AN ANALISIS OF CITIES ENDANGERMENT OF FLOODS ON THE EXAMPLE OF NOVI SAD

Similar documents
Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA

Zoran Đuroković, B. Sc. (Civ.Eng.) Davor Haničar, B. Sc. (Civ.Eng.) Ladislav Grđan, B. Sc. (Civ.Eng.) Silvio Brezak, B. Sc. (Civ.Eng.

Flood Control for Typhoon 18 at Yodo River System in Avoidance of Catastrophe through Coordinated Operation of 7 Dams -

2014 floods in Serbia

Transboundary cooperation of Ukraine and Hungary in river basin and flood management in the framework of the EU Strategy for the Danube Region

The Danube-Tisa-Danube Canal System in a Community Setting

"Transboundary coordination according to the FD Directive in the shared river basins of Greece

Development of a MIKE11 Model of the Danube, Tisa and Sava Rivers in Serbia

BRATISLAVA. and its urban development along the river Danube

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

STUDY OF ALAQI SECONDARY CHANNEL IN LAKE NASSER

Public Works Research Institute

When the preventative evacuation of Orléans can be decided on before a flood?

REPUBLIC OF SERBIA IRRIGATION AND DRAINAGE REHABILITATION PROJECT (P087964) (Credit No 4105YF and Loan No 7467YF)

Outline of the Shinryu Head Works

The Problem.. SuDS: Controlling the Flow. LANDF RM Technical delivery of SuDS 15/10/2013. Bridget Woods Ballard HR Wallingford 1.

Canada s Contributions Abroad WWII

AVALANCHE SAFETY PLAN

"ST. KLIMENT OHRIDSKI FACULTY OF GEOLOGY AND GEOGRAPHY

Byelorussian Battlefields

Statement by Minister of Foreign Affairs of the Slovak Republic Mr. Miroslav Lajčák on

GLOBAL DESIGN OF CRUISE SHIPS BASED ON COMMERCIAL, SAFETY AND SECURITY FRAMEWORK

Members Communication

Technical Explanation Introduction

Site Formation Works of the Kai Tak Cruise Terminal Project

Scientific Support to the EU Strategy for the Danube Region and the Danube Water Nexus project

Simulation Analysis on Navigation Indexes of Wanzhou Yangtze River Highway Bridge after the Anti-Collision Device Construction by Ship Model Test

Danube River Basin District

Remember from last class...

Underwater Archaeological Expedition on Ancient Town Akra in 2012 (Eastern Crimea)

The Timok River Basin in Serbia

EU MACRO-REGIONAL STRATEGY FOR THE CARPATHIAN REGION. Gabriela Szuba Ministry of the Environment, Poland Modra, June 2017

Prosjekt Lesina Mediteranean sea Coastal lagoon

Life in Ancient Egypt

MOSE PROJECT: STATE-OF-THE-ART AND FUTURE DEVELOPMENT

National Parks Called America s Best Idea

Reduction of Wave Runup on a Revetment by Addition of a Berm

Gatwick Stream Riverside Garden Park, Horley

Presentation from 2015 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

R3579. Plastic Female Rod End. Material Housing: Igumid G plastic - Black. Spherical bearing: Iglidor w300.

A Romanian, Hungarian and Ukrainean transboundary basin: Somes - Tisa

AMAS 05. Mine/UXO Clearance Marking System. Second Edition June 2007

Springtime in D.C. Segway Blossom festivities

Hydrological study for the operation of Aposelemis reservoir Extended abstract

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

Long term morphological analysis and simulations

PRESS RELEASE. Address: Hungary, H-1068 Budapest, Benczúr utca 25.

ESTIMATES OF ENDANGERMENT AND PROTECTION FROM TORRENTIAL FLOODS ON SMEDEREVO TERRITORY

HYDRAULIC STUDY OF THE NERETVA RIVER (FROM MOSTAR TO THE BORDER WITH THE REPUBLIC OF CROATIA)

The Galveston Seawall

Development of the Knowledge Society through Research, Education and Information Technologies

GCAA ADVISORY CIRCULAR

Lessons Learned from the Floods this May

Unit 6 Lesson 8 The Persian and Peloponnesian Wars

(1) For many years the Greek city-states had fought against each other over land and TRADE In the 400 s B.C., the city-states UNITED to confront a com

Management of a Large The Danube. Mr. Mitja Bricelj ICPDR President Perth,13 October 2010

The Persian Empire. Mr. Mable 2012

Chapter 4 : Ancient Egypt and Kush

Athens and Sparta. Chapter 7, Section 2

National Standard for Tonnage Measurement and Calculation of the Vessels Engaged on International Voyages General Definitions 2.

RiverWare User Group Meeting, february Migration Lerma-2004 model, from Stella to RiverWare

Note: Please view the Rescue 42 TeleCrib Strut DVD in conjunction with reading this informational packet.

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

THE CHALLENGE OF PERSIA. The Making of Classical Greece

markilux 780 / 880 Remarkably compact yet strong conservatory awnings for small glass areas both on the interior and the exterior

Final declaration of the Danube Summit on 6 th May 2009 in Ulm. Preamble

Runway Roughness Evaluation- Boeing Bump Methodology

FLOW REDUCTION IMPACTS ALONG RIVER NILE IN EGYPT

Guided Notes - Persian & Peloponnesian Wars

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

Document A: Herodotus

LINUS. Vineyard Poles. LINUS Vineyard Poles quality wins. voestalpine Präzisionsprofil GmbH

14. Tent: Multi-purpose

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

Wooden Koi/Octagonal Pond Instruction Manual

Images: ThinkStock

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

procopi.com Igloo II protects beautiful pools IGLOO II Above-ground Automatic Covers STANDARD compliant For existing pools or pools under construction

War Begins. p

STATUS QUO REPORT ON WATERWAY MAINTENANCE HUNGARY

GATEWAY TO EUROPE Cooperation of the ports on the western coast of the Black Sea and the ports on the River Danube

Sample file. Permission is granted to backup and store the audio tracks on a CD disk.

MARQUEE IN THE NEW RAILWAY STATION OF MALAGA

The Glory of Ancient Greece

Chapter 4.0 Alternatives Analysis

PAVEMENT CONDITION REPORT

Supersedes: AD3V (991) AD3V (1294)

World History I SOL WH1.5d Mr. Driskell

THE DANUBE CORRIDOR A DEVELEOPMENT GENERATOR. a company of

The Danube A Stream of Energy

The Armadillo Interlocking Riot Shields

AN OVERVIEW OF DIOXIN CONTAMINATION AND ENVIRONMENTAL REMEDIATION PROCESS AT DA NANG AIRPORT

Rhuddlan Community Flood Plan

Merchant Shipping (Tonnage) Regulations 2017

NETWORK OF DANUBE WATERWAY ADMINISTRATIONS data & user orientation SOUTH EAST EUROPE TRANSNATIONAL COOPERATION PROGRAMME ATLAS OF BERTH

ANNEX IV. Heavily Modified Surface Water Bodies in Serbia and Montenegro

Historical Background

Transcription:

THE INTERNATIONAL CONFERENCE ON FLOOD MANAGEMENT 25-26.06.2018. BAJA, HUNGARY HIDRO CLB CONSULT 21000 NOVI SAD Kisačka 64 A 381 21 6542 657 AN ANALISIS OF CITIES ENDANGERMENT OF FLOODS ON THE EXAMPLE OF NOVI SAD Rade Milutinović, dipl.ing +381 64 225 32 56 rademilu@yahoo.com 1

REASONS FOR THE TREAT OF NOVI SAD HYDROLOGICAL GEOGRAPHICAL MORPHOLOGICAL IMPORTANT EVENTS IN THE PAST 2

ABOUT FLOODS - FLOODS ARE A NATURAL PHENOMENON - LIFE BY THE RIVER IS DESEPTIVE PEACE AND A LABILE BALANCE - SAFETY BY THE RIVER - BATTLES AND WAR - IGNORANCE END FRIVOLITY 3

FLOODS ARE A CATASTROPHE FOR HUMAN COMMUNITIES - THE FLOOD BECOMES A CATASTROPHE WHEN THE RESPONSIBLE PEOPLE THINK THAT IT WON T HAPPEN 4

FLOODS MEAN A STRUGGLE FOR LIFE 5

FLOODS = DAMAGES 6

FLOODS = MUD, POLLUTION, CONTAMINATION 7

FLOODS = EFFORT, FIGHT TO SAVE... FLOODS BRING FEAR, TIREDNES AND SLEEPLESSNESS FLOODS PUT PEOPLE AND STAE STRUCTURES ON GREET TEMPTATION 8

FLOODS ARE EVACUATIONS AND COLLECTIVE ACCOMMODATIONS 9

FLOODS AND CATASTROPHIC FLOODS - THE DIFFERENCE BETWEEN THE TWO IS IN THE DAMAGE THAT ARISES - DAMAGE DOES NOT DEPEND ON THE DEGREE OF FLOODING, BUT RATHER ON WHAT IS FLOODED - WHEN THE CITY FLOODS - DAMAGE IS HUGE, - IN UNTREATED AND AGRICURTURAL AREAS, THE DAMAGE CAUSED BY FLOOD IS MUCH LESS 10

WE CAN T PREVENT ALL FLOODS WE HAVE TO REDUCE THE DAMAGE TO A TOLERABLE LEVEL 11

CITIES ARE THE GREATEST VALUE OF THE DEFENDED TERRITORY CITIES NEED TO PROVIDE A HIGHER LEVEL OF PROTECTION THAN THE SURROUNDING TERRAIN CITIES SHOULD BE PROTECTED IN THE WAY TO BECOME ISLANDS IN THE MIDST OF FLOODED AREA 12

EVENTS WHICH WARN US THAT CATASTROPHIC FLOOD IS APPROACHING SITUATION No 1. HIGH WATER UPSTREAM OF NOVI SAD 13

FLOOD IN PASSAU, KM 2.226 OF DANUBE 2013, 1501, 1595, 1954, 1787, 1862, 1899, 1895, 2002, 1920 - IN THE PAST FIVE HUNDRED YEARS EIGHT TIMES - IN THE 21 ST CENTURY, FOR 13 YEARS TWICE - 2013 year = 1501 year + ~50cm 14

HIGH WATER OF DANUBE UPSTREAM OF NOVI SAD MAXIMUM AMOUNT OF WATER ; WATER COINCIDENCES, 14.000 m3-1501.god. Over 10,000 m3-1899. and 1954 Over 10,000 m3 / s - 2002. and 2013. 15

BRATISLAVA 2013. THE FLOW OF DANUBE WAS 10.540 m3/s THE WATER LEVEL WAS EXCEEDED BY 41 CM 1899. - 10.870 m3/s 1965. 10.540 m3/s 2002. 10.370 m3/s 16

YEAR 2013. - BUDAPEST THE HISTORICAL MAXIMUM LEVEL OF DANUBE WAS EXCEEDED BY 31CM 17

SITUATION No 2. THE LARGEST FLOWS NEAR NOVI SAD 18

Year 1965 - NOVI SAD - THE LARGEST FLOW 9.250 M3/S, - FIVE BURSTS OF EMBANKMENTS AND SIGNIFICANT WATER SPILLAGE - THE MEASURED WATER LEVEL WAS 778 -IF THERE WAS NO PENETRATION OF THE DAM, THE WATER LEVEL WOULD HAVE BEEN 830 -FOR A HIGH WATER VALUE OF 778 WAS TAKEN -THE REAL VALUE OF THE HIGH WATER IS 830 - THE EXISTING EMBANKMENTS SHOULD BE 30 CENTIMETRES HIGHER 19

THE INFLUENCE OF UPSTREAM PENETRATIONS OF THE DAM ON TE DANUBE LEVEL IN NOVI SAD 20

SITUATION No 3 - THE WIDTH OF DANUBE IN NOVI SAD 21

THE WIDTH OF DANUBE IN NOVI SAD IS 300 M THIS IS THE SMALLEST WIDTH OF THE MIDDLE DANUBE 22

ONE UNFAVORABLE SITUATION IN THE CASE THAT WATER GETS HIGHER THAN IT HAS EVER BEEN SITUATION No. 4 - THE RULE IS - NO DEFENSE WITHOUT ARMY - TOTAL OF 22.000 JNA SOLDIERS (14000 PER DAY) PARTICIPATED IN DEFENSE AGAINST THE FLOOD IN 1965. - NOWADAYS, IT WOULD BE IMPOSSIBLE TO ENGAGE THAT NUMBER OF PEOPLE - 23

SITUATION No. 5 - HYDROTECHNICAL HUB OF EUROPE 24

HYDROGRAFIC MAP OF OUR AREA 25

SITUATION No. 6. CONFIGURATION OF THE TERRAIN IN THE CITY NOVI SAD WAS BUILT IN DANUBE BASIN FOR HIGH WATERS 26

Angle 77,00 mnm. WATER LEVEL 527 REGULAR DEFENSE IS ANNOUNCED AT WATER LEVEL 450 27

Angle 77.50 mnm. WATER LEVEL 577 WATER LEVEL 570 APPEARED IN 2005; 590 APPEARED IN 1977; 571 APPEARED IN 1994. 28

Angle 78,00 mnm. WATER LEVEL 627 WATER LEVEL 638 APPEARED IN 1981; 644 APPEARED IN 1988.. 29

Angle 78,50 mnm. WATER LEVEL 677 30

Angle 79,00 mnm. WATER LEVEL 727 They were in 2006. and 1975 Extraordinary defense 700 31

Angle 79,50 mnm. WATER LEVEL 777 THE HIGHEST WATER LEVEL THAT APPEARED 1965 WAS 778 32

Angle 80.00 mnm. WATER LEVEL 827 HUNDRED YEAR REAL WATER 33

Angle 80,50 mnm. WATER LEVEL 877 THE ANGLE OF CONCRETE WALL AT THE QUAY IN NOVI SAD CORRESPONDS TO THE WATER LEVEL OF 880 34

Angle 81,00 mnm. WATER LEVEL 877 -ANGLE OF THE CROWN OF THE EMBANKMENT IS 920 CALCULATING 1000 YEARS HIGH WATER ACCORDING TO ESTIMATION FROM 1967 35

Angle 81,50 mnm. WATER LEVEL 927 1.000 YEARS HIGH WATER PER ACCOUNT FROM 2007.GOD FLOOD 36

HOW TO HELP OURSELF? WHAT CAN BE DONE? FIRST: -ACCEPT THAT FLOOD MAY OCCUR SECOND: -THERE IS NO TIME -IMMEDIATE ACTION -CHANGES ARE IN PROGRESS THIRD: -DEFINE THE MOST UNFAVORABLE SCENARIO AND PROTECT FROM IT FOURT: -THE COST OF PROTECTION IS 5 10% OF THE INEVITABLE DAMAGE 37

GOLDEN FLOOD PROTECTION RULES FIRST: PREPARATION, PREPARATION, PREPARATION SECOND: ORGANIZATION, ORGANIZATION, ORGANIZATION THIRD: THE PROBLEM THAT WE AVOID TODAY, WE WON T HAVE TO SOLVE TOMORROW. IT WILL BE UNSOLVABLE TOMORROW 38

POSSIBLE SOLUTIONS TO FORM A FLOOD MANAGEMENT SYSTEM WHAT IS FLOOD MANAGEMENT? ORGANIZATION AND SYSTEM OF MEASURES TO CONTROL FLOODS THAT CAN T BE AVOIDED OR PROTECTION OF THE MOST VALUABLE PROPERTY IN THE PROTECTED TERRITORY AS THE RIVER GROWS DEFENCE AGAINST IT WHEN THE FLOOD COMES FLOOD MANAGEMENT 39

THE MOST IMPORTANT MEASURE OF FLOOD MANAGEMENT INCREASE THE LEVEL OF PROTECTION OF THE MOST VALUABLE PROPERTY TO FORM CROSS - SECTIONAL AND COMPREHENSIVE EMBANKMENTS OF MOBILE EQUIPMENT CONDITION: - DEFINE MOBILE DEFENCE LINES, - DEFINE THE REQUIRED HEIGHT AND DIMENSION, - GET MOBILE EQUIPMENT, - PREPARE MOBILE INSTALLATION LINES, - TRAIN THE FORMATION OF TRANSVERSE LINES OF DEFENSE 40

CONCRETE L ELEMENTS * ( *EUROPEAN PATENT No. 2545221) POSSIBLE SOLUTION 41

MOBILE BARRIER ALONG THE ROAD No.1 42

MOBILE BARRIER ALONG THE ROAD No. 2 43

MOBILE BARRIER ALONG THE EMBANKMENT No. 3 44

MOBILE BARRIER - WALL HANGING No. 4 45

THE WAREHOUSE OF THE L ELEMENTS NEXT TO THE PLACE OF APPLICATION 46

THE STORAGE OF THE L ELEMENTS IN THE FORM OF A SUMMER STAGE NEXT TO THE PLACE OF APPLICATION 47

THE STORRAGE OF PARTIALLY BURIED L ELEMENTS 48

THE STORRAGE OF COMPLETELY BURIED L ELEMENTS 49

THE STORAGE IN THE FORM OF A FLAKE 50

REINFORCEMENT OF DEFENSE LINES DRIVEN THE WATERTIGHT BARRIER INTO THE GROUND REINFORCEMENT OF EXISTING DEFENCE LINES, HYDRAULIC REINFORCEMENT OF THE BASE FOR THE MOBILE BARRIER 51

MAKING A WATERTIGHT BARRIER DRIVEN IN THE SOIL 52

WATERTIGHT BARRIER ALONG THE ROAD 53

REINFORCEMENT OF EMBANKMENT WITH WATERTIGHT BARRIERS 54

WATERTIGHT BARRIERS IN THE EMBANKMENT 55

WATERTIGHT BARRIERS AROUND INDUSTRIAL OBJECTS 56

THANK YOU FOR YOUR ATTENTION 57