Acadia National Park. Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge Trail Rehabilitation. Acadia National Park

Similar documents
Kit Carson-Challenger Ridge Trail Project

Managing Informal Trail Impacts. Jeff Marion, Unit Leader/Scientist Virginia Tech Field Unit, USGS, Patuxent WRC

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

American Conservation Experience

Waterman Fund Grant Report. Assessing the Condition, Treatment and Costs of Rehabilitating the Alpine Trails of the White Mountains of New Hampshire

GOLDEN EARS PROVINCIAL PARK

Bear Creek Habitat Improvement Project

Site Coordinator Guide

CRAZY HORSE TRAIL GUIDE

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

Photopoint Monitoring in the Adirondack Alpine Zone

Outreach: Terrestrial Invasive Species And Recreational Pathways S U S A N B U R K S M N D N R I N V A S I V E S P P P R O G C O O R D

2019 Work Week Crew. Schedule and Descriptions

Suggested Day Hikes. Mount Greylock State Reservation 3, 4 1, 2. Take a Hike! Things to remember:

A. CONCLUSIONS OF THE FGEIS

Arthur Carhart National Wilderness Training Center s Wilderness Investigations High School

Volunteer Project Trip Report Yosemite National Park May 16-20, 2012

Life in the Alpine Zone

Backpacking and Hiking LEAVE NO TRACE

Wicklow Mountains Path Survey

CAMPER CHARACTERISTICS DIFFER AT PUBLIC AND COMMERCIAL CAMPGROUNDS IN NEW ENGLAND

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Sawtooth National Forest Fairfield Ranger District

USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto

FEASIBILITY CRITERIA

Orienteering. The fundamental outdoors skill!

USDA TRAILS STRATEGY PROGRAM

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s

Instruction Manual. A step-by-step guide to building your own igloo. Andy Meldrum All rights are reserved.

CENTER PIVOT TRACK MANAGEMENT OPTIONS

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Map 1.1 Wenatchee Watershed Land Ownership

Chorley Park Trail Connection New Design Options. Information Booklet Prepared for June 9, 2014 Public Meeting

1. Study the Ordnance Survey Map of Brodick, Isle of Arran.

Why Every Hiker Needs Gaiters

FOOTPATH MANAGEMENT IN ICELAND A VISUAL REFLECTION ON QUALITY CONCERNS AND FOOTPATH POLICY CONSIDERATIONS

Summary of prescribed fires in Prince Albert National Park 2015

PROPOSED PARK ALTERNATIVES

The 7 Principles of Leave No Trace.

Peter Axelson. Beneficial Designs, Inc. Minden, NV

Hiking. Lesson 4.1. Fitness. Hiking

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments

Comments on Grand Canyon National Park Environmental Assessment April, 2010

MS Expedition Antarctica Fact Sheet

APPENDIX K Other Agendas and Course Suggestions

London s Air Ambulance: telling the right story

North Lanarkshire. Skills Assessment January SDS-1163-Jan16

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Franklin Falls. NFCT Waterway Work Trip July Introduction: Driving directions and meeting location: Camping and lodging: Food:

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary

The Vision for the San Juan Islands Scenic Byway

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Cave Run Non-Motorized Trails Initiative Scoping Document

SEGMENT ASSESSMENT REPORT

2016 Trails Maintenance and Operating Costs

KILIMANJARO 2018 RUN & TREK February 28 March 12

Difficult Run Stream Valley Park

Nov. 19 th Public Workshop Summary

Kelly Motorized Trails Project Proposed Action

Colorado Life Zone Scavenger Hunt

Regional Airline Association Phone: (202) M Street, NW Fax: (202) November 3, 2008

F.O.K.O.S. Friends of Kingston Open Space A GUIDE TO KINGSTON OPEN SPACE

BMO Field Rental Rates Update and Field Rental Policy

Four Fourteeners in One Day

2. STAKEHOLDER FEEDBACK // What We Heard

Abbey Chesterton bridge Questions & Answers

TABLE OF CONTENTS Executive Summary. Convention Industry Overview and Trends. Convention Market Competitive and Comparable Analysis

Backpacking Merit Badge Workbook

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Friday October 3. Lower Javelina Trail - Level D. about 3 miles, less than 500. Hike Contact: Joel Tormoen

Restore and implement protected status that is equivalent, or better than what was lost during the mid-1990 s

Backpacking Merit Badge Workbook

APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS

Volunteer Project Report for May 14-20, 2017 Yosemite National Park Volunteer Trip. Executive Summary

Vladivostok, Russia Day 12 Oct. 9:

Smith-Taylor Cabin: Shelter Island, NY 1.0 INTRODUCTION. 1.1 Overview: historical & architectural context

Sunday / Monday - Osceolas

Minimal Impact Caving Guidelines

Wilderness Research. in Alaska s National Parks. Scientists: Heading to the Alaska Wilderness? Introduction

HAROLD E. ALEXANDER SPRING RIVER WILDLIFE MANAGEMENT AREA

Mt. Elbert East Ridge

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

More people floated the Colorado River through

SOCIAL CONFLICT BETWEEN MOTORIZED AND NON-MOTORIZED RECREATIONAL ACTIVITIES.

Mark Beyer SMOKEJUMPERS. Life Fighting Fires

Non-motorized Trail Plan & Proposal. August 8, 2014

What to Do What Not to Do

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Mountain Footsteps. Photo: Ric Carless

Eastern Lake Ontario Beach User Survey 2003/2004.

Trail Assessment Report

Economic Impact of Tourism in South Dakota, December 2017

Backpacking Trip Planning. Presenters: Dana Perry Christine Fogarty

2018 HIGH ADVENTURE SECTION. SUPPORT & HELP (605)

Meet the world s newest glacier at Mount St. Helens

www Littleton, 9861.horn Titan Park Circle CO etoutdoors.com BEYOND COMPARE

9 December 2016 Maxwell Wolckenhauer NYS DEC State Highway 10, Suite 1 Stamford, NY Conservation.

HUT POINT, ROSS ISLAND

Transcription:

Acadia National Park National Park Service U.S. Department of the Interior Natio n alpar kser vic e U. S. Depar tm en t o f the In ter io r Waterman Fund Grant Report 2016 Cadillac Mountain South Ridge Trail Rehabilitation Acadia National Park Sledging Rock for the Trail Tread Charles Jacobi, Natural Resource Specialist Rebecca Flesh, Recreation Technician Gary Stellpflug, Trails Foreman December 2016 ANP Natural Resource Report 2016-1

CONTENTS INTRODUCTION... 1 METHODS... 1 TRAIL REHABILITATION... 1 OBSERVATION... 4 EDUCATION... 4 RESULTS... 4 TRAIL REHABILITATION... 4 OBSERVATION... 4 EDUCATION... 7 DISCUSSION... 7 SUMMARY... 7 PROJECT ACCOUNTING... 8 TABLES TABLE 1: Percent of Hikers Hiking On and Off Trail, Before and After Trail Rehabilitation.... 7 Contact Information Grant Dates Charles Jacobi Date of Grant Award: 1/30/16 Acadia National Park Date of Grant Report: 12/10/16 20 McFarland Hill Drive Bar Harbor, Maine 04609 207-288-8727 charlie_jacobi@nps.gov EXECUTIVE SUMMARY We created about 100 feet of rock-lined causeway in two distinct locations on the Cadillac Mountain South Ridge Trail, clearly defining the trail and eliminating the standing water and mud that was there and the hiker encroachment along the trail edges. Before rehabilitation, 87% of hikers stayed on the trail; afterwards this increased to 99%. Observations showed that visitors strayed from the trail largely due to hiker congestion and water, and that the rehabilitation project prevented these behaviors from continuing. We contacted 165 visitors with a subalpine Leave No Trace message. The cost of the project was $7,264 total. The National Park Service and Friends of Acadia match was $4,064, or 56%. The Waterman Fund grant will cover the remaining $3,200. ii

INTRODUCTION This project was nearly identical to the one completed on Sargent Mountain in 2014 with a grant from the Waterman Fund. The purpose was to stabilize soil, protect plants, and provide a better trail experience for hikers, only this time in the subalpine (dwarf shrubland) zone of the Cadillac Mountain South Ridge Trail. This work was needed to: 1. prevent widening and braiding of the trail by hikers due to the standing water and mud that followed significant rainfall events (and ice in winter); 2. Protect two subalpine species of plants that are of growing concern and are potentially at risk from trampling by hikers; and 3. provide a stable, more narrow, and more inviting trail tread to better concentrate the estimated 5,000 hikers in July and August on a durable surface. Additional purposes were to evaluate the effectiveness of the completed work by observing hiker traffic and behavior before and after the project, and to educate hikers with Leave No Trace messages about the fragility of the subalpine environment and the need to stay on the trail. This project again brought together the Acadia National Park Trail Crew and Friends of Acadia s Ridgerunner, Recreation Technician, and Youth Conservation Corps (YCC) programs. METHODS Trail Rehabilitation On July 19, 2016, the Trails Foreman, two Trail Crew workers, two Trail Crew Youth Conservation Corps (YCC) leaders and eight YCC workers, plus three Friends of Acadia (FOA) Ridgerunners, the FOA Recreation Technician, and their Natural Resource Specialist supervisor converged on the Cadillac Mountain South Ridge Trail (Figure 1, next page) at the two work sites described in the proposal. A temporary sign was posted at the south end of the work site with the names and logos of the Waterman Fund, Friends of Acadia and the National Park Service as partners in the project (Figure 2). On July 20, the size of the crew was about the same but the composition changed slightly. On the final day, July 21 five Friends of Acadia staff worked about 3/4 of a day to finish up. Figure 2: Temporary Sign Professional trail crew staff focused on setting solid retaining walls of large rocks to hold a rubble-filled causeway, assisted by Ridgerunners (Figure 3). Some vegetation and soil was removed during work and relocated to the previously impacted sides of the causeway. YCC crews and Ridgerunners moved big rocks for the retaining walls (Figure 4), removed smaller rocks from the nearby West Face Trail junction cairn (Figure 5), and crushed rocks to create material for the trail tread (Figure 6). Removing rocks from the large intersection cairn reduced the impacts of gathering or quarrying rocks from the surrounding environment. 1

2 Figure 1: Cadillac South Ridge Trail Rehabilitation, Site Location

Figure 4: Moving Rocks Figure 5: Removing Junction Cairn Rocks Figure 1: Setting Retaining Wall Figure 6: Rock Crushers 3

Observation Before the work began, we counted hikers and observed their behaviors (unobtrusively and in civilian clothes) on July 11, 12, 15, and 18 for a total of nine hours at the southernmost of two work sites. We recorded the Date, Time, Weather, and Trail Condition each day. We also recorded hiker direction of travel, whether hikers used the east side, west side, or center of the wide trail (all considered to be on the trail); were off trail; the reason they appeared to be off trail; and group size. After the work was completed, we counted hikers and observed their behaviors at the same site on July 24 and 31, and August 8 and 11 for 8.5 hours and recorded the same data. For the postrehabilitation observations, we removed several temporary signs shown in report images and replaced them when we finished observing. This allowed the trail work to stand on its own to help keep hikers on trails. These signs will probably be removed in a few years when the vegetation grows back more fully. One of our pre-rehabilitation observation times followed a rain event the previous day and a few others had at least a damp trail tread. One post-rehabilitation observation followed a modest rain event the previous day, but conditions were much drier overall. Education The Natural Resource Specialist was the primary Leave No Trace educator on-site for the project. RESULTS Trail Rehabilitation We created about 100 feet of rock-lined causeway in two distinct locations that clearly defined the trail, eliminating the standing water and mud that was there (Figures 7, 8, 9, and 10). We also rebuilt two cairns to better direct hiker traffic to one of the trail sections. Deer hair sedge (Trichophorum cespitosum) and mountain sandwort (Minuartia groenlandica), two species of growing concern in the park, are now better protected in the vicinity of the project. Observation We observed 510 hikers before rehabilitation and 401 after rehabilitation in relatively equal numbers hiking north or south. Groups of six or more were observed eight times before rehabilitation and six times after rehabilitation. Before rehabilitation, 87% of hikers stayed on the trail; afterwards this increased to 99% (Table 1). Of the 13% of hikers who went off trail before rehabilitation, 24 went off trail because of congestion (hikers passing one another on this section of trail in the same or the opposite direction), 16 due to water, and 11 for no apparent reason. After rehabilitation, only 2 hikers went off trail, and they did so for no apparent reason. This suggests that most of encroachment we saw along the trail edge (Figures 7 and 9) was the result of rain and puddling in the tread, and that when it was dry enough, most hikers stayed on the trail. It also suggests that any further trail widening due to congestion has been prevented. It is worth noting that 13% noncompliance from hikers is very good, but it represents thousands of hikers per season on a busy trail, and under wet or icy conditions a small number of them can quickly erode the edge of the trail or create a trail braid, and vegetative recovery is slow. 4

Figure 7: Cadillac South Ridge Trail, South Site October 2015 Figure 8: Cadillac South Ridge Trail, South Site July 2016 5

Figure 9: Cadillac South Ridge Trail, North Site October 2015 Figure 10: Cadillac South Ridge Trail, North Site July 2016 6

Treatment Table 1: Percent of Hikers Hiking On and Off Off Trail, Before and After Trail Rehabilitation. On Trail Education We made 165 Leave No Trace contacts with one or more of the following messages as described in our proposal: Summits and ridgelines have thin soil and plants both fragile and rare. The summit environment is severe wind, snow, ice, rain and aridity make it a tough place to grow. Trail work helps reduce hiker impacts but every footstep makes a difference too. Always look up for the cairns and blazes that mark the trails. Please stay on the trail, and if you must step off trail, stay on durable granite ledge. Anecdotally, we listened to several hikers complain about the tread we crushed, describing it as too hard to walk on because of its large size. Despite this, they stayed on it, perhaps simply because it was obvious. We note that most hikers today, including those we observed, wear low cut trail running shoes or sneakers with little ankle support. Hiking boots are not that common anymore. DISCUSSION Off Trail Before (n=501) 87% 13% After (n=410) 99.5% 0.5% The lessons learned in 2014 still applied here: use of an existing intersection cairn for materials reduces the impacts of gathering materials from the natural environment; a rock causeway has a large visual impact but can work well at keeping hikers on trail; trail projects in remote areas (even at Acadia) cost much; measuring the success of trail rehabilitation is not always a simple matter; and educating hikers during construction is a challenge unless one person is dedicated to it, as there is always the opportunity become distracted and pitch in and help move rocks. Regarding this last one, we need to focus on this more strongly in any future project, and more visually, using our existing Leave No Trace poster props or showing to hikers pre-rehabilitation photos of the trail to help them understand their own impacts and the importance of staying on the trail in fragile habitats. SUMMARY The project met its objectives to stabilize soil, protect plants, and provide a better trail experience for hikers by creating 100 feet of rock lined causeway in the subalpine zone of Sargent Mountain. Observations of hiker behavior before and after the project suggest that most hikers stay on the new trail. We also educated 165 hikers about the subalpine environment and the importance of staying on the trail. We were pleased to partner with the Waterman Fund a second time. 7

PROJECT ACCOUNTING Proposed Budget 13 Trail Crew Days (130 hours) @ $450/day* $5,850 12 YCC Days (96 hours) @ $80/day $ 960 7 Ridgerunner Trail Work Days (56 hours) @ $101/day $ 707 15 Ridgerunner Hours of Education @ $13/hour $ 195 9 Rec Tech Hours of Observation @ $15/hour $ 135 Total Project Cost $7,847 Waterman Fund Request $3,400 (43%) Acadia NP/Friends of Acadia Match $4,487 (57%) * Trail Crew Days includes all overhead costs of training, equipping, transporting, program administration etc., including overhead costs for the YCC program. A Trail Crew Day is the equivalent of 10 hours. Actual Costs 8 Trail Crew Days (80 hours) @ $450/day $3,600 16 YCC Days (128 hours) @ $80/day $1,280 14.7 Ridgerunner Trail Work Days (118 hours) @ $104/day $1,529 17.5 Recreation Technician Hours of Observation @ $15/hour $ 263 16 Natural Resource Spec. Hours (trail work and education @ $37/hour $ 592 Total Cost $7,264 Waterman Fund Grant $3,200 (44%) Acadia NP/Friends of Acadia match $4,064 (56%) We had fewer professional Trail Crew days and more YCC and Ridgerunner days of work than planned. We request that the $3,200 reimbursement check be made to and sent to Friends of Acadia, PO Box 45, Bar Harbor, Maine 04609. 8