Consultation on Town Quay Mooring Redevelopment Proposals

Similar documents
Local Development Scheme

National Passenger Survey Spring putting rail passengers first

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Temporary Uses at the New Central Harbourfront

Local Government Boundary Commission for Scotland Fifth Review of Electoral Arrangements Consultation on Ward Boundaries

PERTH AND KINROSS COUNCIL. 5 October 2016 COMMUNITY PLANNING PARTNERSHIP UPDATE

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

70th Birthday trip to Poole

HMS Unicorn. Unique Ship / Remarkable History. Access Guide for HMS Unicorn HMS Unicorn Victoria Dock Dundee DD1 3BP

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Developing an EU civil aviation policy towards Brazil

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Table 1 overleaf summarises the changes in planned growth between the 2016 and 2017 iterations of the plan.

National Passenger Survey Autumn putting rail passengers first

Dredging in Fowey Chapter 3 Post departure of the Lantic Bay

Terms of Reference: Introduction

TERMINAL DEVELOPMENT PLAN

GOLD COAST AIRPORT - Runway 14 southern departures trial

National Passenger Survey Autumn putting rail passengers first

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

A. CONCLUSIONS OF THE FGEIS

DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. Spring 2016

Water Space. A development opportunity at the Canting Basin, Pacific Quay, Glasgow

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

Draft airspace design guidance consultation

Santos Tour Down Under Tour Village and Bike Expo

The Sydney Zoo D440/16 amendment of proposal

Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes

Mechanized River Valley Access Public Engagement Report. April 2015

Regulatory Committee

Urgent Decision: Y Implementation Date: 27 November If not on Forward Plan Procedure 15 or 16 used?

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update

National Passenger Survey Spring putting rail passengers first

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

POINT OF VIEW on the proposed solutions for improving navigation at critical points at Bechet, Corabia, Belene and Popina

CHART SPECIFICATIONS OF THE IHO (S-4) AND SYMBOLS, ABBREVIATIONS AND TERMS USED ON CHARTS (INT1) Small Craft (Leisure) Facilities Symbols

Greenwich Community Association Inc Submission to the NSW Department of Planning and Environment

Waterways Management Program

TRAVEL PLAN MONITORING REPORT LONDON GATEWAY PORT

STRATEGIC INVESTMENT IN MANCHESTER AIRPORT

National Rail Passenger Survey Autumn 2015 Main Report

Site Formation Works of the Kai Tak Cruise Terminal Project

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Coventry - Visitor Accommodation Growth Study Brief. Invitation to Tender. Introduction

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

Whangarei District Airport Strategic Review

St. Mary s Harbour. Port Waste Management Plan

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

The impact of investments & storms on the economic benefits provided by the South West Coast Path National Trail to the region between 2010 and 2014

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Sydney CBD - Partnering with the coach industry for solutions

Cuadrilla Elswick Ltd

Noise Action Plan Summary

A final follow up on the report into the accessibility of police complaint handling in Scotland

Committee. Presentation Outline

The Edinburgh Glasgow Improvement Programme. Strategic Environmental Assessment (SEA) Consultation Document. October 2013

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

ENVIRONMENT ACTION PLAN

Chapter 8.0 Implementation Plan

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

New free City connector bus service

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local

Ridership Growth Strategy (RGS) Status Update

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY

Alternative Highest & Best Use Analysis Boutique Hotel

Mt. Hood National Forest

Update on the Thameslink programme

Summary Report. Economic Impact Assessment for Beef Australia 2015

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

TORONTO TRANSIT COMMISSION REPORT NO.

DEVELOPMENT OF RECREATIONAL NAVIGATION INCLUDING WATER TOURISM

Jersey Registered Boat Owners Satisfaction Survey Results

Airways New Zealand Queenstown lights proposal Public submissions document

BELFAST HARBOUR COMMISSIONERS PUBLICATIONS SCHEME

2. Project Need and Alternatives

places Mooloolaba s heart five

INTRODUCTION. delegated responsibility for its delivery and the management of the company.

Miner & Silverstein Appraisal Company Division of Miner & Silverstein, LLP

RIVERLINESTAGEONE ATASMANIANGRENS POLICYINITIATIVE. LaunchedbyNickMcKimMP March2014. AuthorisedbyNickMcKimMP,ParliamentHouse,Hobart

Greenslade Pleasure Boats Stuart Rawlinson - Parkstone Bay Marina

Health and Safety Report 2016

SANTANDER PORT CONTROL PROCEDURE

Response to the London Heathrow Airport Expansion Public Consultation

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

REVIEW OF GOLD COAST AIRPORT Noise Abatement Procedures

Figure 3.3 Panoramic photograph across the site

Catchment and Lake Research

MISUSE OF SLOTS ENFORCEMENT CODE ANNUAL REPORT 2014/15

Economic Development Sub- Committee

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

CAA consultation on its Environmental Programme

Written submission from Royal Yachting Association Scotland. Submission to the Secretary of Scotland s stakeholder event in Inverness on 18th February

2006 ANNUAL GENERAL MEETING

Transcription:

Consultation on Town Quay Mooring Redevelopment Proposals Lymington Harbour Commissioners (LHC) would like your views on its proposals to redevelop the Town Quay area to meet the changing market requirements for more walk ashore visitor berths. The proposal to redevelop Town Quay was first incorporated into LHC s Strategic Plan following extensive public consultation in 2010. The Commissioners believe that it is essential to reconfigure the visitor moorings in order to provide the type of mooring facilities expected by modern yachtsmen, and to maintain the vibrancy of the Town Quay area as a tourist destination. Background The Town Quay has historically been a popular area for visiting craft to the harbour. It currently has walk ashore moorings for up to 19 visiting boats (rafted). There are also 97 mid-river moorings which in summer are used for visiting boats and in winter are used to accommodate resident boats that have been relocated from the exposed outer harbour moorings or to accommodate dredging in other parts of the river. The walk ashore pontoon berths at Town Quay are very popular with visitors and are often full to capacity in the sailing season thus significantly frustrating demand. The current pontoon is also nearing the end of its service life and will need to be replaced within the next few years. In contrast, the mid-river moorings are not popular and their use has been in decline, (down by 24% since 2011) with the modern boat owner preferring the greater convenience and ease of mooring on walk ashore pontoon berths. The table below illustrates the difference in popularity of each visitor mooring type at Town Quay in 2015. Location Town Quay # Non Bookable Walk Ashore (rafting berths) Town Quay ** Non Bookable (river moorings) No Visits 2,364 1,867 Visits per berth 124 32 # Based on a capacity of 19 berths when fully rafted. ** Based on 57 moorings allocated for visitor use in 2015 (the other 40 moorings were allocated for longer term 7 month lets during the summer season) It can be seen that on average each walk ashore visitor berth (including rafted) is used approximately four times as often as a river mooring.

The popularity of visitor walk ashore berths is further illustrated by the strong growth in visiting boats using LHC s Dan Bran pontoon. Although further downstream and a longer walk from the town centre, the convenience of bookable walk ashore berths with power has seen visitor numbers using this facility grow from 747 in 2008 to 2,344 by 2015. Yarmouth Harbour who have implemented a phased plan to introduce more walk ashore visitor berths have seen their visitor numbers increase from 21,199 to 33,828 stays over the last 6 years, an increase of nearly 60% 1. LHC s 2011-2015 strategic plan set out an objective to increase visitor walk ashore berths at Town Quay. In 2015, as part of its consultation on an update to the strategic plan, LHC brought forward a plan for the reorganisation of Town Quay moorings to provide more walk ashore visitor berths. Although there was broad support from leisure users and local businesses, some concerns were expressed about the proposed location of the commercial boat moorings, the navigation turning space opposite the commercial quay and the alignment of some berths to the tide. The Commissioners have taken time to consider the feedback received and have made a number of changes to the original proposals. The Commissioners have also obtained an independent risk assessment 2 of the proposals which concluded that they will provide an improvement in safety and a reduction in risk over the present arrangements. To inform the risk assessment, LHC commissioned current flow monitoring 3 over some of the biggest spring tides of the year to support the long term monitoring previously undertaken on behalf of the Environment Agency 4. This demonstrated that current flows in the Town Quay area are low for the vast majority of the time with flows measured at under 0.6 knot for 99.2% of the Environment Agency 549 day monitoring period in a location where flows were expected to be strongest. New Proposal The Commissioners now wish to consult on the revised proposal which is shown on the plan entitled Proposed Mooring Layout below. A plan showing the existing mooring layout is also shown. The new proposals will: Respond to the changing market demand for visitor walk ashore berths thus ensuring that the Town Quay area continues to be a vibrant and successful tourist destination. Still offer a choice between visitor walk ashore berths with power and water and river moorings. Offer the unique prospect of holding major events at Town Quay that will appeal to event participants, local businesses, and local people. In recent years there have been enquiries from prospective event organisers who will only consider bringing their event to Lymington if it can be hosted with participants berthed together on walk ashore berths at Town Quay. This was because of its proximity to the town centre, unique atmosphere and the ability to have local community participation in a waterfront location. Increase the number of visits to local shops, restaurants, pubs and the Saturday market. 1 Source - Yarmouth Harbour Annual Reports 2009 to 2015 2 Copthorne Consulting April 2016 3 Shoreline Surveys April 2016 4 EMU for EA Feb 2012

Improve safety by (amongst other things) widening the navigation fairway and enlarging the turning space opposite the commercial quay. Allow LHC to continue to flex use of visitor moorings based on changing seasonal demand. In the summer months when visitor numbers are at their highest, moorings will be used to meet visitor demand. As at present, during winter months when visitor demand is low, most moorings will be used to accommodate resident boats that need to be relocated from the exposed lower river moorings or which have been displaced from their normal mooring to facilitate maintenance dredging. At times where mooring occupancy is forecast to be below capacity, the Commissioners will continue to offer temporary sublets with priority given to local residents waiting for a mooring. Release visitor dinghy tender berths (not so many needed if a greater proportion of visitor moorings are walk ashore) for resident berth holders on the waiting list for a tender in the Town Quay area. Relocate the 17 resident commercial fishing boat berths upstream to pontoons located on the southern (downstream) side of the railway bridge. This is in line with the feedback received from fishermen and will better separate commercial boat movements from leisure use. Relocate 43 resident small boat leisure berths to a new finger pontoon (25) or fore and aft moorings (18) located to the east of the railway bridge on the north side of the river. Relocate the commercial boat landing to be closer to the slipway thereby giving better visibility to potential customers of the services offered. The commercial landing will also be lengthened to accommodate two boats at the same time. The table below summarises the proposed changes Town Quay & Visitor Area Existing v Proposed Comparison Mooring Type Existing No. Proposed No. Total visitors/multi-purpose* Walk Ashore Pontoon 19 (rafted max 4 out) 51 (23 rafted max 2 out) (20 bookable finger berths) (6 small boat/rib berths) (2 alongside short stay berths) Total visitors/multi-purpose* Mid-river moorings Total resident Mid-river moorings Total resident commercial boat berths (Mid-river pontoon) Commercial Users Pick Up/Drop Off Landing (Walk Ashore) 97 36 43 (mid-river moorings) 43 (25 mid-river pontoon finger berths) (18 mid-river moorings) 17 17 1 2 * Multi-purpose moorings are used for visitors in the summer. Over the winter, when visitor demand is much lower, most are used to relocate resident boats from the exposed lower reaches of the river and from areas being dredged. They can also be used to provide temporary seasonal moorings (with priority going to local residents) at times when surplus capacity is available.

Consultation Process The eight week consultation period commences on Monday 1 st August and ends on Sunday 25 th September 2016. If you would like to talk through any aspect of the proposals, the Commissioners will be holding two half day drop in sessions in the Robert Hole Room, Lymington Community Centre on Thursday 1 st and Friday 2 nd September between 15.00 and 19.00 hours. To comment on the above proposals please click HERE and complete the feedback form. Alternatively you can write to Lymington Harbour Commissioners, Harbour Office, Bath Road, Lymington, SO41 3SE. Please note when making comments you must include your full details. Anonymous representations will not be considered. At the conclusion of the public consultation, the Commissioners will take stock of the feedback received before finalising its plans. 1 st August 2016