STUDY WORK GROUP MEETING No. 4. July 12, 2017

Similar documents
STUDY WORK GROUP MEETING No. 3. November 29, 2016

AIRPORT MASTER PLAN UPDATE

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Community Advisory Committee Meeting No. 5

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

What is an Airport Master Plan?

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

General Aviation Master Plan Update

TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Meeting #4 Presentation Material DATE: July 18, 2017

Birmingham Airport 2033

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

FORECASTING FUTURE ACTIVITY

Lake Tahoe Airport Master Plan

STUDY WORK GROUP MEETING No. 2. March 15, 2016

Regular Board Meeting August 4, 2015

Table of Contents. Overview Objectives Key Issues Process...1-3

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies

CHAPTER 1 EXECUTIVE SUMMARY

Planning, Development and Environment Committee

CHAPTER 4: ALTERNATIVES

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Table E-3 Phased Capital Improvement Program...E - 11

Public Information Meeting. September 2015

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

Master Plan Update Technical Advisory Committee Meeting

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Study Committee Meeting. September 2015

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Current and Forecast Demand

Fort Lauderdale Hollywood International Airport

Master Plan Update Community Advisory Committee Kick-off Meeting

8.0 AIRPORT LAYOUT PLANS

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Savannah / Hilton Head International Airport Master Plan Update

Punta Gorda Airport Master Plan Update

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Chapter 8.0 Implementation Plan

Chapter 1: Introduction Draft

Airport Master Plan Open House Front Range Airport February 23, 2017

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Westover Metropolitan Airport Master Plan Update

Chapter 1: Introduction

CHAPTER 5: Landside Facility Requirements and Development Concepts

CHAPTER 1: INTRODUCTION

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

Fort Wayne International Airport Master Plan Study. Executive Summary

Blue Grass Airport (LEX) serves the needs of a multi-county area that

MASTER PLAN UPDATE GRANT NUMBER

Norfolk International Airport

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

The CLE Master Plan Includes:

Alternatives Analysis EXECUTIVE SUMMARY

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

Tampa International Airport Master Plan Update. December 12, 2012

GREATER ORLANDO AVIATION AUTHORITY

Ted Stevens Anchorage International Airport

BURLINGTON INTERNATIONAL AIRPORT

Ted Stevens Anchorage International Airport

THE CASE OF A SUCCESSFUL PFC APPLICATION

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

MASTER PLAN CONCEPT 1 DRAFT

Stakeholders Meeting

AIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:

The demand/capacity analysis was performed utilizing Federal Aviation Administration (FAA) publications, including the following:

3.9 AIRPORT SUPPORT FACILITIES

CHAPTER 3 ALTERNATIVES CONSIDERED

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Merritt Island Airport

Technical Advisory Committee Meeting February 29, 2016

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

COMMERCIAL AND GENERAL AVIATION

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Raleigh Executive Jetport Master Plan Update MPAC MEETING #3 NOVEMBER 1, 2018

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Kansas City Aviation Department. Airport Committee July 19, 2018

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

Yakima Air Terminal/McAllister Field Airport Master Plan Update

SouthwestFloridaInternational Airport

Planning Advisory Committee - PAC Welcome

Transcription:

STUDY WORK GROUP MEETING No. 4 July 12, 2017

Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments, questions, and next steps

Team Introductions Mead & Hunt, Inc. Jon Scraper, Project Coordinator Bart Gover, Project Manager Jen Boehm, Project Engineer Matt Blankenship, Project Planner Rob Sims, Project Planner Kim Kenville Consulting Public Outreach Program

Project Schedule 5 total Study Work Group meetings 3 total Public Information meetings Project completion estimated in December 2017

Overview of Previous Meeting Critical aircraft Aviation forecasts Demand/capacity analysis Facility requirements

Critical Aircraft MD 80 series Aircraft Approach Category D Airplane Design Group III Taxiway Design Group TDG-4

Aviation Forecasts Moderate enplanement growth to accompany modest growth in operations Larger aircraft to reduce number of required operations Increase in turbine aircraft will drive hangar demand 500,000 400,000 300,000 200,000 100,000 0 80,000 60,000 40,000 20,000 0 Enplanements 431,961 386,743 341,525 296,308 259,734 2015 2020 2025 2030 2035 Operations 58,536 58,536 60,987 63,339 65,598 2015 2020 2025 2030 2035 Total Itinerant Local

Aviation Forecast Summary

Facility Requirements- Airside Runways Runway lengths and widths to remain unchanged Change in FAA design standards has several potential ripple effects RW 13/31 from D-IV to D-III RW 3/21 from C-II to C-III Taxiways New taxiway fillet designs to comply with FAA standards Modification of direct runway to apron connections NAVIADs Add MALSF to Runway 3 Upgrade Runway 3 ILS Update lighting to LEDs Access roads to be relocated/removed

Facility Requirements- Landside Hangars Expand corporate hangar development areas Continued growth of T-hangar development SRE Expansion needed to meet storage needs Pull-through parking for large vehicles Fuel Expand fuel facility (additional capacity) ARFF Expand ARFF station

Facility Requirements -Parking Parking Existing ratios used to determine demand Expand terminal parking Additional employee and rental car spaces Vehicle Parking Demand Airport Parking 2015 2020 2025 2030 2035 Public Parking 0 158 353 548 743 Employee Parking 0 11 26 41 56 Rental Ready/Return 0 15 35 55 75 Rental Storage 0 44 100 156 211 Total 0 229 514 799 1,085

Facility Requirements -Terminal Additional TSA screening and queuing space is needed Additional baggage carousel and expanded baggage handling area Four additional gates for air carriers and charters Apron expansion Total of 128,000 SF expansion

Airside Alternatives

Airside Alternative 1 Requires significant reconstruction of runway environment Full modification to meet current FAA Design standards Proposed relocation of parallel Taxiway C and D Reduce widths of Taxiway C connectors Increase widths of Taxiway fillets Restripe segment of terminal apron Removal/relocation of access and maintenance roads Future NAVAID upgrades

Airside Alternative 1

Airside Alternative 2 Designed to best meet facility needs Reconfigure access roads Approach lighting system modifications Compliance with FAA Design Standards Several surfaces exceed current FAA design standards Reduce widths of Taxiways C3 and C5 Restripe segment of terminal apron

Airside Alternative 2

Landside Alternatives

Landside Alternative 1 SRE Short-term 9,000 SF SRE expansion with 10,700 SF of apron Ultimate 28,000 SF SRE expansion with 80,000 SF of apron expansion Hangars 97,000 SF expansion of TW B hangar development 163,000 SF expansion of corporate hangars 295,000 SF expansion of corporate hangar aprons Preserve area for future aeronautical development Expansion of fuel facility (one additional tank) Expand ARFF facility

Landside Alternative 1

Landside Alternative 2 SRE Short-term 12,000 SF SRE expansion with 64,000 SF of apron Ultimate 28,000 SF SRE expansion with 80,000 SF of apron expansion Hangars 120,000 SF expansion of TW B hangar development 163,000 SF expansion of corporate hangars 295,000 SF expansion of corporate hangar aprons Preserve area for future aeronautical development Expansion of fuel facility (one additional tank) Expand ARFF facility

Landside Alternative 2

Parking Alternatives

Parking Alternative 1 Parking lot expansion with minimal modifications to layout Maximizes use of green space around existing parking lots Terminal Blvd merged with Jetway Avenue Net increase of 945 public parking spaces Net increase of 400 rental car parking spaces

Parking Alternative 1

Parking Alternative 2 Moderate expansion of existing parking Realignment of Terminal Blvd but separate from Jetway Avenue Development of 3-level parking garage located south of the terminal Elevated connection to terminal Net increase of 1,225 public parking spaces

Parking Alternative 2

Terminal Alternatives

Terminal Alternative 1 New 50,000 SF concourse and 10,000 SF terminal expansion Pier expansion allows gates on either side Relocated retail area with improved access Expanded TSA checkpoint and screening area Pier would limit aircraft access near Taxiway C and limit functionality of some gates

Terminal Alternative 1 Level 1 Future GSE, utilities, and baggage handling storage areas Expanded existing inbound baggage area Add third baggage claim belt Expand passenger circulation area/lobby Relocate rental car counters

Terminal Alternative 1 Level 2 8 total aircraft gates (FAA Group III MD-80) Expanded TSA check point New passenger holding areas Additional restrooms and retail space Extended passenger circulation corridor Optional connection to parking structure

Terminal Alternative 1

Terminal Alternative 2 New 53,000 SF linear concourse with 10,000 SF terminal building extension (2 levels) Includes 46,500 SF apron expansion Capability to expand concourse additional 38,000 SF Ultimate concourse expansion (beyond 2035) Includes 191,000 SF apron expansion (beyond 2035) Provides adequate space for baggage claim and TSA holding expansion Aircraft would have ready access to gates

Terminal Alternative 2 Level 1 Expanded existing inbound and outbound baggage areas Add third baggage claim belt Expand passenger circulation area/lobby Relocate rental car counters

Terminal Alternative 2 Level 2 8 total aircraft gates (FAA Group III MD-80) Capacity for three additional aircraft gates (beyond 2035) Designated areas for utilities, concessions and storage Expanded TSA check point New passenger holding areas Additional restrooms Extended passenger circulation corridor Optional connection to parking structure

Terminal Alternative 2

Open Forum Grab lunch Walk around the room and review the alternatives Open conversation, feedback, and questions

Next Steps Hold Public Meeting No. 2 Incorporate public feedback to airport alternatives Identify a preferred alternative concept for development of Airport Layout Plans (ALP) package Prepare environmental overview chapter

Comments & Questions Open discussion Contact Airport Tim Thorsen tthorsen@bismarcknd.gov Contact the Project Manager Bart Gover bart.gover@meadhunt.com Bismarck Airport Master Plan Webpage Access to draft documents and alternatives for review/comment

Thank you!

Terminal Alternative Comparisons Alternative 1 Pros L Alternative 1 Cons Snow removal Construction phasing Alternative 2 Pros Pros Alternative 2 Cons Text here

Current Progress INVENTORY (complete) Documents existing Airport conditions, facilities, and context. FACILITY REQUIREMENTS (draft complete) Identifies needs for key facilities (runways, taxiways, hangars, etc.). FORECASTS (complete) Predicts number of future passengers, aircraft types, takeoffs, landings, and based aircraft. ALTERNATIVES ANALYSIS (in progress) Develops concepts for meeting facility requirements and recommends preferred solutions.