Related Expertise Concession Projects - PPP

Similar documents
MEGAPROJECT Case Study

Greek Interoperable Tolling Systems (GRITS) Interoperability Travel faster and more conveniently using only one transponder

Co-operative Systems in Infrastructure Operation

Greece: Bright opportunities for the future. December 2, 2010

WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS

A Strategy Proposal for Road Infrastructure Development in Recession Times

How, when, what & why to access Structural Funds in Romania

Home About us Contact

THE EXTENSIONS PROGRAMME

THIRTEENTH AIR NAVIGATION CONFERENCE

Government of Montenegro. Ministry of Transport and Maritime Affairs. Podgorica, April 2013

One year of Olympia Odos

ACI-NA/World Conference & Exhibition. PPPs: Will it work for your Airport?

Group Presentation. September 2008

Novelty and opportunities in the Greek PPP market

Road Safety Campaigns in Greece

Bill M. Halkias, PE, F.ASCE, F. ITE CEO, Attikes Diadromes SA Athens, Greece

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Update on the Thameslink programme

Corporate Presentation

Group Presentation. April 2008

Tunnelling Featured Projects

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

IAT Annual Conference 'Driving Forward

Bavarian State Ministry of Housing, Building and Transport. Roads and Bridges. Planning. Building. Maintaining. Operating

National Strategy and Silk Road Project

Terms of Transport with the TRAINOSE S.A trains and buses What you need to know when traveling with us

Group Presentation. March 2009

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Chapter 1: Introduction Draft

Egnatia Odos: An axis for development and co-operation

monitoring of egnatia motorways spatial impacts

Development of the Hellenic Parts of Priority Axes No 22 & 29: A Strategic Approach

Corporate Presentation

Economic impact of investments in new motorways infrastructure

Recent Assignments Synopsis

INTRAKAT ANALYST PRESENTATION FY RESULTS 2013

I would like to thank the organizers for the opportunity to address such an esteemed audience.

European Motorways Forum Oddo Securities. 23 October 2003

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Free State of Bavaria State Building Administration Roads and Bridges. Planning. Building. Maintaining. Operating

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

US-460 CONCEPTUAL PROPOSAL

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

1.2 Corridor History and Current Characteristics

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

Roads Australia Industry Presentation 12 March 2015

STUDY ON SOEKARNO HATTA INTERNATIONAL AIRPORT EXPANSION AND UPGRADING PROJECT IN JAKARTA IN THE REPUBLIC OF INDONESIA

Chapter 1: Introduction

For personal use only

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

DaHar Danube Inland Harbour Development

FirstGroup plc South Western

Minutes of the Meeting of the Board of Scottish Canals held on 23rd August 2012 at The Kingsmills Hotel, Inverness at 9.00am.

An improvement in first-half results relative to the year-earlier period, driven by growth in tourism revenue.

Recommendations on Consultation and Transparency

Business Review and Analysis

TRANS-TEXAS CORRIDOR (TTC-35)

5th Thematic Seminar "Digitization of libraries and archives"

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

NEWSLETTER MARINA, HIGHWAY PRIVATIZATIONS

Investment Opportunity

ANA Traffic Growth Incentives Programme Terms and Conditions

Report to the Dulles Corridor Advisory Committee

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

2 THE MASTER PLAN 23

Economic impact of the Athens International Airport

Major Scheme Business Case Summary Report for Programme Entry

Travel behavior as a determining factor for sustainable transport measures

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

Watpac advises that the Scheme Resolution was not passed by the requisite majorities of Watpac shareholders, with:

SESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager)

Revenue Gross Profit Profit Before Tax Profit After Tax

Athens International Airport. A successful PPP & attractive investment

For personal use only

FEDERAL BUDGET PRIORITIES FOR THE SOUTH WEST METROPOLITAN REGION 2018 TO 2022

Egnatia Odos Observatory. Egnatia Odos Observatory Monitoring of Egnatia Motorway s s Spatial Impacts

1 st US - Kosovo Trade Forum New York, New York

METROBUS SERVICE GUIDELINES

Group Presentation. March 2009

PROPOSAL UNDER THE SMALL COMMUNITY AIR SERVICE DEVELOPMENT PROGRAM

Metropolitan Washington Airports Authority (MWAA)

integrated ANNUAL report 2012

C. SYKIANAKI, President, Organization for Planning and Environmental Protection of Athens.

Νew O-pass online services

PRESS RELEASE VINCI QUARTERLY INFORMATION AT 31 MARCH 2015

Launch of IPO of Aéroports de Paris

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #1 September 24, Peter O. Knight Airport

US 380 FEASIBILITY STUDY

PPIAF Assistance in Swaziland

3RD SEETAC ANNUAL MINISTERIAL MEETING AND SEEIF

Lethbridge Exhibition Park. Economic & Tourism Driver Community Builder

New Trends & Challenges in City Tourism by Alex Galinos Managing Director Athens, October 23, 2006

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

AIR CANADA REPORTS 2010 THIRD QUARTER RESULTS; Operating Income improved $259 million or 381 per cent from previous year s quarter

Main Points in the Results for FY2015

Governance, audit and digital preservation

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

MACQUARIE INFRASTRUCTURE GROUP. Results Presentation 14 August 2000

Transcription:

Related Expertise Concession Projects - PPP IMPETUS-ISIS for Attiki Odos ISIS and Impetus developed a traffic model for the offer that Attiki Odos, SA had provided in the bidding process and won the contract for the construction and operation of the highway Attiki Odos. Impetus had supported ISIS on the model development and had provided the preliminary strategy for the tolls and the traffic related to it, in addition to the various other studies such as the environmental impact assessments, the maintenance of work zones during the construction process, etc. The bidding process was done on the year 1994 and it was successful. went through Attica Road in different time horizons and examine the traffic impacts caused by the operation of the Road on the rest roadway network. The traffic study consisted of many technical stages like the examination, analysis and the evaluation of the traffic conditions of the Attiki Odos J.V. traffic model Attiki Kykloforia Based on the above successful bid, IMPETUS under contract with JV Attiki Odos, SA had developed a traffic model for the whole Attica region. The main purpose of the traffic model Attiki Kikloforia was to forecast the traffic that basic roadway network of Attica, including Attica Road and the rest new road construction works. For the completion of this work, a simulation traffic model was applied, handled in 4 stages (based on the model of Urban Transportation Planning Systems - UTPS) using existing data, which were updated, were needed, following the standards of the modern international transportation modelling. Scenarios with traffic toll levels and the various types of partial operations had been studied during the years 1997 to 2005.

Cost-Benefit Analysis European Investment Bank (EIB) Attiki Odos, SA Impetus, under a contract with Attiki Odos, SA had developed a series of Cost-Benefit analyses for the European Investment Bank (EIB) in Greek and English languages. A traffic model, based on Caliper s TRANSCAD, had been implemented and the various traffic scenarios for the partial operation of the highway, as well as its final approach (full operation) and presented in this study. The work was based on the traffic model Attiki Kykloforia and the results of the study had been updated on a per year basis for 5 consecutive years starting in 1998. Cost-Benefit Analysis for the Rion-Antirion Bridge, ETVA Impetus, under a contract with ETVA, had developed the Cost-Benefit analysis for the Rion-Antirion Bridge. Impetus had based all the work of traffic modelling, as well as the environmental impact assessments, on the traffic model (under the GIS Transcad platform) that had been fully implemented for the whole Greece (all new road constructions until 2025). The Cost- Benefit analysis had to be submitted as a requirement to European Investment Bank (EIB) and it had been submitted on 2004.

Submerged Thessaloniki Tunnel- Artery Thermaiki Odos, SA - Halcrow Group Ltd been appointed as Traffic Advisor to the Banks supporting TOG and in that role carried out an audit of the IMPETUS traffic study in order to provide the Banks with an independent review of traffic and revenue issues related to the project. Thermaiki Odos Group (TOG) Traffic model Thermaiki Kykloforia Impetus developed a small traffic model (selected part of Thessaloniki roadway network) for the offer that Thermaiki Odos, SA had provided in the bidding process and won the contract for the construction and operation of the submerged artery Thermaiki Odos for the city of Thessaloniki. IMPETUS was the traffic consulting engineering organisation, which provided with all the necessary traffic information the Joint Venture for the Thessalonica Submerged Artery to be submitted to the Ministry of Environment and Public WorksImpetus has supported Thermaiki on the model development and has provided the preliminary strategy for the main arteries distribution, transport design, traffic circulation proposals within the project s impact zone, tolls and the traffic related to it, in addition to the various other studies such as the traffic deviations during the construction of the work and numerous traffic arrangements regarding the access and the egress of the artery, the maintenance of work zones during the construction process, etc. The bidding process was done on the year 2004. Halcrow Group had IMPETUS had developed a complete traffic model for the Thessalonica Metropolitan Area under contract with the Joint Venture Thermaiki Odos Group (TOG). The consulting team (IMPETUS) investigated the situation in Thessalonica from many perspectives in relation to the existing data, studies, and other information and developed a full GIS model with all related information (capacities, speeds, on street parking, peak period and 24 hr volumes, signalisation, etc) for the Thessalonica Metropolitan Area. This work had been carried from 2006 to 2007. This was accomplished in order to help the JV to decide over the various proposed traffic approaches regarding the final transport design of the artery. The traffic model was developed and implemented using TRANSCAD s/w v4.7, which is a GIS-based transportation-modelling suite, developed in USA by the CALIPER organisation. Impetus team also supported the JV, with other traffic software (TSIS-5 and HCS Highway capacity software), applying over the micro-study of the city intersections and the East and the West circulation of the city road network after the initiation of the artery s functionality.

Korinthos -Tripoli Kalamata (KTK) Audit in cooperation with Jacobs Consultancy The Ministry of Environment, Physical Planning & Public Works (MEPPPW) of the Hellenic Republic announced the decision to proceed with the 400m Korinth-Tripoli-Kalamata and Lefktro- Sparta DBFO toll road concession in March 2005. The Korinth-Tripoli-Kalamata and Lefktro-Sparta concession formed part of the Greek government s larger programme of DBFO toll road concession, which ould ultimately renew and improve the country s strategic highway network, and create bypasses for major urban centres. Halcrow Group Ltd had been commissioned to undertake traffic and revenue forecast on behalf of the Moreas Group for the Korinthos-Tripoli- Kalamata Motorway concession project and Jacobs Consultancy in cooperation with IMPETUS has been commissioned from the Sponsors to undertake the traffic audit for the banks of Halcrow s traffic study in terms of validity, quality and appropriateness of forecasting model inputs, software and procedures and provide with comments, necessary changes in the assumptions used in the traffic forecasting and amendments to revenue forecasts if appropriate. MATURITY OF STUDIES FOR THE ATTRACTION OF INVESTORS IN THE INTERNATIONAL FREIGHT CENTRE OF THESPROTIA IMPETUS has been signed as the contractor for the development of the International Freight Centre in Thesprotia, Municipality of Paramythia (under PPP legislation). The aim of the project is to lead to the attraction of possible investors after the completion of the two phases of the

Project. The first phase of the project which involved the preparation of the final business plan had already been submitted to the Ministry of Internal Affairs (handling all PPP projects) and we have already proceeded to the second phase which is the identification and attraction of possible investors. Therefore, we certainly believe, that the planning of the International Freight Center of Thesprotia will be available at 2012-2013 time period. The business proposal without rail connection (more realistic scenario) shows an investment situation with an IRR of 6,67 %. Investment volume of the SPV (consortium): 87 Mio EURO Discounted Capital Value: 13 Mio EURO (at a discount rate of 5%) Investment in equity capital for private investors: 11,0 Mio EURO Profitability: 104,47 % operation period: 40 years IRR on TCF (Total Cash Flow): most realistic case = 6,67 % IIR on FTE (Flow to Equity) = 6,42 % Break-even point after eleven years