CTY CP TVTK GTVT PHÍA NAM - TEDI SOUTH

Similar documents
OVERALL EXISTING CONDITION AND DEVELOPMENT STRATEGY OF EXPRESSWAY IN VIETNAM. BANGKOK - 13 June 2016

Transport Infrastructure Investment in Viet Nam

THÀNH PHỐ HỒ CHÍ MINH A Nguyen Van Nghi Street, Ward 7, Go Vap District. 4 1C Nguyen Anh Thu Street, Trung My Tay Ward, District 12

New Challenge & 22 Years Experiences of Consumer Products in Vietnam

Known Producers/Exporters of Vietnamese Laminated Woven Sacks

National project list for attracting foreign direct investment until 2020 (Enclosed to prime ministerial Decision 631/QD-TTg on April 29, 2014)

MINISTRY OF TRANSPORT VIETNAM MARITIME ADMINISTRATION DEVELOPMENT OF CONTAINER PORTS VIETNAM

Ghi chú. Công ty TNHH MTV Dầu khí TP.HCM. 27 Nguyễn Thông, Phường 7, quận 3, TP.HCM. SP Saigon Petro

Location map and area relationship of Viet Phat Industrial Zone and Urban Area

Region/ Province/ State/ City 122 Phan Xich Long Str, Phu Nhuan District, HCM. STT Branch Name Branch Address

TRAVEL & STAYS OFFERS

BRIEF ENVIRONMENT REPORT

APPENDIX 5C Profile of Key Projects

- Borrowing short term loans from State Bank under the form of regranting - Borrowing loans from credit institutions and financial companies.

2.3 Seismic Conditions

Figure 5C.15 Sai Gon Moc Hoa Route. Grade Width Depth Present Target Present Plan Present Plan mainly III & partially I

LIST OF CO-MERCHANTS WITH DISCOUNT RATE FOR IVB'S CARDHOLDERS

SAIGON NEWPORT CORPORATION

ANNEX 1 Subprojects List and Location Maps. Table A1.1: List of the first phase subprojects under Component 4 (5 provinces, 5 basins)

REPORT ON CORPORATE GOVERNANCE OF LISTING COMPANY (the first 6 months of 2016)

Don t believe everything you read in the media about the Vietnam Property Market

TERMS & CONDITIONS HOME&AWAY OFFERS. Offer Detail: - 15% off on mooncake bill

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

UPDATED LIST OF 479 ESTABLISHMENTS NAFIQAD HAS APPROVED (Up to 07 May 2010) Commercial Name of Establishments

TOKYU BINH DUONG GARDEN CITY

PORTCOAST CONSULTANT CORPORATION 92 Nam Ky Khoi Nghia, District 1

CHAPTER 3 PROVINCIAL PERFORMANCE IN 2012

Building hotel, entertainment, conference and exhibition center, approximate area of 130 ha 1,500

- - PORTCOAST CONSULTANT CORPORATION PORT COAST. December 2018 GEOTECHNICAL SURVEY

The Current Status and Conservation of Bears in Vietnam

The Second Annual Coastal Forum Building Resilience to Climate Change Impacts: Coastal Southeast Asia

Vietnam s Transport Sector Outlook and Engineering Opportunities

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

FLC GROUP JSC. INTRODUCTORY PRESENTATION

AMATA VN Public Company Limited

F-92. Catchment Area : 11,250 km 2. Hình 7.1 Mô hình sơ đồ cân bằng nước (Lưu vực sông Bằng Giang & Kỳ Cùng) Bang Giang - Ky Cung River Basin

TECHNICAL SPECIFICATION (OBJECTIVES, PROJECT SCALE)

ITE HCMC, Vietnam s Premier International Travel Trade Event, Returns To Impact World s Travel Patterns For 14 th Edition

INDOCHINES CONSULTANT & COMMERCIAL JSC

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/15 更新 ) 注册地址 注册类型 备注 NO.

Red River Delta Provinces. Phủ Lý, Hà Nam, 24/05/2013. A policy monitoring tool for middle-income Viet Nam

AMATA VN Public Company Limited

DETAILED LIST OF CUSTOMERS I. BUSINESS VALUATION

BẢN TIN THÁNG 04/2015 1Q 2018 EARNINGS CALL

REDEMPTION CATALOGUE

Sika at Work. Sika Vietnam Industrial Factory Projects in Vietnam. Các dự án Nhà máy Công nghiệp tại Việt Nam

PAÍS SECÇÃO. Vietname Produtos da pesca. Em vigor desde 15/02/2018 Data de publicação 02/02/2018. Lista em vigor. Número de aprovação

The Viet Nam Provincial Governance and Public Administration Performance Index (PAPI) Measuring Citizens Experiences

Detail Offer/ Chi Tiết. Merchant/ Khách Sạn & Resorts Sofitel Legend Metropole Hanoi (Le Spa du Metropole)

Belgium Address: Tel.: Fax: E-m ail: Website: Schedule: Consulate in Ho Chi Minh City Address: Tel.: Fax: E-m ail: Website: Schedule:

Conservation And Aquatic Resources Development in Vietnam

Measuring Governance and Public Administration in Viet Nam

Hoi Son Dam VAN CANH. -> Tan An - Dap Da Schemes are to be referred to Figure 13.4 DONG XUAN

Countries» Sourcing From Guides» About» Contact us

The foundation for the sustainable development Welcome to KINHBACCITY

Socio-economic and Tourism Conditions 1999

SHOW REPORT THE 10TH VIETNAM INTERNATIONAL EXHIBITION ON CHEMICAL INDUSTRY VINACHEM EXPO Time: December 02-05, 2015

จ ดท าโดยสถานกงส ลใหญ ณ นครโฮจ ม นห พฤษภาคม 2556

Vietnam Marine Protected Area Management Effectiveness Evaluation

Vietnam Member s report on activities to ICRI. Presented by Nguyen Van Long. Reporting period November April 2007

COMPANY PROFILE THIEN VU ADVERTISING JOINT STOCK COMPANY

Project Manager/ Architectural Planner. 4 Hitoshi ITO/Mr. Architectural Designer Nihon Sekkei, Inc.

越南 ( 水产品 ) 生产企业在华注册名单 (2017/06/19 更新 )

Recommended Itinerary

Investor Presentation December March 2012 INVESTOR PRESENTATION

Table Number of Tourism Resources by Tourism Regions in Vietnam Type of Resources. Tourism Regions North (share) Central South

Nguyễn Ngọc Lan

2018 Calendar. Connecting people and possibilities.

Photography Tour Duration: 8 days / 7 nights Overview: Hanoi Tam Coc Halong Bay Ha Giang

Vietnam Heritage Tour 15 days Destinations: Code: B Breakfast, L Lunch, D Dinner, G - Guide Details: Day 1: Hanoi Arrival (G)

Welcome to Opportunity Day Financial Performance Result for the 9 months period ended Sep 30, 2018

Welcome. In this issue

Index. 000 Map pages 000 Photograph pages. Lonely Planet Publications 540

THE MINING - GEOLOGY DESIGN SURVEY AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY PROFESSIONAL COMPETENCE

8. Projects/ Programs and Provincial Tourism Development Plans

TPP ADVANTAGES INDUSTRIAL ESTATE SOLUTION. By Nguyen Chi TOAN Marketing Manager of VSIP JV 27 November 2015

Binh Thuan Province Wind Power Master Plan

VINCOM JOINT STOCK COMPANY. Investor Presentation March 2012 INVESTOR PRESENTATION

ITE HCMC 2017 Closed with a Record of Attendance & Meetings

Progressing Vietnam s Land Transport

BEAUTY OF NORTH VIETNAM

ULTIMATE RESORT LIVING IN THE HEART OF THAO DIEN

Membership Discount 10% 20% Handbook Sales. special discount. discount

, GIAY CHUNG NHAN BANG KY DOANH NGHIEP CONG TY CO PHAN

2019 Calendar. TNT will become FedEx. Together, we will connect even more people and possibilities around the world.

Viet Nam. Situation Report No. 6 Typhoon #11 Mirinae November 9, pm (Viet Nam time) I Summary

The UNIVERSITY WITHOUT BORDERS Journal of ECONOMICS & BUSINESS

CUSTOMERS LIST OF TOAN CAU PUMPS CO.,LTD

Terms and Conditions of 'Shopping is GREAT' cash back campaign Điều khoản và Điều kiện của Chương trình tặng tiền Mua sắm Tuyệt vời

SET LUNCH MENU : vnd/person SET DINER MENU : vnd/person SET MENU FOR EVENT : From vnd/person

07-11 November 2016 Ho Chi Minh City, Vietnam. Program for the Australian delegation to Vietwater November proudly supported by:

The main points of the MOU concluded by Tokyu Corporation with Becamex IDC Corp. are as follows:

THE PRIME MINISTER DECIDES: Article l.- To approve the Planning on Van

Xin Chào! We look forward to sharing with you the most beautiful sights of Central Vietnam.

WELCOME TO HANOI Regional TVET-Conference in Viet Nam Hội nghị khu vực về Đào tạo nghề tại Việt Nam Hanoi, October 2012

Survey on Socio-Economic Development Strategy for the South-Central Coastal Area in Vietnam. Final Report

DIRECT BILLING MEDICAL PROVIDER LIST

Viet Nam Situation Report No. 3 Floods Central Vietnam October 8, pm (Viet Nam time)

Issue No.19 Jul Sept 2012

The 7 th Da Nang Urban Development Forum. Date & Time: December 22th 8:30-17:00 Venue: Da Nang Administration Center

Transcription:

Master plan of transportation in HCMC to 2030 and Vision to 2050. DUONG VAN SANG Assistant General Director Tedisouth

AGENDA / CONTENTS HIGHWAYS NETWORK ADDITIONAL PROJECTS TO MASTER PLAN NATIONAL RAILWAYS URBAN SUBWAYS - MRT AIRPORT

Ho Chi Minh city is located in the Southern Key Economic Zone, consist of 8 provinces and cities: HCM city, Dong Nai, Ba Ria - Vung Tau, Binh Duong, Binh Phuoc, Tay Ninh, Long An & Tien Giang.

Decision No. 568/QD-TTg dated April 8 th, 2013 from Prime Minister Approving the Adjusted Mater Plan on the Transportation Development of Ho Chi Minh City until 2020 and Vision after 2020.

Decision No. 2076 /QD-TTg dated Dec. 22 nd, 2017 from Prime Minister Approving The Adjusted Mater Plan on the Construction of Ho Chi Minh City s Area until 2030 and Vision upto 2050.

1. EXPRESSWAYS HCMC MOC BAI; L=55km, 4 6 lanes HCMC THU DAU MOT- CHON THANH; L=69 km, 6-8 lanes HCMC Long Thanh Dau Giay; L=55km, 6-8 lanes HCMC Trung Luong; L=40km, 8 lanes (Phase 1: put into operation with 4 lanes in 2010). Bien Hoa Vung Tau; L=76 km, 6-8 lanes Ben Luc Long Thanh; L=58 km, 6-8 lane

2. RING-ROADS RingRoad 4, L=198km, 6-8 lanes e RingRoad 3, L=89km, 6-8 lanes RingRoad 2, L=64km, 6-10 lanes

RING ROAD 2 An Lập ` ` Ng.V.Linh interchange Gò Dưa e ` ` Bình Thái ` RingRoad 2, L=64km, 6-10 lanes It was constructed and put into operation 54.6 /64.1km. There are still 4 sections in the calling for investment and implementation: + Section 1 and 2: from Rach Chiec bridge on the eastern Ringroad - Binh Thai intersection - Pham Van Dong road; + Section 3: from Pham Van Dong to Go Dua interchange; + Section 4: from An Lap to Nguyen Van Linh. Rạch Chiếc bridge

RING ROAD 3 Ben Luc - NH22 section and NH22 - Binh Chuan section: CIPM s study, Tan Van - Nhon Trach section: FS document is under appraisal investment preparation; checking, divided into 2 Component projects: 1A & 1B. + Component 1A (ODA loan from EDCF); + Component 1B (BOT contract).. NH.22 Bình Chuẩn (Mỹ Phước) Tân Vạn Bến Lức Nhơn Trạch. My Phuoc - Tan Van section: Completed the investment phase 1 and put into operation in Oct. 2015 with the width of 32m, standard of urban roads, 6 lanes.

3. ELEVATED ROUTES Line 5 Station 2 interchange Line 4 Line 1 Line 2 Line 3 R.Road 2 An Lạc interchange

1/ Trang Bom - Hoa Hung (North - South Railway), L=41km; 2/ HCM City - My Tho - Can Tho High speed section, L=174km; 3/ Bien Hoa - Vung Tau, L=107km; 4/ Ho Chi Minh City - Tay Ninh (Xa Mat border gate): 139km; Ga Chánh Lưu Ga Trảng Bàng Ga Dó An Ga Taân Chaùnh Hieäp Ga An Bình Ga Bieân Hoøa Ga Traûng Bom 5/ Di An - Loc Ninh, L=128km; 6/ Ho Chi Minh City - Nha Trang High speed section; Thu Thiem Station - Long Thanh Airport section, L=33km; Ga Taân Kieân Ga Sài Gòn Ga Thuû Thieâm Ga Cảng HKQT Long Thaønh 7/ Thu Thiem Light Railway - Long Thanh International Airport, L=37km; Ga Long Ñònh Ga Tiền Cảng Hiệp Phước Ga Cụm Cảng Hiệp Phước Ga Thò Vaûi 8/ Dedicated railway to Hiep Phuoc Port, L=38km. Ga Taân An Ga Cụm Cảng Long An

There are 8 lines: Line 1: Ben Thanh - Suoi Tien, orientation extending to Dong Nai (Cho Sat - Bien Hoa City) and Binh Duong (Binh Duong Industrial, Investment and Service Complex), L=19.7km, is under construction. Line 2: Northwest Urban Area (Cu Chi District) - Ben Thanh - Thu Thiem; L=48 km, is preparing bidding documents for the Tham Luong - Ben Thanh section. Line 3a: Ben Thanh - Tan Kien station, the orientation extending to Long An (Tan An city); L=19.8km. 2 4b 2 6 3a 5 4 4 3b 1 Line 3b: Cong Hoa 6 intersection - Hiep Binh Phuoc, orientation extending to Thu Dau Mot (Binh Duong); L=12.1km. Line 4: Thanh Xuan - Ben Thanh - Hiep Phuoc port; L=36.2km. Line 4b: Gia Dinh Park Station - Tan Son Nhat International Airport - Cha Ca Lang Station; L=5.2 km. 4 Line 5: Can Giuoc Bus Station - Sai Gon Bridge; L=26 km, Line 6: Ba Queo - Phu Lam round intersection; L=5.6km.

MN3 Plan of LRT / Monorail includes 3 lines: 1/ Line No.1: Ba Son - Ton Duc Thang - Me Linh - Vo Van Kiet - Ly Chieu Hoang existing West Bus Station, orientation extending from Ba Son to Binh Quoi urban area, Thanh Da, Binh Thanh); L=12,8 km. 2/ Line No.2: N.Highway 50 (District 8) - Nguyen Van Linh - Tran Nao - Xuan Thuy - Binh Quoi urban area, orienting the connection of Urban railway Line 3a at the new Western bus station; L=27.2 km. LRT1 MN2 3/ Line No.3: Crossroads (Phan Van Tri - Nguyen Oanh) - Phan Van Tri - Quang Trung - Quang Trung Software Park - To Ky - Tan Chanh Hiep Station; L=16.5 km.

Long Thanh International Airport, Dong Nai province: under preparing feasibility study report. Long Thanh Airport is scheduled to be constructed on an area of 5000 hectares (50 km2). Once the first phase is put into operation in 2025, the airport is expected to handle 25 million passengers and 1.2 million tonnes of cargo each year. The first phase will include the construction of 2 runways, a terminal, and auxiliary facilities. Long Thanh Airport Architectural model by Heerim Architects & Planners Co., Ltd., South Korea

1. CAN GIO bridge: Can Gio bridge, L=3.4 km with 4 lanes, vertical clearance H=55 m, will replace Binh Khanh ferry, connecting Can Gio district with the central city and surrounding areas. From here, it forms a direct route to the coastal corridor area in south of Ho Chi Minh City.

2. CAT LAI bridge: Construction Investment project for bridge to replace Cat Lai ferry, connecting Ho Chi Minh City with Dong Nai province by the PPP form. Form of investment: In the form of public-private partnerships (by BOT &/or BT contract); Investment & construction of Cat Lai Bridge to replace the existing Cat Lai ferry. Scale: 6 lanes. Length of bridge and bridge about 4.5 km, bridge section: 3.4 km.

2. CAT LAI bridge: Alignment: The first point connects to the My Thuy interchange, then runs along Nguyen Thi Dinh St., to the beginning of Intercity Road 21, turns right across the Dong Nai River, towards Ly Thai To St. - Nhon Trach Dist., then turn left to connect with Ly Thai To St., the end point located 1.0 km far away from the existing ferry terminal. Total investment phase 1: Billion VND 7,200 (not including borrow interest)..

3. Adjustment of South West Dynamic Axial Line, Ho Chi Minh city. - Adjustment of South West Dynamic Axial Line going parallelly with National Highway 50, the first point connects with Pham Hung road, HCMC, the end point connects to existing NH.50 at Tan Kim intersection - Can Gioc Dist. - Long An province, the route length is about 9.4 km; - Scale: 6 lanes.

THANK YOU