THE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, DAKAR

Similar documents
NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

MID Region Air Navigation Strategy

SAMPLE TEMPLATE APPENDIX 3.5C-1

Third Meeting of the Air Navigation System Implementation Group (ANSIG/3) Cairo, Egypt, 3 5 July Saudi Arabia

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

(Presented by United States) EXECUTIVE SUMMARY

ATFM/CDM ICAO s Perspective

Block 0 to Block 1 Vaughn Maiolla

Second Meeting of the Air Navigation System Implementation Group (ANSIG/2)

MET/SG/12-WP/05 REV2-23/11/14

ASBU Block 0 Implementation and Regional ANPs

ATM processes automatization for Runway (Airport) Throughput Enhancement

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Welcome to AVI AFRIQUE IFEANYI Ogochukwu, Chief Technology Strategist; Debbie Mishael Group

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

PROPOSED AMENDMENT OF THE RPBANIP. (Prepared by Canada and United States) EXECUTIVE SUMMARY

ICAO ASBU Implementation/ Surveillance and ATS Automation

Russian Federation ATM modernization program

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

SERVICE DEVELOPMENT ROADMAP

Date Planned/Implemented Status Not commenced. Status Details Planned for m new MMMX airport 2 Element Description: Airport CDM tools

ICAO GANP Requirements and Evolution

AFI AIR NAVIGATION SYSTEM IMPLEMENTATION ACTION PLAN FOR THE AFRICA-INDIAN OCEAN (AFI) REGION

Approach to implementation Process and checklist

New Barbados State Air Navigation Plan

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

GUATEMALA State Air Navigation Plan

NORTH ATLANTIC (NAT) AIR NAVIGATION PLAN

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

BELIZE Air Navigation Plan

ASBU-Bloc0 Moroccan achievements and planned activities

APIRG/20. Air Navigation System Implementation Action Plan (aligned with ASBU Methodology) Yamoussoukro, Cote d Ivoire 30 November 2 December 2015

International Civil Aviation Organization. Fifth Meeting of MID Region AIM Database Task Force Fourth Meeting of MIDANPIRG AIM Sub-Group

Objective. To show how the aviation system block upgrades (ASBUs) can help to improve safety at airport level and some regional initiatives.

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

INTERNATIONAL CIVIL AVIATION ORGANIZATION. SIXTH MEETING OF DIRECTORS GENERAL OF CIVIL AVIATION (DGCA/6) (Brazzaville, Congo, 2 4 November 2016)

AIP KUWAIT FIR AMENDMENT 28 IMPLEMENTATION AIRAC DATE 25 NOVEMBER 2004

Global Air Navigation Planning

ASBU modules mapped to Work Programme

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

AIM in support of ATM

ICAO provisions on data link implementation

International Civil Aviation Organization. Performance Framework for AIM implementation in the MID Region

MIDAD Project IDS Vision

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

QMS for AIS/MAP Service Implementation Workshop

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Packaging Tomorrow s Aviation System

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

APAC AIR NAVIGATION PLAN VOLUME III

Performance Framework for MID Region Air Navigation Planning and Implementation MEAUSE SURVEYS. (Presented by IATA and CANSO) SUMMARY

Work Programme of ICAO Panels and Study Groups

MET/SG REPORT FOR THE PREPARATION OF THE MET RELATED AFI REGIONAL AIR NAVIGATION IMPLEMENTATION ACTION PLAN

APPENDIX D IDENTIFICATION AND DEVELOPMENT OF AERONAUTICAL METEOROLOGY PROJECTS. Programme Title of the Project Start End

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

GANP ASBU Symposium 2017

AFI/MID Workshop on Aviation System Block Upgrades (ASBUs)

SURVEILLANCE PROJECT Coordinator: Ghana DOMAIN: IIM (Infrastructure & Information Management)

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

THE Aviation System Block Upgrades THE FRAMEWORK FOR GLOBAL HARMONIZATION (DRAFT 2016)

Global ATM System ~Interoperability and Harmonization ~

International Civil Aviation Organization AIR NAVIGATION SYSTEMS IMPLEMENTATION GROUP

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

METEOROLOGY PROJECT.1. Programme Title of the Project Start End

NAM ASBU Handbook Supporting analysis and implementation reporting of the ICAO ASBU Modules

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

NEW FPL Transition Phase & Implementation Stages

Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont

Basic Building Block (BBB) Framework DRAFT APRIL 2018

Avitech GmbH AIXM Capabilities & Experiences

Flight Procedure Design and Cartography

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

INTERNATIONAL CIVIL AVIATION ORGANIZATION

What is safety oversight?

TWELFTH AIR NAVIGATION CONFERENCE

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Air Law and ATC Procedures Subject: AIR LAW AND ATC PROCEDURES

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

CNS/ATM Systems Interoperability and Harmonization

ASBU ACTIONS UNDERTAKEN BY THE ALGERIAN CIVIL AVIATION AUTHORITY IN AIR NAVIGATION FIELD

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

2012 Performance Framework AFI

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

PROGRAMME CALENDAR 2018

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

SAMPLE TEMPLATE. Regional and National planning for ASBU Modules

Connecting ASBU with your State Air Navigation Plan

Transcription:

THE UGANDA ASBU PLAN- HIGHLIGHTS ASBU WORKSHOP 18 TH TO 22 RD SEPT, 2017- DAKAR

Outline Introduction FIR, ATS routes and Aerodromes Air Navigation Services Current Airline Operators Traffic forecast CNS/ATM infrastructure Challenges Progress made

Introduction The Civil Aviation Authority (CAA) is a corporate body established by Act of Parliament, The Civil Aviation Authority Act (CAP 354), with the objective of promoting a safe, regular, secure and efficient use and development of civil aviation inside and outside Uganda. The CAA Act (CAP 354) spells out the mandate for the Authority under sections 6(1) and 6(2).

Introduction Cont d Mandate of CAA Uganda Advises government on matters concerning Aviation Provide ANS Provide Regulatory compliance Management of Aerodromes

ENTEBBE FLIGHT INFORMATION REGION STRUCTURE AND AERODROMES ENTEBBE FIR From Ground to Unlimited From GND to 1500: Class G ENTEBBE UTA and ATS ROUTES From FL 145 to Unlimited, centered on a radius of 150NM from NN Class of airspace: A ENTEBBE TMA From 1500ft to FL 145, Centered on a radius of 65NM from NN Class of airspace: E ENTEBBE CONTROL ZONE From Ground to 9000ft, Centered on a radius of 15NM from NN

Structure of Entebbe FIR ATS ROUTES.pdf

AERODROMES The primary/major international aerodrome in Uganda is Entebbe. Category A: Aerodrome of Entry and Departure of International air traffic Secondary/other international (Category B) aerodromes in Uganda are: 6 in number Category B: Entry and Departure, customs, immigration and health available on request

Aerodromes cont d National (Category C) aerodromes in Uganda are: 38 in number Category C: Domestic Aerodromes Category D: Heliports

Air Navigation Services and Responsibilities The Directorate of Air Navigation Services (DANS), of the Uganda Civil Aviation Authority is the Department responsible for the provision of air Navigation services Air Traffic Services Flight Information Services (FIS) Alerting Service (ALRS) Air Traffic Control Services En-route Radar Control Service (ENR) Approach Radar Service (APR) Approach Control Services (APP) Aerodrome Control Service(TWR) Coordination of search and rescue services

Air Navigation Services cont d Aeronautical Information Services/Charts Aeronautical Information Publication (AIP); Amendment service to the AIP (AIP AMDT); Supplement to the AIP (AIP SUP); NOTAM and Pre-flight Information Bulletins (PIB); Aeronautical Information Circulars (AIC); and Checklists and lists of valid NOTAM Provision of Charts

Communication Navigation and Surveillance services LF/MF Non-Directional Beacon (NDB) Instrument Landing System (ILS) Doppler VOR (DVOR) Distance Measuring Equipment (DME) VHF Direction Finding Station (VDF) Radar SSR Mode S Airspace Management System (AMS) VHF/RTF capable of operating on the appropriate frequencies; ATS/DS systems - VSAT AFTN Aeronautical Mobile Service (HF) TETRA

Meteorological services for ANS The meteorological services for Civil Aviation are provided by the Uganda National Meteorological Authority, National meteorological centre Entebbe Meteorological Observations and Reports Provision TAF, METAR Satellite weather imagery Prognostic charts (geopotential flight levels (wind and temperature) SIGMET Flight documentation (weather charts and tabular forecasts of wind and temperatures) Pre- flight weather briefing

Scheduled OPerators Kenya Airways Ethiopian Turkish Airlines South African Emirates KLM Royal Dutch Airlines Qatar Airways Rwanda air

Scheduled cont d SN Brussels Precision Airlines Etihad Airways Fly Dubai Egypt Air Fly Sax African Express Precision Air

Non scheduled operators AEROLINK Aim Air Auric Air Air Serv Air Tec Africa Coastal AV DHL Eagle Air Grand Air SVC

Non scheduled cont d DAC AVIATION KAFTC Kakira Sugar Works KEA Kibali Gold Mission Aviation Fellowship(UGANDA)-MAF Mission Aviation(DRC)-MAF Saf Air-SFR

Uganda Licensed Air Operators Air Serv / Reliance Eagle Air Kampala Aeroclub Flight Training Centre (KAFTC) Mission Aviation Fellowship (MAF) Premier Safaris Uganda Air Cargo Corporation Ndege Juu Ya Africa Asante Aviation Transafrik (U) Ltd Kampala Executive Aviation Aero Link Kampala Executive Aviation Vule Airlines

Growth indicator : Traffic forecast YEAR Total Movements Total Passengers Cargo (tonnes) 2012 43,449 1,475,631 55,907 2018 55,500 2,377,100 77,100 2023 76,300 3,810,700 100,700 2033 123,700 7,667,700 172,100 Source: CAA Master plan 2014

Current CNS/ATM Infrastructure and Automation LF/MF Non-Directional Beacon (NDB) - 4 Instrument Landing System (ILS) - 1 Doppler VOR (DVOR) - 2 Distance Measuring Equipment (DME) - 3 VHF Direction Finding Station (VDF) - 1 SSR Mode S Airspace Management System (AMS)

Infrastructure cont d VHF radio operating on the appropriate frequencies ATS/DS systems - VSAT AFTN (transitioning to AMHS by Nov 2017) Aeronautical Mobile Service (HF) AIM Automation ATIS AWOS TETRA

Technical and operational challenges High cost of technical training High cost of equipment/systems Evolving technology Bureaucratic procurement procedures Inadequate staffing Retention of technical personnel(staff turn over) Terrorism threats Airspace restrictions Aging technical staff

Economic Concerns Capital intensive nature of the aviation industry. Limited financial resources Inflation Rapid changes in Aviation technology Lack of strong home based airlines low Air Traffic

Stakeholders Needs and Requirements Improved safety Efficient services Increased capacity Access and equity. Environmental protection Security Cost effectiveness

Prioritization of B0 - modules for Uganda Follows the AFI region ANP prioritization Consideration is given to Essentials and Desirable modules From each module considered, prioritization of elements is per need

ASBU Module Review Priorization/ selection of Modules (18 B0) and PIA ASBU BLOCK O MODULE PIA PRIORITY B0-APTA 1 ESSENTIAL B0-WAKE 1 SPECIFIC B0-RSEQ 1 OPTIONAL B0-SURF 1 OPTIONAL BO-ACDM 1 DESIRABLE B0-FICE 2 ESSENTIAL B0-DATM 2 ESSENTIAL B0-AMET 2 DESIRABLE B0-FRTO 2 ESSENTIAL B0-NOPS 2 DESIRABLE B0-ASUR 2 DESIRABLE

ASBU Module review cont d ASBU BLOCK 0 MODULES PIA PRIORITY B0-ASEP 3 SPECIFIC B0-OPFL 3 SPECIFIC B0-ACAS 3 ESSENTIAL B0-SNET 3 DESIRABLE B0-CDO 4 DESIRABLE B0-TBO 4 DESIRABLE B0-CCO 4 DESIRABLE

Progress made B0 DATM 1 Quality Management Systems ISO 9001:2008 Certified 2 Data integrity monitoring Implemented 3 AIRAC adherence monitoring Implemented 4 Monitoring of States differences to Annex 4 and Annex 15 Implemented 5 Implement WGS-84 Partial 6 Integrated Aeronautical information database Implemented

DATM cont d Element Status 7 Unique identifiers of aeronautical features Implemented 8 Aeronautical information conceptual model Implemented AICM 9 Aeronautical data exchange (AIXM 5.1, WXXM, AOXM, FIXM, ENXM) AIXM 5.1 implemented 10 Communication networks based on Internet Protocol (IP) AMHS due for installation in October, 2017 11 Electronic AIP (eaip) Implemented 12 Aeronautical information briefing Implemented 13 Electronic Obstacle data set (etod) Partially 14 Digital NOTAM (enotam) Pending availability

Progress made cont d SN B0 - SNET STATUS Ground-based safety nets functionalities in the ATM systems: 1 Short Term Conflict Alert (STCA), Implemented 2 Area Proximity Warning,) Implemented 3 Minimum Safe Altitude Warning (MSAW) Implemented 4 Specific Controllers Training Implemented

Progress made cont d B0 FRTO 1 Airspace planning Some challenges here 2 Flexible Use of airspace -NOTAM is used to activate Danger areas -Effective civil Military Coordination 3 Flexible Routing PBN routes implemented in the FIR User preferred routes are granted

Progress made cont d B0 - FICE 1 Aeronautical Message Handling Switching (AMHS) or Ground-Ground Network Standard AFTN-AMHS or ATN 2 Implement Flight Data Processing Systems (FDPS) with relevant set of AIDC message capabilities as per ICAO Doc 4444 3 Implement AIDC links with neighboring FIRs 4 Implement processes such as, Notification, Initial coordination, Revision of Coordination, etc. Due for installation in October 2017 Partial Awaiting regional coordination Partial

Conclusion Uganda realises the need to pick the low hanging fruits from the ASBU framework. However, the ones that require high captial investiments will take a bit more time to implement CAA Uganda will continue to engage with the neigbouring FIRs and the ICAO regional office in the implementation of ASBU elements to ensure interoperability and seemlessness of operations. The EAC UFIR is one of such efforts. Stakeholder involvement is key.