Mijloace acceptabile de conformitate. Electronic Flight Bag (EFB)

Similar documents
Form 91 Application for Approval of an EFB System

GUERNSEY ADVISORY CIRCULARS. (GACs) EXTENDED DIVERSION TIME OPERATIONS GAC 121/135-3

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

CHAPTER 24 D APPROVAL OF SPECIAL OPERATIONS- PERFORMANCE BASED NAVIGATION OPERATION

ICAO Provisions: Obligations for Certification Annex 6 Document 8335

9/16/ CHG 213 VOLUME 3 GENERAL TECHNICAL ADMINISTRATION CHAPTER 61 AIRCRAFT NETWORK SECURITY PROGRAM

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

AIRWORTHINESS PROCEDURES MANUAL CHAPTER 26. Modifications and Repairs

GENERAL ADVISORY CIRCULAR

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

Registry Publication 17

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

IRELAND SAFETY REGULATION DIVISION

Application for Low Visibility Operation

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant

Department of Defense DIRECTIVE

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

CIVIL AVIATION PUBLICATION CAP 09 MAINTENANCE CONTROL MANUAL

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

INFORMATION BULLETIN

AIRWORTHINESS ADVISORY CIRCULAR

Subpart H. 2042/2003

Signature: Signature:

CIVIL AVIATION REQUIREMENT SECTION 8 AIRCRAFT OPERATIONS SERIES F PART V ISSUE I, 29 TH JULY 2015 EFFECTIVE: 31 ST JULY 2015

Application for ATO Approval in accordance with ORA.ATO.105

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy

EXPORT AIRWORTHINESS APPROVALS

AIRWORTHINESS ADVISORY CIRCULAR

APPLICATION FOR SPECIAL OPERATIONAL APPROVALS

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

European Aviation Safety Agency. Opinion No 10/2017

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION. Title: Certification of Air Navigation Services Providers

IMPLEMENTATION PROCEDURES AIRWORTHINESS

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OPS General Rules for Operations Manuals

Sao Tome and Principe Civil Aviation Regulations

TCAA-AC-AWS007C. March 2013 CERTIFICATION OF A FOREIGN APPPOVED MAINTENANCE ORGANISATION (AMO) 1.0 PURPOSE

AUDIT SUMMARY REPORT OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

GHANA CIVIL AVIATION (FLIGHT STANDARDS) PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN GHANA

Air Operator Certificate Issue / Renewal Application Form (Flight Standards Directorate CAA Pakistan)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY

PBN Operational Approval Overview

AIRWORTHINESS NOTICE

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

Continuing Airworthiness

CAR 21 CERTIFICATION OF AIRCRAFT

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

Declaration and List of Approvals for EASA Part- NCC and Part-SPO Operators

Seychelles Civil Aviation Authority

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

EASA Air Operations Air Operator Certificate

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

Maintenance Directive

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

Certification Specifications and Acceptable Means of Compliance for Aircraft Noise CS-36

Flight Operations Inspector Manual

Operational Evaluation Board Report

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

RNP AR APCH Approvals: An Operator s Perspective

Surname:... Name of company:... Registration No:... Place of Registration:... Any other SCAA Approval held (quote Approval No.)...

Aircraft Leasing Manual

Overseas Territories Aviation Circular OTAC Type Acceptance Certificates. United Kingdom. Issue 1 2 November Effective: On issue GENERAL

CAR AIR CONTINUING AIRWORTHINESS (GENERAL AVIATION OPERATIONS)

Availability and Competence of Technical and Inspection Personnel in Civil Aviation Administrations

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Terms of Reference for rulemaking task RMT.0325 (OPS.057(a)) & RMT.0326 (OPS.057(b))

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Advisory Circular. 1.1 Purpose Applicability Description of Changes... 2

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE NATIONAL CIVIL AVIATION AGENCY OF ITALY

AIR SAFETY SUPPORT INTERNATIONAL

Air Operator Certification

AMC THE OPERATORS MAINTENANCE INSPECTION PROGRAMME (M.I.P.)

(i) Adopted or adapted airworthiness and environmental standards;

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

Part 135 GA Air Operator Certificate Helicopters and Small Aeroplanes General Aviation Maintenance

AIRWORTHINESS CERTIFICATION OF AIRCRAFT AND RELATED PRODUCTS. 1. PURPOSE. This change is issued to incorporate revised operating limitations.

AUDIT SUMMARY REPORT OF THE CIVIL AVIATION ADMINISTRATION DENMARK

REPUBLIC of SAN MARINO CIVIL AVIATION AUTHORITY

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

COMMISSION IMPLEMENTING REGULATION (EU)

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Acceptance report Airworthiness

7/27/ CHG 605 VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATIONS

Application for Changes requiring prior Approval. FORM

Certification Memorandum. Large Aeroplane Evacuation Certification Specifications Cabin Crew Members Assumed to be On Board

Development of EFB. Electronic Flight Bag. a message for Flight Examiners

EASA Safety Information Bulletin. SIB No.: Issued: 09 December 2013

GENERAL REGULATORY CRITERIA Regulatory Experience and Expertise

Session 2. ICAO Requirements related to Cabin Safety. Overview

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

License Requirements and Leased Aircraft

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

SECURITY OVERSIGHT AGENCY June 2017 ALL WEATHER (CAT II, CAT III AND LOW VISIBILITY) OPERATIONS

Air Operations Requirements. Information Session Commercial Balloon Operations Cologne, 17 February 2009

Transcription:

AUTORITATEA AERONAUTICĂ CIVILĂ REPUBLICA MOLDOVA Mijloace acceptabile de conformitate Electronic Flight Bag (EFB) Ediţia 01/februarie 2014

Log of Signatures Log of Signatures Taken action Function Name / Surname Date Siganture Approved by: Director of Civil Aviation Authority Iurie ARMAŞ Deputy Director of Civil Aviation Authority Nicolae BUZU Head of Flight Operation Division Igor RUSANOVSCHI Head of Legal, Rulemaking and Human Resources Division Sergiu MÂRZAC Advised by: Head of Airworthiness Division Head of Standards and Rulemaking Section Sergiu DARIE Valentina MAMALIGA Main Specialist, Inspector, Flight Operation Division Victor LICIMAN Main Specialist, Inspector, Flight Operation Division Simion MUNTEAN Main Specialist, Inspector, Airworthiness Division Mihail BUDICI Elaborated by: Manager of Developing Procedures, Flight Operation Division Vasile NICHITA AMC-EFB Rev No: 00 / 07.02.2014 Log of Signatures

Log of Revision Log of Revision Reference Version no. Revision no. Effective Date First Issue 01 00 07.02.2014 AMC-EFB Rev No: 00 / 07.02.2014 Log of Revision

List of Effective Pages List of Effective Pages Pages no. Version/Revision no Effective Date Log of Revision 01 / 00 07.02.2014 List of Effective Pages 01 / 00 07.02.2014 Content 01 / 00 07.02.2014 1 01 / 00 07.02.2014 2 01 / 00 07.02.2014 3 01 / 00 07.02.2014 4 01 / 00 07.02.2014 5 01 / 00 07.02.2014 Annex 1 01 / 00 07.02.2014 Annex 2 01 / 00 07.02.2014 Annex 3 01 / 00 07.02.2014 Annex 4 01 / 00 07.02.2014 AMC-EFB Rev No: 00 / 07.02.2014 List of Effective Pages

Content C O N T E N T Chapters Chapter 1 PURPOSE Page 1 Chapter 2 STATUS Page 1 Chapter 3 CONTENT Page 1 Chapter 4 CONTENTS OF OPERATIONS MANUAL Page 1 Chapter 5 FORMAL APPROVAL OF EFB Page 4 ANNEXES Annex 1 Annex 2 Annex 4 Annex 4 EFB Approval Application Form EFB Approval Process Form Notice of Proposed Revision / Amendment EFB Letter of Approval Form AMC-EFB Rev No: 00 / 07.02.2014 Content

Acceptable Mean of Electronic Flight Bag s (EFB) Approval 1. Purpose This publication provides acceptable method of compliance and technical instructions for the certification, airworthiness and operational approval for both portable and installed Electronic Flight Bag (EFB) aircraft computing devices. 2. Status This is the first edition of this publication and it will remain current until withdrawn or superseded. 3. Content of AMC For electronic flight bags (EFB s) approval refer to JAA Administrative & Guidance Material, Section Four: Operations, Part Three: Temporary Guidance Leaflets (JAR-OPS), Leaflet No. 36: approval of electronic flight bags (EFB s). 4. Contents of Operations Manual The training and qualification requirements as well as operational procedures and instructions detailing the tasks of EFB shall be described in compliance with TGL No. 36 and CAA RM Acceptable means of EFB approval in the relevant parts of the Operations Manual: I. Electronic Flight Bag (EFB) (1) Definitions Operations Manual Part A, Chapter 8 Operating Procedures, All used abbreviations regarding EFB shall be listed. (2) Operations Specification EFB Operations Manual Part A, Chapter 0.1 Introduction, The Operations Specification EFB must be included in the list of Operations Specifications. (3) Classification of EFB Systems Operations Manual Part B, Chapter 1 Certification Status and Operational Limitations, A list specifying the certification status and operational limitations. AMC-EFB Rev No: 00 / 07.02.2014 Page 1 of 5

(4) EFB Administrator Operations Manual Part A, Chapter 1.1 Organizational Structure and 1.3 Duties and Responsibilities of Operations Management Personnel, (5) Operational Risk Analysis The EFB Administrator presented on the organizational structure; The EFB Administrator subordinated to the Post holder Flight Operations. Operations Manual Part A, Chapter 8.3.19, Policy on the use of EFB- Systems, Electromagnetic Interference (EMI); Lithium Batteries; Electrical Power Source; Data Connectivity; Risk Mitigation. (6) Quality Assurance & Security (7) Loading Policy Operations Manual Part A, Chapter 8.3.19, Policy on the use of EFB- System, Statements addressing individual behavior and personal attitude to prevent security related interference. Operations Manual Part B, Chapter 7, Loading, The Loading-Policy integrated in the software-application; or, at least, must be described and implemented in a respective crew procedure. (8) MEL Policy (9) Aircraft systems Operations Manual Part B, Chapter 9, Minimum Equipment List, Class 2 and 3 EFB will contain limitations affecting the use of the EFB system in case of a total or partial failure. Operations Manual Part B, Chapter 12, Aeroplane systems EFB systems, related controls and indications and operating instructions applicable for Class 2 and 3. (10) Navigation Documents & Charts Operations Manual Part C, EFB- Navigation Documents & Charts, The description of the concept for EFB-Navigation Documents & Charts; AMC-EFB Rev No: 00 / 07.02.2014 Page 2 of 5

The format of the data provided to the users shall be defined clearly. (paper-format and/or electronic format ). (11) Data Validation / Updating Process Operations Manual Part C, Data Validation / Updating Process, The description of the validation and updating process. II. Operating Procedures (1) Flight Crew Operating Procedures Operations Manual Part A, Chapter 8.3.19, Policy on the use of EFB- Systems, Description compromising: (a) (b) (c) The purpose of the electronic flight bag in general and its specific use by the operator; An explanation of the architecture of the system in relation to hardware and software; The used terms and definitions shall be explained in a comprehensive manner. (2) Human Machine Interface A general description of the philosophy and policy on the use of the EFB-System on the flight deck; All installed software on EFB shall be approved by CAA RM; The restrictions and limitations on the use of the EFB-system on the flight deck; Validity-Check for Software and Database revision status including the appropriate action required in case of recognition of deficiency ( Up-dating process ); A policy on the control and workload-management on the flight deck while using the EFB-System; A procedure applicable to the flight crew in regard to Security- Matters for the EFB-System; The Back-up System shall be described in case of complete EFB-failure including the related procedures and tasks to be followed. Operations Manual Part A, Chapter 8.3.19 Policy on the use of EFB- Systems, General statements and explanations on the Human-Machine- Interface, CRM- and human-factor. (3) Handling of the EFB-System Operations Manual Part B Chapter 2 Normal Procedures, AMC-EFB Rev No: 00 / 07.02.2014 Page 3 of 5

The normal use of the application shall be integrated in the standard operating procedure (SOP) and detailed instruction shall be provided for correct and efficient use in the daily operation environment: (a) (b) (c) Power-up procedure for the EFB-System; Application of the different linked modules of the EFBsystem; Shut-down and securing of the EFB. (4) Performance Calculation Operations Manual Part B, Chapter 4, Performance, The description of the Performance Calculation Software shall include: (a) (b) the relevant data provided to the crew (RW specific performance calculation for take-off and landing); the procedure how the resulted data are used after the calculation process (5) Mass & Balance Calculation Operations Manual Part B, Chapter 6, Mass & Balance, Basic Data; The Input-Screen of the Module; The Output-Screen of the Module; The Mass & Balance Manifest (Load-Sheet). III. Training (1) Training & Checking Operations Manual Part D, Chapter 2, Training Syllabi and Checking Programme The EFB System Training and Checking Module shall be implemented within Key Courses ; EFB-system Training and Checking Module. 5. Formal Approval of EFB s The initial inquiry will be done by letter to CAA RM: For AOC initial certification or variation, AOC certification / variation / renewal application form (Refer to Annex 2 RAC-AOC) will be submitted as a part of AOC formal application request. In addition, the EFB s application form (Refer to Annex 1 of this publication) will be attached to AOC certification / variation / renewal application form. AMC-EFB Rev No: 00 / 07.02.2014 Page 4 of 5

A complete application shall contain the following: AOC certification / variation / renewal application form (Refer to Annex 2 RAC-AOC); EFB approval application form (Annex1 of this publication) signed by Accountable Manager; Notice of Proposed Revision/Amendment (NPRA) form containing the respective OM revision / amendment (Annex 3); Aircraft flight manual; Maintenance Program; EFB Software application and integrity; Operations Manual A, B, C and D; System considerations; MEL (with EFB Adaptation). Approval to operate with EFB will be granted by a letter of Approval issued by CAA RM and the Operations Specifications page of the AOC. This will normally be issued as a EFB approval. Approvals will be valid until revoked by CAA RM. AMC-EFB Rev No: 00 / 07.02.2014 Page 5 of 5

Annex 1 - EFB Approval Application Form Submit at least one month before the intended date of operations ANNEX 1 EFB s Approval Application Form AMC-EFB-AN-01 Rev No: 00 / 07.02.2014

Annex 1 - EFB Approval Application Form Submit at least one month before the intended date of operations Section A - Organization 1. Organization Details. a Company Details Registered name Trading name if different Mailing address Telephone Fax E-mail c Proposed Start Date d AOC variation Focal Point Contact Details Name Phone No. E-Mail Section B - EFBs Approval Details 2. EFBs Approval. Initial AOC Certification AOC Variation Initial Request Additional Request Approval for Class 1 EFB Approval for Class 2 EFB Approval for Class 3 EFB 3. Approval Application Attachments. Notice of Proposed Revision / Amendment (NPRA) Aircraft flight manual Maintenance Program EFB Software application and integrity Operations Manual A, B, C and D System considerations MEL (with EFB Adaptation) Section D - Accountable Manager Declaration. The undersigned certify that statements and answers provided in this application form and attachments are complete and true to the best of my knowledge and agree that they are to be considered as part of the basis for issuance of EFBs approval in accordance with JAR OPS 1 and TGL 36. Name Signature Date Section E - For CAA RM use only Received by CAA RM Name Signature Date Received by Flight Operation Division Received by Airworthiness Division AMC-EFB-AN-01 Rev No: 00 / 07.02.2014 Page 1 of 1

Annex 2 - EFB Approval Process Form ANNEX 2 EFB s Approval Process Form AMC-EFB-AN-02 Rev No: 00 / 07.02.2014

Annex 2 - EFB Approval Process Form When the approval process form has been accepted by CAA RM, it becomes the official schedule which will be used during the approval process Operator Name Address AOC Certification/Variation Focal Point Name Telephone No. E-Mail No. Aircraft Manufacturer, Model and Series List Relevant Make and Model of Related Navigation Equipment 1 PHASE ONE - PRE-APPLICATION Remarks a Applicant making an initial inquiry by letter to CAA RM (1) For AOC initial certification submit EFBs approval application form as a part of AOC formal application attachments (2) For AOC variation submit AOC variation application form as a part of AOC formal variation application attachments b Initial Contact. Provide the applicant with relevant guidance related to the application, attachments and the approval process (1) For AOC initial certification it will be part of certification process meetings (2) For AOC variation a meeting with the applicant representative will be set c Applicant preparation for EFBs approval 2 PHASE TWO - FORMAL APPLICATION Proposed Date Accomplished Date Remarks a Forward the EFBs Approval Application Form (1) EFBs approval team members name: (a) Project manager - Flight Operations Inspector (b) Airworthiness Inspector (2) Approval team review of the applicant EFBs approval application form b Formal application meeting (1) Objective. the reception of EFBs approval application attachments, review the approval process and establish a common understanding on the future procedure for the approval process (2) Attendees: (a) Certification team (b) Applicant Flight operations, Crew training & Maintenance system post holder or AMC-EFB-AN-02 Rev No: 00 / 07.02.2014 Page 1 of 4

Annex 2 - EFB Approval Process Form When the approval process form has been accepted by CAA RM, it becomes the official schedule which will be used during the approval process their permanent representative 2 PHASE TWO - FORMAL APPLICATION Continue Proposed Date Accomplished Date Remarks c EFBs Application Attachements (1) Operations Manual A, B, C and D (2) MEL (with EFB Adaptation) (3) AFM / AFM suppliments (4) System considerations (5) EFB Software application and integrity (6) Maintenance Program 3 PHASE THREE - DOCUMENTS EVALUATION TGL No. 36 3 A Airworthiness evaluation Operator Documents Reference Remarks a Airworthiness documents & Hardware Approval. AFM, AFM revision, supplement, or Type certificate data sheet (TCDS), (1) Class 1 EFB. Configuration List Approved by the manufacturer state NAA Approval or certificate of test evidence to comply with (6.1.1 a, b & c) (a) EMI Demonstrations (b) Lithium Batteries (c) Power Source (d) Data Connectivity (2) Class 2 EFB. AFM, AFM supplements, revisions containing any limitations affecting the use FEB system. (Airworthiness approval Required) (a) Design of Mounting Device (b) Placement of Mounting Device (c) EMI Demonstrations (d) Lithium Batteries (e) Power Source (f) Data Connectivity (3) Class 3 EFB. AFM, Type certificate or configuration list approved by the manufacturer NAA. 6 6.1.1 6.1.2 6.1.3 b Certification Documents: 6.1.4 (1) AFM 6.1.4 (a) (2) Guidelines for EFB Application Developer 6.1.4.(b) c EFB Software Applications (Type A & B) 6.2 AMC-EFB-AN-02 Rev No: 00 / 07.02.2014 Page 2 of 4

Annex 2 - EFB Approval Process Form When the approval process form has been accepted by CAA RM, it becomes the official schedule which will be used during the approval process 3 PHASE THREE - DOCUMENTS EVALUATION TGL No. 36 3 B Flight operation evaluation a Operational Approval 7 (1) Risk Analysis 7.1 (2) Human- Machine interface assessment for Type A & B software applications 7.2 (3) Crew Operating Procedures: 7.3 (a) Procedures for using EFB with other flight deck systems 7.3.1 (b) Flight Crew awareness of EFB software/database revisions 7.3.2 (c) Procedures to mitigate and or reduce work load 7.3.3 (d) Define flight crew responsibilities for performance calculations 7.3.4 b Quality Assurance 7.4 Operator Documents Reference Remarks c Role of the administrator 7.5 d Flight Crew Training 7.6 3 PHASE THREE - DOCUMENTS EVALUATION 3 C Operator information a Evaluation Results of Respective Divisions (1) Flight Operation Division (2) Airworthiness Division b Official letter for Operator regarding non-conformities (1) Flight Operation Division Accomplished date Remarks c Corrected Documents/Manuals/Procedures (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) AMC-EFB-AN-02 Rev No: 00 / 07.02.2014 Page 3 of 4

Annex 2 - EFB Approval Process Form When the approval process form has been accepted by CAA RM, it becomes the official schedule which will be used during the approval process 4 PHASE FOUR - DEMONSTRATION AND INSPECTION Accomplished date Remarks a Operational Test & Evaluation (TGL 36 7.7) (1) Initial retention of paper Back Up (TGL 36 7.7.1) (2) Commencement of operations without paper (TGL 36 7.7.1) b Inspection Assessment Results of Respective Divisions (1) Flight Operation Division (2) Airworthiness Division c Official letter for Operator regarding non-conformities (1) Flight Operation Division d (1) (2) (3) (4) (5) Correction action plan received 5 PHASE FIVE EFB APPROVAL Accomplished date Remarks a EFBs Approval Report Contents (1) EFBs approval application form (2) Approval process form (3) Airworthiness Division letter declaring that, the applicant meets airworthiness requirements for EFBs approval b Director Civil Aviation Authority of Republic of Moldova approval (1) EFBs approval letter (2) Amendment of the OPS SPECS for EFB approval c Log of Signatures Signature Date Airworthiness Inspector Name Head of Airworthiness Division Name Flight Operation Inspector Name Head of Flight Operation Division Name AMC-EFB-AN-02 Rev No: 00 / 07.02.2014 Page 4 of 4

Annex 3 Notice of Proposed Revision / Ammendment ANNEX 3 Notice of Proposed Revision / Ammendment (NPRA) AMC-EFB-AN-03 Rev No: 00 / 07.02.2014

Annex 3 Notice of Proposed Revision / Amendment The NPRA shall be submitted at least 30 days before the proposed effective date Notice of Proposed Revisions/Amendments (NPRA) Applicants Name AOC No: Class No: Contact person Official phone Assigned inspector Function Mobile phone Company Address e-mail Date in: CAA RM Formal Approval Document Choose an item Choose an item Aircraft Type/variant Choose an item Kind of change Change ident Reason for change Chose an item Proposed effective date:: Click here to enter a date Additional information The proposed revision/amendment is released for incorporation in the respective documentation with the effective date stated below Effective date: For official use only Submitted doc medium Choose an item Note: The effective date of revision/amendment will be fixed by the CAA RM in accordance with the applicant, who shall state the proposed effective date only. Date: Click here to enter a date. Signature: Date: The amendment/revision does affect material requiring formal approval by the CAA RM. Formal approval will be granted on specific documentation and will be effective only after the operator has received the respective documentation, signed by the DGCA. Signature AMC-EFB-AN-03 Rev No: 00 / 07.02.2014 Page 1 of 4

List of Revision(s)/Amendment(s) Reference Finding No: Document Reason and Highlight of Revision / Amendement e.g. OPS 1.940 Audit & Inspection Report number Document, part and chapter e.g: OM A, chapter 4.2 Describe reason and highlight of change e.g. "Rules applicable to the designation of the commander changed" Compliance checked by (responsible CAA RM Inspector) AMC-EFB-AN-03 Rev No: 00 / 07.02.2014 Page 2 of 4

Annex 3 Notice of Proposed Revision / Amendment The NPRA shall be submitted at least 30 days before the proposed effective date AMC-EFB-AN-03 Rev No: 00 / 07.02.2014 Page 3 of 4

Operator s Compliance Statement (to be submitted together with each Operations Manual Revision) We, the undersigned, declare that the intended Revision as submitted to Civil Aviation Authority of Republic of Moldova (CAA RM) has been established in accordance with all applicable national rules and regulations as well as ICAO standards and recommended practices. Before submitting the Revision, its content has been thoroughly evaluated internally for compliance with applicable regulations. By our internal quality assurance processes as defined in OM A, Chapter 3, we ensure further that the submitted Revision complies with the scope of the AOC. Accountable Manager Name: Signature: Post Holder Flight Operations Name: Signature: Post Holder Crew Training Name: Signature: Post Holder Maintenance Name: Signature: Post Holder Ground Operations Name: Signature: AMC-EFB-AN-03 Rev No: 00 / 07.02.2014 Page 4 of 4

Annex 4 - EFB Letter of Approval Form ANNEX 4 EFB Letter of Approval Form AMC-EFB-AN-04 Rev No: 00 / 07.02.2014

Annex 4 - EFB Letter of Approval Form LETTER OF APPROVAL FOR EFB s OPERATIONS Air Operator: Address: Name: Title: The Civil Aviation Authority of Republic of Moldova is satisfied that the following operator and aircraft meet the requirements for operations with Electronic Flight Bag s, in accordance with JAA Administrative & Guidance Material, Section Four: Operations, Part Three: Temporary Guidance Leaflets (JAR-OPS), Leaflet No. 36: approval of electronic flight bags (EFB s). This approval is subject to the equipment being operative and credible, the crew has recency training and that all operations are conducted in accordance with the approved Operations Manual. This Approval shall have effect from the date hereof until varied, suspended or revoked. Date: xx.xx.xxxx If you require any additional information please contact the undersigned. Yours truly, Director CAA RM Iurie ARMAŞ AMC-EFB-AN-04 Rev No: 00 / 07.02.2014 Page 1 of 1