Capital Projects 2015 Ward 21

Similar documents
TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

MEETING DATE: February 17, 2010 SUBJECT: ACTION ITEM TORONTO TRANSIT COMMISSION REPORT NO. ACCESSIBLE TRANSIT SERVICES PLAN: 2009 STATUS REPORT

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

NTARIO S INFR STRUCTURE

Construction Staging Area 19 Western Battery Road

Update Report - Etobicoke Creek and South Mimico Creek Trails

Geary Avenue: Option 2_Reconstruction

TORONTO AND EAST YORK COMMUNITY COUNCIL AGENDA MEETING 5

TORONTO TRANSIT COMMISSION REPORT NO.

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

List of Our Ongoing Noise and Vibration Monitoring Projects

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

Casa Loma Heritage Conservation District (HCD) Study. Community Consultation Meeting #1 Summary Report

Neighbourhood Schools and Services

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO EAST YORK COMMUNITY COUNCIL AGENDA MEETING No. 4

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

INFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

TORONTO TRANSIT COMMISSION REPORT NO.

Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario

GREENFIELD DEVELOPMENT PROJECTS

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

CITY CLERK TORONTO AND EAST YORK COMMUNITY COUNCIL REPORT 5. For Consideration by The Council of the City of Toronto on June 27, 28 and 29, 2006

TORONTO TRANSIT COMMISSION REPORT NO.

Neighbourhood Schools and Services

COLLEGE STREET EXCEPTIONAL, HERITAGE CORNER LEASING OPPORTUNITY

KING STREET PILOT STUDY PUBLIC MEETING

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

STAFF REPORT ACTION REQUIRED

WORKING WITH BIAS ON TTC PROJECTS

Building the transportation network we need for the future in Niagara Region

STAFF REPORT INFORMATION ONLY

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street

Eglinton-Scarborough Crosstown LRT Update

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

THE BIG MOVE. Transforming Transportation in the Greater Toronto & Hamilton Area (GTHA) W. Michael Fenn, CEO October 23, 2008

Toronto Community Gardens by Ward Community Gardens

Green Line Implementation Plan Draft Conceptual Master Plan Phase 2: Public Meeting 02 April

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

95 KING STREET EAST, TORONTO

Area Surrounding Maplewood Manor

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

95 KING STREET EAST, TORONTO

EP8.2 Presentation Exhibition GO Station Improvements

Construction Staging Area Blue Jays Way (357 King Street West)

MANAGEMENT S DISCUSSION AND ANALYSIS

Construction Staging Area 197 Redpath Avenue

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

Southwest LRT Alignment Video Narration

FINCH HYDRO CORRIDOR TRAIL PROJECT

New Non-Residential Developments January 4, 2018

CITY OF BROOKFIELD Capital Improvement Fund Budget

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

PARKS & BEACHES PROJECTS

What life needs... COMMUNITY FACTS

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

KING STREET TRANSIT PILOT

Clackamas County Development Agency

CREATING CONNECTIONS IN DURHAM REGION

CITY CLERK TORONTO AND EAST YORK COMMUNITY COUNCIL REPORT 1. For Consideration by The Council of the City of Toronto on February 1, 2 and 3, 2005

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Hospital Link Project Project Update Winter 2018

Live Life Healthy 2 C HAMPAGNE D R IVE, TOR ONTO, ON. M3J 0K 2

TORONTO AND EAST YORK COMMUNITY COUNCIL AGENDA MEETING 8

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

ST. CLAIR CENTRE. st. clair centre - VIRTUAL TOUR. GEOFFREY SMITH Financial Analyst

LESLIE BARNS & CONNECTION TRACK. Leslieville BIA Meeting May 2, 2014

Note: the Rent Review Guideline mandates an increase of 2.6% for 2000, and 2.9% for Sales 2, Dwelling Type Single Detached Semi Detached

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Spadina Avenue Built Form Study Preliminary Report

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Request to Improve Transit along the Dufferin Street Corridor

WHO IS METROLINX?

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Committee. Presentation Outline

Western Bay of Plenty District Council

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Construction Staging Adelaide Street West

Number of New MLS Listings Single-Family Residential Breakdown 21.8%

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

CREATING CONNECTIONS IN CLARINGTON

TORONTO TRANSIT COMMISSION REPORT NO.

FOREST HILL VILLAGE URBAN DESIGN GUIDELINES

Old New Old New Old New M-F Saturday Sunday

Greg Rabin* Steven Weiss* Cynthia Ciacci-Riddell* Account Coordinator Sales Associate

M-F. Old New Old New Old New Old New Old New Old New Miscellaneous Changes

June-December TBD, to be coordinated with Accessibility Ramps Project

2017 Annual Service Plan

Part four. In this part you will find: The next steps to deliver the master plan

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

Transcription:

Capital Projects 2015 Ward 21 BIA Projects Forest Hill North Gateway: The City of Toronto Economic Development and the Forest Hill Village BIA are collaborating to create a dynamic northern gateway to Forest Hill Village. The goals for the project are: to enhance the streetscape at Suydam park for pedestrians with lighting, seating, and planting; to provide a small gathering area at the south gateway to the park; to identify the entry into Forest Hill Village from the North. Bridge Rehabilitation Spadina Road Bridge: Work will start again in early April for the rehabilitation of the bridge over the Nordheimer Ravine, from Churchill reservoir to south of St. Clair W. Spadina Road will be reduced to one lane of northbound traffic from Russell Hill Drive to St. Clair Avenue W. The project will end in the early summer. Community Gardens Frankel Lambert: Proposal received to expand the community garden. Awaiting response on next actions from Parks. Hydro Corridor Allotment Gardens: We are looking forward to building these gardens along the Hydro corridor by Bathurst and Dupont. Currently communicating with the Parks Department to make this project viable in future. The area under consideration is located between the rail line north of Dupont and the south end of the Hillcrest TTC railyards. Cycling Ward 21 Bike Plan Expansion: Priorities are the Beltline West, Winona Dr lane, and Allen Rd lane to Cedarvale. Others for consideration are east/west Benson & Tyrrel, north/south on Wychwood, Glen Cedar contra-flow 2015, and a summer pilot for new signage on Glen Cedar. Bike share: We have committed funds from condominium and rental developments to bring a number of stations to Ward 21. Currently surveying cyclists to draw up a list of preferred locations, which could include George Brown College, Tollkeeper's Park, Davenport Library, and St. Clair West Station.

Developments 1486 Bathurst St. The Barrington: An 18-storey, 93-unit building has been approved at the Ontario Municipal Board. To date, there is no construction schedule. 501 St. Clair W. The RISE: The construction of a 23-storey residential building with 300 residential units and 950 square metres of commercial space on the ground floor has begun. Parking will be provided in a below-grade parking garage containing a total of 243 parking spaces, including 42 Toronto Parking Authority parking spaces. Construction will be completed in 2017. 829 St. Clair W. The Nest: Construction has begun on a 9-storey building and the completion date is anticipated for 2016. 836 St. Clair W. (Formerly Hungarian House): The developer has proposed an 8-storey mixed-use residential and commercial building consisting of 138 residential units. A total of 83 parking spots is proposed in a below-grade parking garage. The proposal is still with the Planning Department with a City decision expected in early summer 2015. St. Matthew's United Church: Funds to be dedicated to sanctuary renovation in exchange for a long term lease to be agreed upon for an arts organization. 155 Wychwood : A development application for a 9-storey condo with commercial space on the ground floor has been submitted to the City's Planning Department. It is at the very beginning of the planning process and community consultation meetings will be held this year. Wychwood Library Renovation and Expansion: One final broad community consultation meeting will take place this year to review the plans and get the community's input. The project is expected to commence in 2016. 925-935 Eglinton W. China House: A 9-storey mixed-use building containing 91 dwelling units and retail on the ground floor is well under way. The anticipated completion date is mid to end of 2016. Petro Canada Site/St. Michael's College High School: The land where the Petro Canada gas station previously existed belongs to St. Michael's College High School. They have decided not to sell the land but to keep it for school purposes. At present, we have no information as to the specifics of their plans. Tammi Lettner Synagogue (356-360 Spadina Rd): Construction nearing completion. Expected opening at the end of August 2015. 109 Vaughan Rd. (Formerly the Occult Shop): A 9-storey residential building consisting of 51 total units, with a total of 30 parking spaces, has been approved by the Committee of Adjustment. Construction is expected to begin in the near future. 230 Vaughan Rd. (At Kenwood ): A 3-storey residential building with 10 residential units has been approved by the Committee of Adjustment. As of now, we do not have a construction timeline.

350 Vaughan Rd. (At Cherrywood ): This development proposal consists of 9 units 7 detached units and 2 semi-detached units. Community consultation meetings have been held and the application will go before Council in the spring of 2015. Metrolinx Eglinton Crosstown LRT: Tunnel boring machines (TBM) will be lifted over the Allen Rd intersection on the weekend of April 17, where it will continue to Yonge. TBMs are also digging the eastern portion from Laird to Yonge. Tunnelling is expected to be complete by the end of 2016 when all machines meet at Yonge. Allen Rd. will close Apr. 17-20 from Eglinton W. to Sheppard W. This is for the moving of the TBMs, and simultaneously, for state of good repair maintenance. Construction to build headwalls at Bathurst St will be finished by the end of May 2015. During April and May, construction efforts will shift to the south side of the street. Requests for proposal are now out for station construction. Miscellaneous Art Installation at Bathurst and Vaughan triangle: "Three Points Where Two Lines Meet" installation by Christian Giroux and Daniel Young; construction tentatively scheduled for September 2015. Chaplin Fire Station Rebuild: Station 135 at Bathurst and Chaplin Crescent, is scheduled for a total rebuild; to be completed by 2016. Parks Taddlewood Seating/Grove of Oaks: Trees planted in summer 2014. Update requested on benches and plaque. Barns Slade entrance: to be revisited in 2016. Cedarvale outdoor rink: Interior renovations of Phil White have opened. Currently finalizing a booking system for the kitchen. Cedarvale Park water play feature: Completed, water pressure to be adjusted. Cedarvale Park lighting project: Due to happen this summer. Sectioned out different lighting areas for park. Dog park lights needed as well as the east/west path. Cedarvale Park pathway drainage: Scheduled to happen this summer with the lighting project. West of the T-path is the priority. Cedarvale dog park shade structure: Planning in progress.

Cedarvale BMX/Skateboarding Park: Discussions underway for programming and supplies. Wychwood Barns dog park shade structure: Should be installed by Parks in 2016. Wychwood Barns rink new pipe: Possibility to do an installation to extend westward in the future. Hillcrest dog park fence extension: Received a community petition, consultation date forthcoming. Phil White Stairs embankment: Bidding process has closed. Purchasing has awarded the project to the selected bidder. Construction to take place this year. Laughlin Playground sandbox & hose-bib: Planning in progress. Frankel Lambert courtyard pavers: Upgrade to be redone possibly in 2015, may include a shade structure in the future. Western Prep playground project: Fundraising underway. Wells Hill lawn bowl/library expansion: Fundraising underway. Humewood Park path resurfacing: Taking place in summer 2015. Heath Street parkette exercise equipment: to be installed as soon as the ground is ready in spring 2015. Sir Winston Churchill Park reservoir: Community consultation to take place in spring 2015. Road Resurfacing Chiltern Hill Road: Stretch between Dewbourne Rd and Ava Rd will be resurfaced in summer 2015. Elm Ridge Drive: Deferred until 2016 due to a Toronto Water project which started in 2014 and continues in 2015. Glen Cedar Road: Notice of work to take place in 2015 for the stretch between Heathdale Rd and Strathearn Rd. Winnett Avenue: Notice of work to take place in 2015 for the stretch between Vaughan Rd and Durham Newgate Road: Notice of work to take place in 2015 for the stretch between Elm Ridge Dr and Ridelle Fairleigh Crescent: Notice of work to take place in 2015 for the stretches between Eglinton Ave W and Hydro Poll 50.

Park Hill Road: Notice of work to take place in 2015 for the stretches between Fairleigh Cres and Citizen Lane. Shaw Street: Notice of work to take place in 2015 for the stretch between Dupont St and Wychcrest Christie Street: Notice of work to take place in 2015 for the stretches between Melita Ave and Davenport Rd. Montclair Avenue: Notice of work to take place in 2015 for the stretch running west from Spadina. Spadina Road: Notice of work to take place in 2015 for the stretch between Eglinton Ave W and Thelma Sidewalk Improvements Old Park Road @ Old Forest Hill Road: Request made to remove turning lane on the northeast corner. Ridelle Avenue: Request deferred for the stretch between Old Park-Bathurst. May be bundled with future road works. Walmer Road @ Austin Terrace: Planning underway for reduction of corner radii. Expected in 2016. Davenport Road @ Christie Street: Planning underway for reduction of corner radii. Expected in 2016. Markdale Avenue dead end: Request being investigated to construct a sidewalk at this location. Wells Hill Avenue: Planning underway. Speed Humps Greensides Avenue: Approval to install speed humps between St. Clair and Tyrrel; construction schedule forthcoming. Toronto Water Roselawn Avenue: Work started in April 2014 between Marlee and Allen Rd. Elm Ridge Drive: Water main rehabilitation work underway in spring 2015 between Newgate Rd. and Bathurst St. Allen Road: Work scheduled to begin in spring 2015 between Roselawn and Elm Ridge Dr.

Toronto Hydro Projects Note: Projects are subject to regulatory approval and timing is subject to change based on project prioritization. For more information on hydro infrastructure in Ward 21, please see the slide deck posted on the website. Dewbourne Avenue Overhead rebuild: Scheduled for 2017; rebuilding the overhead infrastructure by replacing poles and transformers. Short term mitigation work: Completed 2014; replacing overhead defective assets within the overhead infrastructure. Bathurst Street Rehabilitation: Scheduled for 2017; rehabilitate a section of Bathurst Street to remove obsolete assets and rebuild portions of the secondary laterals supplying customers. Vaughan Road Overhead Rebuild: Scheduled for 2015-2016; rebuilding the overhead infrastructure by replacing poles and transformers. Shalmar and Vesta Rear Lot Conversion: Scheduled for 2017-2019; conversion from of the distribution infrastructure from rear lot supply to front lot underground Safety Upgrades on St. Clair W.: Toronto Hydro is replacing the old metal hand wells with new, non-conductive hand wells. Many were replaced before 2010, but due to the moratorium on work along St. Clair they were prevented from finishing. This ended in 2014, so Hydro has gone back to finish the project. Currently the contractor, Aecon, is working on the south side of the street between Greensides and Bathurst St. This will be completed by April 17th. They will then move to the north side. A start date for that side is yet to be determined, but they are aiming to finish before June 1. If that isn't possible, work will pick up again at the end of August after the summer events conclude. TTC St. Clair West Station elevator project: Work underway. The elevators will be operational by 2016. Dupont Station easier access: Scheduled to begin in late 2015.