Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas

Similar documents
January 2018 Air Traffic Activity Summary

Commercial Property Near Primary Island Intersection

The Galveston Seawall

MARCH 2014 HYDROGRAPHIC REPORT

2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski

PORT EVERGLADES SAND BYPASS PROJECT

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

Norfolk District North Atlantic Division

Economic Impacts of Beach Nourishment in Texas

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

2012 Texas Water Conservation Association Meeting

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

U.S. Army Corps of Engineers Wilmington District

HOTEL INDUSTRY OVERVIEW. Texas

St. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

MOBILE DISTRICT 2018 DREDGING PROGRAM

2014 Colorado River Annual Operating Plan Colorado River Management Work Group (CRMWG) Final Consultation September 5, 2013

Norfolk District North Atlantic Division

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

Lake Chelan Operations

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

A Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

Potential Application of. Shore-Stabilizing Structures along an Open-Coast Shoreline. Christopher G. Creed, P.E. 23 rd Annual National Conference on

An International Journal

FOR SALE Acres - Tortuga Harbor Development

USACE GALVESTON DISTRICT PROJECT UPDATE

25 th Avenue Grade Separation. September 13, 2017

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

The Geography of Climate

LAGUNA ISLES DEVELOPMENT

Residential Attitudes about Hurricanes on the Lone Star Coast

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap)

Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

Latest market insights and marketing plans from VisitBritain/VisitEngland. Anke Monestel, VisitEngland 8 th February 2018

The Corps of Engineers Dredges on the West Coast

www: vermilionparishpolicejury.com

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

Guide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech

Post tsunami Recovery of Port and Harbor areas in Japan from the 2011 Great East Japan Earthquake Tsunami

Inner Harbor Navigation Canal Lock. Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers

Stakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study

Tourism Trends. Humphrey Walwyn Head of VisitEngland Research October 2018

Coastal Impact on barrier Islands: Application to Praia de Faro

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

U.S. Hotel Industry Performance. Brad Garner Chief Operating Officer

Buffalo District Navigation Program Overview

August 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

Edisto Beach Renourishment and Groin Lengthening Project. Tim Kana Coastal Science & Engineering

Tim Hunter Christchurch & Canterbury Tourism Steve Clarke Canterbury Earthquake Recovery Authority (CERA) Disaster & Rebuild 16 January 2015

Riverine Sand Mining/Scofield Island Restoration (BA-40)

Campus Construction Program Report WLAC Monthly Facilities Committee Meeting November 16, 2015

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

Hurricane Irma: Palm Beach County Coastal Storm Damage Assessment

TENTATIVE SCHEDULE

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

Project A: Revetment Scale: 1 = 10. 3/7 Revision: Benchmarks. Eroding Parking Area. View from Above. Locklies Creek. Ebb.

March 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

Tim Hunter Chief Executive. CCT Business Partner Update 3 March 2015

TEXAS PORTS Value to the Nation

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. April 27, 2009

Overview of Park Board Budgets & Industry Forecasts. Kelly de Schaun, Executive Director

Hotel Association of North Texas. Karrie Keen Director, Destination and Trend Operations

Elkhorn Slough Tidal Wetland Project

Restoration and Challenge of Sendai Towards a Disaster-Resilient and Environmentally-Friendly City

LAUNCH OF THE COASTAL ZONE MANAGEMENT TRUST

ORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and

Coastal Management: Treasure Island - Long Key Nourishment

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

Baltimore Harbor & Channels, Maryland and Virginia

-,. II II. t:' -I r~ Hor~~on~?~ Environmental Services, Inc. - ~'-""~?>'"'~ .G~\\ \<:--s Po?> I~- Gulf of Mexico FIGURE 1. 2 Legend l:=i Project Area

Size data for all Gulf areas are available starting Fishing areas in the Headboat survey are described in Table 1.

State of the Waterway 2017

Annual Diversion Rate for Class I Waste by Sector. Annual Diversion Rate for Class I Waste. January September University of Arkansas

Presented to: City of Petaluma City Council

Regional Economic Conditions

The Airline Crisis. 25 th IFATCA ASP Regional Meeting. Shixin CHENG Manager, Safety, Operations & Infrastructure IATA North Asia Region

RIVER ACCESS STRATEGY

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

Measures & Projections October 31, GoToBermuda.com

Remote Sensing UAS Imagery Mission Results

Bear Creek Habitat Improvement Project

January 2014 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

September 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

December 2013 Passenger and Cargo Traffic Statistics Reno-Tahoe International Airport

State of the Waterway 2017

Visit Phoenix Market Update January Eric Kerr Director of Research & Business Analysis

U.S. DOMESTIC INDUSTRY OVERVIEW FOR OCTOBER 2010 All RNO Carriers Systemwide year over year comparison

Eficiencia Logistica Q Ruben Medina Director de Desarrollo Economico

Overview of Japan s Sustainable Tourism Development

PERFORMANCE MEASURE INFORMATION SHEET #16

PRELIMINARY ACCOUNTS FOR 2012

Region 1 Piney Woods

Transcription:

Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad Blucher Institute for Surveying and Science Texas A&M University-Corpus Christi Philip Blackmar PE HDR Inc. Philippe Tissot Associate Director, Research Scientist Conrad Blucher Institute for Surveying and Science Texas A&M University-Corpus Christi ASPBA Texas Chapter Symposium Harte Research Institute TAMUCC 24 Apr 2018

Packery Channel Location near Confluence of CC Bay and Upper Laguna Madre Aransas Pass Corpus Christi Bay Mustang Island Fish Pass Gulf of Mexico Upper Laguna Madre North Padre Island Newport Pass Packery Channel Bob Hall Pier

Packery Channel: A Brief History Sand Emily Plug Facilitates Opens Construction Channel June July 2005 Mustang Island Channel Remains Opens North Padre Island Gulf of Mexico 2003 July 2006 Channel Remains Open Oct 2017 1 st Harvey Dredge 2011/2012 Aug 2017 2012/2013

Post-Harvey: Location of Significant Damage Requiring Maintenance and/or Restoration Planning Beach and Backshore Coastal Structures and City Infrastructure

Pre-Harvey (July 2017): Regions of Shoaling Upper Laguna Madre Transient Shoal Persistent Shoal Depth, ft (NAVD88) pc_dogleggulf_3ft_navd88opus_march2012_ramp Elevation ft_navd88opus_march2012_ramp -31.57 - -31.5-16.5 - -16-32 -31.5 - -31-31 - -30.5-31 -30.5 - -30-30 - -29.5-30 -29.5 - -29-29 - -28.5-29 -28.5 - -28-28 - -27.5-28 -27.5 - -27-27 - -26.5-27 -26.5 - -26-26 - -25.5-26 -25.5 - -25-16 -16 - -15.5-15.5 - -15-15 -15 - -14.5-14.5 - -14-14 -14 - -13.5-13.5 - -13-13 -13 - -12.5-12.5 - -12-12 -12 - -11.5-11.5 - -11-11 -11 - -10.5-10.5 - -10-10 -10 - -9.5 Inland Channel Segment -16.5 - -16 (North Reach 2) -16 - -15.5-15.5 - -15-15 - -14.5-14.5 - -14-14 - -13.5-13.5 - -13-13 - -12.5-12.5 - -12-12 - -11.5-11.5 - -11-11 - -10.5-10.5 - -10-10 - -9.5-9.5 - -9-9 - -8.5 Packery Channel County Park Inland Channel Segment (South Reach 1) Mollie Beattie Coastal Habitat Community Mustang Island Newport Pass -25 - -24.5-25 -24.5 - -24-24 - -23.5-24 -23.5 - -23-9.5 - -9-9 -9 - -8.5-8.5 - -8-8 -8 - -7.5-8.5 - -8-8 - -7.5-7.5 - -7-7 - -6.5 Deposition Basin -23 - -22.5-23 -22.5 - -22-22 -22 - -21.5-21.5 - -21-21 -21 - -20.5-20.5 - -20-20 -20 - -19.5-19.5 - -19-19 -19 - -18.5-18.5 - -18-18 -18 - -17.5-17.5 - -17-17 -17 - -16.5-7 -7.5 - -7-7 - -6.5-6 -6.5 - -6-6 - -5.5-5 -5.5 - -5-5 - -4.5-4 -4.5 - -4-4 - -3.5-3 -3.5 - -3-3 - -2.5-2 -2.5 - -2-2 - -1.5-1 -1.5 - -1-1 - -0.5-6.5 - -6-6 - -5.5-5.5 - -5-5 - -4.5-4.5 - -4-4 - -3.5-3.5 - -3-3 - -2.5-2.5 - -2-2 - -1.5-1.5 - -1-1 - -0.5 Lake Padre North Padre Island (NPI) Entrance Channel Packery Channel Google Imagery Jan 2017 NPI Seawall Gulf of Mexico

Post-Harvey (Sep 2017): Change in Shoaling and Scour Mollie Beattie Coastal Habitat Community Transient Shoal Persistent Shoal Scour Depth, ft (NAVD88) pc_dogleggulf_3ft_navd88opus_march2012_ramp Elevation AVD88OPUS_March2012_ramp -31.57 - -31.5-16.5 - -16-31.5 - -31-16 - -15.5-32 -31 - -30.5-31 -30.5 - -30-30 - -29.5-30 -29.5 - -29-29 - -28.5-29 -28.5 - -28-28 - -27.5-28 -27.5 - -27-27 - -26.5-27 -26.5 - -26-26 - -25.5-26 -25.5 - -25-25 - -24.5-25 -24.5 - -24-24 - -23.5-24 -23.5 - -23-23 - -22.5-23 -22.5 - -22-22 - -21.5-22 -21.5 - -21-21 - -20.5-21 -20.5 - -20-20 -20 - -19.5-19.5 - -19-19 -19 - -18.5-18.5 - -18-18 -18 - -17.5-17.5 - -17-17 -17 - -16.5-16 -15.5 - -15-15 -15 - -14.5-14.5 - -14-14 -14 - -13.5-13.5 - -13-13 -13 - -12.5-12.5 - -12-12 -12 - -11.5-11.5 - -11-11 -11 - -10.5-10.5 - -10-10 -10 - -9.5-9.5 - -9-9 -9 - -8.5-8.5 - -8-8 -8 - -7.5-7.5 - -7-7 -7 - -6.5-6.5 - -6-6 -6 - -5.5-5 -5.5 - -5-5 - -4.5-4 -4.5 - -4-4 - -3.5-3 -3.5 - -3-3 - -2.5-2 -2.5 - -2-2 - -1.5-1 -1.5 - -1-1 - -0.5-16.5 - -16-16 - -15.5-15.5 - -15-15 - -14.5-14.5 - -14-14 - -13.5-13.5 - -13-13 - -12.5-12.5 - -12-12 - -11.5-11.5 - -11-11 - -10.5-10.5 - -10-10 - -9.5-9.5 - -9-9 - -8.5-8.5 - -8-8 - -7.5-7.5 - -7-7 - -6.5-6.5 - -6-6 - -5.5-5.5 - -5-5 - -4.5-4.5 - -4-4 - -3.5-3.5 - -3-3 - -2.5-2.5 - -2-2 - -1.5-1.5 - -1-1 - -0.5 Packery Channel County Park Lake Padre Mollie Beattie Coastal Habitat Community North Padre Island (NPI) Mustang Island Newport Pass Packery Channel Gulf of Mexico Image: CNSA 30 Aug 2017

Shoaling and Scour in the Entrance Channel Harvey VS Ike Pre-Harvey Pre-Ike Pre-Ike Post-Harvey Post-Ike Post-Ike Net Sand Volume Decreased by 30,000 cu yd pc_dogleggulf_3ft_navd88opus_march2012_ramp Depth, Elevation ft (NAVD88) VD88OPUS_March2012_ramp -31.57 - -31.5-16.5 - -16-16 - -15.5-16 -31.5 - -31-15.5 - -15-31 - -30.5-15 - -14.5-15 -30.5 - -30-14.5 - -14-30 - -29.5-14 - -13.5-14 -29.5 - -29-13.5 - -13-29 - -28.5-13 - -12.5-13 -28.5 - -28-12.5 - -12-28 - -27.5-12 - -11.5-12 -27.5 - -27-11.5 - -11-27 - -26.5-11 - -10.5-11 -26.5 - -26-10.5 - -10-10 - -9.5-10 -26 - -25.5-25.5 - -25-9.5 - -9-9 - -8.5-9 -25 - -24.5-24.5 - -24-8.5 - -8-8 - -7.5-8 -24 - -23.5-23.5 - -23-7.5 - -7-7 - -6.5-7 -23 - -22.5-22.5 - -22-6.5 - -6-6 - -5.5-6 -22 - -21.5-21.5 - -21-5.5 - -5-5 - -4.5-5 -16.5 - -16-16 - -15.5-15.5 - -15-15 - -14.5-14.5 - -14-14 - -13.5-13.5 - -13-13 - -12.5-12.5 - -12-12 - -11.5-11.5 - -11-11 - -10.5-10.5 - -10-10 - -9.5-9.5 - -9-9 - -8.5-8.5 - -8-8 - -7.5-7.5 - -7-7 - -6.5-6.5 - -6-6 - -5.5-5.5 - -5-5 - -4.5-4.5 - -4-4 - -3.5-3.5 - -3-3 - -2.5-2.5 - -2-2 - -1.5-1.5 - -1-1 - -0.5-16 -12-10 -8-6 -4-2 -32-28 -16-24 -22-20 -17-32 -31-30 -29-28 -27-26 -25-24 -23-22 -21 - -20.5-20.5 - -20-21 -4.5 - -4-4 - -3.5-4 -20 - -19.5-19.5 - -19-20 -3.5 - -3-3 -19 - -18.5-3 - -2.5-18.5 - -18-19 -2.5 - -2-2 -18 - -17.5-18 -2 - -1.5-17.5 - -17-1.5 - -1-1 -17 - -16.5-17 -1 - -0.5 Net Sand Volume Increased by 30,000 cu yd

Elevation, Jul2017 ft (NAVD88) Elevation, ft (NAVD88) Jul2017 West 5 0 Basin Inner Entrance Channel Entrance Channel East Jul pos -5 Harvey 2017-10 -15-20 -25 Jul 2017 Pre-Harvey Oct 2017 Post-Harvey Gulf of Mexico -30 5 0 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 Basin Distance Along-Channel from Basin Inner Entrance Channel Jul2017 Entrance Channel Sm sm Ike 2008-5 -10-15 Gulf of Mexico -20-25 Jul 2017 Pre-Ike Oct 2017 Post-Ike -30 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 Distance Along-Channel Jul2017 from Basin

Along-Channel Current Velocity, m/s 1.0 0.8 0.6 0.4 0.2 0.0-0.2-0.4-0.6-0.8-1.0 8/5/2017 8/10/2017 8/15/2017 8/20/2017 8/25/2017 8/30/2017 9/4/2017 1.0 0.8 + Flood Water Velocity Water Level Along + Flood - Ebb Water Velocity Water Level 4 3 2 1 0-1 -2-3 -4 4 Water Level, ft MSL Harvey 0.6 0.4 0.2 0.0-0.2-0.4-0.6 2 0-2 Water Level, ft MSL Ike -0.8 - Ebb Ike -1.0 9/1/2008 9/6/2008 9/11/2008 9/16/2008 9/21/2008 9/26/2008 10/1/2008 Date (MDY) -4

Force Driving Scour and Structural Damage 1.5 m/s Mustang Island NPI Island Packery Channel Velocity m/s Gulf of Mexico 0 m/s Developed by: Larry Dell and Philippe Tissot (CBI TAMUCC)

North Padre Island And Mustang Island Mustang Island State Park Fish Pass ² Net Volume Change and Rate of Erosion Mustang Island -454,000 cy -24 cy/ft City Jurisdiction and Multi-Jurisdictional North Padre Island Viento del Mar Padre Balli Park -23,000 cy -14 cy/ft Newport Pass -38,200 cy -17 cy/ft Bob Hall Pier +41,000 +11 cy/ft -38,200 cy -7 cy/ft +38,000 cy +11 cy/ft -175,000 cy -70 cy/ft City Jurisdiction Net Erosion City Jurisdiction Net Accretion County Jurisdiction Net Erosion County Jurisdiction Net Accretion State Jurisdiction NPI Seawall Limits Gulf of Mexico Scale 1.0 mi/ 1.6 km

Shoreline Position Change Aug 2004 Pre-Construction Sep 2007 (Pre-Ike) Aug 2004 Pre-Construction Jul 2017 (Pre-Harvey) Pre-Ike Pre-Harvey

Aug 2004 Pre-Construction Sep 2007 (Pre-Ike) Sep 2008 (Post-Ike) Aug 2004 Pre-Construction Jul 2017 (Pre-Harvey) Sep 2017 (Post-Harvey) Post-Ike Post-Harvey

Post-Ike Recovery Post-Harvey Partial Recovery Recovery Aug 2004 Pre-Construction Sep 2007 (Pre-Ike) Sep 2008 (Post-Ike) Jul 2009 (10 mo. Post Ike) Post-Ike: Recovery > Erosion North End of Seawall Aug 2004 Pre-Construction Jul 2017 (Pre-Harvey) Sep 2017 (Post-Harvey) Apr 2018 (8 mo. Post Harvey) Post-Harvey: Partial Recovery

Rate of Shoreline Position Change: Viento del Mar to Packery NPI Seawall Viento Del Mar Packery Packery Post Harvey: -13 ft/yr Post Ike: -48 ft/yr Post- Ike Post- Harvey

Rate of Shoreline Position Change: Mustang Island Packery Newport Fish Pass Post Harvey: -25 ft/yr Post Ike: -62 ft/yr Post- Harvey Post- Ike

Structural Assessment: Packery Structural Components Reach 1 SH361 Bridge Boat Ramp Parking Lot 10 ton Granite Blocks Reach 2 1 to 3 ton Riprap Reach 3 Reach 2 Reach 1 Reach 3 Concrete Block Mattresses (ABMs) Reach 4 Unprotected on north side

Structural Assessment: Reach 1 Damage Displaced armor stones Indication that some damage occurred during previous storms (Hurricane Ike) Repairs include re-setting the stones

Structural Assessment: Reach 1 Original Design Damages to armor stone weaken system for next storm Damage presents increased threat for more significant damage and greater repair cost

Packery Structural Components: Reach 2 Reach 2 1 to 3 ton Riprap SH361 Bridge Boat Ramp Parking Lot Reach 3 Reach 2 Reach 1

Structural Assessment: Reach 2 Damage Displaced Riprap Damage likely Cumulative of Previous Storm Impacts Existing Damage = System More Prone to Future Damage Repairs Should Place additional riprap to rebuild section

Packery Structural Components: Reach 3 SH361 Bridge Boat Ramp Parking Lot Reach 3 Concrete Block Mattresses (ABMs) Reach 3 Reach 2 Reach 1

Structural Assessment: Reach 3 Damage Loss of Foundation Material Beneath ABM and Sidewalk Recommended repairs: Removal of ABM, Re-grade Slope, and Replacement of Protection Damage progressively worsen until repaired

Structural Assessment: Reach 3 Location of Damaged Segments

End Material