Doha Hamad International OTHH - Guideline for pilots

Similar documents
PILOT BRIEFING GENEVA RFE 2018

Lisboa RFE. Respect the ATC and the other pilots at all times and be understanding.

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

IVAO Switzerland Division

VATSIM-UK Essex RTS STANSTED CROSS THE POND PILOT GUIDE 25th October 2014

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

Pilot Briefing Document Cross The Pond 2013 Heathrow Airport EGLL/LHR

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7 th 2009 Event time: 1200z 2200z. 1 Athens FIR Guide 2 LGAV Procedures

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

HOLDING STACK MANAGEMENT

VATUSA Approval 3/21/18

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

MODULE 4: SIDs and STARs. Slide <#> of

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS

Northern Regional Training Scheme. EGBB Birmingham Airport Pilot s Guide. REVISION 1 (Monday, 30 January 2012)

PHRASEOLOGY COMMON MISTAKES

Burlington ATCT Standard Operating Procedures

LFPG / Paris-Charles de Gaulle / CDG

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Standard Operational Procedures

Pilot ATC RT Phraseology

SECTION 4 - APPROACH CONTROL PROCEDURES

CTP PILOT BRIEFING EDDK 2015

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, AVALON EAST (YAVE) OPERATIONS

Pilot: ELAL 385 Position J6 Request IFR clearance Info D to Larnaca as filed.

NETHERLANDS ANTILLES ATC PHRASEOLOGY GUIDE ATC OPERATIONS BY: MATHIEU LAFLAMME

THE TOWER CONTROL POSITION (TWR)

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual

Cross the Pond westbound 2013 Pilot Briefing Berlin Tegel EDDT

CLEARANCE INSTRUCTION READ BACK

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

A Hong Kong-based Virtual Airline. Hong Kong VFR Guide. VOHK Training Team. Version 1.2

IVAO Switzerland Division

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Good radio calls not only sound professional, they help ATC and alleviate stress in the cockpit!

EDDF - Frankfurt Pilot Briefing. Yannic Brodersen 03 rd November 2012

THE AREA CONTROL CENTRE (CTR) POSITION

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN

Frankfurt (EDDF) Pilot Briefing. Cross the Pond 2016 Westbound

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

USE OF RADAR IN THE APPROACH CONTROL SERVICE

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Letter of Agreement. between. and

CLASS D CONTROLLED AIRSPACE GUIDE

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

SHARM ELSHEIKH INTERNATIONAL AIRPORT (SSH/HESH) BRIEFING & AERODROME CHARTS

The IFR Burger. Here is the flight plan: FIM.V186.DEANO.V27.KWANG Cruise Altitude: 6000 ft. ZLA Tech Route: BURN39

Holland-America Line Pilot Briefing. December 14, bvartcc.com

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT

Inauguration 2017 Dulles Tower

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

Operating Procedures. For the Provision of Air Traffic Control Services. RAF Mount Pleasant EGYP. Falklands Islands. RAF Monte Agradable EGYP

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

CLASS D CONTROLLED AIRSPACE GUIDE

LFBO / Toulouse-Blagnac / TLS

IVAO XG Division IVAC2 Human Machine Interface (HMI) Handbook Version /05/2017

ELLX Procedures PROCEDURES FOR ELLX

LISBON(LPPT) PILOT GUIDE. August 2017 v.2.0

Cross the Pond Westbound 2013 London Gatwick (EGKK) Pilot Briefing

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

Gulf Region Division of IVAO Rev Jan 26, Dubai Pilot Guide. Dubai Pilot Guide. Strictly for Flight Simulation use only Page 1

CDA Continuous Descent Approach

AIP ENR JORDAN 01 MAY 2014

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures

ATC BRIEFING March 7th 2009 Event time: 1200z-2200z

Cape Area Airports Standard Operating Procedures

FINAL REPORT BOEING B777, REGISTRATION 9V-SWH LOSS OF SEPARATION EVENT 3 JULY 2014

OMNI Departures 12/30

SUBJECT: Kai Tak International Airport (VHHX) Standard Operating Procedure

IFR SEPARATION USING RADAR

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

AIR LAW AND ATC PROCEDURES

IFR PHRASEOLOGY. It s a mandatory procedure except when a pilot is in emergency and he has no time to read back or when pilot s radio is broken.

AERONAUTICAL INFORMATION CIRCULAR 18/18

Clearance & Ground Air Traffic Control. Clearance Delivery An Introduction to Ground Control... 2

Stanfield VOR Procedures

ERIE ATCT STANDARD OPERATING PROCEDURES

Albany ATCT Standard Operating Procedures

EDDF - Frankfurt Pilot Briefing. Yannic Brodersen / David Kirchner April 2016

Approach / Departure Phraseology

Piedmont Triad International Airport

Virtual Royal Air Force 208 (R) Sqn Syllabus

Scenario Training VGT - IWA

Friday Night Operations

GROUND TOWER HELI RADAR

Northern RTS. EGNT and EGNV vmats Part 2. REVISION 1 (Saturday, 19 February 2011 at 22:29) Newcastle and Durham Tees Valley

S1 Ground Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc

TO DO THIS. pilot and

IFR SEPARATION WITHOUT RADAR

IFR FLIGHT BRIEFING. This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation.

Transcription:

Page.1 of 10 Doha Hamad International OTHH - Guideline for pilots

Page.2 of 10 Index 1. INCOMING TRAFFIC... 3 1.1. GENERAL NOTES... 3 1.2. DESCENT PLANNING... 3 1.3. WHICH RUNWAY?... 3 1.4. ENTRY INTO AIRSPACE... 3 1.5. ARRIVAL AND STARS... 4 1.5.1. Missed Approach procedures... 5 1.6. ATC UNITES TO BE EXPECTED:... 5 1.7. TAXIWAY OPERATIONS... 6 1.8. PARKING/GATES:... 6 2. OUTBOUND TRAFFIC... 8 2.1. GENERAL NOTES... 8 2.2. WHICH RUNWAY?... 8 2.3. PUSHBACK OPERATIONS.... 8 2.4. TAXIWAY OPERATIONS... 8 2.5. CHECKLIST FOR DEPARTURES... 9 3. CHARTS... 10 4. SCENERY... 10

Page.3 of 10 1. INCOMING TRAFFIC 1.1. GENERAL NOTES Plan ahead look over the charts and be ready for holds, vectors and speed changes. Remember: Aviate, Navigate, Communicate 1.2. DESCENT PLANNING Plan your descent to be at or below 12000 ft at the STAR entry points: BAYAN, GINTO or AFNAN In addiction of minimum IFR fuel, load an extra fuel of 1 hour (most probably expect to make some holds over BAYAN, GINTO or AFNAN). 1.3. WHICH RUNWAY? There are two possible configurations for OTHH - Either 34L/R or 16L/R. Most times we have wind from North west directions. Both runways L/R are used for arriving and departing traffic. The 34L/R configuration can be expected when max tailwind component is up to 5kts. 1.4. ENTRY INTO AIRSPACE If you are coming from uncontrolled airspace please contact Centre/Control at least of 20 nautical miles before to entry in the airspace. Don t wait for a force act from them. Depending on which ATC service is active your first contact will likely be with (in descending order): POSITION FREQ CALLSIGN OGCC_E_CTR 132.125 Arabian Control OBBB_CTR 127.525 Bahrain Central OTHH_R_APP 121.100 Doha Radar

Page.4 of 10 1.5. ARRIVAL AND STARS Normally expect to receive a Standard Arrival from Centre controller. Check these constraints in your FMC (It s really important). Note that the star you are assigned will also define which runway you are landing on. RUNWAYS 34L/R: STAR ARRIVAL POINT GINTO BAYAN AFNAN STAR RUNWAY CONSTRAINTS 1W 1E 1W 1E 1W 1E RUNWAYS 16L/R: STAR ARRIVAL POINT GINTO BAYAN AFNAN 34L 34R 34L 34R 34L 34R GINTO (-12000ft) - OTIDA (+8000ft) DANOK (+5000ft; - 220kts) IMKAT (max 180kts) GINTO (-12000ft) - SIDMO (+8000ft) MUXED (+5000ft; - 220kts) LAGMA (max 180kts) BAYAN (-12000ft) - OTIDA (+8000ft) DANOK (+5000ft; - 220kts) IMKAT (max 180kts) BAYAN (-12000ft) - SIDMO (+8000ft) MUXED (+5000ft; - 220kts) LAGMA (max 180kts) AFNAN (-12000ft) - PUXEL (+6000ft; -220kts) DANOK (+5000ft; -220kts) IMKAT (max 180kts) AFNAN (-12000ft) - LOVAN (+8000ft; -220kts) MUXED (+5000ft; -220kts) LAGMA (max 180kts) STAR RUNWAY CONSTRAINTS 1M 1C 1M 1C 1M 1C 16L 16R 16L 16R 16L 16R GINTO (-12000ft) - DATMO (+8000ft) IVANI (+5000ft; - 220kts) TOVAN (max 180kts) GINTO (-12000ft) - DATMO (+8000ft) TANDO (+5000ft; - 220kts) GOLSI (max 180kts) BAYAN (-12000ft) - EGNUG (+8000ft) IVANI (+5000ft; - 220kts) TOVAN (max 180kts) BAYAN (-12000ft) - EGNUG (+8000ft) TANDO (+5000ft; - 220kts) GOLSI (max 180kts) AFNAN (-12000ft) - EGNUG (+8000ft) IVANI (+5000ft; - 220kts) TOVAN (max 180kts) AFNAN (-12000ft) - EGNUG (+8000ft) TANDO (+5000ft; - 220kts) GOLSI (max 180kts) Note: Please pay attention to speed restrictions reported in Standard Arrivals and/or from ATC. Use of speed brakes may be needed.

Page.5 of 10 1.5.1. Missed Approach procedures The missed approach procedures varies depending on the runway. It is essential you have the appropriate charts so you can follow standard missed approach procedures. 1.6. ATC UNITES TO BE EXPECTED: Position IvAcCallsign Radio Callsign Frequency Vertical limits ARR R OTHH_R_APP Doha Radar 121.100 From boundaries 1 to FL245 / Class A ARR OTHH_APP Doha Approach 119.725 From boundaries 1 to FL145 / Class C FIN OTHH_F_APP Doha Director 119.400 From SFC to 4500 ft / Class C AIR W OTHH_W_TWR Hamad Tower 118.025 AIR E OTHH_E_TWR Hamad Tower 118.525 GMC W OTHH_W_GND Hamad Ground 121.675 GMC E OTHH_E_GND Hamad Ground 120.225 GMP OTHH_DEL Hamad Delivery 120.875 n.a. From SFC to 2500 ft, responsible for 34L/16R / Class D From SFC to 2500 ft, responsible for 34R/16L / Class D Responsible for movements to west from T2 Responsible for movements to east from T3

Page.6 of 10 1.7. TAXIWAY OPERATIONS All ground operations are made to avoid conflicts among traffic, especially between inbound and outbound, so please follow ground and tower instructions. 1.8. PARKING/GATES:

Page.7 of 10 CHECKLIST FOR ARRIVALS Use this check list to write the main instructions coming from ATCs Call sign Freq Position Bahrain Central 127.525 OBBB_CTR Doha Radar Covering all Qatar airports Doha Approach (OTHH & OTBD) LEVELS TL Transition Level FL 150 TA Transition Altitude 121.100 OTHH_R_APP 119.725 OTHH_APP Doha Director 119.400 OTHH_F_APP Hamad Tower 118.525 OTHH_E_TWR Hamad Tower 118.025 OTHH_W_TWR Hamad Ground 120.225 OTHH_E_GND Hamad Ground 121.675 OTHH_W_GND Hamad Delivery 120.875 OTHH_DEL 13000 ft HOLDS COURSE TURNS LEVELS GINTO 087 RIGHT 8000-FL210 BAYAN 229 LEFT 8000-FL240 AFNAN 268 RIGHT 8000-FL220 RWY 34L 34R 16L 16R ILS 111.9 110.1 108.7 108.1 COURSE 336 336 156 156 FAP FIX ILS ALT IMKAT 3000 LAGMA 3000 TOVAN 3000 GOLSI 3000 STAR 34L 34R 16L 16R GINTO 1W 1E 1M 1C BAYAN 1W 1E 1M 1C AFNAN 1W 1E 1M 1C SQ CODE: STAR ARRIVAL: EXPECTED RUNWAY: QNH: GATE: TAXI INSTRUCTIONS:

Page.8 of 10 2. OUTBOUND TRAFFIC 2.1. GENERAL NOTES Check accurately your Estimated Time of Departure (ETD) and Estimated Off Block Time (EOBT). Keep in mind that it takes about 10-15 minutes to perform startup, pushback and taxi. So if you have an ETD at 10:15, you must start with push back and start operations at 10:00-10:05 approximately. 2.2. WHICH RUNWAY? There are two possible configurations for OTHH - Either 34L/R or 16L/R. Most times we have wind from North west directions. Both runways L/R are used for arriving and departing traffic. The 34L/R configuration can be expected when max tailwind component is up to 5kts. 2.3. PUSHBACK OPERATIONS. During the request phase of pushback take care, in according to ground instructions, where you must rotate the aircraft. Here an example of ground instruction: Etihad xxx pushback and start-up approved, face to south-east. This is very important to avoid conflict during ground operations. 2.4. TAXIWAY OPERATIONS All ground operations are made to avoid conflicts among traffic, especially between inbound and outbound, so please follow ground and tower instructions.

Page.9 of 10 2.5. CHECKLIST FOR DEPARTURES Use this check list to write the main instructions coming from ATCs Call sign Freq Position Bahrain Central 127.525 OBBB_CTR Doha Radar Covering all Qatar airports Doha Approach (OTHH & OTBD) LEVELS TL Transition Level FL 150 TA Transition Altitude 121.100 OTHH_R_APP 119.725 OTHH_APP Doha Director 119.400 OTHH_F_APP Hamad Tower 118.525 OTHH_E_TWR Hamad Tower 118.025 OTHH_W_TWR Hamad Ground 120.225 OTHH_E_GND Hamad Ground 121.675 OTHH_W_GND Hamad Delivery 120.875 OTHH_DEL 13000 ft SID 34L 34R 16L 16R ALSEM 1W 1E 1M 1C 3000 ALVEN 1W 1E 1M 1C 3000 BATHA 1W 1E 1M 1C 3000 BUNDU 1W 1E 1M 1C 3000 NAMLA 1W 1E 1M 1C 3000 PATOM 1W 1Z 1E 1M 1C 3000 SALWA 1W 1E 1M 1C 3000 MUXOP 1W 1E 3000 LOXUL 1M 1C 3000 SQ CODE: SID DEPARTURE: INITIAL ALTITUDE: 3,000 ft RUNWAY: QNH: GATE: TAXI INSTRUCTIONS:

Page.10 of 10 3. CHARTS The charts needed to fly in Dubai are available in AE-IVAO website (http://ae.ivao.aero/), or on Qatar Aeronautical Information Service (AIS) (https://www.aim.gov.qa/eaip.html) 4. SCENERY IMPORTANT OTHH IS NOT IN THE DEFAULT SCENERY We recommend Taxi2Gate payware scenery available for FS2004/FS9/FSX/P3D: FS2004/FS9 Taxi2Gate OTHH FSX/P3D Taxi2Gate OTHH For freeware scenery and other options please visit: http://ae.ivao.aero/