Community Aviation Consultation Group Record of Proceedings Wednesday 25 th November 2015

Similar documents
GOLD COAST AIRPORT - Runway 14 southern departures trial

A Master Plan is one of the most important documents that can be prepared by an Airport.

Communication and consultation protocol

PERTH AIRPORT AIRCRAFT NOISE MANAGEMENT CONSULTATIVE COMMITTEE MINUTES OF MEETING (FINAL)

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

Gold Coast Airport. Aircraft Noise Information Report. Quarter (July to September) Page 1

Gold Coast Airport Aircraft Noise Information Report

Terms of Reference. Canberra Airport Community Aviation Consultation Group

Gold Coast Airport Aircraft Noise Information Report

Adelaide Airport Consultative Committee MINUTES

Busselton-Margaret River Regional Airport Development Project. Consultative Group. Meeting 5 Minutes

New Runway Project. Connecting people and places. Supporting business. Engaging with community

Gold Coast Airport offers an important link to south east Queensland and northern New South Wales.

2 THE MASTER PLAN 23

Gold Coast Airport Aircraft Noise Information Report

Aviation Development

Gold Coast Noise Information pack June 2012

Noise Abatement Committee Minutes

Appendices. Appendix A Schedule of Consultation. Appendix B SCA Public Participation Program Report (dated September 2006)

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001

Pilot, Virgin Australia (proxy for Capt Darren Gray) Australian Mayoral Aviation Council

PAL Management Centre, Building 18, Tigermoth Lane, Parafield Airport, South Australia 5108

Essendon Airport stakeholder engagement activities Annual Report

Minutes Essendon Airport Community Aviation Consultation Group Meeting held Friday March 10, 2017 at Essendon Fields House

Review of the Gold Coast Airport Environmental Monitoring Units (EMUs)

Fallside Road Bothwell G71 8BB Telephone:

80 projects are. 100 days since City Plan commenced. More than. updates to City Plan have been completed.

Appendix 3-B. Phase 2 - Recent Consultation

ENVIRONMENT ACTION PLAN

Adelaide Airport Consultative Committee MINUTES

Canberra Airport Aircraft Noise Information Report

Brisbane Airport Community Aviation Consultation Group. Auditorium Aviation Australia, 15 Boronia Road, Brisbane Airport

PERTH AIRPORT AIRCRAFT NOISE MANAGEMENT CONSULTATIVE COMMITTEE MINUTES OF MEETING (FINAL)

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

NCC SUBMISSION ON EXPLANATION OF INTENDED EFFECT: STATE ENVIRONMENTAL PLANNING POLICY NO 44 KOALA HABITAT PROTECTION

Sunshine Coast Airport Master Plan September 2007

1. The purpose of this report is to seek the Works, Traffic and Environment Committee s recommendation for:

MELBOURNE AIRPORT COMMUNITY AVIATION CONSULTATION GROUP

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators

Darwin Airport Aircraft Noise Information Report

3. DIA Air Service Developments, Retail and Ground Transport

What options were considered

Canberra Airport Aircraft Noise Information Report

Memorandum of Understanding with ACT Government

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

CACG MINUTES OF MEETING

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

Non-emergency Patient Transport (NEPT) Reform Update

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

Minutes Essendon Airport Community Aviation Consultation Group Meeting held Friday June 16, 2017 at Essendon Fields House

Notice of Meeting and Agenda Renfrewshire Licensing Forum

Great Barrier Local Board OPEN MINUTES

PAL Management Centre, Building 18, Tigermoth Lane, Parafield Airport, South Australia 5108

Community Sports Hub

Community Aviation Consultation Group Meeting Notes - Meeting No 77

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

Community Aviation Consultation Group Meeting Notes - Meeting No 76

They were accompanied by Mary Gray, President of the Urban Bushland Council of Western Australia.

LEEDS BRADFORD INTERNATIONAL AIRPORT CONSULTATIVE COMMITTEE

Dublin Airport Update Presented by Pat Molloy

1. To inform members of the views of the West of England Joint Scrutiny Committee (JSC) following a meeting held on Wednesday 5 th March 2014

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

DRAFT PLAN OF MANAGEMENT MASSY GREENE

It is essential that planning take full account of air safety and efficiency of operations.

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

27 December Companies Announcement Office Australian Securities Exchange Limited 20 Bridge Street Sydney NSW Dear Sir

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Baslow Sports Field Trust Minutes of the Trustees Committee Meeting

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport

COUNTY OF LOS ANGELES

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

Board Member Comments (items not on the Agenda)

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport

STANSTED AIRPORT CONSULTATIVE COMMITTEE USER EXPERIENCE GROUP

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

East Hampton Airport (KHTO) Noise Abatement Plan 2016 Prepared by the Eastern Region Helicopter Council

Sydney Airport Master Plan

MEMBERSHIP CONNECTING AUSTRALIAN AIRPORTS FOR OVER 30 YEARS

STAFF REPORT ACTION REQUIRED

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

UNCONFIRMED Minutes. Ordinary Meeting

Review of brisbane Airport Noise Abatement Procedures

Rebuilding NSW. Joint Community Consultation Submission

Western Sydney Airport Draft EIS 2015

Tourism and Climate Change A Framework for Action

Curriculum Vitae - Tony Charters AM

~ s: Memorandum

Sunshine Coast and Caloundra Airports Aircraft Noise Information Report

HOBART AIRSPACE DESIGN

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

2. RAAF Base Operational Update including Airservices Matters & Defence Support Report

Innovation and excellence recognised at AAA National Airport Industry Awards

INFRASTRUCTURE SUMMIT Capturing the value of our growth cities

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.

Airservices Australia

The major parties key coastal policy initiatives

Cairns Airport Aircraft Noise Information Report

Transcription:

Community Aviation Consultation Group Record of Proceedings Wednesday 25 th November 2015 Attendees Les Fisher AO Carla Golar Marion Charlton Brett Curtis Norbert Benton Matt Shinkel Melissa Pearce Nick Seselja Chris Cooper Donna Perera Paul Burton Geoff Provest Jodie Bellchambers Rod Bates Sue Wilkinson Rose Adams Bill Pinkstone Pat Tate Kay Bolton Philip Follent Lindy Smith David Gray George Beattie Jeff Godfrey Chair Secretary Airservices Australia Australian Federal Police Department of Infrastructure & Regional Development Griffith University NSW Member for Tweed Proxy for Justine Elliot Proxy for Geoff Provest MP Gold Coast City Council Gecko ANACC Banora Point and District Residents Association Fingal Head Community Association Tugun West Neighbourhood Watch Tweed Heads Pony Club Bilinga Neighbourhood Watch Oxley Cove Community Group Tweed Heads Residents & Ratepayers Apologies Carolyn Byrne Chris Robbins Jann Stuckey Justine Elliot Helen Gannon Tim Abberton Steve Murray Greg Wyatt Toni Brownie Neil Hall Graham Quick Rob Anderson Adrian Slootjes Arthur Elliott Helen Twohill Wilf Ardill Tweed Shire Council Gold Coast City Council Member for Currumbin Australian Labor Party Department of Infrastructure & Regional Development Aircraft Noise Ombudsman NSW Department of Planning QLD Dept. Transport & Main Roads Gold Coast City Council Airservices Australia Jetstar Virgin Australia Virgin Australia Cyclades Cres Neighbourhood Watch Fingal Head Community Association Tugun Village Community Association 1

1. Welcome and Introduction The Chair opened the meeting at 0905 and welcomed all attendees to the final CACG meeting for 2015. The Chair welcomed Marion Charlton and congratulated her on her new appointment as Chief Operating Officer for Gold Coast Airport. The Chair reminded everyone of the CACG Objectives: Provide a forum for the exchange of information and ideas between all parties Allow the concerns of interested parties to be raised and taken into account Contribute to community understanding of airport operations The purpose of the CACG is for consultation, not decision-making 2. Apologies Apologies are recorded as above. Marion Charlton introduced herself to the Group highlighting her many years of previous experience within the Aviation industry and her plans for the future at leading up to the 2018 Commonwealth Games. 3. Record of Proceedings of Previous Meeting The previous meeting s Record of Proceedings was accepted by the Group. 4. Recommendations from previous meeting All-weather access to aircraft. Emphasis on public consultation for RWY 14 Golf Couse Trial. The CACG Review tasked by The Department of Infrastructure & Regional Development be transparent to all Group members. 5. Airport Developments The Chair introduced Brett Curtis General Manager Operations and Service Delivery,. Brett provided an update on current developments at : ILS Approximately 6,500 comments were received during the public consultation process. These comments have been compiled into a supplementary report. This report and the draft MDP has been submitted to the Department for the Minister s consideration and a decision is expected in late January 2016. A Runway Maintenance Overlay is currently underway and involves the replacement of the entire asphalt surface of the runway. All works are being carried out during the curfew period to ensure the operation of the airport is unaffected. The total project budget is $12M. Stage 1 of the project (the replacement of the asphalt surface) is scheduled to be completed by the 2 nd Feb 2016. Stage 2 (grooving of the runway surface) is expected to be completed by the 23 rd March 2016. Pat Tate Banora Point & District Residents Association What do you do with the old bitumen? Brett Curtis This is stock piled onsite and used for the airport perimeter roads and general maintenance of the airport. It is good quality material, it s just not suitable for use on a runway. Airport Lighting and Equipment Room Project This building houses all controls for runway lighting, taxiway lighting, illuminated windsocks, guidance signs. The budget for this project was $1.5M. This work was undertaken to upgrade the existing facilities and relocate the building to a secure airside area. AFP Building New 3 level building has been constructed and AFP will relocate in December. The budget for this project was $11M. Building C Southern Cross University works have commenced, with an expected completion date of February 2017. 2

Lindy Smith Tweed Heads Pony Club At the March 2014 meeting, with regards to the ILS, I asked the estimate of fill on the Crown Reserve. The response to that question was to be provided when the information was available, that still hasn t been provided and it wasn t provided in the MDP. Brett Curtis I will take that on notice and come back to you. Project Lift Brett Curtis introduced Matt Shinkel, Senior Project Manager Queensland Airports Limited, to provide an update on Project LIFT. The public consultation period closed on the 30 th September. A total of 43 submissions were received, 23 were supportive of the project, 14 were opposed to the project and 6 were neutral. 67 different issues were raised within the submissions received and a response has been provided to these issues within the supplementary report. The draft MDP and supplementary report were submitted to the Department on the 16 th November, a draft environmental offset strategy has also been submitted. These documents are currently being assessed by the Department of Environment for approval under the EPBC Act and a decision is expected from the Minister for the Environment in early January 2016. Following this the project will be assessed by the Minister for Infrastructure and his decision is expected in mid- March 2016. The subject of environmental offsets attracted a number of specific submissions during the consultation period. The provision of offsets is the mitigation measure implemented in response to the clearing that needs to be undertaken as part of the project. An environmental offsets strategy has been prepared in accordance with the EPBC Act Environmental Offsets Policy. In order to achieve the offsets, land needs to be acquired and management agreements need to be established with land holders for properties that contain the desired properties. Suitable land is still in the process of being sought and negotiations are underway. The airport is required to secure land that has the various environmental habitat values and ecological communities as the land that is being impacted through the project. Lindy Smith Tweed Heads Pony Club Following the presentation at the last meeting in regards to flood volumes, the response was that those volumes would not increase. The MDP indicated that those volumes would increase in the lower Coolangatta Creek. The flood modelling was done on Coolangatta Creek, it appears that Tweed flood modelling wasn t used and the southern end of the creek realignment is to be filled and the levels raised. I think it is important as far as the Tweed River catchment is concerned. In the flood history and the flood events of the 30 th June 05, it only mentions the flooding of the Coolangatta Creek catchment not what occurred in the Tweed catchment. It only mentions that the operations of the airport were Matt Shinkel Queensland Airports Ltd Just running through each of the points you raised, in order to undertake the flood modelling assessment we have worked with a professional flood modelling consultant and we have considered all the relevant catchments both in the base line case and the developed case. We received a couple of comments on the draft MDP that indicated that it wasn t clear what the development case was. We then went back and reviewed the draft MDP and we realised it could have been explained in a little more detail and that has now been added to the draft MDP. Basically, what we have modelled is the full realignment of 3

suspended due to the flooding around the terminal. That flood event actually happened prior to the existing runway extension and the Tugun bypass. I just wanted those points noted. Kay Bolton Fingal Head Community Association I was at the consultation session down at Kingscliff and we were told that day that the offsets were being discussed with the Minister and that we would find out soon after through the website what the offsets were planned to be. I think now you are saying that we are in fact not going to be told, is that what is happening? We are still waiting it s been quite a few months. the drainage reserve and the filling of the project footprint area so that has actually been captured in the developed case flood model and we have modelled the relevant catchments as well. The criteria we set for the flood model was no worsening of peak flows and volumes in the downstream catchments. Matt Shinkel Queensland Airports Ltd I apologise that we weren t able to give you that information at the information session. As you said we were in Canberra that day meeting with the Department to discuss the offset policy. What we will do is put out some information about our approach to offsets along the lines of how we are intending to achieve the offsets and the process that we need to go through to do this and the types of management measures that would be put in place for that land. We do need to consider the privacy of the land holders that we are dealing with as well. We may not be able to make public which land actually forms part of the policy. I understand that, but you will be putting something on the website? What we are intending to do is put up a document with answers to frequently asked questions now that we have completed the preparation of the supplementary report. We have a lot of content there that we can make available to explain how we responded to various issues. We are aiming to have the document available on the website before Christmas. The clearing that we are undertaking is fully explained in the MDP already. 6. Airservices Update The Chair introduced Nick Seselja Airservices Community Relations Advisor. Nick provided a presentation to the Group covering the following: 1) Update on the Banora Point Golf Course Trial 2) Letters from the Kingscliff Ratepayers Association concerning international departures 3) NCIS Nick s presentation is attached to these minutes. 4

Les Fisher CACG Chairman Do you have a timeline for the outcomes/decisions on the trial? Pat Tate Banora Point & District Residents Association The people I represent have asked me to ask you three questions. One of them you have already answered that no the trial will not be stopped in a few weeks time. Another question was, will there be a community consultation period at the end of the trial? The third question is how can you make an informed decision when the trial was not carried out on the agreed designated track down the centre of the golf course? Rod Bates Office of Geoff Provest Just a question on that issue, if you go back to the first slide showing the white and the blue, the white is up the middle of the golf course and the blue is the actual flight path, is that correct? You mentioned that you are going to regard the trial as where it is flying now but you haven t said why they couldn t fly up the middle of the golf course. If we can get some feedback on that issue it would be appreciated. Nick Seselja Airservices Australia I don t have a direct one, I can say that internally I have begun the process of reviewing it. As close as possible, it will stay to a 12 month trial. I don t have exact guidelines at this point. Nick Seselja Airservices Australia That is a good question, I am going to take that on notice because I want to ensure I give a very clear response to that in terms of exactly how it will go, I will respond in writing to you. My understanding is that at the end of a trial a report is published and feedback is received on that report. I would like to confirm that in writing once I receive confirmation from Airservices. It s a question that has come to me quite a lot. The history of this trial has been long. The only thing I can do and we as Airservices can do is to assess the trial as it has been flown for the 12 months. I accept that for some people they are not going to be happy with an answer like that but the best advice that I have received from people internally is that this is the as best that we can track down the centre of the golf course. The 12 month trial that was agreed to needs to be assessed as it is. Nick Seselja Airservices Australia The blue is prior to the trial and the white is the trial, so it s a sample of tracks with before and afters. I d have to take it on notice as a technical question and respond in writing as to exactly why it could be flown in the way people expected it to be flown. I would reiterate that we will assess the trial on how it was flown, not on how it might have been flown. 5

7. ANACC Report Brett Curtis, Chairman of the ANACC, provided an update on the meeting that was held on the 29 th October. There was discussion on the membership of the ANACC; we are looking for a southern member and a northern member. We have been holding off on a decision for a northern member until a determination is received on the ILS. In turn we will try and synchronize the appointment of a 5 th southern member at the same time. An update was provided, similar to that provided today, on the progress of the ILS. Nick Seselja provided an update on the runway 14 departure trial. An item was raised for discussion around whether the Committee would consider it appropriate to have an independent Chair of the ANACC. The Committee was unanimously against discussing this change, it was a useful discussion and will be taken onboard by the airport. Kay Bolton Fingal Head Community Association Can you tell us what the process is for selecting these two additional members? Brett Curtis Typically we will go to the community groups in the areas that are represented within the ANACC boundaries. There is a 5 th southern boundary for the ANACC which historically represented the western areas e.g. Bilambil. We would look for community groups, similar to how all the other memberships are selected for the ANACC. To the north it is a little bit different as there are not so many community groups available north of Currumbin. It is a task that we have been trying to discuss with local community members and members of Council. Through the consultation period for the ILS MDP we actually asked a lot of people if they would be interested. At this stage there are a couple of options but it all depends on if a decision is made for or against the ILS. 8. CACG/PCF Review Report Donna Perera, Department of Infrastructure and Regional Development The Chair introduced Donna Perera from the Department of Infrastructure and Regional Development to provide an update on the results and recommendations of the recent CACG/PCF review. Donna provided a presentation to the Group and a copy of this presentation is attached to these minutes. Paul Burton Griffith University I was listening on the radio to Mr Wagner regarding his operations at Toowoomba and I wondered if these requirements apply to private airfields and airports as well as public ones? Donna Perera Department of Infrastructure and Regional Development No this only applies to Commonwealth Leased Airports. 9. Other Business The Chair asked the Group if there was any other business to be discussed. There was no other business to be raised. 6

10. Recommendations this Meeting All-weather access to aircraft. Emphasis on public consultation for RWY 14 Golf Couse Trial. 11. Proposed future Meeting Dates for 2016 Proposed meeting dates for 2016: - Wednesday 16 th March - Wednesday 22 nd June - Wednesday 23 rd November The Chair summarised the CACG for 2015: Presentations have been provided by Gold Coast Tourism and Destination Tweed Continuous briefs and updates have been provided on the Runway 14 Departure Trial Updates have been provided at every meeting on the ILS process and where it is all headed Briefs have been provided on Project LIFT Results have been presented on the review of CACGs and PCFs A considerable amount of information has been passed on from various authorities, the, Airservices and the Department to the community and the opportunity has been presented to the community to question the officials and airport representatives at every meeting. The Chair expressed that he believed the Charter has been fulfilled, not all issues have been addressed yet and there is still more information to be passed on and this will be ongoing. The Chair congratulated the Group on the manner in which the meetings have been approached and the consideration shown to the presenters. The Chair wished all a Merry Christmas and Happy New Year and called the meeting closed. 7