KP Lasnaya 1 River

Similar documents
Sakhalin-2 Phase 2 Lenders Monitoring Visit Report Annex D: Individual RoW Descriptions

Peace Project Water Use Plan

MORGAN CREEK GREENWAY Final Report APPENDICES

Specification for Grip blocking using Peat Dams

Bear Creek Habitat Improvement Project

Property access tracks

M.J. Milne & Associates Ltd.

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

DRAFT. Dorabelle Campground Rehabilitation

Mt. Hood National Forest

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Mount Rainier National Park November 2006 Flood Damage

Northern Rail Extension, Phase One

Lidar Imagery Reveals Maine's Land Surface in Unprecedented Detail

Finn Creek Park. Management Direction Statement Amendment

GILBERT & WEST TOWN INTERCOUNTY DRAIN Windsor Township, Eaton County and City of Lansing, Delhi Township, Ingham County, Michigan

Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT

Control Description Sheet 1

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

COON CREEK WATERSHED DISTRICT Request for Board Action

Attachment G STREAM IMPACTS. Ridge Road Extension Alternatives Analysis

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

AGAWAM CONSERVATION COMMISSION April 26, 2018

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019

Yard Creek Provincial Park. Management Plan

Shrubs and alpine meadows represent the only vegetation cover.

DREDGED MATERIAL DISPOSAL HISTORY AVOCA ISLAND LAKE

Ammonite Falls Descent

Wicklow Mountains Path Survey

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Electric System Serving Pierce County Current system and future investments

X. WHATCOM CREEK SMA. X.1 Watershed Analysis. X.1.1 Landscape Setting

Archaeological Investigations Project South East Region SOUTHAMPTON 2/842 (C.80.C004) SU

PacifiCorp North Umpqua Hydroelectric Project FERC Project No VOLUME 1 EXHIBITS

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

APPENDIX F List of Commitments

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Hydro-Electric Schemes Compliance Report June June 2013

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

1. PROJECT BACKGROUND. June 25, Alberta Transportation Central Region #401, Street Red Deer, Alberta T4N 6K8

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013

Gatwick Stream Riverside Garden Park, Horley

Self-guided Tours Tour 4: Warden Woods and The Goulding Estate

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

The Appleton Wetland; Its Decline, Cause and Recommended Action. Appendix K: Wetland Inspection

Hawke s Bay Regional Parks Network. Pekapeka Regional Park Individual Park Plan

Glacial Geomorphology Exercise

General Summer and Winter Views

Permeable RECREATIONAL TRAILS

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

Mark West Creek Flow Study Report

SH73 Route Security Strategic Study Project Summary

Chuckanut Ridge Fairhaven Highlands EIS Scoping Concerns

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west

Just how big is Africa?

RIO VISTA MUNICIPAL AIRPORT

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Appendix A2 Traffic and Transportation Management Plan

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

BOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010

STREAKED HORNED LARK. Conservation of a threatened species in an industrial landscape. Cat Brown US Fish and Wildlife Service

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary

Trail Assessment Report

Independent Technical Reference Group Wild Horse Damage around Currango Homestead Made by: Friends of Currango Inc. (FoC) Date: 13 April 2015

II. THE BOULDER CREEK DRAINAGE BASIN

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

2.0 Physical Characteristics

e-news TRACK REGENERATION WORK AT DINGO DELL, WEST OF SYDNEY.

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

1.1.1 Landscape character This is the upper part of a bowl-shaped landform, extending east from the Rothiemurchus character area, contained by the

Days Days Days 2 Days Hours Hours

ALPINE PIPELINE RIVER CROSSINGS 2009 MONITORING REPORT

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

The Year in Review 2014, Beothuk Institute Inc. We have had several highlights this year. At the AGM in May there were two guest speakers, Dale

BEST MANAGEMENT PRACTICES

Advisory Circular CT

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Juvenile coho salmon use of constructed off-channel habitats in two Lower Klamath River tributaries: McGarvey Creek & Terwer Creek

Significant Natural Area Assessment. Property Name: Hillend Station

Region 1 Piney Woods

Erskine Creek via Pisgah Rock and Jack Evans

beach. Make the ford and follow the trail out to the junction with Red Creek Tr in an open grassy area.

Ancient Egypt and the Near East

Chapter 7 Geography and the Early Settlement of Egypt, Kush, and Canaan

Report on an archaeological watching brief at Thomas Lord Audley School, Monkwick, Colchester

ISOM & ISSOM forbidden symbol comparison

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

APPENDIX L -4 RECREATIONAL TRAIL CROSSING PLANS

Southern Shenandoah Valley Chapter

USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto

A Possible Roman Road Discovered in Lanarkshire

Transcription:

KP 370.2 Lasnaya 1 River The Lasnaya 1 River crossing is protected by Reno mattings and a gabion wall on the north bank (Photo 1). The south bank consists of natural river gravel deposits on top of Reno matting. The RoW on both sides is densely vegetated (some tree saplings are appearing that need to be removed). An armoured drainage ditch within the gabion wall appears to be functioning well (Photo 3). Photo 1 View of northern bank gabion walls. Also note the dense vegetation. Photo 2 View of dense vegetation on southern bank. Photo 3 View of Drainage ditch with northern bank gabion wall.

KP 370.2 Lasnaya 2 River The Lasnaya 2 River crossing is protected by Reno mattings and a gabion wall on both banks (Photos 1 and 2). Some erosion and damage to the gabion wall was visible at either end of the northern bank gabion wall (Photo 3). Good vegetation was visible on the RoW on both sides (Photos 1 and 2), although tree saplings are appearing that need to be removed. Geojute-protected slope breakers on the southern were found to be in good condition. Photo 1 View of northern bank gabion walls. Photo 2 View of southern bank gabion walls. Photo 3 Erosion and gabion damage on the northern bank

KP 373 Madera River The river crossing is protected by gabions on the south bank and Reno matting on the north bank (Photo 1). The placement of the reno matting on the northern bank has noticeably narrowed the river compared to the river width up- and down-stream (Photo 1), and this is leading to some under-cutting of the matting. Erosion of the upstream southern bank has occurred but this is protected by good size riprap at present (Photo 2). The RoW on each side of the river is densely vegetated (Photos 3 and 4). Photo 1 View downstream showing Reno matting on the north bank and gabions on the south bank. Visible narrowing of the river is seen on the northern bank. Photo 2 View downstream showing Reno matting on the north and gabions on the south. Photo 3 View of RoW to south with good revegetation. Photo 4 View north showing well vegetated RoW.

KP 376 Zhelezhnyak River The Zhelezhnyak River crossing was damaged during the 2009 Typhoon season and was since then repaired. The banks are protected by gabion walls and Reno matting and appear in to be good condition (Photos 1 and 2). The RoW slope south of the crossing held well and the RoW on both sides the crossing is very well vegetated. Photo 1 View upstream of the river crossing showing Reno matting and gabion walls. Photo 2 View downstream of the river crossing showing Reno matting and gabion walls.

KP 380.6 Lasnaya 3 River The Lasnaya 3 River crossing is well protected on both banks with Reno matting on the north and Reno matting and gabion wall on the south (Photo 1). The RoW on the north side of the crossing has good vegetation cover (Photo 2). The south slope is also well vegetated but with partially bare side cuts (Photo 3). The silt fencing on the south side is damage and in need of repair (Photo 3). Photo 1 View to the upstream of the river crossing showing Reno matting and gabion wall. Photo 2 View of the RoW north of the crossing with dense vegetation cover. Photo 3 View south showing the south slope with generally good vegetation cover, but bare side slopes and silt fencing in need of repair.

KP 382 Landslide on RoW Recent landslide at KP 382 on the west side of the RoW has been repaired since 2011. The project was classified as Category 3 repair work and is executed directly by Sakhalin Energy. The works included stabilization of the side slope using gabion walls and geotextile and construction of a drainage system (Photos 1 to 2) and at the time of the site visit appeared in good condition. Photo 1 View of drainage channels. Photo 2 View of gabion wall

KP 384.5 Lazovaya River The Lazovaya River crossing is well protected with Reno matting and gabion walls on both banks (Photo 1). The bridge on the access road has good permanent sediment control. The slopes on both sides of the river have dense vegetation cover (Photos 1 and 2). Reportedly, the bridge is now scheduled to stay as a permanent access point. Photo 1 View to the downstream showing gabion walls and Reno matting. Good revegetation on RoW. Photo 2 View to the north showing slope with good vegetation cover.

KP 421 Pugachevka River and wetlands The Pugachevka River is surrounded by flat RoW on either side, with the area to the south classified as wetlands. The riverbanks are protected by reno matting on the southern bank (Photo 1) and riprap on the north bank (Photo 2), all of which appears to be in good condition. The river divides within the width of the RoW and the riverbanks at the divide appear in good condition (Photo 3). Spawning salmon were seen in the river at the time of the inspection. The wetland was well vegetated, but the soils were found to be dry and no evidence of wetland were found either on the RoW or in adjacent areas. A slight depression over the FOC was evident. Photo 1 Reno matting on southern bank Photo 2 Riprap on northern riverbank. Photo 3 River divide at edge of RoW Photo 4 River divide at edge of RoW

Photo 5 Dry soils in area classified as wetlands

KP 435 Travyanaya River The RoW crosses a minor tributary (to the north) and the main channel (to the south) of the Travyanaya River. The minor channel is protected by reno matting, through which a good level of vegetation has grown through (Photo 1). The main channel is protected on both banks by reno matting, but the positioning of these have resulted in a noticeable narrowing of the channel (Photo 2) and this had also resulted in some under-cutting of the reno matts themselves. Also steps in the river bed were evidence at the crossing (Photo 4). The drainage channel on the eastern side of the south slope to the main channel was partially washed-out and minor collapse of the side cut was evident (Photo 3). This was resulting is minor sediment flow into the river. Hard engineering of ephemeral drainage channels to the north of the Travyanaya were seen to be in good condition (Photo 5). Photo 1 Reno matting and vegetation on northern tributary Photo 2 Reno matting on the main stream leading to narrowing of the channel.

Photo 3 Erosion of side cut on eastern side of south slope to main channel Photo 4 Steps in the bed of the main channel Photo 5 Hard engineering of ephemeral drainage channel

KP 444.3 Tikhaya River The Tikhaya River flows adjacent to the railroad and both were crossed using a horizontal thrust boring method. This resulted in undisturbed river banks which can be seen in their natural state in Photos 1. The river valley was disturbed by the excavation for the thrust boring and pipe trenches but it is graded and mostly well vegetated. As Photo 2 shows, the vegetation on the slope to the south is limited. Photo 1 View of riverbanks Photo 2 View south across the river and railroad (limited vegetation of slope)

KP 449.5 Duet 3 River The Duet 3 River crossing is situated at the southern edge of valley, and the river flows along the RoW to the Duet 2 crossing. The river banks are protected with Reno mats and are well vegetated (Photo 1). A temporary bridge is still in place (Photo 2) despite previous reports that it would be taken out, and the marks of the running track are visible to the south (Photo 3). Photo 1 View of re-vegetation of banks Photo 2 View of temporary bridge Photo 3 View across the river at RoW with running track leading to BVS

KP 460 Manui River and wetlands The Manui River is approached from the south through a wetland area. Re-vegetation of the wetland area was of mixed quality, with bare soil visible over much of both pipelines and the FOC (Photo 1). Closer inspection also revealed: the presence of imported material (soils/gravels), especially on the old running track (Photo 2); significant areas of pooling due to depression between the pipeline (Photo 1 and Photo 3); and, where re-vegetation was occurring plant species remain significantly different from those evident outside of the RoW. Recovery was generally found to be most advanced nearer the river, and we note that this is the location of the monitoring transect (which therefore may provide a generally optimistic picture of the overall recovery of the wetland area). The river itself was found to be in generally good condition, with reno matting on the south bank (Photo 4) and a gabion wall on the north bank, although some minor slumping of the gabion was identified (Photo 5). Photo 1 View wetland. Bare soils over pipelines and FOC and depression between pipelines visible Photo 2 Imported material visible on RoW Photo 3 Pooling on RoW Photo 4 Reno matting on southern bank

Photo 5 Gabion on north slope with minor slumping

KP 466 Krasnaya River The Krasnaya River crossing has a long steep slope which is protected by slope breakers on the south side and Reno matting protection on the banks. At the time of the visit, the slope appeared to be well vegetated and intact (Photo 1). The RoW on the north side of the river and north of the railroad and federal highway is also well vegetated (Photo 2). The riverbanks are protected with reno matting through which good vegetation has grown (Photo 3). Some minor damage was evident to reno matting on the western bank in the downstream direction (Photo 4), which is likely to be due to is being placed too far into the channel. Photo 1 View to the south showing well vegetated slope and river crossing Photo 2 View to the north showing well vegetated RoW. Photo 3 View of the river banks Photo 4 Minor damage to reno matting

KP 483.7 Slavnaya River The Slavnya River is protected with Reno mats and significant re-vegetation has occurred on the matting (Photo 1). On the northern approach to the river, vegetation growth is mixed, with some areas of good growth, some areas of significant tree growth that needs to be removed (Photo 2), and other areas of bare soil (especially on the previous running track where imported material was still visible Photo 3). A side cut on to the south of the river is bare and while geojute is in place it offers no protection (Photo 4). The temporary bridge on the crossing previously seen during the 2010 site visit has been removed. Photo 1 Re-vegetation on riverbanks through reno matting Photo 2 Vegetation with tree growth on northern approach

Photo 3 Imported material and bare soil on old running track Photo 4 Side cut on south side of river

KP 502 Kirpichniya River The Kirpichniya River crossing is located in the northern boundary of the river valley. The river banks at the crossing are well protected with Reno mats and thick vegetation (Photo 1 and 2). The river on the downstream side of the RoW bends sharply to the north (and cuts) into the RoW on the Oil Pipe side. It was not possible to see the side of the RoW at the bend during the visit and it is recommended that it will continue to be monitored (Photo 3). The valley floor is densely vegetated throughout (Photos 3 and 4) and the slope to the south is well protected with vegetation and slope breakers (Photo 4). Photo 1 View to the downstream showing well vegetated river banks Photo 2 View to the upstream showing well vegetated river banks. Photo 3 View to the north across the river showing good ground cover. Also note the river bend on the right side of the slope (see text) Photo 4 View of the river valley to the south with a slope in the background showing very good ground cover and good slope protection.

KP 513-511 Sandy Slopes RoW The sandy slopes between KP513 to the Ai River show some improved levels of vegetation over previous years (Photo 1), including some areas where seeding effects are evident (Photo 2). However, overall re-vegetation of these sandy slopes remains limited with some areas still showing very limited or no vegetation at all (Photo 3). The slope breakers which were installed along the sandy area mostly function well but in places need increased in frequency. The sandy area will need surface preparation and re-seeding for improved bio-restoration. The river itself could not be inspected closely due to the presence of poachers, but from a distance the riverbanks appeared to be well vegetated and in good condition (Photo 4). Photo 1 View to the north along the RoW Photo 2 Recently seeded area Photo 3 Poor re-vegetation of sandy slopes Photo 4 View of the River

KP 530 Dolinsk Wetlands The RoW crosses the Dolinsk Wetlands from north to south approximately 2 km west of Dolinsk. During the site visit, access to the wetlands was gained via the federal road close to DOB-10. The section to the north of the federal road was inspected, included the monitoring transect location. Overall, re-vegetation on the RoW is extensive (Photo 1), although: In some areas over the pipelines and removed running track re-vegetation is sparser and dominated by pioneer species (Photo 2). Significant tree growth was evident (Photo 3) but at the time of the site visit a tree-control maintenance crew was working at this location on the RoW. The vegetation on the RoW still shows distinct difference from adjacent area immediately outside of the RoW (some locations off the side of the RoW also appeared to be more marshy than was evident on the RoW itself). Photo 1 - View to the south along the RoW Photo 2 Areas of sparse re-vegetation on RoW

Photo 3 Tree growth on RoW

KP 600.6 Pultovka River and RoW The slopes to the river are steep to both the north and south. The slopes are protected slope breakers that were seen to be in reasonable condition (Photo 3). Re-vegetation on the slopes immediately adjacent to the river has improved significantly over the last 2 years (Photo 1), although some patches of weak re-vegetation remain. The riverbanks are protected by reno matting which appeared to be good condition and vegetation through the matting is occurring (Photo 2). Photo 1 View of river showing significantly improved vegetation of the slopes Photo 2 Reno matting on the riverbanks with vegetation growth through. Photo 3 Showing slopes with slope breakers but some areas of patchy re-vegetation

KP 611 RoW and R. Vodopyanovka The R. Vodopyanovka banks are protected by reno matting which appeared to be good condition and vegetation through the matting is occurring (Photo 1). The slopes on the RoW on both sides of the river have only moderate re-vegetation (Photo 2), although this is nonetheless improved over conditions seen during the last visit to this river in 2010. Slopes breakers are installed on the slopes and were found to be in good condition. A side cut on western side of the northern slope, close the river has only weak re-vegetation and may be prone erosion in future. Photo 1 Showing Reno matting and revegetation of the riverbank Photo 2 Northern slope with moderate grass cover Photo 3 Side cut on western side of the northern slope

KP 617 Korsakovka River and slopes The Korsakov River was crossed using horizontal thrust bore which left the river banks largely unimpacted (Photo 1). The lower river valley has good vegetation cover (Photo 2) but the slope leading to the river from the north has very poor vegetation and shows strong erosion (Photos 2 and 3). This slope is need of additional and more effective slope breakers and full bio-restoration. Water pooling over the pipeline was visible at the location where a pit had been installed for the thrust boring equipment during construction (Photo 4). This requires technical survey by Sakhalin Energy. Photo 1 View of banks with natural vegetation Photo 2 View north showing river valley with good vegetation but slope without vegetation. Photo 3 View of erosional rill development and lack of grass cover. Photo 4 Water pooling over pipeline at location where the bore pit had been installed

KP 621 Block Valve Station above Mereya River The hill to the north of the river crossing was also inspected. The southern slopes of the hill overlooking the R. Mereya had moderate levels of re-vegetation and the slope was protected by geojute armoured slope breakers which were found to be in good condition (Photo 1). The slopes on the north side of the hill showed generally weaker revegetation (photo 2), although it was noted that the soils in the area have a low erosion potential and also there is no stream at the bottom of the slope (hence reducing the environmental significance of any run off). The site visit was undertaken on still day and the operation of the LNG plant audible from the hilltop. Photo 1 South slope on hill overlooking R. Mereya Photo 2 North slope on hill overlooking R. Mereya

KP 622 Mereya River and Slopes The Mereya River is crossed with two separated RoWs, one for the oil pipe (Photos 1 and 2) and one for the gas pipe (Photos 3 and 4). Both crossings are protected with Reno matting which has begun to disintegrate but have been nonetheless stabilised by good levels of re-vegetation (photos 1 and 3). The RoW on adjacent to both river crossings is revegetating well (Photos 2 and 4), although some tree growth was identified that needs to be removed. Photo 1 View to north bank on oil pipe crossing Photo 2 View to the south from oil pipe crossing showing well vegetated RoW Photo 3 View to north bank on gas pipe Photo 4 - View to the south from oil pipe crossing showing well vegetated RoW

Sokol Laydown Yard (Federal Highway, near pipeline KP542) The Sokol laydown yard is adjacent to the former Sokol construction camp (south of the city of Sokol, 30 km north of Yuzhno-Sakhalinsk). It was decommissioned and the ground reinstated two years ago and is now used as an agricultural field by local entities. The site has a very good grassy vegetation cover.