O T M PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE

Similar documents
THE EXTENSIONS PROGRAMME

O T M PROJECT CHARACTER PERIOD OWNER VALUE KIND STAGE

INTRAKAT ANALYST PRESENTATION FY RESULTS 2013

Corporate Presentation

Corporate Presentation

How, when, what & why to access Structural Funds in Romania

Tunnelling Featured Projects

Corporate Presentation

Group Presentation. September 2016

Current Traffic Arrangements on. Korinthos-Patra. 16 kilometers of tunnels under construction on. Korinthos-Patra

Group Presentation. September 2017

1. Getting from Athens International Airport to the Liossion Coach Station:

Issue 02 Spring Works in progress. OLYMPIA PASS: quick and easy. The first 4 tunnels of the Korinthos- Patra Motorway. Alliance for Road Safety

Related Expertise Concession Projects - PPP

Group Presentation. December 2015

Group Presentation May 2018

Group Presentation. May 2017

Group Presentation. April 2012

Group Presentation. March 2009

MEGAPROJECT Case Study

Group Presentation. April 2008

Group Presentation. November 2011

Group Presentation. September 2008

The Aesthetics of the Athens Metro Stations

INTRAKAT. Analyst Presentation June 2012

Group Presentation. March 2009

CURRICULUM VITAE MAY 2013

One year of Olympia Odos

WORKING PAPER In the context of the placement in the Observatory of the Egnatia Odos A.E.

Novelty and opportunities in the Greek PPP market

WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS

L. Issaia - Keramida Consultant to the Managing Director of ERGOSE

Greek Interoperable Tolling Systems (GRITS) Interoperability Travel faster and more conveniently using only one transponder

Strategic investment of 47.37% * in ATHENA

Elvan S.A. COMPANY PROFILE. 20 km Lavriou Ave., Peania, Greece

Special Coordination Service for Implementation (SCOS) - ROLE

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach

AUSTRIA. Project Services U1/8 Alaudagsse; 2 x 350 m single track subway tunnel (NATM), 237 m C&C station box and 85 m switch shaft

A. KARANIKOLAS & ASSOCIATES S.A. CONSULTING ENGINEERS LIST OF SELECTED PROJECTS

Hellenic Days of Research & Technology European Cooperation 22 & 23 June 2006

3-day trip with rafting at Lousios, and not only!

A Strategy Proposal for Road Infrastructure Development in Recession Times

INDICATOR RESULTS FACTSHEET TRA01: TRAFFIC VOLUME

TWF INERGEN SYSTEMS REFERENCE LIST (HELLAS)

Road Safety Campaigns in Greece

Relocation of applicants for international protection

BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014

INDICATOR RESULTS FACTSHEET ΤRA04: TRAVEL-TIME

NEW, POST-OLYMPIC ATHENS

CURRICULUM VITAE DATE OF BIRTH : APRIL 16, 1955 SPECIALΙTY: SOIL - ROCK MECHANICS

PRESS RELEASE. Graph 1: Road traffic accidents and casualties, January January Jul-14. Jul-15. Apr-15. Jan-15. Oct-15.

1. TU2 tunnel at Edessa Florina trunk road 2. Cut & cover (25x250m) Thessaloniki 3. Edessa bypass Cut & cover tunnel 4. Trunk tunnel road at

P R O J E C T S L I S T

Financial Crisis in Greece, Economical Evaluation of Replacement of Heating Diesel Oil with a Heat Pump System

We are stepping on the gas to complete the Project!

The results of indicators, the reports, and generally the Observatory material are available on the internet at:

A T H E N S I N V I T E S You to. 11 th International Congress of Engineering and Food

First draft program of CONT mission to Greece (24-25 September 2015)

Season s Greetings All our best wishes for the New Year

INTRODUCTION 2 OUR VISION 3. Chapter_1 ATTICA TOLLWAY: THE PROJECT 4 Project cost and financing 5 Financing bodies 6

Egnatia Odos Observatory. Egnatia Odos Observatory Monitoring of Egnatia Motorway s s Spatial Impacts

A) Corporate Portfolio B) Land Development

Infrastructure in Greece

Νew O-pass online services

Meetings & incentives.

December Athens. Greece.

Operation Report of the NNGS for the Year 2015

GLYFADA RESIDENCE ATHENS SEACOAST APARTMENTS

LIST OF BANK BRANCHES BY BRANCH NAME 31/12/2015

GBR HOSPITALITY QUARTERLY NEWSLETTER. Greek Hospitality Industry Performance 2018 Q4

Egnatia Odos: An axis for development and co-operation

Inspection system for in use pesticide application equiupment in Greece. First three years of application

RESULTS FACT SHEET SE-F-3: ACCESSIBILITY OF SITES OF CULTURAL & TOURIST INTEREST

The Egnatia Motorway, Development and Combined Transports

PROPERTY MARKET ATHENS 1 st semester 2017

Have you got any real estate property?

ELIAS TH. KARAGIANNIS GROUP OF COMPANIES TECHNICAL & ELECTRICAL INSTALLATIONS COMPANY PROFILΕ

PARALLEL SOCIAL ACTIVITIES

ATHENS OFFICE MARKET OVERVIEW

PROPERTY MARKET ATHENS 1 st semester 2017

HRADF: Putting Greek economy into long-term perspective

Personal Information. Name : GEORGIOS MARGARITIS Tel.: , Date of birth: 01/11/1969 Fax:

Co-operative Systems in Infrastructure Operation

Congress Secretariat MACT MEDIA GROUP GREECE ATHENS Sygrou 72, 11742, Tel:

GBR HOSPITALITY QUARTERLY NEWSLETTER. Greek Hospitality Industry Performance 2017 Q1

The re-emergence of Greece s Upstream Oil & Gas sector:

monitoring of egnatia motorways spatial impacts

TRAVEL ABROAD WITH FLORIDA COLLEGE

PAGONI CONSTRUCTION COMPANY

Management of Contaminated Sites in Greece

INDICATOR RESULTS FACT SHEET SET08: ACCESSIBLE SITES OF CULTURAL AND TOURIST INTEREST

Contents. 1 Overview 3. 2 Government Stakeholders 5. 3 NGOs and other interested parties (National & Regional) 7 LIST OF TABLES

2008 OCEA Award (Outstanding Civil Engineering Achievement Award)

possession rate of vehicles and basic developmental indicators in the impact zone of Egnatia motorway, Greece THESSALONIKI, Oct.

RESULTS FACT SHEET INDICATOR - SET13: COMPOSITION OF GROSS VALUE ADDED (GVA) PER SECTOR

The Acropolis: Monuments And Museum By G Papathanasopoulos

Balkan Flexipass 2008

2.2. Greece Greece - geography

KONSTANTINOS E.VOGIATZIS. Associate Professor Head, Laboratory of Transportation Environmental Acoustics (L.T.E.A)

Greece: Bright opportunities for the future. December 2, 2010

Transcription:

"Orfana" two-way Railway Tunnel Diameter D=10m. Length L=1000m. Stages: Feasibility Study, Preliminary Design. R p 1982-1983 "Greek Railway Organization" D.O.M.P. 4.770.000 (*) "Sphinx" two-way Railway Tunnel. Diameter D=10m. Length L=1200m. Preliminary Design for the Greek Railway Organization Tender. R e 1983 "AKTOR" 5.385.000 (*) "Metsovo" Road Tunnel, New National Road "Ioannina - Trikala". Diameter D=10m. Length L=3500m. Preliminary design and Tender Documents. H e, c 1984 Three Road Tunnels S1, S2, S3 - National Road "Kolimbari - Kastelli", Crete Island, Diameter D=10m. Length L=90-130m. Stages : Feasibility Study. Preliminary Design. H p 1984-1985 Tunnel, National Road "Arta-Trikala", section 1+920-2+511. Diameter D=10m. Length L=591m. Stages : Feasibility Study. Preliminary Design. H p 1984-1985 Design of a cut and cover for the National Road "Arta - Trikala" Section: 1+876-1+920. Diameter D=10m. Length L=44m. Stages: Feasibility Study. Preliminary Study. H p 1985 Public Works" EYDE - OSYE 26.920.000 (*) Public Works" BM1 Division 2.150.000 (*) Public Works" BM1 Section District Service of Ioannina 4.615.000 (*) Public Works" BM1 Section District Service of Ioannina 310.000 (*) Sewage Tunnel under Syngrou Av., Athens. Diameter D=3m. Length L=250m. Stage: Final Design. Y d 1986 "AKTOR" 650.000 (*) Outlet Tunnel of the Psitalia Sewage Treatment Center at Piraeus. Diameter D=10m. Length L=140m. Stage: Final Design and Construction of the Project. Y d, e 1988 "ATHINA" S.A 700.000 (*) Restoration of a Sewage Tunnel under Amynta Street in Athens. Diameter D=3m. Length L=150m. Stage: Final Design and Construction of the Project. Y d, w 1989 "AKTOR" 100.000 (*)

Kremada Tunnel of the Water Supply Conduit between Iliki and Athens, near Tanagra at Boetia, Greece. Diameter D=3,5m. Length L=900m. Design for a lumpsum offer. Y d 1989 "AKTOR" 4.000.000 (*) Underground Connection Tunnel of the New Apollonia Healing Center. Diameter D=5m. Length L=800m. Stage: Preliminary Design. S p 1989-1990 Tunnels for the Imittos Peripheral Highway in Attika. Twin Tunnels D=10m, L=200-600m. Preliminary Design. H p 1991-1992 Deviation Tunnel for the construction of Evinos Dam. Design during construction for the contractor: Evinos Dam, GRITAU J/V. D=8m, L=1000m. Y d, e, c 1992-1993 Klissoura Tunnel of the Kastoria - Florina National Road. D=10m, L=800m. H p, j 1993 Press Room Construction under an existing Arch Bridge inside the Corfu Castle for the 1994 Top Conference of the European Union. Design during construction for the Contractor J/V. "AVAX" - "I.CORONTZIS" D=20m, L=100m. S d, e, c, 1993-1994 Road Tunnels of the Veroia - Kozani Highway. D=10m, L1=300m, L2=600m, L3=200m, L4=800m. Preliminary Design. H f 1994 Spillway Tunnel of Evinos Dam. Design during Construction for the Contractor: "EVINOS DAM GRITAU" J/V., D=12m, L=400m. Y d, e, c 1994-1995 Tunnels of the Athens Metro underpassing existing Buildings into the Depot Station at Sepolia. D=6m, L=40+50m. R d 1995 Tempi Railway Tunnel D=12m, L=4800m, design for the Contractor: "TEMPI TUNNEL" J/V. R d, e 1996-1998 "Greek Bank for the Industrial Development" 1.000.000 (*) Public Works" 20.000.000 (*) Public Works" 6.000.000 (*) Public Works" 5.000.000(*) "Ministry for Sciences and Culture" 2.000.000 (*) Public Works" 100.000.000 (*) Public Works" 6.000.000 (*) "Olympic Metro" J/V. 1.400.000 (*) "Greek Railway Organization" 100.000.000 (*) Railway Tunnels of the new Ikonio - Elefsis Line. R f, p 1996-1998 Road Tunnel into St.Nikolaos - Koumaria Section of Egnatia Road. D=10m, L=800m. H d 1996-1998 "Greek Railway Organization" 200.000 (+) Public Works" 15.000.000 (*)

Rapsomatis Road Tunnel D=10m, L=1000m Design for the preparation of a Bid. H p 1997 PARNON SA 14.000.000 (*) Gropa Road Tunnel over the District Road of Arta Trikala D=7.5m, L=1200m H f 1997 Hydraulic Tunnel of Taxiarches at Thisvi of Boetia, part of the Mornos Aquaduct. Design into the frame of a Design Construction Contract. Contractor DOMIKA ERGA SA. Y d, e 1997-1998 Ministry of Public Works 6.000.000 (*) Athens Water Supply Agency 3.000.000 (*) Road Tunnels of Egnatia Odos, Section Grevena Kozani (part 2) at Taxiarches D=10.5m, L=2x260m H p, d, w 1998-1999 AEGEK SA 6.000.000 (*) Railway Tunnel of Melissi on the New Railway Line of Korinthos Patras, section Kiato Xilokastro D=11.5m, L=1265m. R f, p 1998-2000 Mavri Ora Road Tunnels of the Elefsis Stavros Spata Highway, near Aspropyrgos. D=14m, L=305+335m. H p, d, w 1998-2000 Railway Tunnel of Perama into the new Railway Line Ikonio Thriassio at Attica D=10m, L=3520m. R f, p 1998-2000 Structures by Cut & Cover Method of the Railway Line Korinthos Patras, section Kiato Xilokastro D=11.5m, L=800m. R f, p, d 1998-2001 Organization 40.000.000 (*) SA 8.500.000 (*) Organization 42.000.000 (*) Organization 15.000.000 (*) Tunnel by Cut & Cover Method, 230m long, 12.25m width, on the Katehaki Interchange of the West Peripheral Road of Imittos (Attiki Odos). H d, w 1998-2001 Attiki Odos JV 2.220.000 (*) St. Nikolas Road Tunnel D=10.5m, L=823m, second south branch on the Egnatia Road, Section St. Nikolas Koumaria. H d, e 1999-2000 Twin Road Tunnels of Asprovalta D=10.5m, L=231+212m of Egnatia Road, section Asprovalta Strymon River. H d, e 1999-2000 St. Stefanos Hydraulic Tunnel of the EYDAP Conduit along Kifissos River in Attica D=4m, L=1100m. Y p, d, e 1999-2000 Democritus Twin Road Tunnels on the Western Peripheral Road of Imittos, in Attica D=13.5m, L=290+275m. H p, d, w 1999-2000 Dafni Railway Tunnel of the new Railway Line Perama - Elefsis (Thriassio) D=10m, L=970m. R f, p 1999-2000 Egnatia Odos SA 13.000.000 (*) Egnatia Odos SA 5.700.000 (*) DOMIKA ERGA SA 7.000.000 (*) SA 10.000.000 (*) Organization 9.500.000 (*)

Tunnels for the Athens Metro, sections Syntagma Monastiraki and Monastiraki Assomaton Sq. D=13.5m, L=400m, D=8.5m, L=700m, D=7m, L=2x200+ +2x280m Construction into soft material under the Commercial Center of the Athens City. R p, d, e 1999-2001 Fitia Twin Tunnels of Egnatia Road, section Nestos River Vaniano D=11m, L=240+230m. H f 2000 Skaramagas Twin Road Tunnels on the Interchange of the Athens Korinthos Highway with the Egaleo Peripheral Road D=17m, L=2x215m. Design into the frame of a Design Construction Contract. Contractor Pantechniki SA. H d, e 2000-2001 Aspropyrgos Tunnel on the new Railway Line Ikonio Thriassio in Attica D=10m, L=210m. R f, p 2000-2001 College Tunnels of the Western Peripheral Road of Imittos, in Attica, D=19m, L=2x600m, D=10.5m, L=600+600m. H p, d, e 2000-2001 Podoniftis Hydraulic Tunnel at Stavros Glyka Nera area of Attica D=7m, L=2850m. Y d, e 2000-2001 Hydraulic Tunnels of Podonifti flood Protection Scheme in Gargittos Area of Attica D=4m, L=1664m with Access Shafts D=11m, L=2x18m. Y d, e 2000-2001 Dihalorema tunnels of Athens Salonica Highway, section Loggos St. Constantine D=10.5m, L=2x500m. H f, p 2000-2002 Tunnels of Athens Salonica Highway, section St. Constantine K. Vourla. D=10.5m, L=2x2450m. H f, p 2000-2002 Third additional Skaramagas road tunnel at Athens Korinthos Highway Interchange with peripheral Egaleo road, D=11.0m, L=216m according to the scope of Design - Construction Contract. Contractor Pantechniki SA. H d, w 2001 Tunnels constructed by NATM method at the extension of metro line from Ethniki Amyna Station to Halandri Station. Variable diameter D=15~10m, total length L=305m. R p, d, w 2001-2003 OLYMPIC METRO JV 700.000 (+) Egnatia Odos SA 5.600.000 (*) Ministry of Public Works 10.000.000 (*) Organization 2.800.000 (*) SA 54.000.000 (*) SA 28.000.000 (*) SA 5.500.000 (*) Ministry of Public Works 27.140.000 (*) Ministry of Public Works 71.400.000 (*) Ministry of Public Works 3.150.000 (*) J/V AEGEK AKTOR SELI 250.000 (+) 14.335.000 (*) Athens metro Tunnel, extension from Dafni Station to Papagou Shaft, Diameter D=10m, Length L=536m. R p, d, w 2002-2003 AEGEK METON 200.000 (+) 15.000.000 (*)

Tunnels constructed by NATM or Cut and Cover method, at the extension of metro line from Doukisis Plakentias Station to Suburban railway interchange, Variable diameter D=15~6m, total length L=1160m. R p, d, w 2002-2004 Hydraulic Tunnel at Attiki Poikilo Mt. Diameter D=5m, length L=582m. Y p, d, w 2003 Athens metro Tunnels, extension to Egaleo, constructed by NATM method. (a) D=21m L=110m (b) D=17m L=22m (c) D=15m L=650m (d) D=12~10m L=1050m (e) D=6m L=674m R p, d, w 2003-2005 Tempi S2 twin Tunnels, Diameter D=11m, total Length L=2x6030m. Design for participating in the bid of the project concession with a lump sum of the Highway Maliakos Kleidi. H p 2004-2005 Tunnel of Peristeri Athens metro extension, from Fleming Shaft to Peristeri Station. Construction by NATM method, diameter D=10m, length L=500m. R p 2004-2005 Knimida Tunnel on Athens Lamia Highway, for St. Constantine deviation. Twin tunnel, one for each direction, diameter D=10.5m, length L=2x2450m. Construction by NATM method on limestone. Final Design on construction contract scope. H d, e 2004-2006 Drainage tunnel to stabilize the landsliding events in the 2.4 area (Peristeri) of the Egnatia Road. Diameter 3m with lengths 330+360+365=1055m. T,Y d,e,w 2004-2007 Water supply tunnel from Gadouras Dam in Rhodes island. Hydraulic tunnel of a small width (4m) used as passage for a tubular steel pipe. Tunnel length 315m opened in sandstone & siltstone. Preliminary design for the preparation of tender documents. Y p, c 2005 Road tunnels at the New Highway connecting Tripoli Kalamata and Tripoli Sparti. Twin tunnels, section: 2xD=10m, Length: 2x730+1x1370+2x90+ +2x720+2x285+1x1330. Design for a proposal in a concession system. ATTIKI ODOS ATTIKI ODOS AKTOR IMPREGILO PANTECHNIKI 380.000 (+) 35.000.000 (*) 28.000 (+) 1.400.000 (*) 1.000.000 (+) 82.000.000 (*) J/V OLYMPIA ODOS 200.000 (+) ATTIKO METRO J/V AKTOR IMPREGILO EGNATIA ODOS H p 2005 J/V ΜOREAS 60.000 (+) 14.000.000 (*) 550.000 (+) 27.000.000 (*) 80.000 (+) 3.500.000 (*) Ministry of Public Works Δ6 30.000 (+) 280.000 (+) 60.000.000 (*)

Dihalorema Tunnel on Athens Lamia Highway, for St. Constantine deviation.. Twin tunnel, one for each direction, diameter D=10.5m, length L=2x500m. Construction by NATM method on marls and conglomerates. Final Design on construction contract scope. H d, e 2005-2006 J/V AKTOR IMPREGILO PANTECHNIKI 205.000 (+) 10.000.000 (*) Road tunnels at the E65 Highway in Central Greece, section Lamia Egnatia Odos. Double-lane sections, two in each side of the highway. D=10m Lengths: 2x318+2x3335+2x275+2x480+2x430+ +2x1420+2x1000+2x2150. Preliminary design for a proposal in a concession system. H f 2006 J/V Ε-FTHIA ΟDOS 60.000 (+) Design supporting the offer for the access tunnels of public in the stations Holargos, Nomismatokopion and Ag. Paraskevi of the Athens Subway. R d 2006 AKTOR 20.000 (+) Design of the Tempi tunnel for a proposal/bid of the Concession Contract: Maliakos- Klidi :D=11m L1=6000m, L2=6000m and D=8m, L1=400m & L2=300m and an underground ventilation station D=25m, L=300m H p 2006 NATM tunnels for the extension of the Athens Metro towards Hellinikon :D=6,5m with L=70m, D=8,5m with L=68m and D=13 with L=31m R d,e,w 2006-2007 Tunnel for the Athens Metro extension towards Chaidari constructed with NATM method. D=17m & L=50m, D=12m & L=1100m. R p, d, w 2006-2008 J/V OLYMPIA ODOS 30.000 (+) VINCI- CONSTRUCTIO NS HELLAS 120.000 (+) PANTECHNIKI Road tunnels and Cut & Cover structures for the new highway Korinthos-Tripolis Kalamata and Lefktro Sparta. Totally eight tunnels: D=11m, L=950+970+670+ 680+1430+1300=6000m, D=10,5m, L=750+750=1500m and 4 C&C D=22m and L=750m Η,T,B d,e,w 2006-2013 J/V MOREAS 350.000 (+) 31.000.000 (*) 2.512.000 (+) 140.000.000 (*) Caverne, part of the underground Station Peristeri of the Athenian Subway: D=18m, L=65m and auxiliary access tunnels D=5m, L=15+30m T,R d,e,w 2007-2009 JP-AVAX, FCC Construction 135.000 (+) 4.000.000 (*) Athens subway extension towards Hellinikon. Tunnels by NATM, D=13m, L=45m, D=9m, L=65m T d,w 2007-2008 AKTOR 160.000(+) 8.000.000(*) Athens subway extension towards Chaidari. Tunnels by ΝΑΤΜ. D=18m, L=340m, D=12m, L=970m T d,w 2008-2009 PANTECHNIKI. 200.000 (+) 39.000.000 (*) Access tunnel for public to the Anthoupolis Station of the Athenian Metro, passing with a minor overburden unter the Thivae avenue: D=5m, L=30m R d,e,w 2007-2008 JP-ΑVAX, FCC Construction 30.000 (+)

Railway tunnel Trikokia, section Theotokos-Dimitra, D=10m, L=5120m, D=6m with L=2500m. Preliminary design T,E,R p 2008-2012 OSE Studies of tunnels in the Korinth-Patra highway: Akrata D=11m L1=800m D=15m, L2=300m, Derveni D=11m L1=610m, D=15m, L2=480m, Mavra Litharia D=11m L1=1200m, L2=1250 and auxiliary escape tunnels D=5m & L=600m H d,e,w 2009-2011 J/V APION KLEOS 80.000 (+) 100.000.000 (*) 1.710.000 (+) 95.800.000 (*) Twin road tunnels of the highway Pafos- Polis. Preliminary design an offer T1: D=9m, L=717+720m T2: D=9m, L=253+300m ML: D=9m, L=540m T,H p 2010 Cut & Cover, Lane Cover constructions Korinthos-Patra-Pirgos Highway: Xilokastron : D=2x14m, L=154m Derveni : D=2x14m, L=60m Akrata : D=14m, L=58m East of Derveni : D=2x14m, L=200m Platanos : D=14m, L=126m Ag. Georgios : D=2x12m, L=320m Kolirion : D=2x12m, L=250m B,T,H d 2010-2011 J/V JP-AVAX SA- VINCI SAA J/V APION KLEOS 40.000 (+) 25.000.000 (*) 340.000 (+) 25.000.000 (*) Tunnel constructed by the NATM method, for the Doha Metro of Qatar D=9m, L=1500+1500m (Red Line) (Offer Study) T,R f 2012 JP AVAX 90.000 (+) Preliminary design of depressing, OSE s railway line at the Ag. Meletios area of Athens D=2x10m, L=50m T,R f 2012 ERGOSE S.A 30.000 (+) Athens Metro line extension towards Piraeus Tunnel studies constructed with the NATM method 1x10x127m, hosting tunnels for TBM machinery 1x10x12m and triple line tunnel, 1x16x210m T,R d,e 2012-2014 Detailed design for the extension of Thessaloniki Metro towards Kalamaria. NATM tunnels D=7m,L=10=15m Piraeus Subway, Maniatika Station Complex of underground tunnels. (a) Underground cavern for the main Station Length 110m, Section dimensions: 17m Width, 18m Height. (b) Inclined tunnels giving accesses to different levels of the station: Excavation size 6mx6m. Total length 250m. J/V JP AVAX SA- GHELLA Spa 140.000 (+) 10.000.000 (*) T,E, R,M d,e 2013-2014 AKTOR 20.000 (+) d,w T,R 2012-2016 J/V JP AVAX SA- GHELLA Spa 250.000 (+) 10.000.000 (*)

Preliminary investigation of the possibility for depression of a road under the Alipedou and Omiridou Skylitsi roads in Piraeus. T,H,F f 2013-2014 Ministry o fpublic Works, DMEO 20.000 (+) Railway tunnel underpassing the Olympia Odos freeway at Derveni of Achaia. Tunnel width 10m, cover height 1m under the highway pavement. T,R,F d,w 2016-2017 METKA 25.000 (+) Road Tunnels S1 and S2, into the Qukes-Qafe-Plloce section of the road axis Tirana-Gorca in Albania: S1 Tunnel D=10m, L=680m S2 Tunnel D=10m, L=450m T,H,M, F d,w 2016-2017 Alb Building 230.000 (+) Twin road Tunnels into the Itea-Ag. Nikolaos section of the Amfissa- Naupactos road axis. Kallithea tunnel: D=2x10m, L=300m Ag. Nikolaos tunnel: D=2x10m, L=450m Tylichtes tunnel: D=2x10m, L=900m T,H,M, F p 2014-2015 Ministry of Public Works DMEO 60.000 (+) Twin road tunnels (D=2x10m, L=1600m) in the Schisto-Perama section Design supporting proposals into a system of a Competitive Dialogue for the project connecting Perama with the Salamis island with an immersed tunnel. T,H,M, F p 2017-2018 AKTOR-VINCI 24.000 (+) Design of the underground mining of the Venizelou subway station in Thessaloniki under the existing to be preserved in situ antiquities. Net width 20m, total length 100m. T,R,F d 2017-2018 AEGEK-AKTOR 450.000 (+) Chequing the design of a road twin tunnel into the highway E2-Lugoj-Deva in Romania. T,H,F p 2017 AECOM 15.000 (+)