borut juvanec ljubljana university, faculty of architecture, slovenia institute of vernacular architecture, ljubljana architecture of water bosna i hercegovina popovo polje ponor mlinica ICOMOS Bosnia and Herzegovina ljubljana 2o15
prof dr borut juvanec, ljubljana university, faculty of architecture zoisova 12, 1 LJUBLJANA insitute of vernacular architecture, Prijateljeva 11, 1 LJUBLJANA Slovenia borut.juvanec@fa.uni-lj.si ljubljana 2o15
1 kusalovića mlinica ICOMOS Bosnia and Herzegovina
< Neum Hutovo < Donje Hrasno < Trebišnjica Melja Međa Ravno Sedlari Stolac Mostar > Mrkonjići Bosna i Hercegovina Bosnia and Herzegovina Hercegovina ponor mlinica, documented ponor mlinica, photographed serial mlinica, stream classical watermill Hrvatska Croatia POPOVO POLJE Poljice Popovo Žakovo Dobromani Staro Slano o 18 E Bosna i Hercegovina Bosnia and Herzegovina < Dubrovnik HR Hum Pridvorci TREBINJE Crna Gora > Montenegro Bileća > Herceg Novi MNE > Nikšić MNE > < Mostar < Trebišnjica ponor mlinica Kusalovića mlin Poljice Popovo N 42.49,2721 E 18.o5,o817 255 m above the sea < Trebišnjica Trebinje > Ponor mlinica or ponor (shaft) waterwell is unique system of using water. Popovo polje is the karst region with a lot of natural, karst sinks, but the river Trebišnjica flows twice a year all the plain. The flooding level of the water increases for five to six metres. Watermill in the cylinder is the only solution, as told unique and brilliant invention of inhabitants there. Unfortunatelly all of them are in 2o15 abandoned, mostly ruined, hard to find, to see and to explore. Ponor mlinice in Popovo polje deserve to be rescued from the silence, preserved, researched and showed to the both professional and laic public, as the jewell of the heritage in Bosnia and Herzegovina. supervised by: prof dr Maja Roso Popovac, Univerzitet u Mostaru, Mostar 4
october 2o15: groundplan distance to the river on October 2o15 16.5 m > North - 5.85 m - 5.78 m + o.oo m 1.26-6.88 m 1.24-3.oo m 5.6o 1.1o 7.94 11.2o m - o.7o m - 4.78 m - 3.o5 m + o.oo m 1.4o.6o 1.42 5.78 - o.3o m 4.94.7o 1.3o 1.57 6.94 m.89 1.32 1.25.69 9.93 m 5
october 2o15: cross section lifting device for the income water traces of the maximum height of water entrance of the water -5.78 m - 4.78m - 3.o1m the rock +- o.oo m -o.3o outside 5.78 m 2.1o 1.77 3.o1.69 6.88 m -6.88 jet of water (2.oo) the rock the rock dissapearing water into the underground sink (ponor) 1.28 2.34 7.94 5.6o 11.2o m 2.oo 6
photo October 2o15 7
reconstruction: groundplan distance to the river on October 2o15 16.5 m > North - 5.85 m - 5.78 m + o.oo m.6o 1.26 5.6o 1.1o - 6.88 m - 4.78 m 1.24-3.oo m 7.94 11.2o m 1.4o - o.7o m - 3.o5 m + o.oo m 1.42 5.78 - o.3o m 4.94.7o 1.3o 1.57 6.94 m.89 1.32 1.25.69 9.93 m 9
8 photo October 2o15
reconstruction: cross section 1.16 7.94 2.oo traces of the maximum height of water entrance of the flood water -5.78 m - 4.78m - 3.o1m +- o.oo m -o.3o outside 5.78 m 2.1o 1.77 3.o1.69 6.88 m -6.88 jet of water (2.oo) dissapearing water into the underground sink (ponor) 1.16 2.34 7.94 5.6o 11.o8 m 2.oo 1o