广东省机场管理集团公司 GUANGDONG AIRPORT MANAGEMENT Co. 白云机场 IT 建设与应用 The Use of Airport IT at Guangzhou Baiyun Int. Airport Chen Fenghua 2008 年 4 月 1 日
OVERVIEW The Background of GBIA Issues & Challenges We Met How the IT Response to the Challenges GBIA IT Implementation Progress IT Application Case Study The Future of GBIA IT
1. The Background of GBIA Terminal I of GBIA contains a 350,000 m2, Designed capacity of 25,000,000 annual passengers, 1,000,000 tones cargo per year on/before 2010. Two runways and a standard of 4F, meeting the criterion of A380 s take off and landing. Future five runways, 360,000 flights on take off/landing, annual passengers 80,000,000.
1. The Background of GBIA -Fast Growth One night switched off on August 5 th 2004 26.32 million passengers in the year of 2005 Mile stone breakthrough to 30 million passengers in the year of 2007 At 17.8% growth rate on annual passengers FEDEX Asia Hub at GBIA and the Expansion on Terminal one ( 150,000 m2 ) will be fully on production In the year end of 2008
2. Issues & Challenges of GBIA A high effective operation on 24 hours a day, 365 days a year To satisfied both the customers & ourselves critical service demands To meet the requirement of the customers complex and diverse demands To constantly striving to improve performance levels, operating efficiencies, and profitability.
3. How the IT Response to the Challenges KEY:IT is the core of GBIA operations Check-in, FIDS, CUSS, Baggage handling, and even the car parking system etc, depend on IT To provide a more effective, secure, less costly, comfortable airport depend on IT The investment of IT leads the cost reduction to the airport and its tenants The investment of IT will generate new business opportunities Innovation and investment does not necessarily mean additional cost or complexity
4. The GBIA IT Implementation (1)The integrated, reliable and open IT system Information share Clock DGS DCS BHS practicability advanced BGA FCS reliable integration DSS Netwoek AODB BA CCTV EPS TV FIDS PA PS
(2)The seven operation command center at an unified platform Apron Command Center Customer Service Center Operation Emergency Command CenterCommand Center Security Command Center Terminal Management Center Fire Command Center
(3)How to achieve the purpose A modern, fully-integrated CAN, using IP-based technologies and operating across the entire airport campus. (ACAN) An open, well designed data storage & exchange system An open, easy-to-use application system structure
5. The GBIA IT Application Case Study (1)A mile stone on reforming the China Custom procedure in GBIA
The troubles of old procedure : # A long procession and crowded # A baggage should be check three times # Waste more time to check in # Hard to get full security check-up # Passenger was embarrassed #
The new China Custom procedure in GBIA X RAY DCS heck In passports CIQ ASI Customs Cooperate Safety Inspection Pass Pass Boarding BHS X-RAY
(2)The expansion from Terminal to Pearl River Delta Cities In-Town Check-in Service
( Con. ) Inquiring the flight information and booking become easy depend on the airport database Established GBIA s In-Town check-in service around Pearl River Delta such as Shenzhen, Zhuhai, Dongguan, and so on Provide the real-time flight information and propositional measures Passengers can finish all the process before they come to the airport
6. The Future of GBIA IT (1) E-airport materialize in every aspect Self-service Mobile information & media RFID used on baggage & boarding cards E-passport
6. The Future of GBIA IT (Con.) (2)E-Cargo Platform in GBIA Depend on the Airport network an IT to realize the fully-integrated E-cargo platform connecting with the Office E-port Reduce the time of cargoes transacting at airport Provide more better service for FEDEX Asia Hub at GBIA
谢谢! Thank You!