HUNTCO SITE FURNISHINGS. Double Bike Locker Assembly Instructions HUNTCO SITE FURNISHINGS

Similar documents
DURA WHEEL CHAIR LOCKER ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Assembly TOOLS REQUIRED: 17mm and 14mm or equivalent wrenches.

* * KR54-F, KR9854 & KR9954 Installation Instructions. Read All Warnings Before Starting Installation! Index:

* * 4023 KR. Step 1 Prepare the Keyed Removable Unit. Not for use on electric or fire rated removable mullions

KAWNEER 1786 RIM EXIT DEVICE

SteadiCam Parts List*

AND LOAD CANOPY RACK SPECIFICATIONS

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS. Part # A7006

Vanagon Ladder Kit Assembly & Installation Instructions

Shut off combine and remove key before installing the hopper extension. Make sure the combine is on a level surface. Engage parking brake.

COOPER FREESTANDING TUB FAUCET INSTALLATION

PRODUCT INFORMATION MANUAL SECTION: 17 METAL LOUVRE AWNINGS METAL LOUVRE AWNINGS

Tarp Return. Questions? Contact Customer Or Parts Diagrams see Parts and Diagrams section on web at

INSTRUCTION SHEET DETHATCHER KIT. STS-422LX LPSTS-42JD Assembly Installation Operation Repair Parts L-1660-D. Visit us on the web!

Realhome LCL Lockers Specification

CHANGING YOUR LANDSCAPE SINCE 1945 OWNER S MANUAL. Tow Hitch Replacement Kit For Rough Cut Trailcutters. Starting Serial # L

DO NOT USE WITH CROSSBAR SPREAD LESS THAN 24.

Primrose Awnings - Standard Manual Instructions

ASSEMBLY & CARE INSTRUCTIONS

Structural Mullion System

ASSEMBLY & CARE INSTRUCTIONS. 7 x4 TRAILER TENT SERIES 4 9. OPTIONAL SUNROOM Wall and floor kit. OPTIONAL SPARE ROOM Roof, wall and floor kit

READ ME FIRST! IMPORTANT WARNING! ENG. Roof top tent

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

INSTALLATION INSTRUCTIONS AND OWNER'S MANUAL AWNINGS. For trailers & motor homes with straight sides TOOLS REQUIRED

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C3215/C3215A

Vinyl French Door Assembly Instructions

JOINING MULLION (DIRECT MULL) ASSEMBLY INSTRUCTIONS FOR 3-WAY OR 4-WAY JOINTS FOR IMPERVIA AWNING, CASEMENT AND LARGE AWNING

250 SERIES 1" STRUCTURAL TUBE MULLION ASSEMBLY INSTRUCTIONS

SHOWER CONVERSION KIT WITH HAND SHOWER

EEZI - AWN series 1000 / 2000 Awning bracket

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

/ Tool and Equipment Safety Tether System (T.E.S.T.S)

RETRACTABLE AWNING w/ OPTIONAL HOOD ASSEMBLY INSTRUCTIONS

Seven-eighths-spacing Rackmount Kit/Chassis Rackmount Kit. Techmar enclosure designs include interchangeable modular components,

Assembly Instructions

42" SNOW BLADE. Owner's Manual. Model No Safety Assembly Operation Maintenance Parts

POP-UP TENT CANOPY INSTALLATION & REMOVAL

Item #: BTOT Assembly Instructions

Otter Pro X-Over Lodge Installation and Set-Up Instructions

INSTALLATION INSTRUCTIONS FOR BALCO, INC. FLOOR MATS FM2R-(A, C, D) W/O FRAME 4V

FLEX KEY ASSEMBLY. ..._ o RAFTER ARM TUBE MAIN ARM TUBE CAP NUT CLAW HINGE

Notes, Parts List & Drawings

Uptown Fire Pit Table

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

RETRACTABLE PATIO SHADE AWNING Patio Awning Guide-10ft. x12ft.(proj. X Width) Model: APR ***/APR (version: GEN2-V1)

TWO PERSON WALL MOUNT

Tall Cabinet Drawer Keyless Double Lock Installation [ xx]

HARD DOOR UPGRADE KIT

80070 TOP MOUNT CAMPER SHELL and TRANSIT CONNECT RACK TMCS_3:1

300 Model 870 Four Wheel Hose Cart Owner s Manual

RETRACTABLE PATIO SHADE AWNING Patio Awning Guide-10ft. x14ft.(proj. X Width) Model: AP (version: GEN2-V1)

Core Systems Installation Instructions

D3107/ FMT09DGRO6.5 REAR TIEDOWNS W/ FACTORY INSTALLED RECEIVER APPLICATION FITS

Solera Classic Awning

Installation Instructions for the Rolltec Physique XL Awning

ALPINE SLIDEOUT COVER

front runner READ ME! IMPORTANT WARNING! ENG Foxwing Awning Brackets

Utility Trailer Loadbar Kit Model: MPG493 TopTier - Assembly Instructions

Cabinet Mount Assist Lift n Lock Instructions

Solera Classic Awning OEM INSTALLATION MANUAL

POP-UP OPTION USER HARDWARE MANUAL. EdgeTech 4 Little Brook Road West Wareham, MA _REV_B 8/29/2018

Otter Pro XT Cabin Installation and Set-Up Instructions

ASSEMBLY GUIDE. Customer Service: INCH² 2-BURNER & 864 INCH² 2-BURNER

INSTANT GARAGE MODEL NO: CIG81224 ASSEMBLY INSTRUCTIONS PART NO: ORIGINAL INSTRUCTIONS

STOP BOX SCRAPER/GRADER BLADE. Owner's Manual. Model No Safety Assembly Operation Maintenance Parts

Operating Instructions

Thanks for shopping with Improvements! 10 Solar Lighted Gazebo Item #531753

FEATHER-LITE ROOF TOP TENT SET-UP GUIDE

FLUSH MOUNT ALUMINUM DOOR DETAIL (LH SWING)

Use steel clip angle as a drill template and drill through mullion. Install bolts with bolt heads on the masonry side of the jamb mullion.

--- BIG LEAGUE BATTING CAGE ---

Contents. Awnings USA - Full Protective Hood Manual Instructions ft 11" - 11ft 6" Awnings

Installation Instructions for the Rolltec Adalia X3M Extenda Awning

Closet and Specialty Hardware

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C2213 / C2220

HANDLE AND WHEEL KIT INSTALLATION

LEG KIT. Pizza Oven OWNER S MANUAL. For 6000 Series Portable Ovens

CFF PRO SERIES SUPER DECLINE BENCH

Tank. Part B, Section 1. This section covers the following unit configurations. Pump Piston Pump (E or G)

AJW. Athletic Series Lockers. Architectural Products ONE TIER TWO TIER THREE TIER FOUR TIER FIVE TIER SIX TIER

Item # BJ2PC With 8 Leg Frame, Cover, and Enclosure Kit with Windows Size: 10 8 Wide x 20 Long (Side Height 6 8 ) (Center Peak Height 9 9 )

INSTALLATION INSTRUCTIONS for folding arm awnings

Gas Go Anywhere /23/01

C Locker. Options: Small compartment storage perfect for personal effects. Louvered doors, simple and convenient to open and close.

Installation Instructions Traditional Awnings in a box Classic Awnings in a Box

14522 Naples St Ham Lake, MN fax GUN & PISTOL LOCKERS EVIDENCE LOCKERS PASS THRU DEVICES PERSONNEL LOCKERS

INSTALLATION INSTRUCTIONS for vertical awnings

RAFTER VI. Installation and Operation CAREFREE WITH AUTOMATIC AWNING SUPPORT. RV Accessory PRODUCT OVERVIEW

INSTRUCTIONS INSTALLATION UNIVERSAL SERIES PATIO AWNING HARDWARE , , ,

Auxiliary 63.5l Fuel Tank Ford/Mazda Pick-up Truck 2012-Current READ ME! IMPORTANT WARNING!

Installation Instructions Part # 2784 Awning

SOLHARO ASSEMBLY & INSTALLATION INSTRUCT IONS

USER MANUAL PLEASE READ AND UNDERSTAND THIS MANUAL COMPLETELY BEFORE USE.

Otter XT 650 Cabin Installation and Set-Up Instructions

Start-Up Procedures 3. Frequently Asked Questions 4. Facility Maintenance 7. Handicap Accessibility 9. Ordering Replacement Parts 10

When moving the frame don t force anything! Move the leg to allow the brace to go over the rod.

33100 LH - Batwing Awning RH - Batwing Awning

Product Description of Klozit Sliding Glass Door Closing and Latching System

Transcription:

Double Bike Locker Assembly Instructions Includes instructions for both handle styles. Padlock Handle with U Lock Box and Keyed Pop Out T Handle SITE FURNISHINGS SITE FURNISHINGS and architectural site furnishings Bike Tradition racks, lockers, & Innovation benches and architectural site furnishings Tradition & Innovation E salesandsupport@sportworks.com.com

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com GENERAL INSTRUCTIONS 1. Locate a Frame and Door: Start by locating a frame and door. Remove the door and hinge from the frame and set the door (with hinge) aside and move to step 2. 2. Front Frame: Now stand up the frame (louvers at the top). 3. Exterior Wall: Next, locate an exterior wall (these are the painted/powder coated walls. Attach the wall to the frame using (5) pan head screws insuring the painted side faces the outside of the bank of lockers and is flush with the frame. 2

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com GENERAL INSTRUCTIONS 4. Back Frame: The back frame should be installed next. Repeat step one, removing the door and hinge from the frame. Stand up the frame and position it on the other end of the wall and attached it using (5) pan head screws. You should now have two frames and a wall standing ready for the divider panel. 5. Divider Panel and Hinges: The divider panel runs diagonally between the two frames and attaches where the hinges are mounted. Once the panel is in place locate the hinge you removed in step one. Next open the hinge and, with the flat side away from you, line it up with the holes on the divider panel and door frame, then place a pan head screw through the top right hole of the hinge, and going through the divider panel screw it into the door frame. Now,working from the bottom up, screw in the remaining (7) screws. Repeat the hinge installation on the opposite frame. 6. Interior Wall: Locate a galvanized (non-painted) interior wall. Position the wall between the two frames you have already setup. Now insert a splice plate between the frame and wall (this links the lockers in the bank giving them more stability/rigidity) and secure the wall to the frames using (10) pan head screws, (5) for each frame insuring the splice plates are aligned and sandwiched between panels. 3

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com GENERAL INSTRUCTIONS 7. Top: The locker top can now be installed (we recommend using two people to carry these panels as they are very heavy). Lift the top over the two frames, divider panel, and walls you have assembled in the previous steps. Slide a splice plate between the top and wall (this supports the top of the next locker in the bank). Now from inside the locker, attach the frames and walls to the top using (24) pan head screws, (6) for each wall and (6) for each frame. 8. Doors: Now the doors can be attached to the hinges you mounted in step 7. Hang the door by inserting one screw through the top left hole in the hinge, then working from the bottom up,screw in the remaining (8) screws. Repeat on the opposite frame. You are now ready to mount the door lock hardware. 4

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com PADLOCK / U-LOCK BOX HANDLE ASSEMBLY If you have the Padlock U-Lock Box, use this section to assemble your Bike Vault. 1. Padlock Handle: Next the Padlock Handle can be installed. Put the shaft of the padlock handle through the punch in the door and secure the handle using (4) one-way security screws and (4) nylock nuts. 2. Upper Lock Bar Prep.: Now the CAM and lock bars can be installed. The upper lock bar must be inserted into the guide at the top of the door before the CAM can be installed. 5

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com PADLOCK / U-LOCK BOX HANDLE ASSEMBLY 3. Lock CAM: The CAM slides onto the padlock handle shaft after a nylon washer (.75 OD x.50 ID x.06 THK), insure the orientation of the CAM is correct otherwise the unit won t lock properly. Next secure the CAM using a zinc washer (.438 ID x 1 OD x.083 THK) and cotter pin (bend the legs of the cotter pin once inserted to keep it snug). 4. Upper Lock Bar: The lock bars can be attached at this point. Link the upper lock bar you slid into the door (step 12) to the CAM using (1) pan head screw (#10-24 x 1 zinc plated), (1) nylon washer (.5 OD x.266 ID x.06 THK, this get sandwiched between the CAM and lock bar), and (1) nylock nut. 6

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com PADLOCK / U-LOCK BOX HANDLE ASSEMBLY 5. Lower Lock Bar: Now install the lower lock bar by sliding it through the guide on the bottom of the door then link it to the CAM using (1) pan head screws (#10-24 x 1 zinc plated), (1) nylon washer (.5 OD x.266 ID x.06 THK, these get sandwiched between the CAM and lock bar), and (1) nylock nut. 6. Door U-Lock Box: Locate the U-Lock Box (this comes as two pieces, one for the Frame and one for the Door. Install the Door U-Lock Box (it is the larger of the two pieces) using the included hardware. 7

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com PADLOCK / U-LOCK BOX HANDLE ASSEMBLY 7. Frame U-Lock Box: Now install the Frame U-Lock Box (it is the smaller of the two pieces) using the included hardware. 8

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com POP OUT T-LOCK HANDLE ASSEMBLY If you have the Pop T -Lock handle, use this section to assemble your Bike Vault. 1. Pop Out T Handle: Next the Pop Out T Handle can be installed. Put the shaft of the Pop Out T Handle through the punch in the door and secure the handle using (2) screws and (2) nylock nuts. 2. Upper Lock Bar Prep.: Now the CAM and lock bars can be installed. The upper lock bar must be inserted into the guide at the top of the door before the CAM can be installed. 9

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com POP OUT T-LOCK HANDLE ASSEMBLY 3. Lock CAM: Remove the hex nut that came pre-installed on the Pop Out T Handle, the CAM then slides onto the Pop Out T Handle shaft. Insure the orientation of the CAM is correct otherwise the unit won t lock properly. Next secure the CAM using a zinc washer (.563 ID x 1.06 OD x.06 THK) and the hex nut you removed from the pop t earlier. 4. Upper Lock Bar: The lock bars can be attached at this point. Link the upper lock bar you slid into the door (step 12) to the CAM using (1) pan head screw (#10-24 x 1 zinc plated), (1) nylon washer (.5 OD x.266 ID x.06 THK, this get sandwiched between the CAM and lock bar), and (1) nylock nut. 5. Lower Lock Bar: Now install the lower lock bar by sliding it through the guide on the bottom of the door then link it to the CAM using (1) pan head screws (#10-24 x 1 zinc plated), (1) nylon washers (.5 OD x.266 ID x.06 THK, these get sandwiched between the CAM and lock bar), and (1) nylock nut. 10

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com GENERAL INSTRUCTIONS 9. Continue the Bank: The rest of the bank can now be constructed, continue by locating another frame (remove the door and hinge) then attach it to a splice plate (just as you would a wall).repeat this on the opposite end of the locker. A divider panel can now be added by following step 5 and the rest of the locker can be assembled by repeating steps 6-16. Finish the remaining lockers until you reach the end of the bank configuration (using a painted wall at the end). 11

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com GENERAL INSTRUCTIONS 10. Finishing: Now that the lockers are completely assembled ensure all screws are tight and all panels are flush. If anchoring is desired continue to the next step, otherwise enjoy your new bicycle lockers! 11. Anchoring: The bank configuration can be anchored to the concrete using the provided (4) redheads. a. Anchors are placed in four corners of the bank. 12

Bike and racks, architectural lockers, benches site furnishings PHONE 503.224.8700 E WEB Sales@Huntco.com P.O. Portland, Box 10385 Or. 97296-0385 E salesandsupport@sportworks.com.com GENERAL INSTRUCTIONS b. Line up a Hammer Drill with a 3/8 bit suitable for concrete and drill a hole through the frame into the concrete. c. Next the frame can be anchored to the ground, ensure the redhead is straight not crooked when inserting it through the frame into the hole you drilled. Using a hammer, pound the redhead into the ground (make sure you already have the nut on your redhead before you begin hammering as they tend to mushroom where struck). Be careful not to strike the locker, once the redhead is secure tighten the nut to anchor the locker in place (do not over tighten as it could bend the frame and damage the locker). 13