superseded by 2008 nhc report

Similar documents
HOPEWELL DISTRIBUTION CENTRE

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

APPENDIX A: SCREENLINE SURVEY STATION DETAILS

HOLDOM SKYTRAIN STATION

HOLDOM SKYTRAIN STATION

STADIUM- CHINATOWN SKYTRAIN STATION

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

September Samsung Double-th -in-Rebate

Implementation Plan for local governments

% Chg Due to Market Light Industry Region

Leaders in energy management

BETTER BUSINESS BUREAU 2015

Top 75 British Columbia Secondary Schools

Where to buy Snappy Grains Barley in BRITISH COLUMBIA

LifeLabs Legal Urine Drug Screen Designated Collection sites

DELIVERY SCHEDULE THE RIGHT PRODUCTS TO THE RIGHT PLACES, RIGHT ON TIME

Vancouver Downtown & West

2013 June 2014 `

Developmental Cost Charge (DCC) Program Summary

Welcome! metrovancouver.org. Aldergrove Regional Park - Management Plan

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN :

PASSENGER TRANSPORTATION BRANCH MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE LICENCE. Passenger Transportation Licence COPY

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE

Transit Network Review translink.ca

IMPORTANT MEMBERSHIP MEETINGS

Mental Health and Substance Use Centres (Plan G) Contact Information

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

TABLE 1A - PROVINCIAL OVERVIEW OF RECALCULATED 2008/09 OPERATING GRANTS

REDEFINING THE NEW BUSINESS HUB OF GUILDFORD TOWN CENTRE

Pattullo Bridge Replacement Project

Application Summary. Taxi - Amendment to Licence

BCLC Gambling Service Provider Commissions Report Fiscal Year 2015/16

Multiculturalism Grants Paid to Community Organizations 2016/17 (by community) - March, 2017

2012/13 STORE SALES BY REGION UNAUDITED

Selected Maps of British Columbia Published During 1976 and 1977

RETAIL REPORT METRO VANCOUVER FALL 2016 LEE & ASSOCIATES COMMERCIAL REAL ESTATE (BC) LTD.

BCLC Gambling Service Provider Commissions Report Fiscal Year 2016/17

British Columbia. Shoppers Drug Mart SEVENOAKS SHOPPING CENTRE SOUTH FRASER WAY, UNIT 143 ABBOTSFORD, BC, V2S 5A1 Phone:

K.~ Mike Redpath Senior Manager, Parks ( )

Rider ' s Guide. Blue Bus PROUDLY SERVING THE COMMUNITY SINCE Information:

IMTC RESOURCE MANUAL 2015

USACE GALVESTON DISTRICT PROJECT UPDATE

Roberts Bank Terminal 2 Project

MSC/ACDF Approved Diagnostic Facilities DU - DIAGNOSTIC ULTRASOUND as of December 8, 2015

METRO VANCOUVER REGIONAL DISTRICT (MVRD) - PARKS BOARD OF DIRECTORS

BCLC Gambling Service Provider Commissions Report Fiscal Years 2012/13 and 2013/14

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

2010/11 Community Gaming Grant Recipients Grant Category: Arts and Culture

State/Province. Clinic. Clinic. Grand Canyon Therapy. Clinic. Ruehle-Kumar Karen 1322 W. Amberwood Dr. Phoenix

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019

1716. PRESENT: 1. By striking out subsection (3) of Section and substituting the following:-

Delivery Zone and Sod Item Guide Western Canada

Funders/Service Partners 2016

Status. Agreement announced: June 2004 Completed: Value for Money Report. released: Nov 2004 *CCPPP: Financing Award Agreement announced:

PRESENT: recommend: By deleting Schedule 1 of Section and substituting the following:

CANADIAN FLYER T T O S TTOS CANADIAN DIVISION EXECUTIVE. From the President MEETING DATES. Inside this issue:

Retail Report. Metro Vancouver Annual Retail Market Report

WEEKLY INCIDENT SITUATION REPORT

Standing Committee on Planning, Transportation and Environment

2016 Development Cost Charges (DCC) UPDATE

WEEKLY INCIDENT SITUATION REPORT

BCLC Gambling Service Provider Commissions Report

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

U.S. Army Corps of Engineers Wilmington District

South Westminster and Bridgeview

METRO VANCOUVER INDUSTRIAL MARKET

Pattullo Bridge Replacement Project

Hydrology Input for West Souris River IWMP

Licence Frequency Site Site Name Record Identifier Identifier ON1276 Amherstburg - Front St/Middle Side Rd

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

2018 Development Cost Charges (DCCs) Update

Children Who Witness Abuse Counselling Programs Contact List

PA S S P O R T HISTORIC SITES IN DELTA VOLUME II. Historic Sunbury & Annieville BRITISH COLUMBIA

Community/Proponent Project Amount Abbotsford Abbotsford-James Treatment Plant Bio Solids Dewatering $2,170,000

Pattullo Bridge Replacement Project

Roberts Bank Terminal 2 Project

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT

WEEKLY INCIDENT SITUATION REPORT

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

Building Energy Performance Index (BEPIs)

METRO VANCOUVER REGIONAL DISTRICT REGIONAL PARKS COMMITTEE

IMTC Resource Manual. 20th Anniversary For the International Mobility & Trade Corridor Program

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

WEEKLY INCIDENT SITUATION REPORT

$6.60 NEW SOUTH WALES. Both METRIC and Feet and Inches TIMES: am/pm Sunrise/Sunset Moon Phases Moon Rise/Set DIARY NOTES.

Sod Delivery Guide FSAs and Cities Western Canada

Long term morphological analysis and simulations

Weekly Performance Update

Weekly Performance Update

Decision (Applicant claims urgent public need )

CONCEPTUAL DRAWING VILLAGE PEDESTRIAN WALKWAY

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

Port Hedland South-West Creek Dredge Plume Modelling Final Report Version 4 Prepared for Port Hedland Port Authority

Weekly Performance Update

Segment 2: La Crescent to Miller s Corner

Grain Monitoring Program

Walk-On Waterfront Executive Home Qualicum Beach, BC

2014 Library Grant Allocations

Transcription:

Steveston North Jetty Steveston South Jetty Georgia Strait Middle Arm West Vancouver UEL Legend Vancouver North Vancouver City North Arm Richmond Canoe Pass Fraser Valley Regional District North Vancouver District Greater Vancouver Regional District South Arm Delta Burnaby Belcarra Port Moody New Westminster Anmore Port Mann Surrey White Rock Coquitlam Port Coquitlam Pitt Meadows Pitt River Langley City Pitt Lake Maple Ridge Langley Township Alouette Lake Mission Mission Rail Bridge Abbotsford Scale - 1:, 1 1 Distance in Kilometres UTM NAD Zone Sumas Mountain DATE: DEC Harrison River Chilliwack FRASER BASIN COUNCIL LOWER FRASER RIVER HYDRAULIC MODEL Site Map northwest hydraulic consultants Kent - DWG BY: CM Figure 1.1 \\Linux-services\projects\ Fraser Profile\GIS\GIS Project Files\sitemap.mxd

Discharge (m /s) 1 1 1 Flow Volume (km ) 1 1 9 7 9, 7. Annual Maximum Discharge at Hope 7,9 9,,17 19 19 19 197 199 Year Annual Runoff Volume at Hope 79. 91.1. 19 19 19 197 199 Year Trends in Annual Fraser River Discharge at Hope December Figure.1

Water Level (m GSC) 9 7 WSC Curve WSC Curve WSC Curve 's 7's 's 9's+ 7 9 1 1 1 1 1 1 17 1 19 Discharge (m /s) WSC Rating Curves and Discharge Measurements at Mission Gauge December Figure.

Velocity (m/s) Depth (m) Velocity (m/s). 1. 1. 1. 1. 1..... y =.x.91. 1 1 1 1 1 1 y =.x.9 Discharge (m /s) 1 1 1. 1. 1. 1. 1. 1. y =.1x 1.977 Velocity vs. Discharge Depth vs. Discharge Discharge (m /s) Velocity vs. Depth... 11. 11. 1. 1. 1. 1. 1. 1. Depth (m) Hydraulic Geometry at Mission Gauge (MH) December Figure.

Dune Steepness in the Fraser River Manning's Roughness Dune Height (m)...... 1. 1. y =.x -... 1 Dune Length (m) Steveston Survey Line 1 Steveston Survey Line Mission Froude Number versus Manning's Roughness.........1.1.1.1. Froude Number (-) Steveston Mission Dune Characteristics at Mission and Steveston December Figure.

Predicted Mean Velocity at Mission Mean Velocity (m/s) Manning's Roughness... 1. 1.........1. 1 Discharge (m /s) Predicted Channel Roughness Assumed lower limit for flat bed Mission observed Engelund-Hansen Einstein-Barbarossa Van Rijn 1 1 1 1 Discharge (m /s) Predicted from observed dune geometry Engelund-Hansen Einstein-Barbarossa Predicted Channel Roughness at Mission December Figure.7

Dredge Volume (million cubic metres) 7 1 North Arm - Total South Arm - Borrow South Arm - Maintenance Ratio of Annual Dredging Volume to Bed Material Inflow at Mission 19 19 19 19 19 197 197 197 197 197 19 19 19 19 19 199 199 199 199 199 Year 7 1 Ratio of Dredge Volume to Material Inflow Historic Trends in Dredging on the Lower Fraser River December Figure.

Water Level (m GSC).. 1. 1.. Pitt River near Port Coquitlam Fraser River at Port Mann. 19 197 197 19 19 199 199 Year Trends in Water Levels Pitt River and Port Mann December Figure.9

rt po 1 % %% % 17 1 %% 1 WOODWARD REACH 7 % ANNACIS 1 % %% % 1A 7 1 % 9 ANNIEVILLE CANADIAN COAST GUARD STRUCTURE INDEX F.R. - LADNER REACH PARSONS 1- NORTH ARM BREAKWATER - NORTH ARM JETTY - STEVESTON NORTH JETTY - STEVESTON SOUTH JETTY - STEVESTON WINGDAMS No. & - STEVESTON STRUCTURE (not indexed) 7- WOODWARD TRAINING WALL 9- DEAS & KIRKLAND ISL. BANK PROTECTION - FRASER RIVER TRIFURCATION- PHASE 1 11- FRASER RIVER TRIFURCATION- PHASE 1- FRASER RIVER TRIFURCATION- PHASE 1- SAPPERTON 'V' DIKE 1A- SAPPERTON WINGDAMS 1- ALBION TRAINING WALL su p er se d ed CANOE PASSAGE 1 % BEDFORD 7 ENTERPRISE 9 BRIDGE CROSSINGS 1- ANNACIS ISLAND WEST CAUSEWAY - ANNACIS ISLAND EAST CAUSEWAY - DERWENT BRIDGE - WESTHAM ISLAND - ALEX FRASER - SKYTRAIN 7- PATULLO - PATULLO RAILWAY 9- PORT MANN - MISSION 11- MISSION RAILWAY 1- JACOB-HALDI 1- NO. ROAD BRIDGE 1- DINSMORE BRIDGE 1- MIDDLE ARM (MORAY) 1- NEW AIRPORT CONNECTOR 17- MARPOLE RAIL BRIDGE 1- OAK ST. BRIDGE 19- KNIGHT ST. SOUTH - CN RAIL - LULU TO BURNABY 1- QUEENSBOROUGH - QUEENSBOROUGH RAILWAY - MITCHELL ISLAND - KNIGHT ST. NORTH - ARTHUR LAING -CP RAIL 7- PITT RIVER N SCALE - 1:, BRIDGE LOCATION CANADIAN COAST GUARD STRUCTURES 11 % % W E S DISTANCE IN KILOMETRES UTM NAD ZONE MATSQUI NOTES: 1) DATA TAKEN FROM FISHERIES AND OCEANS CANADA CANADIAN COAST GUARD WATERWAYS DEVELOPMENT DWG. NO. FR--, AUGUST 199. LOWER FRASER RIVER HYDRAULIC MODEL River Control Structures and Road/Railroad Bridges DATE: DEC dgm:\projects\- Fraser Flood Profile\GIS FRASER BASIN COUNCIL LEGEND % 1 11 % 9 % % 1 %% by 19 GRAVESBEND REACH % % NORTH ARM nh MIDDLE ARM % 7 1 1 1 1 SAPPERTON c NORTH ARM re %% - DWG BY: WPH northwest hydraulic consultants FIGURE.1

MH MH MH MH MH MH11 MH MH MH17 MH MH MH MH MWLAP STAFF GAUGE QUEENSBOROUGH PORT MANN KENNEDY PUMP STATION BAYNES PUMP STATION SALMON RIVER ALBION FERRY GLEN VALLEY SILVERDALE McLENNAN CREEK MATSQUI SLOUGH DEWDNEY HATZIC GAUGE NO. 1 9 7 1 < S 9 re T$1 c $T nh S S W'11 W'1 T $ 1 W ' 1S ' 9W W ' W' U%1 W'7 ANNIEVILLE $T LEGEND 1 MUNICIPAL GAUGE 1 MWLAP STAFF GAUGE 1 WSC HYDROMETRIC STATION 1 CHS TIDAL GAUGE W' U% S $T W' LADNER REACH CANOE PASSAGE ed S 1 U% S 111 W' 11 W ' PARSONS RECORDER CONTINUOUS INTERMITTENT INTERMITTENT INTERMITTENT CONTINUOUS CONTINUOUS INTERMITTENT INTERMITTENT CONTINUOUS INTERMITTENT CONTINUOUS INTERMITTENT CONTINUOUS INTERMITTENT CONTINUOUS ID CHS TIDAL GAUGE GAUGE NO. 1 779 77 79 7 POINT ATKINSON VANCOUVER HARBOUR SANDHEADS LIGHT NEW WESTMINSTER S W' U% U% 1 BEDFORD 7 7 U%S 1 ENTERPRISE U% 9 S U% 1 1 11 U% U % MATSQUI se d W' S W' W' WOODWARD REACH W' S U% 9 SCALE - 1:, FRASER BASIN COUNCIL N W E S DISTANCE IN KILOMETRES UTM NAD ZONE LOWER FRASER RIVER HYDRAULIC MODEL Tidal and Hydrometric Gauge Locations DATE: DEC dgm:\projects\- Fraser Flood Profile\GIS su p GRAVESBEND REACH MUNICIPAL GAUGE BATH SLOUGH WESTHAM ISLAND ELLIOT & RIVER RD. B & RIVER RD. NO. RD. NELSON RD. 9 RIVER RD. QUEEN'S PUMP QUEENSBOROUGH QUAYSIDE MANSON BRAID STREET 19nd STREET YORKSON SALMON RIVER CONFLUENCE er MIDDLE ARM ANNACIS NORTH ARM S 7 U% SAPPERTON by NORTH ARM S ID 1 7 9 11 1 1 1 1 rt FRASER R. AT STEVESTON FRASER R. AT DEAS ISLAND TUNNEL FRASER R. (NORTH ARM) AT VANCOUVER FRASER R. AT NEW WESTMINSTER FRASER R. AT PORT MANN COQUITLAM R. AT PORT COQUITLAM PITT R. NEAR PORT COQUITLAM ALOUETTE R. NEAR HANEY PITT R. NEAR ALVIN NORTH ALOUETTE R. AT nd ST. FRASER R. AT MISSION FRASER R. AT PORT HAMMOND FRASER R. AT WHONOCK 1 7 9 11 1 1 ID 1 7 9 11 GAUGE NO. po ID WSC HYDROMETRIC STATION - DWG BY: WPH northwest hydraulic consultants FIGURE.

Water Level (m GSC) 7 1-1 - - 1-1- 1-1 1-1 - - -1-1 - Pacific Standard Time (Day-Hour) Mission Whonnock Salmon River (Municipal) 19nd St (Municipal) Pitt River Port Mann New Westminter (CHS) Manson (Municipal) Nelson Rd. (Municipal) No. Rd. (Municipal) Steveston (CHS) Tidal Estimate (Triton) Freshet Calibration Main Arm Water Levels December Figure.

rt.7%.7% < WESTHAM ISLAND.% 7% McMILLAN ISLAND % CRESCENT ISLAND BEDFORD 9% 7 % DEAS ISLAND LADNER REACH ENTERPRISE 9% 9 % MATSQUI ISLAND 71% MATSQUI 9% su p er se d ed CANOE PASSAGE << << c 7% ANNACIS ISLAND 9% < nh ANNIEVILLE 9% PARSONS < DOUGLAS ISLAND << re po 1% by ANNACIS % < 1% < << WOODWARD REACH BARNSTON ISLAND % << GRAVESBEND REACH <.% < << < 7.7% MIDDLE ARM LULU ISLAND % % < SEA ISLAND NORTH ARM SAPPERTON < MITCHELL ISLAND.% < NORTH ARM SCALE - 1:, W E S < LEGEND FLOW SPLIT SURVEY LOCATION FRASER BASIN COUNCIL N DISTANCE IN KILOMETRES UTM NAD ZONE NOTES: 1) PERCENTAGES REFER TO TOTAL FRASER RIVER FLOW AND CORRESPOND TO AVERAGE RECORDED VALUES. ) DATA COLLECTED BY PWGSC (MAY-JUNE, AND NOV, -JAN, ). LOWER FRASER RIVER HYDRAULIC MODEL Recorded Flow Spits DATE: DEC dgm:\projects\- Fraser Flood Profile\GIS - DWG BY: WPH northwest hydraulic consultants FIGURE.

Manning's Roughness Coefficient...1..9..7. 1 1 1 1 Flow (m /s) 197 & 197 WSC Measurements Model Calibration/Verification 19 Model Calibration/Verification 19 Upper bound n-value 19 Best est. n-value 19 Lower bound n-value Flow vs. Roughness Sumas Mountain to Douglas Island December Figure.

Water Level (m GSC) 9 7 WSC Curve WSC Curve WSC Curve MIKE11 Model 7 9 1 1 1 1 1 1 17 1 19 Discharge (m /s) Comparison of WSC Rating Curve and Model Prediction at Mission Gauge December Figure.

1 7 9 Chainage (km) Base Run +% n +% n -% n Water Level (m GSC) Steveston New Westminster Port Mann Mission Roughness Sensitivity Fraser River Freshet Design December Figure.1

Water Level (m GSC) 1 Steveston Base Run n.7 Manning's n.9 Manning's n. Manning's n. Manning's n. Manning's n. 199 Profile New Westminster Port Mann 7 9 Chainage (km) Mission Roughness Sensitivity (Km 7 to ) Fraser River Freshet Design Flood December Figure.

1 7 9 Chainage (km) Base Run +% Inflow -% Inflow Water Level (m GSC) Steveston New Westminster Port Mann Mission Inflow Sensitivity Fraser River Freshet Design December Figure.

1 7 9 Chainage (km) Base Run +.m Global Warming +% Swing Water Level (m GSC) Steveston New Westminster Port Mann Mission Ocean Level Sensitivity Fraser River Freshet Design December Figure.

1 7 9 Chainage (km) Base Run Local Bed Scour Water Level (m GSC) Steveston New Westminster Port Mann Mission Sensitivity to Local Scour Fraser River Freshet Design December Figure.

Water Level (m GSC) 9 7 1 Steveston Base Winter Run Base Freshet Run +% Roughness -% Roughness New Westminster Port Mann 7 9 Chainage (km) Mission Roughness Sensitivity Fraser River Winter Design December Figure.

9 7 1 7 9 Chainage (km) Base Winter Run Base Freshet Run +% Inflow -% Inflow Water Level (m GSC) Steveston New Westminster Port Mann Mission Inflow Sensitivity Fraser River Winter Design December Figure.7

Water Level (m GSC) 9 7 1 Steveston Base Winter Run Base Freshet Run -Year Inflow -Year Inflow New Westminster Port Mann 7 9 Chainage (km) Mission Inflow Sensitivity (Event Based) Fraser River Winter Design December Figure.

Water Level (m GSC) 9 7 1 Steveston Base Winter Run Base Freshet Run Global Warming Scenario New Westminster Port Mann 7 9 Chainage (km) Mission Ocean Level Sensitivity Fraser River Winter Design December Figure.9

Water Level (m GSC) 1 Steveston Base Run 199 Profile Inflow 1 Inflow 17 Inflow 17 Inflow 1 Inflow 1 Inflow 1 Inflow 1 Inflow 1 Inflow 1 New Westminster Port Mann 7 9 Chainage (km) Mission Range of Inflows Fraser River Freshet Design December Figure.1

Dike Elevation (m GSC).1.9..7..... Ground LiDAR.1 1 Distance (m) Coquitlam Dike Ground Survey vs. LiDAR December Figure.

.......1... 7 9 Chainage (km) Dredging Stoppage km to km 11 Dredging Stoppage km to km Increase in Predicted Flood Level (m) Steveston Mission Massey Tunnel Alex-Fraser Bridge New Westminster Port Mann Dredging Sensitivity Fraser River Freshet Design December Figure 7.1