Priority Trail Projects

Similar documents
FY17 FUNDING SOURCE

REGISTERING YOUR ASSOCIATION STAY INFORMED ABOUT DEVELOPMENT PROPOSALS IN YOUR COMMUNITY

Discovering the Trails of Prince George s County

Appendix 1: Phase I Strategies

Lake Artemesia. Getting There

2016 BASKETBALL GYMS

Washington Metropolitan Area Transit Authority Services Utilization Study

2017 BASEBALL & SOFTBALL FIELDS Prince George s County Boys and Girls Club, Inc.

Awards of Excellence for 2016 Presented January 26, 2017 in Baltimore, Maryland

Trinity Campus Community Survey on Metro SafeTrack Issues June Q1 I am a. Answered: 310 Skipped: 2. NHP Student SPS Student.

Welcome! Good luck to you on your adventures! Do you enjoy the outdoors? Do you and your family visit parks and use trails?

Eagle Rock Loop Ouachita National Forest Page 1 of 8

GREENBELT-BWI THURGOOD MARSHALL AIRPORT EXPRESS LINE ROUTE B30

Transportation Systems

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Classifications, Inventory and Level of Service

Metro s Transit Police Crime Statistics and Upcoming Events Information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

Bear Creek Habitat Improvement Project

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

FEASIBILITY CRITERIA

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Non-Motorized Transportation

The Transportation Corridor Overlay District

OR MISSION TRAIL ELEMENTARY

City Council Workshop July 26, 2010

EXECUTIVE SUMMARY FALL Introduction. Findings

Regional Wayfinding Sign Strategy Thurston County Trails 2017

WALDORF (METRO WASHINGTON, D.C.), MARYLAND

Tallahassee-St. Marks Historic Railroad Trail

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Committee. Presentation Outline

Blue River Trail Master Plan JSA to Town Hall June 2004

Walking Tips. Locations. Good luck on your journey to better health! Earleigh Heights Ranger Station

WALDORF (METRO WASHINGTON, D.C.), MARYLAND

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I. File No Project Manager: Richard Retecki

Coast to Coast Connector Summit

A GUIDE TO THE SERVICES AVAILABLE NEAR YOUR NEW HOME. Cheltenham Estates COMMUNITY GUIDE

University Region Non-Motorized Plan 2015

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Design Charrette Public Meeting

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

Score. Category. Access Aesthetics Community Resources

Aurora Hills. Getting There

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

MORGAN CREEK GREENWAY Final Report APPENDICES

CPBR 2005 Annual Symposium

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

Explore the Bay the Green Way

Port Gamble Shoreline Area Conceptual Trail Proposal

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

Black Hill Regional Park, Little Seneca Lake

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

BACK COUNTRY UNIT PREFERRED ALTERNATIVE

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Washington-Baltimore Regional Airport System Plan Ground Access Element Update

Every Future Has a Past

FDOT Treasure Coast Traffic Report through

Welcome to the Downtown Fort Lauderdale Neighborhood Working Group Meeting. First meeting june 17, 2010

Sacramento Placerville Transportation Corridor Alternatives Analysis

Segment 2: La Crescent to Miller s Corner

The Baker/Carver Regional Trail is intended to

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

Non-motorized Trail Plan & Proposal. August 8, 2014

Waukee Trailhead Public Art and Amenities Project

Jackson Miles Abbott Wetlands Refuge/Fort Belvoir

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Why we re here: For educational purposes only

Area Surrounding Maplewood Manor

Transportation Supporting Dulles Airport

Community Development Committee

4.19 Parks, Recreation, and Conservation Lands

Wichita Falls MPO - MTP Project List 1 of 6

Oregon Section B - Page m

French Regional Park Creative Play Area

Business Item No

Independence: overview

RTSP Strategies: PCN+, Streetcar, Light Rail, Beltway Line, Brown Line, Metrorail extensions, spurs/bypasses

Partner With Prince George s County at the International Council of Shopping Centers. littleny / Shutterstock.com. Experience, Expand, Explore

STRATEGIC PRIORITIES FOR ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS Recommended May 9, 2012

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Guide to. Suffolk. Walking. Trails. Lake Meade Park

Guide to. Road Construction Projects

MARYLAND. Parks, Wildlife Refuges and National Park Service Areas in PATC Area Affected by Proposed Changes to Current Gun Regulations

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Des Plaines River Trail Southern Segment Corridor Plan

Green Line Implementation Plan Draft Conceptual Master Plan Phase 2: Public Meeting 02 April

Major Projects Overview

Silver Spring/Takoma Park (East Side)

MARYLAND RV PARKS & CAMPGROUNDS RECOMMENDED BY THE NRVOA

Town of Frisco. Trails Master Plan. Legend. Planning Area 1. i l. 9 Campground. Lake Hill Development. Giberson Property. Frisco Transit Center

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Environmental Assessment and Final Section 4(f)

Trail Feasibility Study

Transcription:

R I V E R P Priority Projects 2018 System Area-wide Projects 3-A: Addressing System for Emergency Responce 3-B: Anacostia Tributary System - Wayfinding Signage 3-D: Develop deploy pilot trail ranger program (2 year pilot) 4-E: DPR Natural Surface Plan Development Guide 5-A: System wide Brdige Inspection Repair Program 9-C: ATTS to WB&A Connector 5-B: Anacostia Tributaries System (ATTS) 3-C 6-C 6-A 1-B 1-C 5-B 6-B 9-C 9-C 5-D 2-B 2-B 1-A 3-D 7-A 1-D 3-C 9-A 9-B 8-C 2-A 8-D 2-A 4-C 8-B 8-E 7-B 5-C 5-E 4-B 4-A 4-D 8-A 2-C P A T U X E N T Priority Projects Priority Primary, Existing Primary, Planned Secondary, Existing Secondary, Planned Metro Stations Blue Line Orange Line Green Line Water Institution s Area Outside of the Metropolitan District Boundary Service Areas County Boundary 0 1 2 Miles

Priority 1: Ensure Funding for Unexpected Project Costs for Projects Already Underway 1-A WB&A Connection Bridge from Anne Arundel County to Prince George s County 600 ft Bridge over Patuxent River to complete trail gap $5.5 million 1-B Little Paint Branch Extension Phase 1 Beltsville Community Center to Little Paint Branch 2 miles Completes trail gap between Paint BridgeatCherry Hill Rd to the Little Paint Branch at Beltsville Community College $4,200,000 1-C College Woods Connector 1-D Rhode Isl Avenue Trolley DePauw Place to Paint Branch Farragut St to Armentrout Drive & Northwest Branch at Melrose. 0.5 miles Connector trail $1,600,000 0.5 miles Completes trail gap $468,000 (partial funding) Priority 2: Continue Phased Development of Major in the Design Development Process 2-A Central Avenue Corridor Phase 1 Addison Plaza to Peppermill Road 1 mile New trail $5,800,000 2-A Central Avenue Corridor Phase 2 Capitol Heights Loop & Peppermill Road to Largo Town Center 6.5 miles Includes 2.5 mile loop west of Addison Rd Metro to Seat Pleasant Capital Heights 4-mile segment to Largo at Lottsford Road. $37 million 2-B Bowie Heritage Phase 1 Falling Water Court via Adnell to Jericho 1 mile New trail. Design construction managed by City of Bowie $192,000 2-B Bowie Heritage Phase 3 (Phase 2 is complete) Bowie State/DNR property line to WB&A Spur 0.5 miles Completes trail gap. Managed by DPR. $278,000 2-C Piscataway Creek - Fort Washington Ft. Washington (NPS) at King Charles Terrace to Piscataway Drive 1 mile Partnership with NPS. Improved natural surface trail for hiking. $925,000

Priority 3: Develop a Management Team Address Lighting & Security Needs 3-A Addressing System for Emergency Response Phase 1 implement on Anacostia Tributaries System (ATTS) System-wide Design install a set of trail address signs to help trail users locate themselves accurately when calling 911. ~$50,000 3-B Anacostia Tributary System - Wayfinding Signage 30+ mile ATTS 30 miles Install replacement wayfinding signage $860,000 3-C Install Lighting ART in Cottage City NW Br Tr in Langley 1-2 miles Based on study findings install trail lighting in select locations on the ATTS. $500,000 3-D Develop deploy pilot trail ranger program (2 year pilot) ATTS 30 miles Fund a pilot project to be integrated into operating expenses if successful. $300,000 Priority 4: Fund Natural Surface Rehabilitation Development 4-A Cosca Regional Cosca Regional Complete construction of planned mountain biking trails. Under $25,000 4-B Jug Bay HikingEquestrian Jug Bay Natural Area Implement planned upgrades to natural surface trails. 4-C Watkins Regional Hiking/Mt. Biking/ Equestrian Watkins Regional Implement upgrades to natural surface trails identified in the WRP Master Plan 4-D Cosca to Rosaryville Powerline Stream Valley Corridors 6.5 miles Study alignment options for un-paved trail linking Cosca RP to Rosaryville State 4-E DPR Natural Surface Plan Development Guide DPR System -- Develop a plan that includes needs assessment, study of user groups, design manual management guidelines. $150,000

Priority 5: Fund Conduct Safety Audits & Rehabilitation Action Plans 5-A System wide Bridge Inspection Repair Program System wide 5 B---E Safety Audits Rehabilitation Activities for Major 5-B Anacostia Tributaries System (ATTS) 5-C Oxon Cove/ Oxon Run Existing Older ATTS ~50 miles Conduct detailed safety audits develop implement trail upgrades. Issues to be reviewed include: Bridges Oxon Cove / Oxon Run near Forest Heights Oxon Hill Farm. 5-D WB&A Race Track Road to MD 450. 5-E Henson Creek Oxon Hill Road to Temple Hill Road Underpasses Boardwalks Bollards Pavement Quality Drainage Vegetation Signage & Striping Pavement Width Priority 6: Address Short Gaps in the Network & Construct In- Connector Paths 6-A Little Paint Branch Extension Phase 2 Along Old Gunpowder Road from Denim Road to I-95 bridge 900 feet Completes trail gap $79,000 6-B Old Calvert Road Connector NE Branch Stream Valley near CP Airport 0.25 miles The City of College has asked for a bridge to connect NE Branch to the. 6-C Fairl Regional Aquatic Center to Gardens Ice House ing Lot 0.25 miles Connector trail $232,000 Priority 7: Revive Stuck Projects 7-A Prince George s Connector Chillum Road to Russell Avenue 0.5 mile Completes trail gap $2,329,000 7-B Henson Creek Extension TempleHillRoadto Branch Ave Metro Station 2 miles extension including crossing I-495 & MD 5 $3,085,000

Priority 8: Fund Conduct Major Feasibility Studies 8-A Piscataway Creek Piscataway Drive to Westphalia Central 15 miles New trail $12,203,000 8-B Oxon Run (Northern Extension) Southern Avenue to Naylor Road. 1.0 mile Connects Suitl way in DC with Naylor Road Metro. Also links Hillcrest Heights Community Center. $1,125,000 8-C Folly Branch --Atwell Ave to Lottsford Vista Rd Enterprise Golf Course Loop. --Sunflower Place to OldLottsfordVista Rd. --Enterprise Golf Course Loop east side. 8-D Western Branch Canterbury Court to Watkins Regional Ketttering Perrywood Community Center 3.0 miles Completes trail gaps including crossing US 50 gaps on east west sides of Enterprise Golf Course 2 miles Completes trail gap including crossing MD 214 $2,918,000 $3,025,000 8-E Chesapeake Rail Seat Pleasant to Jug Bay 13 miles New trail $9,178,000 Priority 9: Support Non- Proposals Studies 9-A Cheverly to Anacostia Cheverly-Euclid Neighborhood to Bladensburg Waterfront 1.6 miles Connector trail $1,900,000 9-B WB&A Extension to District of Columbia MD 450 to DC Boundary 6.5 miles Study feasibility to reduce travel lanes /or add sidepath to create a continuous trail. 9-C ATTS to WB&A Connector Feasibility Study of potential alignments to connect WB&A with Indian Creek outside of the Beltway. 8.5 miles Study potential alignments such as Beaver Dam Road, Good Luck Road, the BARC, Greenbelt, other public ls to determine if a feasible trail/low volume road route can be created.