget Tour

CHICAGO DEPARTMENT OF AVIATION. Current Construction Projects AND THE O HARE MODERNIZATION PROGRAM. May 2, 2014

CITY OF BROOKFIELD Capital Improvement Fund Budget

Guide to. Road Construction Projects

SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Fort Wayne/Allen County Trails Program

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

MINUTES. Upper Saucon Township Board of Supervisors. Regular Meeting Monday, November 10, :30 P.M. Township Municipal Building

Long water shutdown scheduled for Tuesday, September 18

Ohio Department of Transportation Construction Update

Additional Economic Development Strategy submissions- Klickitat County

2 Construction Program

MANHEIM TOWNSHIP PLANNING COMMISSION MINUTES Wednesday September 19, 2007

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

COMPANY INFORMATION DATA

BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION

NORTH STRABANE TOWNSHIP ZONING HEARING BOARD **MINUTES** July 6, 2016

Mason Street Bike/Pedestrian Trail Project

TMACOG Consistency Review Log ========================== 08/07/2018

Culpeper District. Albemarle County Monthly Report December 2011

EAST COCALICO TOWNSHIP BOARD OF SUPERVISORS MEETING AGENDA

Before the meeting began, Chairwoman Cipriani thanked all our veterans mentioning Mayor Herbert and Dan Grescavage for their service.

CUY LAKE TO LAKES TRAIL (PHASE 2): PID

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

RIVERBEND REGION CAPITAL INVESTMENTS

Capital Improvement Program Fiscal Year

SMYRNA MUNICIPAL PLANNING COMMISSION MEETING MINUTES

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

ALDAN BOROUGH, DELAWARE COUNTY, PENNSYLVANIA. May 9, 2012

Capital Improvement Plan

CITY COUNCIL AGENDA MEMORANDUM

TAMAQUA AREA SCHOOL DISTRICT BUS SCHEDULE TRANSPORTATION DEPARTMENT ext 1000

2017 Armstrong County Outreach

State Route 8 Corridor. Northern Summit County s Path to Success

Additional Fee Free ATM Locations For Elliott Federal Credit Union Members (1 st Commonwealth Bank) Locations for Westmoreland County

VILLAGE OF FONTANA ON GENEVA LAKE WALWORTH COUNTY, WISCONSIN. Monthly Meeting of the Public Works Committee Friday, July 24, 2015

"This is the catalyst we've been waiting for," Norristown Planning Director Jayne Musonye said of the project.

CAPITAL IMPROVEMENT PLAN FOR THE FIVE YEAR PERIOD ENDING JUNE 30, 2023 ALLOCATION OF RESOURCES. Cash - General Fund Transfer Total

2014 Project Update. PennDOT District 2-0 Karen Michael

Tenders. Manitoba Infrastructure

Completion: August 2011 LS #321 Design LS #8

Community Facilities ADA Door & Restroom Retrofits at Various Facilities - Phase I

Town of Cary Capital Listing

CITY OF NAMPA, Department of Building Safety Permit Activity Type Report

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

COUNTY OF LOS ANGELES

Cherrytree Township Board of Supervisors Regular Monthly Meeting March 6, 2017

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

Transportation TRANSPORTATION PROJECTS

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

N. Central St. & W. Jackson Ave. Streetscape Projects

November 21, 2012 Barbara Kelleher, (954)

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

PROJECT UPDATES October 26, 2017

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

Whittier Bridge Project

BOROUGH OF GLENOLDEN GLENOLDEN, PENNSYLVANIA

M I N U T E S OKLAHOMA COUNTY PLANNING COMMISSION

City of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020

PennDOT Interstate Work next week March 30-April 3:

2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

PUBLIC INFORMATION SESSION #2

Logansport Cass County Aviation Authority Meeting Minutes July 9 th, 2003 Board Meeting

Construction Update. Local Officials Briefing March 2016

June 2013: Capital Improvements Update. through $ 126,196,202 Available Funding through 2018 $ 149,783,656. Staff s Recommendation

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

FY Transportation Improvement Program Basic Project List (in Thousands)

PROJECT UPDATES: November 22, 2017

PennDOT MAJOR ROAD PROJECTS

Transcription:

JOHNSTOWN AREA PUBLIC SERVICE COORDINATION MEETING September 22, 2004; 11:30 a.m. President: Len Hillegas Vice President: Bob Thomas Treasurer: Pat Replogle Secretary: Leslie Quinn Treasurer s Report: Current Balance $55.50 ATTENDANCE: Neil Sivic, Forest Hills/Adams Township Municipal Authority Steve Tatrai, PA One Call Pete Hohrun, H.F. Lenz Leslie Quinn Byrnes, PennDOT Keith Gardner, Penelec Pat Replogle, L. Robert Kimball & Assoc Mark Walker, Richland Township Edward Olshefski, Penelec Len Hillegas, Atlantic Broadband COPY TO: Dean Rumsey, Verizon Terry Zerfouss, Southwest Central Rural Electric Co-op Bob Thomas, Dominion Peoples Jerry Adams, Charter Communications Karl Smith, Jackson Township Water Authority Darby Sprincz, City of Johnstown Denny Devlin, Dominion Peoples Tim Lentz, Laurel Management Co. Jim Leap, Southwest Central Rural Electric Co-op William Ickes, Adelphia Communications Rian Barker, Richland Township George Beyer, Highland Sewer and Water Authority Scott Mulhollen, Highland Sewer and Water Authority Dennis Mash, Windber Area Authority Frank Hauser, Geistown Boro Meeting called to order at 3:00 p.m. by Treasurer Pat Replogle, motion made to accept the minutes of the previous meeting as presented. Motion carried.. Adelphia Communications (Not Represented) Atlantic Broadband Len Hillegas

2 1. Replacing 400 of underground feeder on Bassett Lane, Middle Taylor Twp. 2. Design in progress for American Red Cross. Jari Drive 3. Aquiring permit for well and holding tank for master head end on Wertz Road, Stoney Creek Twp. 1. SR 0022 Project: Process of engineering and design for the project. 2. Covered bridge road Ext. design and permits in process to place 10 poles from Weber road to Govier lane. Permits approved, under construction. 3. Cumberland to Johnstown interconnect back on plate Conemaugh Township Municipal Authority (Not represented) Dominion Peoples (Not represented) 1. Osborne Street/ Boyd Avenue intersection Boyd completed. Awaiting railroad permit for Osborne work. 2. Goucher Street PennDot relocation. Contractor bid meeting on 5/27. Work to begin late June. Replace 1200 feet of 10 inch plastic. 3. Harshberger Street PennDot relocation S & C pipeline to begin in late June. 4. Menoher Blvd. Replace 1200 feet of 4 inch steel due to leakage. All mainline in ground. Service work to be completed in near future. 5. Hystore Ave Replace 1400 feet of 4 inch steel due to leakage. All mainline in ground. Service work to be completed by end of May. 6. Dowling Road Replace 1000 feet of 2 inch steel from Cherry Lane to Evelid Ave due to leaks. Work to begin early July. 7. Metzler St Replace 600 feet of steel due to leaks. Work to begin Mid July. 8. SR 22/ Dishong Mt Road intersection Relocate 2 transmission lines due to Penndot construction. Work to begin first week of June. 1. Elton Road Relocation West side of 219 completed. East side completed by June 7. 2. Richland Towne Center Install 1370 ft of 4 inch main to serve new construction. 900 ft in ground and tied-in. Cinema only service connected. Remainder of pipe to be installed in near future as scheduled by developer. Forest Hills/Adams Township Municipal Authority Neil Sivic

3 1. Elton Heights Sanitary Sewers. Bids opened. Contract to be awarded April 9, 2002. Lumadue Contract redevelopment Authority, Cambria County. Pump station Greenland Construction. Taps to be released. 2. Mine 42 Sanitary Sewer Rebuild; Pennvest is awarding financing. On Hold. 1. WWTP/PS In Operation. Geistown Boro (Not represented) 1. DEP Storm Water Control Project- On Hold 1. Heinze Building Project One Unit complete, Streets and Utilities complete-working on second unit. 2. Street Resurfacing 2004-$47,400 project. H.F. Lenz Pete Hohrun 1. Advanced Auto Parts Scalp Avenue (Taco Bell Building) Pending approval by Richland Township & PennDOT Construction 2005 2. City of Johnstown Paving schedule See Attached sheet 1. Advanced Auto Parts Broad Street - Under Design Construction Spring 2005 2. Conemaugh Health Systems Franklin Street Behind Good Samaritan new boiler plant and utility tunnel (tunnel to extend under Osborne Street to the new emergency room) Under Design On Hold 3. United Cerebral Palsy Jari Park Under Construction 4. Upper Yoder Township Goucher St Wheel and Walkway On Hold Township wants study to determine if Goucher is best location Under Study. 5. Baumer Street Storm Sewer Relocation Airco Redesign On Hold 6. Oakridge Drive Widening of Intersections: Galleria & Oakridge - Complete, Jari & Oakridge Design Complete, Construction 2005. 7. American Red Cross Jari Drive Under Construction 8. Army Corp of Engineers Transient Quarters Johnstown Aviation Facility Under Construction. 9. Team Motors Scalp Ave. New Building Construction Spring 2004 10. PA National Guard Maintenance Shop Airport Road. Under Construction 11. Jackson Township Water Authority Relocate Waterline for S.R. 0022 PennDOT Construction Design Complete Under Construction 12. Sanitary sewer improvements- 900 Block of Franklin St.- Under design. On Hold

4 13. Elton Road Waterline relocation - Under Construction. 14. Clinton St. Enhancement Curbs, Sidewalks, Traffic Lane Upgrade Construction 2005. Highland Sewer & Water Authority (Not represented) 1. Repairing Water Main at 118 Vivian Drive on 4/17/03 2. Repairing Water Main at 128 Hoffman Drive on 4/24/03 3. Installing new water service connection at 76 Grove Street in Sidman 4/25/03 4. Next Project will be the replacement of water main on Coldren Street and Woodside Avenue in Richland Twp 5. Creslo Construction will be working on small water system improvements. Tenative construction date is May 5, 2003. Starting in Lilly first. 1. Coulter St./Dunlo Relocating approx. 100 ft of 3 inch water main and one service. Construction to begin 4/28/03 2. Eisenhower Blvd. Pressure Reducing Valve: Construction to begin 4/23/03 3. Arbutus Village replacing 4 meter pits to be scheduled 4. Fifficktown Hill/South Fork Borough Replacing approx 400 ft of 1 inch water main with 2 inch water main and relocating three water services to be scheduled Jackson Township Water Authority (Not represented) 1. In conjunction with Cambria Redevelopment Authority, 8 inch waterline through private near Solar Rd. off of Pike Road. 90 % Complete. 2. New Consultant Engineer is Gwinn Dobson & Foreman 1. Bid Opening on April 10, 5R Exc. Inc. was low bidder. Start date June 1 st 1400 ft of 8 inch pvc, 2 hydrants and 6 service connections. City of Johnstown (Not represented) 1. Vine Street between Walnut and Market will change from one-way to two-ways as soon as weather breaks. On Hold, in court system. 1. Curb cuts Various locations - Will resume in Spring

5 2. Replace catch basins on Horner Complete,Bedford 60-80 Construction to resume in Spring L. Robert Kimball & Associates, Inc. Pat Replogle 1. S.R. 0022, Indiana County line to Mundy s Corner Awarded to NES&L 2. S.R. 0022, Section 495, S.R. 0403 to Cambria County line Gas Center Under Construction 3. Northern Altoona Access, Juniata to Pinecroft Interchange Preliminary engineering Utility Coordination not started Design One Call made 4. West End Bypass Preliminary engineering Utility Coordination in early phase Laurel Management Co./Greater Johnstown Water Auth. (Not represented) 1. Johnstown Water Authority will award bids for water line replacement on Woodmont Road and Amherst Road. Project awarded 2. Johnstown Water Authority will award bids for water line replacement on Fender Lane and Meadow Drive. Bid retracted by contractor 1. Hershberger and Goucher for PennDOT PA One Call Steve Tatrai 1. PA One Call Tickets.02$ price reduction. Penelec, A First Energy Company Ed Olshefski, Keith Gardner 1. Conemaugh Industrial Park Old Sani-dairy location. Preliminary Engineering 2. Conemaugh Township, Tire Hill Sanitary Sewer System, 3 sites, Preliminary Engineering. Project to be completed late 2005. 3. Basic Engineers, Jari Drive, Industrial Park. Preliminary Engineering. 4. United Cerebral Palsy, Jari Drive, Industrial Park, Preliminary Engineering. 1. Airport Surveillance Radar Unit Fox Run Road 3 phase primary underground line extension. Engineering done, released to Construction.

6 2. American Red Cross Jari Drive Preliminary Engineering. Engineering done, released to construction. 3. Harshberger and Goucher Roadway realignment Engineering complete. Received authorization to proceed. Released to construction. 4. Theatre Drive Underground to overhead relocation of the 23 kv Gallikers circuit along the former Richland Mall property. Work will involve extending the overhead line from the new Walmart service to Elton Road and eliminating the underground electric line along Theatre Drive. Approximately 1000 ft. Engineering complete, released to construction. PennDOT Leslie Quinn Byrnes 1. Walnut Street Bridge October 2005 let. 2. S.R. 0022 Indiana County to Mundy s Corner Awarded to New Enterprise. Utiltiy work in progress. Next partnering meeting Friday October 29 th at 10:00 am at job trailer.. 3. Clinton Street Enhancement Utility Clearance completed. Construction should start Spring 2005. 4. SR 3007/3002 Intersection Harshberger and Sunray Not yet awarded to CH & D, spring 2005 start. Richland Township Mark Walker 1. New subdivision/development Elton Road Conemaugh Project 2. New subdivision off Eisenhower or Krings area. 3. Leventry Road 25 Lot residential subdivision. 4. Jari Drive New Bldg Basic PSA 1. Parker Woods Subdivision - Residential subdivision off Parker Road 54 lots, Phase I, 17 building lots Construction underway 2. Richland Town Centre Richland Mall Cinemas completed, WalMart permit issued. 3. TVM Products/Garnell Industries New Facility on Jari Drive next to Burley s Under Construction. 4. Industrial Park Road Widening/improvements from Verizon to Elton Road 5. Donald Lane Widening from Industrial Park Rd. to UPS 6. Industrial Park Road extension from Elton Road to tie into Votech Drive 7. Arrow Concrete New ready mix plant Solomon Run Road near asphalt plant. Near completion

7 8. Marines Reserves residential barracks Transient Quarters Near Heliports Construction underway. 9. PA National Guard Vehicle Maintenance Facility Airport Road Plans approved Construction underway. 10. Tractor Supply Company Galleria out-parcel Construction Underway. 11. American Red Cross Jari Drive Permit issued 12. United Cerebal Palsy Jari Drive Grading permit approved South West REA (Not represented) 1. S.R. 0022 Pole Relocation with Verizon 2. Airport Road from Birtel Road through runway to Lowes Verizon (Not represented) 1. Cable to Theatre and Wallmart Heritage development to look at AT&T to place cable and building terms. Heritage back to Verizon. One separate feed to Walmart underground. One feed to town center near cinema, underground. One feed to Buchanan St. Strip Mall Aerial with Penelec. One feed to old Michaels and Chilis. Aerial cross Elton 2. Cable to American Red Cross and UCPO via underground near intersection of Ind pike road and Oakridge, possible feed from Jari Drive to Conemaugh Hosp Tech Pk. 3. Radar site Johnstown municipal Airport by feed off of Fox Run Rd in Eng. 1. Thomason Defective pole replacement program ongoing 2. S.R. 0022-Eng. & Order issued for Cambria County Side to Construction, Indiana County in Construction, Cambria County out to construction. Rte 22 orders all issued. Construction underway. 3. Parkerwood Development - In Construction Windber Area Authority (Not represented) 1. Construction of Lower Sewer Interceptor to Ingleside STP Under Design, Construction in 2004 2. Construction of Upper Sewer Interceptor to be completed in Spring of 2005 Next meeting will be held on Wednesday October 20 th 2004, 11:30am at Brainstormers at the Johnstown Airport.