Chapter 1: Introduction

Similar documents
Chapter 1: Introduction Draft

What is the ABIA 2040 Master Plan?

ENVISIONING AUSTIN s Airport of the Future

Introduction DRAFT March 9, 2017

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Chapter 1 Introduction and Project Overview

Westover Metropolitan Airport Master Plan Update

Planning, Development and Environment Committee

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

CHAPTER 1: INTRODUCTION

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

Chapter 1 Introduction and Project Overview

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Chapter 1 Introduction

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Nantucket Memorial Airport Master Plan Update

Austin-Bergstrom International Airport Master Plan Update


The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

STUDY WORK GROUP MEETING No. 4. July 12, 2017

CHAPTER 1 EXECUTIVE SUMMARY

Norfolk International Airport

CVG Overview Connect with CVG March 29, 2017

Will it Fit? Preliminary Findings

FLL Master Plan Update Technical Advisory Committee (TAC) Briefing #1. September 28, 2016

Dallas Love Field Update. Dallas City Council Briefing February 18, 2015

Lake Tahoe Airport Master Plan

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

FLL Master Plan Update BOARD OF COUNTY COMMISSIONERS BRIEFING

Fort Wayne International Airport Master Plan Study. Executive Summary

Casper/Natrona County International Airport Master Plan Update Technical Advisory Committee Meeting Two - October 14th, :30 PM

Kansas City Aviation Department. Airport Committee July 19, 2018

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

Preferred Alternative Summary

FORECASTING FUTURE ACTIVITY

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Master Plan Update Community Advisory Committee Kick-off Meeting

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Ted Stevens Anchorage International Airport

AUSTIN-BERGSTROM INTERNATIONAL AIRPORT 2040 MASTER PLAN THE AIRPORT OF THE FUTURE

Ted Stevens Anchorage International Airport

July 21, Mayor & City Council Business Session KCI Development Program Process Update

CHAPTER 4: ALTERNATIVES

Ted Stevens Anchorage International Airport

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Master Plan Update Technical Advisory Committee Meeting

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam

Current and Forecast Demand

Sunshine Coast Airport Master Plan September 2007

Alternatives. Introduction. Range of Alternatives

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Kansas City Aviation Department. Community Listening Session

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

Kelly Field at Port San Antonio Airport Master Plan

The vision for enhanced service on Riverside between downtown and the airport is not a new concept.


AIRPORT MASTER PLAN UPDATE

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

ACTION TRANSMITTAL

BURLINGTON INTERNATIONAL AIRPORT

Terms of Reference: Introduction

General Aviation Master Plan Update

INDEPENDENCE STATE AIRPORT (7S5)

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

2015 PURDUE ROAD SCHOOL March 11, 2015

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Agenda: SASP SAC Meeting 3

FIRST PUBLIC WORKSHOP

BNA Master Plan Update Public Meeting No. 2

Love Field Modernization Program Update: Master Planning Recommendations

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

A Master Plan is one of the most important documents that can be prepared by an Airport.

TRACK: B TERMINAL/LANDSIDE

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Funding Package TOTAL $15,172,000

Executive Summary DRAFT

SAN BERNARDINO INTERNATIONAL AIRPORT AUTHORITY (SBIAA) Annual Evaluation and Review - Strategic Plan December 16, December 21, 2016

Pierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Regular Board Meeting August 4, 2015

Tulsa Airports Improvement Trust Strategic Plan Update

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

Planning Advisory Committee November 20, 2014

Dallas Executive Airport Marketing Plan

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

LOVE FIELD MODERNIZATION PROGRAM (LFMP)

SAN MARTIN BUSINESS PLAN COMMUNITY MEETING

Welcome to the Boise Airport Master Plan Update Open House

Applewood Heights Community Open House

Transcription:

Chapter 1:

TABLE OF CONTENTS 1... 4 1.1 Master Plan Study Content... 4 1.2 Purpose and Scope of Master Plan Study... 4 1.3 Airport History and Role... 6 1.4 Airport Location and Service Area... 6 1.5 ABIA 2040 Master Plan Goals... 8 1.6 Public and Stakeholder Involvement Program... 9 1.6.1 Stakeholder Engagement Plan... 10 Chapter 1 Page 2

LIST OF EXHIBITS Exhibit 1.2-1: ABIA Annual Growth Since 1993... 5 Exhibit 1.4-1: ABIA Location Map... 7 Exhibit 1.4-2: ABIA Service Area... 8 Chapter 1 Page 3

1 INTRODUCTION 1.1 Master Plan Study Content This Austin-Bergstrom International Airport (ABIA) 2040 Master Plan Study was conducted in accordance with FAA Advisory Circular 150/5070-6B, Airport Master Plans. The ten main elements of the ABIA 2040 Master Plan Study are: 1. Sustainability 2. Public Involvement 3. Environmental Considerations 4. Existing Conditions 5. Aviation Forecasts 6. Facility Requirements 7. Alternatives Development Analysis 8. Airport Layout Plans 9. Facilities Implementation Plan 10. Financial Feasibility Analysis The ABIA 2040 Master Plan Study has been divided into the following chapters: Executive Summary Chapter 1: Chapter 2: Existing Conditions and Issues Chapter 3: Aviation Activity Forecasts Chapter 4: Demand/Capacity and Facility Requirements Chapter 5: Alternatives Analysis Chapter 6: Safety Assessment and Management Process Chapter 7: Sustainability Plan Chapter 8: Implementation Plan Chapter 9: Financial Plan Chapter 10: ALP and e-alp Description Each of these chapters and subject matter are presented in this master plan study. 1.2 Purpose and Scope of Master Plan Study Passenger growth at Austin-Bergstrom International Airport has tripled at a 4.2% average annual growth rate since 1999. Exhibit 1.2-1 shows that between 2011 and 2017 ABIA grew at a 7.3% average annual growth rate, and had 13.94 million annual passengers (MAP) in 2017. This growth Chapter 1 Page 4

rate exceeds the national average growth rate of 2.8% for the same time period. 1 For the first ten months in 2018, ABIA set monthly passenger growth records from the previous year with an average monthly growth rate of 15.06 %. This anticipated continued double-digit passenger growth rate was the impetus for ABIA to undertake a new 20-year Master Plan Study that provided information regarding the needed airport infrastructure to accommodate the anticipated growth through 2037. This ABIA Master Plan Study also addressed emerging aviation technologies and the effect of the continued growth and expansion of ABIA. Exhibit 1.2-1: ABIA Annual Growth Since 1993 Source: ABIA historical data The airport covers 4,242 acres, including two parallel runways. The Barbara Jordan Terminal was originally designed to serve 11 MAP. The terminal expansion, with completion scheduled in early 2019, is designed to increase the capacity of the Barbara Jordan Terminal to serve 15.5 MAP. ABIA is forecasted to exceed this level of passenger activity before the terminal expansion is completed and will require additional terminal processing, gate capacity, and support facilities to accommodate the increasing demand while maintaining passenger experience. 1 US DOT Scheduled T100 Passenger Data and DatabaseProducts Chapter 1 Page 5

1.3 Airport History and Role When the Bergstrom Air Force Base was announced to be closed in 1991, the City of Austin began actions to relocate the airport to Bergstrom. At that time, the City of Austin s air transportation needs were provided by the Robert Mueller Municipal Airport (RMMA). In May 1999, ABIA opened for passenger service and continues to serve the Central Texas region. The original 1993 Master Plan was completed and used for converting the former Air Force Base into the new ABIA. However, traffic quickly outgrew the new airport infrastructure and a master plan update was conducted in 2003. Since 2014, ABIA has undergone $466 million in expansion projects, such as: 9-Gate 90,000 sq. ft. Barbara Jordan Terminal Expansion 80,000 sq. ft. Administration Building 6,000 space Parking Garage 16.4 acre Airport Maintenance Facility East Infill for TSA Security Checkpoint #1 and Customs Facility The FAA classifies airports 2 based on the type of air carrier operation. ABIA is a Class I airport, which requires scheduled large air carrier aircraft designed for at least 31 passenger seats, an Airport Operating Certificate (AOC) and meeting the specific Part 139 regulations. ABIA serves the greater Austin and Central Texas Region, and is also a reliever airport to the surrounding Texas airports, such as Dallas-Fort Worth, San Antonio International Airport, George Bush Intercontinental and Houston William P. Hobby Airports. Due to this, ABIA receives more diversions than any other airport in the country. 1.4 Airport Location and Service Area ABIA is approximately eight miles southeast of the Austin Central Business District (CBD), as shown in Exhibit 1.4-1. The airport is owned by the City of Austin and operated by the Department of Aviation (DOA). ABIA occupies approximately 4,242 acres of land bound by State Highway (SH) 71 to the north, Burleson Road to the south, Farm to Market (FM) Road 973 to the east, and U.S. Route 183 to the west. The majority of ABIA s passengers come from the Travis County region shown in Exhibit 1.4-2 in the dark blue area. However, in recent years passengers have come from 21 counties surrounding the greater Austin Metropolitan Area, and even south of San Antonio. 2 Federal Aviation Regulations (FAR) Part 139, Airport Certification. Chapter 1 Page 6

Exhibit 1.4-1: ABIA Location Map Source: Adisa Chapter 1 Page 7

Exhibit 1.4-2: ABIA Service Area Source: ABIA passenger data and Landrum & Brown, Inc. 1.5 ABIA 2040 Master Plan Goals The Vision for Austin-Bergstrom International Airport is To Be the Airport of choice for Central Texas. While its Mission is To connect our community to the world with an Austin-Style Experience. 3 Where appropriate, the following Master Plan Goals have been incorporated into this Master Plan Study. Customer & Community Value The Austin-Bergstrom International Airport serves an external customer base of passengers as well as internal customers of employees and business partners. 3 Austin-Bergstrom International Airport, 2017 Focus and Execution Plan for a Sustainable Future. Chapter 1 Page 8

We will continue to grow our brand around a quality customer experience, providing passengers with exceptional facilities and services and improving work flow processes. The Airport is part of the community it serves and supports and represents the character and culture of its community. Goal 1: Enhance Customer Experience Goal 2: Build the Best Team Goal 3: Strengthen Partnerships and Relationships Goal 4: Connect Our Community to the World Operational Excellence Austin-Bergstrom International Airport is committed to constantly improving the way we do business. Operational excellence can be achieved by using a systematic approach to the management of resources, processes, safety and security, planning facilities and infrastructure that will support future demands to connect ABIA with the world, and promoting a risk culture to reduce liabilities and exploit opportunities. Goal 1: Ensure Efficient and Reliable Airport Operations Goal 2: Plan, Design, and Build Capital Project to meet Central Texas Growth and Demand Economic Sustainability Our economic sustainability is dependent on generating sufficient revenue to balance our operating and capital needs in a manner that allows us to remain cost competitive in the marketplace. Goal 1: Increase and Diversify Non-Airline Revenue Goal 2: Maintain and Enhance Our Competitive Cost Structure Goal 3: Strengthen ABIA s Financial Position Environmental Stewardship Austin-Bergstrom International Airport has recognized its responsibility to the environment and taken actions to continually enhance and promote its environmental program accomplishments and be recognized as a leader in airport environmental stewardship. Goal 1: Minimize Our Environmental Impact 1.6 Public and Stakeholder Involvement Program This ABIA Master Plan was conducted in three phases and considered input from residents, airport-related business, local and federal agencies and city planners. Phase I: Stakeholder Input Outlines overall direction from various stakeholder and public meetings. Phase II: Draft Master Plan Defines preliminary improvements and phases for the development of the Master Plan for review and evaluation. Chapter 1 Page 9

Phase III: Final Master Plan A final recommended airport development plan submitted to ABIA and the FAA for approval. This Master Plan Study envisions the ABIA layout of the future and identifies the facilities, infrastructure, and emerging aviation technologies necessary to meet the growth and expansion of the Airport over a 20-year (2017 to 2037) period. At minimum, this Master Plan will include the following: New North Terminal for passenger ticketing, bag claim and security activities New Midfield Concourse that will provide 32 new commercial aircraft gates Supporting baggage handling system Ground transportation center Entrance and egress roadway improvements New utility upgrades Apron expansion Additional taxiway/taxilane network Refurbishment of the existing Barbara Jordan Terminal 1.6.1 Stakeholder Engagement Plan Throughout this Master Plan Study, the Department of Aviation executed a Stakeholder Engagement Plan to inform, educate, and engage residents, airport users and related businesses, local and federal agencies, and City planners. This included, but was not limited to, the Austin Airport Advisory Commission, airport tenants, the general public, and community leaders (elected or otherwise) in the vicinity of the Airport, as well as other active members of the airport community and aviation industry. The DOA staff and consultants designed and facilitated interactive formats at all meetings to ensure a fair and balanced discussion of issues from all perspectives. Stakeholders were organized and mobilized into the following groups and their responsibilities during the Master Plan Study: Austin City Council A draft final ABIA Master Plan Executive Summary and Airport Layout Plan drawing were presented to the City Council members to inform and receive feedback prior to submitting the final Master Plan Study to the FAA for approval. Austin Airport Advisory Commission (AAAC) The Department of Aviation and consultants held meetings with the AAAC members to keep them abreast of the Master Plan status and to receive feedback on the proposed ABIA development plan. A total of four meetings were held with the AAAC. Project Advisory Committee (PAC) The PAC was formed to provide the City with visioning and ideas for the expansion of the ABIA facilities and services. The PAC included members from the Airport serving businesses, Real Estate Council of Austin, Chambers of Commerce, Capital Area Metropolitan Planning Organization, Austin Technology Council, Del Valle School District, Chapter 1 Page 10

Austin Neighborhood Council (including Southeast Austin), University of Texas, and the Austin City Visitors Bureau. A total of four meetings were held with the PAC. Technical Advisory Committee (TAC) The TAC was formed to provide the City with detailed technical input into the ABIA Master Plan process and recommendations. The TAC included members from the FAA, airlines, the Texas Department of Transportation, Central Texas Regional Mobility Authority, Capital Metro, Austin Executive Airport, general aviation industry, airport tenants, and the State of Texas, Travis County. A total of four meetings were held with the TAC. Public Outreach The Department of Aviation and consultants held widely publicized meetings on the proposed ABIA Master Plan to provide information about the preliminary visioning and potential community impacts, as well as to solicit public comments, feedback and suggestions. A public website was created with details about the ABIA Master Plan, including information on meetings, materials and a survey. Public Workshop #1: The first public workshop was held on October 12, 2017 to introduce the project and gather input on community values. Twenty-one people attended the meeting, where attendees were encouraged to review the display boards around the room (in English and Spanish). The workshop participants were then split into two groups and engaged in discussion with each other and the project team on values and preferences. Public Workshop #2: The second public workshop was held on April 19, 2018 and fortyone stakeholders attended. The first thirty minutes of the workshop was conducted as an open-house style meeting, followed by a 90-minute presentation, which discussed the demand analysis and facility requirements for ABIA. Public Workshop #3: The third public workshop was held on June 7, 2018. It was open house style meeting and 35 stakeholders attended. There were boards around the room that described the elements of the master plan and the shortlisted runway, terminal and roadway alternatives. An online survey was also made available to attendees. Public Workshop #4: The fourth public workshop was held on September 26, 2018 and was open-house style. There were boards around the room that depicted the terminal concepts and phased airport layout plan. Survey: An online survey was administered for the final input phase for the Master Plan. Paper copies of the survey were distributed at the public meeting #3 and the online version was available for 2.5 weeks. The survey described each of the shortlisted alternatives and gauged the level of preference for the preferred alternative. Website and Social Media: A comprehensive project website was developed and then maintained throughout the life of the project. ABIAMasterPlan.com was updated on a monthly basis with construction updates and news about the master planning activities. It was also updated with the meeting materials within week of the meeting. Social media posts were created to advertise an upcoming public meeting and the online survey. Executive Committee The Executive Committee is comprised of various Department of Aviation managers. Monthly update meetings were conducted throughout the Master Plan Study to solicit input, feedback and direction on each stage of the plan. A total of 12 meetings were held with the Executive Committee. Chapter 1 Page 11

Additional details and materials for each stakeholder meeting are provided in Appendix 1.1 Austin Airport Advisory Commission (AAAC), Appendix 1.2 Project Advisory Committee (PAC) & Technical Advisory Committee (TAC), and Appendix 1.3 Public Outreach. Chapter 1 Page 12