C H A P T E R 1. Inventory

Similar documents
Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Agenda: SASP SAC Meeting 3

Current Airport Roles

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

ERIE INTERNATIONAL AIRPORT MASTER PLAN TABLE OF CONTENTS

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan

Source: Chippewa Valley Regional Airport ASOS, Period of Record

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

OREGON AVIATION PLAN AIRPORT SUMMARY CRATER LAKE-KLAMATH REGIONAL AIRPORT

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Table of Contents. Overview Objectives Key Issues Process...1-3

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

CHAPTER 1 EXECUTIVE SUMMARY

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

Table of Contents. Master Plan March 2014 TOC i Spokane International Airport

Chapter 2 FINDINGS & CONCLUSIONS

Recommended Performance Measures

SouthwestFloridaInternational Airport

Chapter 9 - AIRPORT SYSTEM DESIGN

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Chapter One INVENTORY

OREGON AVIATION PLAN AIRPORT SUMMARY CORVALLIS MUNICIPAL AIRPORT

FORECASTING FUTURE ACTIVITY

BELFAST MUNICIPAL AIRPORT OVERVIEW

Westover Metropolitan Airport Master Plan Update

Norfolk International Airport

What is an Airport Master Plan?

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

JOHNSTON COUNTY AIRPORT AUTHORITY

Current and Forecast Demand

DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

CHAPTER 1 INTRODUCTION AND BACKGROUND

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Merritt Island Airport

STUDY WORK GROUP MEETING No. 3. November 29, 2016

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

CHAPTER 3 ALTERNATIVES CONSIDERED

AIRSIDE CAPACITY AND FACILITY REQUIREMENTS

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Attachment B Ordinance Campus Master Plan Marshfield Municipal Airport

COMMERCIAL AND GENERAL AVIATION

Chapter 8.0 Implementation Plan

ACTION TRANSMITTAL

The following criteria shall be applied within the boundaries of the AO District:

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.

City of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

Economic Impact. Airports and economic development. Airport location. Regional profile. Middleton Municipal Morey Field (C29) 2008 Middleton, WI

Lake Tahoe Airport Master Plan

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

Boise Municipal Code. Chapter DEFINITIONS

Airport Planning Area

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

Chapter 4 Airport Facility Requirements

ACRP 01-32, Update Report 16: Guidebook for Managing Small Airports Industry Survey

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

Plan prepared for: The Wyoming Department of Transportation, Aeronautics Division and the Federal Aviation Administration

APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS

CHAPTER 1 EXECUTIVE SUMMARY

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Chapter 1 Introduction and Project Overview

Airport Closure Evaluation Report Prepared by MnDOT Aeronautics

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Hartford-Brainard Airport Potential Runway Closure White Paper

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

RESOLUTION NO

Funding Package TOTAL $15,172,000

Airport Master Plan Update

AVIATION. MichiganReportCard.com 5

PIERCE COUNTY-THUN FIELD AIRPORT MASTER PLAN MASTER PLAN ADVISORY COMMITTEE (MPAC) AIRPORT TOUR RD AVE. E., PUYALLUP, WA WEDNESDAY,

SASP Advisory Committee Meeting #3

The Future of Aviation for Central New Mexico

Finance and Implementation

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

CHAPTER 1: INTRODUCTION

Yakima Air Terminal/McAllister Field Airport Master Plan Update

SASP Advisory Committee Meeting #2

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

APPENDIX D AIRPORT CLASSIFICATION

Chapter 1. Inventory

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

Forecast of Aviation Activity

AIRPORT MASTER PLAN FOR. charles B. WHEELER DOWNTOWN AIRPORT KANSAS CITY, MISSOURI

AIRPORT WITH NO RUNWAYS IS A MALL

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

STATEWIDE AIRPORT INVENTORY

General Aviation Master Plan Update

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

Transcription:

C H A P T E R 1 Inventory 1.0 INTRODUCTION The inventory element of an airport master plan identifies existing infrastructure at an airport and its surrounding community, and describes the framework within which airport facilities function. This chapter presents information on existing airport facilities at the Chippewa Valley Regional Airport (FAA identifier EAU), as well as information on historical aviation activity, environmental resources, and socioeconomic trends. Airport information is presented in the following sections: Airport Background Federal, State, and Local Airport-Related Planning Documents Existing Airport Facilities Near-In Obstruction Review Historical Aviation Activity Environmental Resources Demographic and Socioeconomic Trends Inventory Summary Chippewa Valley Regional Airport Master Plan (May 2013) 1-1

1.1. AIRPORT BACKGROUND 1.1.1. Airport Location and History The Chippewa Valley Regional Airport (Airport) is located in the City of Eau Claire and within Chippewa County, Wisconsin. It is located in the west-central part of Wisconsin approximately 90 miles east of Minneapolis-St. Paul, Minnesota. The Airport lies in the northeastern portion of the city of Eau Claire, roughly three miles northwest of downtown. The Airport is bounded by the Chippewa River and Airport Road to the west, North Lane to the south, 26th Avenue to the north, and Runway and Starr Avenues to the east. Figure 1-1 presents the general location of the Eau Claire-Chippewa Falls Metropolitan Area within the state of Wisconsin, and Figure 1-2 presents the Airport s general location within the metro area. EAU is owned by Eau Claire County, and operated by the Chippewa Valley Regional Airport Commission, which includes representatives from both Chippewa and Eau Claire Counties. Administrative and daily operations rest with five full-time and one part-time Airport employees, including an Airport Manager, Office Associate, and maintenance and custodial staff. In 1940, EAU opened at its current location, replacing the earlier 1923 airfield located south of downtown Eau Claire. The Airport contained a single runway surrounded by farmland. The Airport was formally opened in 1945 with an afternoon air show. At this time, two 4,000 foot-long runways were still under construction. As shown in this photograph (dated 1938), land at the future airport site was primarily developed for agriculture. Source: Wisconsin Historical Society (http://maps.sco.wisc.edu/wha/finder/) Chippewa Valley Regional Airport Master Plan (May 2013) 1-2

Figure 1-1 Metropolitan Statistical Area PREPARED BY: MASTER PLAN CHIPPEWA VALLEY REGIONAL AIRPORT (EAU) EAU CLAIRE/CHIPPEWA FALLS, WI May 2013 1-3

Source Information: Esri,, DeLorme,, NAVTEQ, Q, TomTom,, USGS,, Intermap. p Figure 1-2 Airport Location PREPARED BY: MASTER PLAN CHIPPEWA VALLEY REGIONAL AIRPORT (EAU) EAU CLAIRE/CHIPPEWA FALLS, WI May 2013 1-4

By 1946, the main runway at the Airport (Runway 4/22) was 4,300 feet long and the crosswind runway (Runway 14/32) was 4,100 feet long. In 1967, Runway 4/22 was extended by 3,000 feet to total length of 7,300 feet. In 1972, an instrument landing system (ILS) was commissioned for Runway 22. In 1980, Runway 14/32 was extended by 900 feet to its current 5,000-foot length. In 2003, the Runway 4 threshold was displaced by 801 feet to provide a compliant Runway Safety Area (RSA) and Runway 22 was extended by 801 feet, resulting in the current 8,101-foot length. Upon opening during the 1940s, the Airport s first terminal was a Quonset-style building. In 1967, corresponding to the rise of general and commercial aviation activities nation-wide, a new terminal was constructed to accommodate increasing passenger service from nearby communities. The Airport transferred ownership from the city to the county in 1979 and was renamed. Within two years, in 1981, the terminal was expanded. More recently, in 2006, the Airport s first Traffic Control Tower was opened. A two-phase project consisting of the remodel and expansion of the existing terminal began in 2008 and was completed in 2011. EAU serves both scheduled and non-scheduled commercial passenger airlines, as well as private general aviation (GA) activities. The Airport is the largest in the 30-county northern Wisconsin region and serves the Chippewa Valley region, consisting of Eau Claire, Chippewa Falls, Altoona, Menomonie, and surrounding rural areas. As of September 2012, the Airport s sole commercial carrier providing daily passenger service, United Express, offers two daily departures to the Chicago O Hare International Airport. Allegiant Airlines provides periodic service to Wendover, Nevada, and Sun Country Airlines provides periodic service to Laughlin, Nevada. 1.1.2 Climate, Topography, and Soils Eau Claire County, much like the majority of the Upper Midwest, experiences a continental climate with warm, humid summers and cold, dry winters. Total annual precipitation is approximately 32 inches, with August being the wettest month of the year. Snowfall averages approximately 51 inches per year, with January being the snowiest month of the year. Elevations on the Airport vary especially near the Chippewa River to the north and west of the airport. However, the airport terrain is generally flat on landing surfaces. The established Airport elevation, defined by the FAA as the highest point on an airport s paved landing surface, is 913 feet MSL. This elevation occurs near the northeastern end of Runway 4/22. A soil survey conducted by the Natural Resource Conservation Service reveals that soils located on, and adjacent to, the Airport consist primarily of Menahga loamy sand, Burkhard Sandy loam, Richford loamy sand, Chetek-Mahtomedi complex, and traces of several other soil types. Figure 1-3 shows the varying soil types located around the Airport. Chippewa Valley Regional Airport Master Plan (May 2013) 1-5

Source Information: USDA NRCS Web Soil Survey PREPARED BY: Legend MkB - Menahga loamy sand, 0-6% slopes MkC - Menahga loamy sand, 6-12% slopes BuA - Burkhardt sandy loam, 0-3% slopes CeA - Caryville sandy loam, 0-3% slopes Pc - Pits, gravel PfC2 - Plainfield loamy sand, 6-12% slopes, eroded Be - Beseman muck, 0-1% slopes CkE - Chetek-Mahtomedi complex, 25-40% slopes ScB - Scott Lake sandy loam, 1-6% slopes Wb - Warman variant sandy loam, 0-2% slopes RfA - Richford loamy sand, 6-12% slopes Figure 1-3 Soil Survey MASTER PLAN CHIPPEWA VALLEY REGIONAL AIRPORT (EAU) EAU CLAIRE/CHIPPEWA FALLS, WI May 2013 1-6

1.2. FEDERAL, STATE, AND LOCAL AIRPORT-RELATED PLANNING DOCUMENTS The following sections summarize recent Federal, State, and local planning documents and reports related to planning and development at EAU. Documents and reports considered include the following: 2011-2015 National Plan of Integrated Airport Systems Wisconsin State Airport System Plan 2001 Airport Master Plan Update 2003 Tier 2 Airports Study 2003 City of Eau Claire Comprehensive Plan 2010 Eau Claire County Comprehensive Plan 2010 Chippewa County Comprehensive Plan Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan 1.2.1 2011-2015 National Plan of Integrated Airport Systems (NPIAS) The NPIAS is updated every two years by the Federal Aviation Administration (FAA). The most recent update to the NPIAS, covering the years 2013 to 2017, was transmitted to Congress in September 2012. The NPIAS is used by the FAA in administering the Airport Improvement Program (AIP), and supports FAA safety and capacity goals by identifying airports and airport improvements that will help achieve those goals. The NPIAS currently lists EAU as a Primary Commercial Service airport. Primary Commercial Service airports are defined as receiving scheduled passenger service and having 10,000 or more enplaned passengers per year. There are 378 airports nationwide that are considered Primary Commercial Service airports by the NPIAS, including eight airports in the State of Wisconsin (Appleton, Eau Claire, Green Bay, La Crosse, Madison, Milwaukee, Mosinee, and Rhinelander). Of the 378 nationwide Primary airports, 240 are considered Nonhub airports. Together, these 240 Nonhub airports account for 3% of nationwide passenger enplanements. The determination of whether an airport is a Hub or Nonhub airport is made by dividing the number of annual enplanements at the airport by the number of annual enplanements nationwide. Based on this percentage, the specific airport in question is categorized as a Large Hub, Medium Hub, Small Hub, or Nonhub. The Chippewa Valley Regional Airport is classified as a Nonhub airport because its annual passenger enplanements are less than 0.05 percent of all U.S. passenger enplanements. The NPIAS indicates that Primary Nonhub Commercial Service Airports are also heavily used by general aviation aircraft, together comprising approximately 11% of nationwide based aircraft with an average of 92 based aircraft per airport. The NPIAS provides estimated 5-year costs for airport improvements that are eligible for Federal development grants under the Airport Improvement Program, and lists an estimated five-year total development cost of approximately $2.1 million for EAU. 1.2.2 Wisconsin State Airport System Plan The Wisconsin State Aviation System Plan (SASP) 2020 is the current long-range aviation system plan published by the Wisconsin Department of Transportation (WisDOT) Bureau of Aeronautics (BOA). The Chippewa Valley Regional Airport Master Plan (May 2013) 1-7

Wisconsin SASP 2020 was published in 2000. As of May 2013, a new update to the SASP is underway. The SASP provides input to the NPIAS, individual airport master plans, and the State s Long-Range Multi-Modal Transportation System Plan. There are 98 airports in the Wisconsin state aviation system. The Wisconsin SASP 2020 designated EAU as one of ten air carrier/air cargo (AC/C) airports in the state. AC/C airports are designed to accommodate virtually all aircraft up to and, in some cases, including, wide-body jets and large military transports. These airports have runway lengths between 6,500 and 9,800 feet, are capable of serving airport reference code (ARC) C and D aircraft, and have a service area radius of approximately 60 miles. In 2010, the BOA conducted a review and update of statewide airport classifications. This review took into account state demographic trends, national commercial service trends, and national general aviation trends in updating the classification system, and assessed each airport in the system based on the following four performance categories: activity, economics, accessibility, and facilities. The 2010 classification update designates EAU as one of eight commercial service airports in the state. The update defines commercial service airports as those that support regularly scheduled year-round commercial airline service and support the full range of general aviation activity to domestic and international destinations. The typical facility and service attributes of commercial service airports, as defined by the 2010 update, are summarized in Table 1-1. Table 1-1: SASP Commercial Service Airport Typical Facility and Service Attributes Facility/Service Typical Attribute ARC C or greater Runway Length (primary) 6,700 feet or greater (actual runway dimension determined by each airport's critical aircraft) Runway Width (primary) 150 feet Taxiway Type Full Parallel Approach Capability Visibility minimum of 0.5 mile or less Runway/Taxiway Lighting HIRL and MITL Visual Aids Rotating Beacon, Wind Cone, MALSR or better, REILS, VGSI (VASI/PAPI) Weather Reporting AWOS or ASOS Pavement Condition 70 PCI or greater Hangar Space Per Master Plan Ramp Space Per Master Plan General Aviation Terminal/Admin Bldg Per Master Plan Operations/Maintenance Hangar Per Master Plan Auto Parking Per Master Plan FBO Full Service Maintenance Full Service Fuel 100LL & Jet A Terminal/Pilot's Lounge Phone, Restrooms, Flight Planning/Lounge Ground Transportation On-Site Rental Car Security Full Perimeter Fencing, Controlled Access, Night Guard, Signage Other Snow Removal and Aircraft De-Icing Source: Wisconsin SASP 2010 Chippewa Valley Regional Airport Master Plan (May 2013) 1-8

1.2.3 2001 Airport Master Plan Update In 2001, an airport master plan update was completed for EAU by Coffman Associates. The master plan update consisted of an airport inventory, aviation demand forecasts, aviation facility requirements, airport development, alternatives analysis, recommended development plan, and a financial plan. The 2001 master plan update recommended a wide range of short-, intermediate-, and long-term development projects. Projects that have been completed since the 2001 master plan update include runway safety area (RSA) improvements, an 800-foot extension to Runway 4/22, construction of the air traffic control tower, renovation of the passenger terminal building, installation of a passenger boarding bridge, and development of new GA facilities on the south side of the airfield. These improvements are shown in Figure 1-4. 1.2.4 Airport Zoning The Airport is officially zoned P for public properties district by the City of Eau Claire. The public properties district allows for public use of certain areas, such as parks, playgrounds, schools, governmental uses, or other public areas. The following uses are permitted in the public properties district: Municipal uses, city owned and operated; Public parks, playgrounds; Public utility and public service uses; Non-commercial parking; Boat landings and boat docks for public use; Signs for municipal and public utility use; Public schools, athletic fields and golf courses, and related educational or recreational facilities; Other public buildings, lands, grounds, and uses, including public housing facilities. One-family, two-family, and non-sewered one-family residential development (R1, R2, R1A) is located adjacent to Airport property to the west, southwest, south, and southeast. Heavy and Light Industrial development (I1 and I2) is located to the east of the Airport. Figure 1-5 shows the current zoning designations surrounding the airport. While the Airport is located within City of Eau Claire city limits, the Airport is also under the jurisdiction of Eau Claire County s zoning ordinance (Chapter 18.60 Airport Zoning). In 1980, Eau Claire and Chippewa Counties adopted an airport zoning ordinance that regulates structure heights in the vicinity of the Airport. In 2002, the airport zoning ordinance was revised to also regulate land uses in the vicinity of the Airport, and in 2007 the ordinance was further revised to reflect recent changes in the runway end locations. The purpose of the airport zoning ordinance is to protect neighboring land uses from noise and other aviation hazards. The Airport is divided into four zoning districts Zone A, Zone 1, Zone 2, and Zone 3 with specific land use restrictions and setbacks applied to each defined zone. Figure 1-6 shows the four zoning districts and Table 1-2 shows the permitted land uses and setback regulations for each of the four zoning districts as defined by the County. Zone 1 is the most restrictive and Zone 3 is the least restrictive. Areas regulated under height restrictions are indicated in Figure 1-7. Table 1-2 details the Eau Claire County Airport zoning districts. Chippewa Valley Regional Airport Master Plan (May 2013) 1-9

Table 1-2: Eau Claire County Airport Zoning Districts Zone A Airport District Permitted Land Uses Setback Regulations Air Terminals Aircraft Hangars Aircraft runways, taxiways, aprons, and related lighting and air support apparatus Airport administration buildings Aircraft repair and maintenance buildings and facilities Fuel storage and pumps 30 for all structures Commercial uses directly related to the airport operations Public gatherings in conjunctions with an airport related activity sponsored or approved by the airport Air Cargo facilities Intermodal facilities Other related airport uses and structures Zone 1 Runway Approach and Departure District Permitted Land Uses Agriculture, including essential non-residential facilities Floriculture, horticulture, silvaculture, orchards, hatcheries, game farms, wildlife sanctuaries and game preserves, except aviaries Mining and excavation Open space Transportation routes including roads and rail lines Setback Regulations Requirements shall meet municipal setback requirements for the applicable zoning code Parking lots and parking facilities Light recreational (non-spectator) Other related airport uses and structures Zone 2 Noise Control/Over-flight District Permitted Land Uses All uses allowed by the underlying zoning of the affected municipality Setback Regulations Requirements shall meet municipal setback requirements for the applicable zoning code Zone 3 Height Limitation District Permitted Land Uses All uses allowed by the underlying zoning of the affected municipality Setback Regulations Requirements shall meet municipal setback requirements for the applicable zoning code Chippewa Valley Regional Airport Master Plan (May 2013) 1-10