High Speed UK. Regional Mapping covering the East and West Midlands

Similar documents
High Speed UK. Regional Mapping covering the Northern Powerhouse Region

A5209. Bolton Standish. Ormskirk Skelmersdale. Wigan A58. Kirkby A58. St Helens Bootle A580 A57 M62. Sale. Warrington Widnes. Altrincham.

Central Retail Park Manchester, M4 6DL

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

M6 Toll West Midlands Regional Map

Emerging Strategy. Executive Summary November Midlands Connect Powering the Midlands Engine

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: (extract from HS2 High Speed to Nowhere)

Midlands Connect Strategy: Powering the Midlands Engine

A New Era for West Midlands Rail Travel

CONTRACTS EXCHANGED WITH STAFFORD RIVERSIDE

Campaigning by the Railway Development Society Ltd.

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: MANCHESTER AIRPORT. (extract from HS2 High Speed to Nowhere)

Department for Transport

Driving a Revolution in Rail Services for West Midlanders

Chapter 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

Doncaster Chamber of Commerce. Andy Taylor Head of Public Affairs, HS2 Ltd

space+ location Derby Commercial Park Raynesway, Derby, East Midlands Over 2 million sq ft of multi-use space

West Midlands Rail Vision

West Midlands and Domestic Tourism

West Midlands & Chilterns Route Study Technical Appendices

Appendix 8. Capacity and Service Disbenefits. Prepared by Christopher Stokes

AVRO MANCHESTER AIRPORT OFFICE SUITES TO LET FROM 200 2,500 SQ FT FOR 2 25 PERSONS

Delivering the High Speed Network the Nation Needs

CONNECTIVITY IMPROVEMENTS ACHIEVED BY HS2 AND HIGH SPEED UK FOR: and Merseyside conurbation. (extract from HS2 High Speed to Nowhere)

Design and Build Industrial Warehouse Opportunities

Design and Build. New Industrial Warehouse Opportunities. Up to 1 million sq ft (92,903 sq m)

Burton Place Shopping Centre

BENTLEY MILL WAY WALSALL WS2 0LE. Prominent retail investment with annual fixed rental uplifts

This report, and information or advice which it contains, is prov ded by MVA Consultancy Ltd solely for internal use and reliance by ts Client in

WCML Service Plans. The Purpose, Background and Method

Don t stress over. 20 July 25 August. Pick up this leaflet for all the information you need to travel during the re-signalling works

Department for Transport (DfT) Response to the Recommendations of Passenger Focus for the New Cross Country Rail Franchise.

RAPIDA102 AVAILABLE Q FOR SALE / TO LET NEW SPECULATIVE INDUSTRIAL/WAREHOUSE UNIT 102,750 SQ. FT. (9,546 SQ. M.)

HS2 and Classic Service Plans

West Midlands & Chilterns Route Study Advice and choices for funders

Phase II provides a further 45 acres for industrial and distribution space (B1/B2/B8); 25,000 sq ft 850,000 sq ft

Autumn 2017 Customer Report

CHRONOLOGICAL LIST OF THE RAILWAYS OF CHESHIRE,

Lyons 135. Lyons Park, Coventry, West Midlands CV5 9DQ. 135,000 sq ft. A new speculatively developed industrial/ warehouse unit to let

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

Spring 2017 Customer Report

Manchester to Stoke-on-Trent via Macclesfield. Stockport. Cheadle Hulme. Bramhall. Poynton. Adlington. Prestbury. Macclesfield. Congleton.

LYONS 135 COVENTRY AVAILABLE NOW. A new speculative development. 135,048 sq ft industrial warehouse unit. 12.5m haunch height & 72m yard depth (max)

Bus Service Changes. Changes to Local Bus Service Registrations within the West Midlands. Produced by the Network Delivery Team

CfR Campaign for Rail

East Midlands. Route Utilisation Strategy. February 2010

BIRMINGHAM. Design and build opportunities available for offices, industrial and warehousing. birmingham business park

MODERN TOWN CENTRE LEISURE SCHEME The Basin, 4 Bridge Street, Loughborough, LE11 1NQ

The Hybrid Bill and the journey to Royal Assent. Andy Taylor Head of Public Affairs, HS2 Ltd

Autumn 2018 Customer Report

National Passenger Survey TOC Report for East Midlands Trains Spring 2011

HIGH SPEED RAIL: INVESTING IN BRITAIN S FUTURE

High Speed Rail Connected to our Regions

Spring 2018 Customer Report

Staffordshire Pharmacy Opening Times Christmas and New Year 2014/15 Bank Holidays

Contents. Executive Summary Introduction A regular interval timetable for the West Coast Main Line (south) 8. 3.

550,270 sq ft TO LET AVAILABLE Q1 2019

West Coast Main Line W e s t C o a s t M a in L ineprogressreportmay2006 Progress Report May 2006

High Speed Two: From Crewe to Manchester, the West Midlands to Leeds and beyond

CABINET 1 MARCH 2016 DEVELOPMENT OF A RAIL STRATEGY FOR LEICESTER AND LEICESTERSHIRE REPORT OF THE DIRECTOR OF ENVIRONMENT AND TRANSPORT PART A

Midlands Connect Objectives for Improved Transport Connectivity

SAT NAV: NG17 1JF Entrance to Pinxton Lane off Alfreton Road (A38)

West Midlands Regional Transport Priorities Action Plan. Progress Report

MANTON WOOD FOR SALE / TO LET FROM 200,000-1,000,000 SQ FT A 63 ACRE DESIGN & BUILD INDUSTRIAL / DISTRIBUTION DEVELOPMENT

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

South Staffordshire Integrated Transport Strategy

#THECITY# #DOANDSEE# Make your trip start at home

CORPORATION STREET, COVENTRY. Another prestigious development by Award Winning Developer 1/7

East Midlands and Domestic Tourism

Bus Service Changes. Service withdrawn by this Operator. Service withdrawn by this Operator

Contractor VIKING Swadlincote, Bus Station BURTON UPON-TRENT, Town Hall bus stop on Waterloo

Have your say Proposed changes to how we support passenger transport services in Leicestershire

premium prime attractive accessible

Derby Commercial Park

Derby Commercial Park

High-Speed Rail Development Programme 2008/9

The resignalling scheme

PRIME RETAIL INVESTMENT

Modern Business Park Office Investment Opportunity

North West smart motorways 100 miles of extra lanes

Scotland, The North East & Manchester to The South West & South Coast

Jim Steer. Director Greengauge 21. HS2 and the North. Transport Times Conference. October October 2016 Transport Times, London 1

Robin Retail Park Wigan, WN5 0UH

SUSTAINABLE DEVELOPMENT PLAN 2015

Staffordshire Pharmacy Opening Times Christmas and New Year Bank Holidays

Derby Commercial Park

550,270 sq ft TO LET AVAILABLE Q1 2019

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Major Schemes and the wider Strategic Network

PQ Local Authorities with exceedances of NO 2 annual mean limit value (based on 2015

West Coast Main Line Track Access Applications Consultation:

Meeting, conference and event spaces

DISTRIBUTION INDUSTRIAL UNITS FROM 25, ,000 SQ FT

The Evergreen 3 Project

West Midlands. Rail User.

Welcome. Stunning place. Peaceful and tranquil. Cath

Meeting the capacity challenge: The case for new lines

Address Town City Telephone. 240 Uttoxeter Road Blythe Bridge Staffordshire Hanbridge. Newcastle-under-

40 ACRE HIGH PROFILE DEVELOPMENT SITE

CONSTRUCTION UNDER. Cross-docked warehouse/distribution unit 550,270 sq ft TO LET AVAILABLE Q M1/J26 PANATTONI PARK NOTTINGHAM NOTTINGHAM 550

Transcription:

High Speed UK Regional Mapping covering the East and West Midlands CC0 Potteries CC0 Trent Valley CC0 East Midlands CC0 West Midlands CC0 Rugby & Leicester Maps in reverse numerical order for enhanced screen viewing!!

WARRINGTON A9 09 M 0 NORTHWICH A WYTHENSHAWE LYMM ALTRINCHAM SOUTH MANCHESTER FREIGHT BYPASS TO AVOID PICCADILLY & VICTORIA 9 S009 7 S00 NEW DIRECT RAIL ACCESS TO MANCHESTER AIRPORT FROM ALTRINCHAM LINE S007 M KNUTSFORD S00 NEW DIRECT RAIL ACCESS TO MANCHESTER AIRPORT FROM STOCKPORT LINE S00 S00 BRAMHALL A WILMSLOW CHEADLE HULME P0 STOCKPORT P0 P00 P09 HAZEL GROVE MARPLE A LONGPORT-CHEADLE HULME LINE SELECTIVELY -TRACKED TO PROVIDE INCREASED CAPACITY FOR HIGH SPEED & LOCAL SERVICES HOLMES CHAPEL MACCLESFIELD P0 P07 P0 PEAK DISTRICT NATIONAL PARK MIDDLEWICH P0 NANTWICH CREWE A00 A 0 POTTERIES RAIL STRATEGY CC0 : POTTERIES MAPPING JULY 0 P07 P0 7 SANDBACH A A P0 ALSAGER NEW CURVE TO BYPASS STONE STATION A P0 A00 P0 NEW DIRECT CREWE- LONGPORT LINE TO FACILITATE REORIENTATION VIA STOKE A P0 KIDSGROVE P0 P0 P0 A CONGLETON P0 LONGPORT-CHEADLE HULME LINE SELECTIVELY -TRACKED TO PROVIDE INCREASED CAPACITY FOR HIGH SPEED & LOCAL SERVICES LONGPORT P0 P09 P00 ETRURIA P0 P099 NORTON BRIDGE STOKE P0 FENTON BRITANNIA TRENTHAM P009 A BARLASTON P007 STONE LEEK NEW STATIONS AT ETRURIA, BRITANNIA, TRENTHAM & BARLASTON ENABLED BY - TRACKING OF LONGPORT- STONE ROUTE. RESITING OF STOKE STATION AT ETRURIA AS PER STOKE CITY COUNCIL PLANS TO BE CONSIDERED DERBY-STOKE LINE UPGRADED AS CORE ELEMENT OF EAST MIDLANDS-POTTERIES-NORTH- WEST INTERCITY CORRIDOR TO REPLICATE A0 ROAD ROUTE P0 P00 A0 P0 STONE-LONGPORT SECTION UPGRADED & QUADRUPLED FOR HIGHER SPEED AND CAPACITY VIA STOKE ROUTE NEW TUNNELLED ROUTE TO AVOID STONE URBAN AREA & LEVEL CROSSINGS P0 0

A M A P09 A 0 P099 STAFFORD A NORTON BRIDGE LOCAL -TRACKING AT PENKRIDGE TO OPTIMISE CAPACITY BETWEEN BUSHBURY JN & STAFFORD CODSALL BUSHBURY BARLASTON P00 P00 P007 STONE PENKRIDGE J0 J0 J009 P00 0 P00 CANNOCK P0 NEW TUNNELLED ROUTE TO AVOID STONE URBAN AREA & LEVEL CROSSINGS NEW CURVE TO BYPASS STONE STATION FOR ENHANCED BIRMINGHAM -MANCHESTER TIMINGS J0 A HEDNESFORD T WOLVER- HAMPTON P00 T7 A P0 A A RUGELEY A0 TRENT VALLEY LINE UPGRADED TO FACILITATE REORIENTATION VIA STOKE P00 CANNOCK CHASE AONB P0 WALSALL LICHFIELD ROUTE RESTORED AS PART OF STRATEGY TO DECONGEST BIRMINGHAM NEW STREET & RADIAL ROUTES, ALLOWING FREIGHT BYPASS & CIRCULAR MIDLANDS RING SERVICES (T) L0 P07 L0 NEW COLWICH CUT-OFF TO FACILITATE REORIENTATION VIA STOKE P00 T WALSALL UTTOXETER L07 P0 LICHFIELD T P09 P00 DERBY-STOKE LINE UPGRADED AS CORE ELEMENT OF EAST MIDLANDS-POTTERIES-NORTH- WEST INTERCITY CORRIDOR TO REPLICATE A0 ROAD ROUTE L0 L09 BURTON STATION REMODELLED FOR -TRACK ALIGNMENT & HIGH SPEED RUNNING WICHNOR L00 L0 A A P0 A A D0 D0 0 P0 D00 D0 D09 GREAT NORTHERN ROUTE FROM DERBY TO EREWASH VALLEY RESTORED TO ALLOW DIRECT ACCESS TO FROM UPGRADED ROUTE VIA DERBY BIRMINGHAM-NOTTINGHAM DIRECT HS ROUTE VIA RESTORED DERBY TEARDROP P0 D0 D0 D0 P0 D0 BURTON on TRENT UPGRADE BETWEEN WICHNOR & STENSON S TO FACILITATE EUROGAUGE-CAPABLE WATER ORTON TAMWORTH BURTON DERBY ROUTE UPGRADED & MOSTLY - TRACKED AS PRIMARY HIGH SPEED CROSSCOUNTRY ROUTE TAMWORTH M A D07 A D0 DERBY D00 STENSON D0 DERBY AVOIDING LINE UPGRADED AS CORE ELEMENT OF EUROGAUGE- CAPABLE NORTH-SOUTH SWADLINCOTE A ASHBY de la ZOUCH D09 D0 D00 A A0 0 A LEICESTER-BURTON IVANHOE LINE UPGRADED AS CORE ELEMENT OF EURO- GAUGE-CAPABLE NORTH- SOUTH POTTERIES RAIL STRATEGY CC0 : TRENT VALLEY MAPPING JULY 0

A BIRMINGHAM- T0 NOTTINGHAM DIRECT HS ROUTE VIA RESTORED DERBY TEARDROP EUROGAUGE-CAPABLE NORTH- SOUTH 0 T0 PRIMARY HIGH SPEED INTERCITY HUB AT DERBY MIDLAND A D07 DERBY D00 BELPER A A A A DERBY AVOIDING LINE UPGRADED AS CORE ELEMENT OF EUROGAUGE- CAPABLE NORTH-SOUTH WATER ORTON TAMWORTH BURTON DERBY ROUTE UPGRADED & MOSTLY -TRACKED AS PRIMARY HIGH SPEED CROSSCOUNTRY ROUTE D0 D0 D00 D09 D0 A0 ALFRETON T09 A T0 T07 GREAT NORTHERN ROUTE FROM DERBY TO EREWASH VALLEY RESTORED TO ALLOW DIRECT ACCESS TO FROM UPGRADED D0 D0 D0 ILKESTON A 0 & NORTH-SOUTH EUROGAUGE FREIGHT ROUTE VIA TOTON YARD & EREWASH VALLEY LINE, UPGRADED/RESTORED TO TRACKS EAST MIDLANDS 7 A A M 7 0T0 EASTWOOD 0 ASHFIELD PARKWAY M T0 A T0 T0 T00 T0 T0 KIRKBY in ASHFIELD N A HUCK -NALL 0 T09 07 A0 NOTTINGHAM N N0 N0 N0 A N0 NOTTINGHAM BOTTESFORD GRANTHAM ROUTE UPGRADED & BOTTESFORD NEWARK ROUTE RESTORED TO ACCESS ECML TO SOUTH & NORTH AND ENHANCE INTERCITY FLOWS THROUGH NOTTINGHAM PRIMARY HIGH SPEED INTERCITY HUB AT NOTTINGHAM MIDLAND POTENTIAL FREIGHT YARD & TRAIN MAINTENANCE DEPOT AT TOTON A A0 DIRECT HIGH SPEED ACCESS TO NOTTINGHAM VIA NEW ROUTE AVOIDING ATTEN- BOROUGH LEVEL CROSSINGS EAST MIDLANDS RAIL STRATEGY NOTTINGHAM EXPRESS TRANSIT (NET) N0 0T0 T07 LOUGHBOROUGH CC0 : EAST MIDLANDS MAPPING JULY 0 PASSES UNDER RIVER TRENT IN TUNNEL FROM RATCLIFFE TO TOTON N0 N07 N0 A NOTE ONGOING NET EXTENSIONS TO TOTON & CLIFTON 0 0 ASHBY de la ZOUCH A NEW GRADE SEPARATION TO ELIMINATE COALVILLE LEVEL CROSSING COALVILLE LEICESTER-BURTON IVANHOE LINE UPGRADED AS CORE ELEMENT OF EUROGAUGE-CAPABLE NORTH- SOUTH M 0 COMPRISES TRACKS FROM BUNCEFIELD TO KILLAMARSH A0 A LEICESTER T0 A T0 T09 0 T0 T0 T00 0 T0 T0 ROUTE NORTH OF LEICESTER ON - TRACK ALIGNMENT OF MIDLAND MAIN LINE PRIMARY HIGH SPEED INTERCITY HUB AT LEICESTER LONDON RD 0

J009 J00 J0 STOUR VALLEY LINES J0 M STOURBRIDGE-WALSALL LINE RESTORED TO PROVIDE ALTERNATIVE TO SOUTH-WEST, BYPASSING CENTRAL BIRMINGHAM & LICKEY INCLINE. NOTE ALSO PROPOSALS TO EXTEND WEST MIDLANDS METRO ALONG THIS ROUTE A STOURBRIDGE A BESCOT-WICHNOR RESTORATION/ UPGRADE TO PERMIT EUROGAUGE FREIGHT FLOWS GRAND J007 J00 WOLVERHAMPTON T7 BESCOT WEST MIDLANDS METRO M 9 A A WALSALL J00 L0 TAME BRIDGE BARNT GREEN (T) L0 J00 LICKEY INCLINE L0 J00 PRIMARY HIGH SPEED INTERCITY HUB AT B HAM NEW STREET 0 7 L07 M LICHFIELD GRAND UPGRADE & NEW SOHO JN TAME BRIDGE LINK FOR HIGHER CAPACITY ACCELERATED ROUTE NORTH- WEST FROM NEW STREET T J00 HAWTHORNS D00 SOHO JN BIRMINGHAM J00 L0 RESTORED WALSALL LICHFIELD LINE CUTS CONGESTION AT NEW STREET & ON RADIAL ROUTES & ENABLES MIDLANDS RING & FREIGHT BYPASS D0 T T (T) A D0 R0 L09 A A T SOLIHULL WICHNOR D0 A M0 T 9 M D00 D09 BIRMINGHAM - WATER ORTON ROUTE UPGRADED & MOSTLY -TRACKED R0 WATER ORTON STATION REBUILT TO SUIT NEW FLYING S WATER ORTON A T D0 B0 D0 B D0 COLESHILL R0 B 7 R0 TAMWORTH D0 D07 HAMS HALL B0 A M WATER ORTON TAMWORTH BURTON DERBY ROUTE UPGRADED & MOSTLY - TRACKED AS PRIMARY HIGH SPEED CROSSCOUNTRY ROUTE FREIGHT TERMINAL & POTENTIAL TRAIN MAINTENANCE DEPOT AT HAMS HALL B0 B0 BIRMINGHAM INTERNATIONAL HAMPTON in ARDEN R0 R00 L&B COVENTRY-B HAM INTERNATIONAL-B HAM NEW STREET ROUTE -TRACKED FOR MOST OF LENGTH TO OPTIMISE CAPACITY & (TOGETHER WITH VIRTUAL -TRACKING ALONG BIRMINGHAM-WOLVERHAMPTON ROUTE) IMPROVE SE-NW FLOWS THROUGH B HAM NEW STREET KENILWORTH ORIGINAL MIDLAND MAIN LINE TO HAMPTON IN ARDEN RESTORED WITH NEW CURVES TO FORM WEST MIDLANDS RING VIA NEW STREET, WALSALL, SUTTON PARK LINE & BIRMINGHAM B0 R09 0 NUNEATON BEDWORTH B00 B09 BEECHWOOD TUNNEL REBUILT FOR TRACKS R0 A A COVENTRY R07 PROJECTED HIGH SPEED LINE TO BIRMINGHAM TO ADDRESS FUTURE CONGESTION & PROVIDE EUROGAUGE ROUTE. -TRACKING OF RUGBY COVENTRY-BIRMINGHAM & BIRMINGHAM- DERBY ROUTES IS INITIAL PRIORITY B0 R0 CC0 : WEST MIDLANDS MAPPING JULY 0 HINCKLEY 9 R0 A NEW DIVE-UNDER AT COVENTRY STATION TO ELIMINATE CONFLICT BETWEEN N-S FREIGHT, NEW NUCKLE LOCAL FLOWS & E-W PASSENGER FLOWS WEST MIDLANDS RAIL B07 R0 B0 0 A NUNEATON-WATER ORTON LINE ELECTRIFIED AS DIVERS- IONARY ROUTES FOR RUGBY- BIRMINGHAM -TRACKING B0 R0 RUGBY

0 M A T0 0 LEICESTER-BURTON IVANHOE LINE UPGRADED AS CORE ELEMENT OF EURO- GAUGE-CAPABLE NORTH-SOUTH ROUTE SOUTH OF LEICESTER ALONG CORRIDOR OF FORMER GREAT CENTRAL MAIN LINE A T00 T09 T0 LEICESTER ROUTE NORTH OF LEICESTER ON -TRACK ALIGNMENT OF MIDLAND MAIN LINE PRIMARY HIGH SPEED INTERCITY HUB AT LEICESTER LONDON ROAD A7 T0 HINCKLEY 9 A T07 M T0 T0 MIDLAND MAIN LINE UPGRADED AS CORE ELEMENT OF EURO- GAUGE-CAPABLE NORTH-SOUTH HIGH SPEED UK COMPRISES NEW-BUILD TRACKS FROM KILLAMARSH TO BUNCEFIELD A LUTTERWORTH T0 MARKET HARBOROUGH B07 0 R0 B0 R0 A B0 R0 PROJECTED HIGH SPEED LINE TO BIRMINGHAM TO ADDRESS FUTURE CONGESTION & PROVIDE EUROGAUGE ROUTE. -TRACKING OF BIRMINGHAM- COVENTRY-RUGBY & BIRMINGHAM- DERBY ROUTES IS INITIAL PRIORITY EXISTING ROUTE THROUGH RUGBY BETWEEN NORTHAMPTON LOOP & BIRMINGHAM LINE UPGRADED INCLUDING NEW FLYOVERS AND BYPASSING ALIGNMENT AROUND RUGBY STN EAST MIDLANDS RAIL STRATEGY B0 B0 R R0 RUGBY 0 CC0 : RUGBY & LEICESTER MAPPING JULY 0 R M A T0 09 9 R0 B0 R00 0 07 T0 DAVENTRY T0 DAVENTRY INTERNATIONAL T00 7 T0 0 T09 T07 T0 M A NORTHWARD CONNECTION FROM RUGBY TO VIA LNW & GC ROUTES ALLOWS IMPROVED LINKS FROM COVENTRY & BIRMINGHAM AIRPORT TO HIGH SPEED NETWORK AND MIDLANDS RING SERVICES LINKING ALL PRINCIPAL MIDLANDS COMMUNITIES R0 R07 NORTHAMPTON LOOP R0 T0 A T0 NOTE PROXIMITY OF PRIMARY TRANSPORT CORRIDORS. ROMAN WATLING STREET (circa AD, NOW A). (OLD) GRAND UNION CANAL (). LONDON & BIRMINGHAM RAILWAY (7, NOW ). M (99, FIRST MOTORWAY LINKING LONDON & MIDLANDS). HIGH SPEED UK R0 NORTHAMPTON A T0 R0 A NORTHAMPTON LOOP UPGRADED TO ENABLE IMPROVED INTERCITY HIGH SPEED SERVICES ALONG SOUTH COAST-OXFORD-MK-EAST MIDS-YORKSHIRE-SCOTLAND AXIS T0 A 0 R0 R0 0 09 A T0 T00