TIFAX 2016 campaign. Campaign Report (22. July 03 August 2016) Basecamp: Station Nord Aircraft: Polar 6

Similar documents
NORTH POLE EXPRESS. Barneo Ice Camp

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

Aerial Photography and Flight Planning

North Pole Express: Barneo Ice Camp

Arctic UAS Operations

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

LOFT A/B-90 SIM PRE/POST

Heathrow DET09 Steeper Departure Trial. Interim Trial Presentation Trial Data: January - June 2018

LFMN / Nice Côte-d Azur / NCE

Flying for Free Exploiting the weather with unpowered aircraft. Martin Ling

National Transportation Safety Board Aviation Accident Final Report

Phases of a departure

Tidewater Glaciers: McCarthy 2018 Notes

Aeronautical Knowledge Training Record

Services for Air Transport. The mobile satellite company

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

AVIATION OCCURRENCE REPORT VFR FLIGHT INTO ADVERSE WEATHER. RUSTY MYERS FLYING SERVICE BEECH D18S C-FBGO SIOUX LOOKOUT, ONTARIO 35 nm SE 06 JULY 1996

National Transportation Safety Board Aviation Accident Final Report

Index. What is Take Off/Landing Chart? 3 Take Off Chart 4 Landing Chart 10 Final Comments 14

Pilot Procedures Photographic Survey Flights Flight Planning, Coordination, and Control

Performance. Aircraft System

ADVENTURE WEEK Welcome to your bespoke adventure with Basecamp Explorer. SUMMER TRIPS days adventure at Nordenskiöld Lodge

VORCORE/STRATEOLE. VORCORE / STRATEOLE Workshop. September 16-17, Paris VORCORE SYSTEM DESCRIPTION VORCORE IMPLEMENTATION 1/10/02

The Importance of Flight Dispatching in Air Transportation

11 20 Knot Tailwind Operations

VFR GENERAL AVIATION FLIGHT OPERATION

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

AI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT PRIVATELY OWNED J A T

COMPANY POLICY Flight Safety & Operating Regulations

the atlantic challenge - aviation in a hostile environment

3D SURVEYING AND VISUALIZATION OF THE BIGGEST ICE CAVE ON EARTH

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Operational and emergency equipment to be carried on board Isle of Man registered helicopters

5/4/2016 ht.ttlms.com

TRAINING BULLETIN No. 1

Gleim Airline Transport Pilot FAA Knowledge Test 2014 Edition, 1st Printing Updates May 2014

RVSM GMU Monitoring in the AFI Region for ARMA. Flight requirement guide Operators

Updates to Procedures at St. John s International Airport

USE OF RADAR IN THE APPROACH CONTROL SERVICE

First Flight 19 July 2018

Operational and emergency equipment to be carried on board Isle of Man registered aeroplanes

ADS-B Implementation Update 2011 CNS/ATM Conference

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Change History. Table of Contents. Contents of Figures. Content of Tables

Monitoring the marine environment

Airworthiness considerations for UAVs

3) There have some basic terminology of a flight plan and it is the fuel calculations

Open Polar Expedition Training USA. Turpin Meadow Ranch

Water masses and circulation in the North Atlantic

Safety Brief. 21st March Operations in Somali Airspace

Reporting Instructions FILING REQUIREMENTS

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

An advisory circular may also include technical information that is relevant to the rule standards or requirements.

LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM

Audit of Acme Air Training Manual to Advanced Aircrew Academy Online 135 Pilot Recurrent and Initial Curriculums - EXAMPLE

OPERATIONS MANUAL PART A

Description of the Occurrence

Virtual Royal Air Force 45 (R) Sqn Syllabus

54 th CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS. Ulaanbaatar, Mongolia August 2017

Sitting 2 3. Meteorology (20 Questions, Time allowed 1 hour) 4. Human Performance & Limitations (20 Questions, Time allowed 40 minutes)

ONE-ENGINE INOPERATIVE FLIGHT

REPORT ULM A-006/2013 DATA SUMMARY

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

Scientific Committee for Oceanographic Aircraft Research

Skydive the North Pole

Advancing FTD technologies and the opportunity to the pilot training journey. L3 Proprietary

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

Flight Inspection for High Elevation Airports

Airmen s Academic Examination

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT

DECISION NUMBER NINETEEN TO THE TREATY ON OPEN SKIES

Introducing Glass Cockpit to Ab- Initio Flight Training

Counselor s Name: Counselor s Ph #: 1) Do the following: a) Define "aircraft." Explain the operation of piston, turboprop, and jet engines.

BAe-146 Next Generation Airtanker Frequently Asked Questions. Q. Why do you have to download on retardant at some airtanker bases?

AVIATION INVESTIGATION REPORT A06Q0181 FLIGHT IN WEATHER CONDITIONS UNFAVOURABLE FOR VISUAL FLIGHT AND COLLISION WITH TERRAIN

Data pool documentation Status

BID TO HOST THE PASA 2014 NATIONAL SKYDIVING CHAMPIONSHIPS IN CANOPY PILOTING, FORMATION SKYDIVING AND ARTISTIC EVENTS

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

NATA Part 135 Training Center Available Courses

Turbulence Data Sharing Project. Katya Vashchankova Head, IATA Meteorological (MET) Program

Air Accident Investigation Unit Ireland FACTUAL REPORT

Heathrow s Blueprint for noise reduction. Ten practical steps to cut noise in 2016/17

SKUKUZA OPERATIONAL BRIEFING

Pre-Solo Written Exam ROCKY MOUNTAIN FLIGHT SCHOOL

PROPOSED UPDATES TO FLIGHT OPERATING PROCEDURES FOR HURRICANE HUNTER AIRCRAFT (TEAL & NOAA) (Presented by the United States) SUMMARY

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Glaciers. Reading Practice

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

Staff Instruction. Aerial Assessment Requirements Prior to Heliport Certification

Section I Page 1 Operator/Airframe Details Completion mandatory. Section III Page 2 Signature Block Completion mandatory

CSET Operations Debrief. 29 Oct 2015

Virtual Royal Air Force 208 (R) Sqn Syllabus

AIRCRAFT ACCIDENT REPORT AND EXECUTIVE SUMMARY

Wake Encounter In-Situ Flight Tests in Cruise - Wake Characterization

AI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT PRIVATELY OWNED J A 0 1 E P

ALTIMETER SETTING PROCEDURES

Operational Procedures

Consideration will be given to other methods of compliance which may be presented to the Authority.

Transcription:

TIFAX 2016 campaign Campaign Report (22. July 03 August 2016) Basecamp: Station Nord Aircraft: Polar 6 Crew: Thomas Krumpen (lead scientist), Manuel Sellmann (engineer), Esther Horvath (photographer), William Houghton (chief pilot), Jorgen Christison (second pilot), Lucius Cirtwill (mechanic) Table of Content 1.0 Aims/objectives of TIFAX 2016... 1.1 Weather and ice information... 1.2 Flight operations... 1.3 Flight hours... 2.0 Weekly report... 2.1 July 22, 2016... 2.2. July 23, 2016... 2.3. July 24, 2016... 2.4. July 25, 2016... 2.5. July 26, 2016... 2.6. July 27, 2016... 2.7. July 28, 2016... 2.8. July 29, 2016... 2.9 July 30, 2016... 2.10 July 31, 2016... 2.11 August 01, 2016... 2.12 August 02, 2016... 2.13 August 03, 2016...

1.0 Aims/objectives of TIFAX 2016: During the last decade, an increased advection of thick multi-year ice that originates from an area north of Greenland, out of the Arctic through the Fram Strait has been observed. A replacement of this old and thick sea ice by much thinner ice might precondition for rapid sea ice retreat in summer. Aim of the TIFAX campaign is therefore to monitor ice conditions during summer in the main export pathway of the Arctic Ocean. The campaign complements the large scale spring sea ice survey PAMARCMIP and is a continuation of earlier TIFAX campaign in 2010, 2011, 2012 and 2015. Expedition permit: C-16-21 Total number of flight hours: 50 h (excluding ferry) 1.1 Weather and ice information: Weather and sea ice information were obtained via FTP from the German Weather Service (DWD). The DWD offers meteograms for different locations, cloud cover forecasts (78 h) from different models and temperature, humidity and pressure charts. Prior flight, weather in formation is used to locate sites suitable for low level flight operations. Example Data: Meteogramm for Station Nord (source GFS/DWD).

Example Data: 2m temperature, dew point and relative humidity for low level flight planning (source ECMWF/DWD) Example Data: Low/mid/high level cloud forecast (source ICON/DWD)

1.2 Flight operations Flights were made towards one or more pre-defined points of return. The point of return and profile length were chosen according to 1. fuel capacity 2. weather condition, 3. ice condition. 1.3 Flight hours Date Route Type Air Time T/O Time Ldg Time July-13-2016 EDDW- EDDW Test flight 1,90 12:17 14:09 July-13-2016 EDDW- EDDW Test flight 0,60 15:18 15:54 July-14-2016 EDDW- EDDW Test flight 0,70 11:51 12:31 July-15-2016 EDDW- EDDW Test flight 1,60 11:40 13:18 July 20-2016 EDDW-ENVA Ferry flight 3,60 05:04 08:39 July 20-2016 ENVA-ENTC Ferry flight 2,30 09:30 11:50 July 20-2016 ENTC-ENCB Ferry flight 3,00 13:14 16:16 July 22-2016 ENCB-BGNO Ferry flight 2,40 09:13 11:38 July 23-2016 BGNO-BGNO Survey flight 2,50 10:54 13:24 July 23-2016 BGNO-BGNO Survey flight 0,60 14:55 15:30 July 24-2016 BGNO-BGNO Survey flight 4,90 11:22 16:13 July 25-2016 BGNO-BGNO Survey flight 3,50 11:39 15:07 July 26-2016 BGNO-BGNO Survey flight 6,10 09:51 15:57 July 28-2016 BGNO-BGNO Survey flight 4,60 06:02 01:36 July 29-2016 BGNO-BGNO Survey flight 6,00 09:39 15:39 July 31-2016 BGNO-BGNO Survey flight 5,90 12:25 18:20 August 01-2016 BGNO-BGNO Survey flight 5,60 10:15 15:49 August 02-2016 BGNO-BGNO Survey flight 2,00 10:10 11:57 August 02-2016 BGNO-BGNO Survey flight 0,50 12:42 13:14 August 02-2016 BGNO-BGNO Survey flight 0,50 14:37 15:07 Total air time (survey and test flights) 47,50

2.0 Daily activities 2.1 July 22, 2016 After integration of the EM-Bird system in ENCB, ferry flight to BGNO was made on July 22. Additional system checks and preparation of survey flights were made on the same day.

2.2 July 23, 2016 First survey flight was made southeast of BGNO. Due to instrument failures, survey flight had to be interrupted after 120 minutes. Back at BGNO, system was checked and reason for failures indicated. During a second short 30 minutes test flight in the vicinity of BGNO operational readiness was confirmed. Survey flight: BGNO to BGNO July 23-2016 2,50 10:54 13:24 Test flight: BGNO to BGNO July 23-2016 0,60 14:55 15:30 EM-Bird, Canon Camera and Video, KT-19 EM-Bird failures during flight. Therefore flight had to be interrupted

2.3 July 24, 2016 On July 24 flight along Fram Strait (76.5 N 81 N) was performed. Measurements shall be used to capture along Strait thickness gradients associated to atmospheric and oceanic processes like recirculation of Atlantic Water or increasing surface heat flux with increasing latitude. Survey flight: BGNO to BGNO July 24-2016 4,90 11:22 16:13 EM-Bird, Canon Camera and Video, KT-19 no comments

2.4 July 25, 2016 A flight straight North from BGNO was made on July 25 to complement measurements made during TIFAX 2010 2012. Due to low cloud cover and fog north of 85 N, flight track was changed towards East. Survey flight: BGNO to BGNO July 25-2016 3,50 11:39 15:07 EM-Bird, Canon Camera and Video, KT-19 no comments

2.5 July 26, 2016 Low level flights along 45 W towards North were planned for July 26. Flight had to be interrupted at 85.2 N due to low level clouds and fog. Hence, survey was continued in westerly direction until 10 W. Survey flight: BGNO to BGNO July 26-2016 6,10 09:51 15:57 EM-Bird, Canon Camera and Video, KT-19 no comments

2.6 July 27, 2016 No flight due to bad weather conditions in the survey areas.

2.7 July 28, 2016 Low rh and cloud coverage in Fram Strait area enabled us to perform a flight across Fram Strait and north towards 84 N 10 E. The way out was performed at high altitude. EM-Bird survey was made on the way back. Survey flight: BGNO to BGNO July 28-2016 4,60 06:02 01:36 EM-Bird, Canon Camera and Video, KT-19 No comments

2.8 July 29, 2016 On July 29, a survey at low level along the Canadian border starting from 82 N, 59 W to 86 N, 59 W was made. Most of the flight back to BGNO was made at high level. Survey flight: BGNO to BGNO July 29-2016 6,00 09:39 15:39 EM-Bird, Canon Camera, KT-19 No comments

2.9 July 30, 2016 No flight due to bad weather conditions in the survey areas.

2.10 July 31, 2016 Flight towards 88 N, 19 W at low level and back. On the way out, validation data for a Radarsat and TerraSAR data take were obtained. Survey flight: BGNO to BGNO July 31-2016 5,90 12:25 18:20 EM-Bird, Canon Camera, KT-19 no comments

2.11 August 01, 2016 Flight towards 86 N, 7 E and south towards 85 N, 7 E. Flight at low level during entire survey. Survey flight: BGNO to BGNO August 01-2016 5,60 10:15 15:49 EM-Bird, Canon Camera, KT-19 no comments

2.12 August 02, 2016 Fast ice survey flight over Independence Fjord and Danmark Fjord in the morning. Afterward, two short flights for EM-Bird tests were made. Survey flight: BGNO to BGNO August 02-2016 2,00 10:15 15:49 Survey flight: BGNO to BGNO August 02-2016 0, 50 12:42 13:14 Survey flight: BGNO to BGNO August 02-2016 0, 50 14:37 15:07 EM-Bird, Canon Camera, KT-19

2.13 August 03, 2016 Ferry flight to Longyearbyen. Official end of campaign.