JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

Similar documents
PBN and Flight Planning

Open Questions & Collecting Lessons Learned

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

Status of PBN implementation in France

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF)

EUROCONTROL approach to the execution of the PBN IR Mandate

ICAO WORKSHOP. LOW VISIBILITY PROCEDURES (LVP) and APPROACH PROCEDURE with VERTICAL GUIDANCE (APV) ICAO EUR/NAT, PARIS.

ESSP EGNOS Service Provider. ICAO APV Workshop (26/05/2011)

ICAO framework for LPV

UK Implementation of PBN

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

DSNA NAVIGATION STRATEGY

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

Patrizio Vanni (Project Coordinator)

ENAV experience on LPV implementation

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

PBN/TF/7 DRAFT Appendix D to the Report D-1

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

The support of an European ANSP

French DSNA approach to CNS rationalization & evolution


USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

Introduction. European Airspace Concept Workshops for PBN Implementation

Measurement of environmental benefits by ICAO Secretariat

APV Implementation in the UK Initiative

UK Performance-based Navigation (PBN) Implementation Status

Learning Objectives. By the end of this presentation you should understand:

IATA EUR Airline PBN implementation requirements - March State Airport TMA/Runways Specifics. Austria VIE PRNAV SIDs/STARs

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Evolving and improving landing networks with EGNOS

EUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL

GNSS/EGNOS services and applications in civil aviation

PBN Implementation in the UK

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

FLIGHT OPERATIONS PANEL (FLTOPSP)

European Aviation Safety Agency

ASSEMBLY 39TH SESSION

International Civil Aviation Organization. Performance Based Navigation Sub-Group (PBN SG) MEASURES TO FOSTER THE PBN IMPLEMENTATION IN THE MID REGION

NEW FPL Transition Phase & Implementation Stages

SDM WORKSHOP ON PBN (19/10/2017)

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

APAC PBN UPDATE Slide 1 of xx

Appendix 2 List of regulatory references. Appendix 3 List of reference documents. Appendix 4 Background information

Terms of Reference for a rulemaking task. Revision of operational approval criteria for performance-based navigation

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

ICAO EUR Region Performance Framework

Guidance for the preparation of EGNOS National Market Analysis

Flight Operations Inspector Manual

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March RPAS Panel. Leslie Cary, RPAS Programme Manager, ICAO Randy Willis, RPAS Panel Chairman

DSNA Navigation Strategy. Benoit Roturier (DSNA)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Work Programme of ICAO Panels and Study Groups

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

APPENDIX L PRIORITY SAFETY TARGETS AND ASSOCIATED METRICS FOR THE ICAO EUR REGION

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

EURNAT-DGCA 2017/1 ICAO EUR

TWELFTH AIR NAVIGATION CONFERENCE

EASA RNP (AR) Workshop The Landscape Working Together

Technical Resources - Automation European AIS Database (EAD)

Performance Based Navigation (PBN) Implementation Plan. The Gambia

MEDUSA & NANSC, Egypt

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

(Presented by the Secretariat)

International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics. Paul Willis Managing Director, Aviation Solutions

Performance Based Navigation Implementation of Procedures

ICCAIA CNS-ATM Committee Report to Council

Título ponencia: Introduction to the PBN concept

GENERAL REPORT. Reduced Lateral Separation Minima RLatSM Phase 2. RLatSM Phase 3

EGNOS History, Status and Plans

NNF Work-shop on Navigation, Safety and Technology. Dato: 2. February Gunn Marit Hernes Luftfartstilsynet

Implementation of PBN in Armenian airspace

PBN Implementation inside Italian Airspace

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

AIS-AIMSG-Memo/1 8/10/2008 MEMORANDUM. Members, Aeronautical Information Services-Aeronautical Information Management Study Group (AIS-AIMSG)

NEW CALEDONIA PBN PLAN

TWELFTH AIR NAVIGATION CONFERENCE

EUR/SAM corridor airspace concept

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

The Single European Sky & the SESAR programme

GNSS/EGNOS services and applications in civil aviation

EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF)

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Terms of Reference for a rulemaking task

Russian Federation ATM modernization program

(Presented SUMMARY 1.1. The fourth meeting 1.2. by the Secretary) /7 meeting. the group on 1.3 IVATF/4 2. DISCUSSION. The appendix paper 2.

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

Volcanic Ash Operations Workshop

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

IAL 2 INTERNATIONAL AIR TRANSPORT ORGANIZATIONS

TWELFTH AIR NAVIGATION CONFERENCE

V3 SPR. Abstract. Document information

Transcription:

PBNTF ECTL-RAISG/2 - WP/01 13/03/2014 JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & RAISG MEETING SECOND MEETING (, Brussels 12 14 March 2014) PROPOSED DETAILED AGENDA V8 Agenda Item Supporting material Est. Time Speaker 12 March 2014 (from 14h to 17h) EUROPA 1 Opening IP 1 Co-Chairmen/Secretary 2 Global and Regional PBN developments, including: WP2 & 6- task 3 ICAO latest developments/outcomes of the list Elkhan Nahmadov 30 min EANPG COG IP 2 to ICAO 7 + IP15 4 latest developments (including NSG report and PBN IR status) 5 Status report on SDCM and GLONASS IP 10 PP06 30 min IP 8 & 9 30 min F. Pavlicevic & S. Neshevski - Vladimir Korchagin - Russian Federation 6 Status report on EGNOS system status PP08 20 min GSA 7 Status report on EGNOS service provision PP09 20 min ESSP 8 RNAV routes data quality monitoring - status report IP 11 PP10 30 min Lucie Kovacova - WP 3 9 Monitoring RNP APCH deployment WP7 Aline Troadec WP8 PP11 30 min CNS 4b ICAO table 13 March 2014 (from 9h to 17h) POLLUX 10 PANS-OPS OAS software for APV I SBAS WP 4 verbal 15 min P. Bizet French CAA (DGAC DTA) 11 Status report from EASA ppt 30 min Bryan Jolly - EASA 12 National PBN implementation report 12.1 PBN implementation status in Portugal PP22 30 min Victor Estrella - NAV Portugal 12.2 PBN implementation in Norway PP01 30 min Einar Stein Haugen - (5 pages)

-2- PBNTF ECTL-RAISG/2 - WP/01 AVINOR 12.3 PBN implementation status in UK PP07 30 min UK CAA and NATS 12.4 PBN implementation status in Finland PP05 30 min Samu Tuparinne - Finavia 12.5 PBN implementation status in Switzerland PP12 30 min Marc Troller - Skyguide 12.6 PBN implementation status in Italy PP13 30 min ENAV 12.7 Other national implementation status reports verbal 30 min all 13 APV at visual airfields (Spain) PP03 Rev 1 20 min AENA 14 Introduction to draft ICAO Concept of operations Rick Farnworth - IP 12 verbal 5 min for RNAV visual approaches 15 "RNAV visual" trials in France PP14 30 min DSNA 16 French implementation of the ESSP APCM tool (Airports Performances Continuous Monitoring tool) PP02 30 min DSNA 17 EGNOS NOTAM service status IP 13 PP15 30 min ESSP and 18 PBN and FPL PP16 15 min Aline Troadec - 19 PBN fleet equipage according to FPL content IP 14 PP04 30 min Michel Roelandt - 14 March 2014 (from 9h to 15h) EUROPA 20 IATA priorities for RNP APCH implementation PP17 30 min Anthony van der Veldt - IATA 21 EGNOS adoption projects funded EC verbalpp18 30 min GSA / INECO 22 Discussion on GNSS information distribution WP 5 verbal 20 min 23 Guidelines for RNP APCH implementation (doc 025) 30 min 24 FAQ and lessons learned PP20 2h and all including: Operational use of VOR PP21 G. Berz - FAS DB PP19 25 AOB 26 Recap and conclusions, review of actions 30 min Co-Chairmen/Secretary

-3- PBNTF ECTL-RAISG/2 - WP/01 PBNTF ECTL RAISG/2 LIST OF SUPPORTING DOCUMENTS 1. WP Agenda 1 v8?? Proposed detailed agenda v8?? Secretariat 2 6 2 Att A (EN) 2 Att A (RU) 2 Att B (EN) 2 Att B (RU) ICAO EUR PBN Approvals Guidance Material (EUR Doc 029) 6 Guidance material on RNAV 10 Approvals 6 Guidance material on RNAV 10 Approvals 6 Guidance material on RNP 4 Approvals 6 Guidance material on RNP 4 Approvals 3 9 Updated CNS4b Table 4 10 PANS-OPS OAS Software France 06/03/2014 5 22 Stimulating discussions on GNSS information distribution Eurocontrol 07/03/2014 6 3 7 9 Appendix H - Task List of SoD of the 1 st ICAO EUR Performance Based Navigation Task Force & Eurocontrol RAiSG Meeting (Paris, France, 11-13 September 2013) Update of CNS 4b table and Status of PBN Implementation for ICAO EUR States 7 Att A 9 Updated CNS 4b table of the EUR Air Navigation Plan 7 Att B 9 8 9 ICAO EUR Member States Status of PBN Implementation for 2014 PBN Approach map tool deployment status at the end of 2013 & future updates List of information papers Eurocontrol 11/03/2014 2. IP Agenda 2 1 Global Aviation Safety Plan 2013 3 8 4 1 Resolutions Adopted Assembly 38 th Session (Montreal, 24 September 4 October 2013, Provisional Edition November 2013) Doc 9750 AN/963 Fourth Edition - 2013-2028 Global Air Navigation Plan (5 pages)

-4- PBNTF ECTL-RAISG/2 - WP/01 5 1 6 8 Report of the Fifty-fifth Meeting of the European Air Navigation Planning Group (Paris, 25-28 November 2013) Electronic Bulletin (EB 2013/38) of 30 Aug 2013, Annex amendments that have become effective 15 July 2013 Secretariat 30/01/2014 7 8 ANB Publications 2012- (Forecast)2014 Secretariat 30/01/2014 8 2 GLONASS and SDCM status 9 3 Development of a new plan for PBN implementation in the Russian Federation Russian Federation Russian Federation 27/02/2014 27/02/2014 10 4 11 8 12 13 Report of the 18 th Meeting of the Navigation Steering Group (24 September to 26 September 2013 Brussels, (Eurocontrol) RNDSG-81 WPA Airspace AIP Publication Issues Progress OPSP.WGWHL16.WP-19 AI-5.4 Concept of operations for RNAV visual approaches 13 Rev 16 AI Operations Inputs to the Group on GNSS NOTAM 13 Att A 16 AI Operations-9/AP7 - GNSS NOTAM in Europe State of the Art 13 Att B 16 GNSS NOTAM in Europe State of the art 13 Att C 16 The Provision of GNSS Status Information and NOTAMs 13 Att D Rev 13 Att E Rev 16 Presentation AI Operations #9 GNSS NOTAM EGNOS NOTAM 16 Presentation - AI Operations Subgroup-9 Conclusions 13 Att F 16 AI Operations-9 ACT 10 Consolidated comments 14 17 PBN 2013 data collection Fleet Capability Assessment 15 3 SL AN 13/2.5-13/85 Proposal for the amendment of the Procedures for Air Navigation Services Air Traffic Management (PANS-ATM, Doc 4444) relating to 9.3 km (5 NM) terminal separation based on RNP, PBN lateral separation and VOR/GNSS lateral separation List of Powerpoint presentations 3. PPT Agenda 1 12.2 PBN Implementation Plan Norway Norway 07/03/2014 2 16 RAISG/PBN-TF#02 French experimental implementation France- 10/03/2014

-5- PBNTF ECTL-RAISG/2 - WP/01 of ESSP APCM tool DSNA 3 Rev 1 13 APV at visual airfields AENA 11/03/2014 4 19 PBN Fleet equipage according to FPL content Eurocontrol 11/03/2014 5 12.4 PBN Implementation status in Finland Finland 11/03/2014 6 4 NAV & PBN related Eurocontrol training Eurocontrol 11/03/2014 7 12.3 United Kingdom PBN Implementation Status 8 6 EGNOS Implementation status Focus on LPV 200 United Kingdom European GNSS Agency 13/03/2014 19/03/2014 9 7 EGNOS Service status ESSP 19/03/2014 10 8 RNAV routes data quality monitoring status report Eurocontrol 19/03/2014 11 9 PBN Approach implementation monitoring Eurocontrol Eurocontrol 19/03/2014 12 12.5 Status report of Switzerland Switzerland 20/03/2014 12 Att 12.5 PBN Implementation Status in Switzerland Switzerland 24/03/2014 13 12.6 PBN Implementation inside Italian Airspace Italy 20/03/2014 14 15 Visual RNAV evaluation in France France 21/03/2014 15 17 EGNOS NOTAM Proposals: Status update ESSP 21/03/2014 16 18 PBN and Flight Planning Eurocontrol 21/03/2014 17 20 PBN Implementation IATA 24/03/2014 18 21 EU funded initiatives to support EGNOS adoption in Aviation European GNSS Agency 24/03/2014 19 24 FAS Data-Block tool issues Eurocontrol 24/03/2014 20 24 Open Questions & Collecting Lessons Learned Eurocontrol 24/03/2014 21 24 Operational use of VOR Eurocontrol 24/03/2014 22 12.1 RNP APCH in Portugal Portugal 24/03/2014 -END- Page 5 of 5