PBNTF ECTL-RAISG/2 - WP/01 13/03/2014 JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & RAISG MEETING SECOND MEETING (, Brussels 12 14 March 2014) PROPOSED DETAILED AGENDA V8 Agenda Item Supporting material Est. Time Speaker 12 March 2014 (from 14h to 17h) EUROPA 1 Opening IP 1 Co-Chairmen/Secretary 2 Global and Regional PBN developments, including: WP2 & 6- task 3 ICAO latest developments/outcomes of the list Elkhan Nahmadov 30 min EANPG COG IP 2 to ICAO 7 + IP15 4 latest developments (including NSG report and PBN IR status) 5 Status report on SDCM and GLONASS IP 10 PP06 30 min IP 8 & 9 30 min F. Pavlicevic & S. Neshevski - Vladimir Korchagin - Russian Federation 6 Status report on EGNOS system status PP08 20 min GSA 7 Status report on EGNOS service provision PP09 20 min ESSP 8 RNAV routes data quality monitoring - status report IP 11 PP10 30 min Lucie Kovacova - WP 3 9 Monitoring RNP APCH deployment WP7 Aline Troadec WP8 PP11 30 min CNS 4b ICAO table 13 March 2014 (from 9h to 17h) POLLUX 10 PANS-OPS OAS software for APV I SBAS WP 4 verbal 15 min P. Bizet French CAA (DGAC DTA) 11 Status report from EASA ppt 30 min Bryan Jolly - EASA 12 National PBN implementation report 12.1 PBN implementation status in Portugal PP22 30 min Victor Estrella - NAV Portugal 12.2 PBN implementation in Norway PP01 30 min Einar Stein Haugen - (5 pages)
-2- PBNTF ECTL-RAISG/2 - WP/01 AVINOR 12.3 PBN implementation status in UK PP07 30 min UK CAA and NATS 12.4 PBN implementation status in Finland PP05 30 min Samu Tuparinne - Finavia 12.5 PBN implementation status in Switzerland PP12 30 min Marc Troller - Skyguide 12.6 PBN implementation status in Italy PP13 30 min ENAV 12.7 Other national implementation status reports verbal 30 min all 13 APV at visual airfields (Spain) PP03 Rev 1 20 min AENA 14 Introduction to draft ICAO Concept of operations Rick Farnworth - IP 12 verbal 5 min for RNAV visual approaches 15 "RNAV visual" trials in France PP14 30 min DSNA 16 French implementation of the ESSP APCM tool (Airports Performances Continuous Monitoring tool) PP02 30 min DSNA 17 EGNOS NOTAM service status IP 13 PP15 30 min ESSP and 18 PBN and FPL PP16 15 min Aline Troadec - 19 PBN fleet equipage according to FPL content IP 14 PP04 30 min Michel Roelandt - 14 March 2014 (from 9h to 15h) EUROPA 20 IATA priorities for RNP APCH implementation PP17 30 min Anthony van der Veldt - IATA 21 EGNOS adoption projects funded EC verbalpp18 30 min GSA / INECO 22 Discussion on GNSS information distribution WP 5 verbal 20 min 23 Guidelines for RNP APCH implementation (doc 025) 30 min 24 FAQ and lessons learned PP20 2h and all including: Operational use of VOR PP21 G. Berz - FAS DB PP19 25 AOB 26 Recap and conclusions, review of actions 30 min Co-Chairmen/Secretary
-3- PBNTF ECTL-RAISG/2 - WP/01 PBNTF ECTL RAISG/2 LIST OF SUPPORTING DOCUMENTS 1. WP Agenda 1 v8?? Proposed detailed agenda v8?? Secretariat 2 6 2 Att A (EN) 2 Att A (RU) 2 Att B (EN) 2 Att B (RU) ICAO EUR PBN Approvals Guidance Material (EUR Doc 029) 6 Guidance material on RNAV 10 Approvals 6 Guidance material on RNAV 10 Approvals 6 Guidance material on RNP 4 Approvals 6 Guidance material on RNP 4 Approvals 3 9 Updated CNS4b Table 4 10 PANS-OPS OAS Software France 06/03/2014 5 22 Stimulating discussions on GNSS information distribution Eurocontrol 07/03/2014 6 3 7 9 Appendix H - Task List of SoD of the 1 st ICAO EUR Performance Based Navigation Task Force & Eurocontrol RAiSG Meeting (Paris, France, 11-13 September 2013) Update of CNS 4b table and Status of PBN Implementation for ICAO EUR States 7 Att A 9 Updated CNS 4b table of the EUR Air Navigation Plan 7 Att B 9 8 9 ICAO EUR Member States Status of PBN Implementation for 2014 PBN Approach map tool deployment status at the end of 2013 & future updates List of information papers Eurocontrol 11/03/2014 2. IP Agenda 2 1 Global Aviation Safety Plan 2013 3 8 4 1 Resolutions Adopted Assembly 38 th Session (Montreal, 24 September 4 October 2013, Provisional Edition November 2013) Doc 9750 AN/963 Fourth Edition - 2013-2028 Global Air Navigation Plan (5 pages)
-4- PBNTF ECTL-RAISG/2 - WP/01 5 1 6 8 Report of the Fifty-fifth Meeting of the European Air Navigation Planning Group (Paris, 25-28 November 2013) Electronic Bulletin (EB 2013/38) of 30 Aug 2013, Annex amendments that have become effective 15 July 2013 Secretariat 30/01/2014 7 8 ANB Publications 2012- (Forecast)2014 Secretariat 30/01/2014 8 2 GLONASS and SDCM status 9 3 Development of a new plan for PBN implementation in the Russian Federation Russian Federation Russian Federation 27/02/2014 27/02/2014 10 4 11 8 12 13 Report of the 18 th Meeting of the Navigation Steering Group (24 September to 26 September 2013 Brussels, (Eurocontrol) RNDSG-81 WPA Airspace AIP Publication Issues Progress OPSP.WGWHL16.WP-19 AI-5.4 Concept of operations for RNAV visual approaches 13 Rev 16 AI Operations Inputs to the Group on GNSS NOTAM 13 Att A 16 AI Operations-9/AP7 - GNSS NOTAM in Europe State of the Art 13 Att B 16 GNSS NOTAM in Europe State of the art 13 Att C 16 The Provision of GNSS Status Information and NOTAMs 13 Att D Rev 13 Att E Rev 16 Presentation AI Operations #9 GNSS NOTAM EGNOS NOTAM 16 Presentation - AI Operations Subgroup-9 Conclusions 13 Att F 16 AI Operations-9 ACT 10 Consolidated comments 14 17 PBN 2013 data collection Fleet Capability Assessment 15 3 SL AN 13/2.5-13/85 Proposal for the amendment of the Procedures for Air Navigation Services Air Traffic Management (PANS-ATM, Doc 4444) relating to 9.3 km (5 NM) terminal separation based on RNP, PBN lateral separation and VOR/GNSS lateral separation List of Powerpoint presentations 3. PPT Agenda 1 12.2 PBN Implementation Plan Norway Norway 07/03/2014 2 16 RAISG/PBN-TF#02 French experimental implementation France- 10/03/2014
-5- PBNTF ECTL-RAISG/2 - WP/01 of ESSP APCM tool DSNA 3 Rev 1 13 APV at visual airfields AENA 11/03/2014 4 19 PBN Fleet equipage according to FPL content Eurocontrol 11/03/2014 5 12.4 PBN Implementation status in Finland Finland 11/03/2014 6 4 NAV & PBN related Eurocontrol training Eurocontrol 11/03/2014 7 12.3 United Kingdom PBN Implementation Status 8 6 EGNOS Implementation status Focus on LPV 200 United Kingdom European GNSS Agency 13/03/2014 19/03/2014 9 7 EGNOS Service status ESSP 19/03/2014 10 8 RNAV routes data quality monitoring status report Eurocontrol 19/03/2014 11 9 PBN Approach implementation monitoring Eurocontrol Eurocontrol 19/03/2014 12 12.5 Status report of Switzerland Switzerland 20/03/2014 12 Att 12.5 PBN Implementation Status in Switzerland Switzerland 24/03/2014 13 12.6 PBN Implementation inside Italian Airspace Italy 20/03/2014 14 15 Visual RNAV evaluation in France France 21/03/2014 15 17 EGNOS NOTAM Proposals: Status update ESSP 21/03/2014 16 18 PBN and Flight Planning Eurocontrol 21/03/2014 17 20 PBN Implementation IATA 24/03/2014 18 21 EU funded initiatives to support EGNOS adoption in Aviation European GNSS Agency 24/03/2014 19 24 FAS Data-Block tool issues Eurocontrol 24/03/2014 20 24 Open Questions & Collecting Lessons Learned Eurocontrol 24/03/2014 21 24 Operational use of VOR Eurocontrol 24/03/2014 22 12.1 RNP APCH in Portugal Portugal 24/03/2014 -END- Page 5 of 5