March Some of the group specific highlights include:

Similar documents
Ewen Maddock Dam RECREATION GUIDE

Lake Kurwongbah RECREATION GUIDE

Lake Manchester RECREATION GUIDE. seqwater.com.au

Cooloolabin Dam RECREATION GUIDE. seqwater.com.au

Lake Wivenhoe RECREATION GUIDE

Lake Baroon RECREATION GUIDE

Lake Somerset RECREATION GUIDE

Recreation Management Plan Lakes Atkinson/Somerset/Wivenhoe

Lake Kurwongbah RECREATION GUIDE. seqwater.com.au

Recreation Management Plan Lake Baroon and Ewen Maddock Dam

Consultation Summary Report

Cooloolabin Dam Recreation Management Discussion Paper. November 2013

Hinze Dam RECREATION GUIDE

Welcome to the future of Terwillegar Park a Unique Natural Park

Corabelle Park. Inventory. Future Development

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

BOAT DOCKS AND LAUNCHES. Public Engagement Report July 2015

Land Management Summary

Business needs consumers! Get people back in to Port by attracting them!

South East Queensland Outdoor Recreation Strategy 2010

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Wilds. Headwaters. Lakes. Oxbows. Falls

Silver Lake Park An Environmental Jewel for the Citizens of Prince William County

Lane Poole Reserve, Dwellingup Prospectus

Santos Tour Down Under Tour Village and Bike Expo

O REGON TRAILS SUMMIT. Oregon Trails Summit. Rogue River National Forest

Flow Stand Up Paddle Board Parkway Plan Analysis

Camping (Primitive) Camping (RV) Electrical Potable Water Grill Established Fire Pit Picnic Table

QUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting

Dunsmuir Community Park

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Rogue River Access and Management Plan Draft Alternatives

French Regional Park Creative Play Area

City of Fremantle. Joel Levin, Aha! Consulting INTRODUCTION 2 BACKGROUND 3

Wanaka Community Board 15 April Report for Agenda Item: 4

South Dakota RV Parks and Campgrounds. Three Flags RV Park and Camp. Hills RV Park BROKEN ARROW CAMPGROUND. Amenities

Calgary River Access Strategy Priority Sites and Proposed Funding

Plan, host and run an event to remember. It s easy at Elmore Events Centre.

AUTUMN 2016 WILLIAMS LANDING NEWS

About Equinox Adventure Camp

Lake Myra County Park. Wake County, North Carolina Community Forum #2 June 12, 2008

Royal Burgh of Burntisland Community Council.

GREENWOOD VEGETATION MANAGEMENT

SAXON HARBOR REDEVELOPMENT SURVEY

Kielder Camping and Caravanning Site

South Dakota RV Parks and Campgrounds

Proposed Action Kaibab Campground Capital Improvement Project September 2008

City of Galion Park Satisfaction Survey Results

200' to Beach,Wi-Fi,AC,Hot Tub,Golf Cart,Lakeviews,2000sf,3BR,2 Bth

Dublin Airport Update Presented by Pat Molloy

Public Park System. Township of Derry. Providing natural open space for the recreational use of our residents and guests.

Schoolcraft Township is located in northeast Houghton County. A portion of the township borders Keweenaw County and Lake Superior.

Tabor Mountain Recreation Society Who We Are What We Do Regional Park The Ask. Photo by Ken Hodges

2018 Oneida County Outdoor Recreation Plan (ORP) Survey Results Summary

7. Plan Implementation

Campground Reservations Open

Whakapirau and Kaipara District Council Working in Partnership

Community Forum 24 October Resort Management Update

Greater Minnesota Regional Parks and Trails Commission Designation Application

Department for Transport

NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PRAIRIE DOG PARK VICTORY PARK

Bibbulmun Track. Cape to Cape Track. Two of the world s great long distance walking tracks. 973 km. 135 km km Off-road cycle touring

places esplanade Distinctive Destinations Healthy,Active and Event Ready Family Friendly Foreshore Evolution five

PAGE OF CONTENTS PAGE 3

Watchorn Provincial Park. Management Plan

A summary of Draft Makara Peak Mountain Bike Park Master Plan

Topsham Trail Guide.

Welcome. to Osprey Waters. The Mirvac Difference

Survey Summary. 1. Overview. Pilot Implementation Survey Toronto Parks & Trails Wayfinding Strategy (Phase II) September 30 November 6, 2017

Outdoor Activity Leadership Program Overview

System Group Meeting #1. March 2014

Lewis and Clark Recreation Area

SPECTACLE LAKE PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN

GLASS HOUSE MOUNTAINS PEAKS WALK, BEERBURRUM TRAILHEAD DRAFT CONCEPT PLAN

Binley Woods Parish Plan - Analysis of Main Survey Responses Section D1 Sports Activities & Play Equipment

Blue River Trail Master Plan JSA to Town Hall June 2004

A BOAT RAMP TO NOWHERE

Group camps made easy, naturally!

Plan Outdoor Recreation Activities / Use and Maintain a Temporary or Overnight Campsite

QUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

Tallahassee-St. Marks Historic Railroad Trail

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Immediately inform a member of staff or Event Team. They will initiate the appropriate procedures.

Rules and Regulations

Carnarvon Station Reserve, Qld Camping Information

SUMMER DAY CAMP. Estes Park Center YMCA of the Rockies REGISTER ONLINE! YMCAROCKIES.ORG/SUMMER-DAY-CAMP

2016 National Conference

EAST COAST TASMANIA. Holiday Park Guide

Our Murray River Beaches

The natural choice. Parks de COORA STREET WISHART

Tahoe Donner Association Public Scoping Meeting DUDEK

Dungeness Recreation Area County Park Master Plan

KETTLE CREEK CONSERVATION AUTHORITY TRAIL GUIDE.

Alliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017

EAST COAST TASMANIA. Holiday Park Guide

Chair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

Rating: 5.0 (scale of 1-10)

Transcription:

March 2017 Achievements of the Recreation Review three years of progress In 2013-14, Seqwater conducted a large scale community consultation project known as the Recreation Review. We grouped lakes that are in close proximity into clusters and examined the type, mix and amount of recreation activities on offer. More than 2,500 survey responses were received and numerous consultation sessions conducted. A report for each group was produced which highlighted some of the key improvements each community said they felt would benefit recreation in the area. You can read these reports online. Many of these improvements were made possible through funding from the Department of National Parks, Sport and Racing. Some of the group specific highlights include: Cluster 1 Atkinson, Somerset and Wivenhoe A designated swimming area was established at Lake Atkinson in early 2014. At Lake Somerset, a 6 knot gazette area was established in the northern end of the lake to improve safety and allow fishers and kayakers to recreate safely in this area. To help support this initiative, a new access point at Westvale Road was built so that small fishing vessels and paddle craft can launch directly into this 6 knot area. A new playground was also installed at The Spit, enriching this family friendly day use area. At Lake Wivenhoe, a 6 knot on-water speed limit for low emission fuel powered vessels was established and those wanting to pursue more high octane activities encouraged to visit Lake Somerset. Two designated stop off points with picnic facilities were established for paddle craft users. The Billies Bay and Hays Landing recreation area was refurbished and opened to the public in late 2016. The area features a range of facilities including a boat ramp, swimming area, toilet amenities, parking and ample picnicking facilities. The boating permit scheme for Lake Somerset and Lake Wivenhoe will be phased out, and the scheme discontinued from 1 August 2017. This will bring the access policies for these lakes back in line with our other sites and allow recreation users to enjoy on-water access without the cost of a permit. Cluster 2 Kurwongbah and Samsonvale Paddle craft were permitted access to Lake Kurwongbah in late 2014. To support this change, a new designated launch point and wash down facility was established at Mick Hanfling Park, fishing was permitted from kayaks, and updated signage was installed. In mid 2016, a new car park was established at the end of Postman s Track at Lake Samsonvale, and more than 7km of fire break trails were opened for public multi-use access. An extensive study was untaken at Lake Samsonvale to determine whether opening the lake to public paddling would have an impact on the drinking water quality. The study determined an increase in paddle craft could be accommodated, and discussions are underway to investigate possible launch points and other details of the potential arrangement. Cluster 3 Maroon, Moogerah and Wyaralong

In late 2014, we established a new paddle craft launch point in the Maroon day use area and permitted visitors to bring their dogs on a leash to the area. Lake Moogerah received numerous upgrades including: a designated swimming area at Muller Park, the establishment of a 6 knot speed limit for two arms of the lake and dogs were permitted on a leash at Haigh Park. In addition, the picnic facilities were upgraded with a ceremonial structure, new bollards, resurfacing of the car park and new gardens. Seven new shade shelters were installed at Meebun Day Use Area at Lake Wyaralong, along with the new car park and toilet facilities at the improved Eastern Trail Access. Additional multi-use trails were also established. Cluster 4 Baroon and Ewen Maddock The upper reaches of Lake Baroon were opened up to paddle craft in early 2014, and the Martin Williams Walk was extended in early 2015. Throughout 2014 many changes were implemented at Ewen Maddock, including the installation of a new wash down facility, improved paddle craft access and parking facilities. The Gympie Street North entry point to the trail network was improved with new entry fences and the local council laid new road base. In addition, Seqwater will be installing a new toilet block over the coming months at the Ornamental Wetlands area to facilitate use of the adjacent mountain bike trails in Beerwah State Forest. Cluster 5 Enoggera, Gold Creek and Manchester Many of the 2014 upgrades at Enoggera were done in conjunction with Queensland Parks and Wildlife Service (QPWS), including: a new paddle craft launch point, allowing fishing from paddle craft and establishing a picnic area. Trail signage and mapping is still being investigated. Gold Creek received some basic picnic facilities, and an updated orientation sign is currently being installed. More signage updates are anticipated for the area. Recreation users can now fish from paddle craft on Lake Manchester with a new paddle craft launch point installed. In addition, the picnic area has been refurbished with two new gas BBQs, three new rubbish bins and repairs to picnic tables. The trail linkage has been improved so that trail users no longer need to use Lake Manchester Road and we have some signage and mapping updates on the horizon. Cluster 6 Cooloolabin and Wappa Cooloolabin Dam received a security upgrade with a lockable gate as well as new signage and upgraded picnic and playground facilities. The picnic and playground facilities were also upgraded at Wappa with an additional revamp of the toilet system. Cluster 7 Clarendon and Dyer Some exciting new changes took place in 2015 at Lake Clarendon with a new bird watching trail established adjacent to the dam wall, paddling and fishing becoming approved recreation activities as well as the installation of a new launch point. A new swimming area was established at Lake Dyer in 2015 and signage throughout the recreation area was improved. Seqwater is also currently investigating the installation of a graded track below the dam wall linking the caravan park to the golf course. Cluster 9 Borumba and Macdonald Borumba underwent a significant upgrade in mid-2016 with a new double lane boat ramp constructed in August. To further extend this ramp, Stage 2 will begin construction in the next few months and should be completed by mid-2017. The 6-knot speed limit for timbered areas was investigated and approved by Maritime Safety Queensland (MSQ), but further consultation with the community indicated the change was not supported. Improvements have been made to the wash-down facilities and picnic areas at both Lake Macdonald Park and Mary River Cod Park at Lake Macdonald. These upgrades included a new BBQ, horse hitching rail and landscaping in 2015 and resealing the car parks in 2016. Dogs were also permitted on leash at Lake Macdonald Park from late 2014. Cluster 10 Hinze Numerous upgrades have taken place at Hinze Dam during the last three years, including: the installation of new shade shelters and picnic tables, new rigging/de-rigging areas at the Eastern and Western boat ramps, signage improvements, the formalisation of a trail entry point on Advancetown

Road, a new paddle craft launch point at the Western Boat Ramp, the installation of a soft-fall rubber surface under the playground and allowing dogs on leash at Picnic Parkland and Pocket Park. Across all areas, Seqwater have updated the opening hours for all recreation areas (excluding Lake Dyer) after an extensive trial period with community feedback. The opening hours were changed from 6am to 6pm throughout the year to be 5:30am 6:30pm September to April and 6:00am to 5:30pm May to August. This change allows recreation users to enjoy an additional 180 hours of recreation time a year. The implementation of the majority of outcomes from the Recreation Review represents a huge achievement and milestone for all the members of the community who participated in this process. Together we have achieved many positive outcomes for all of our lakes and recreation areas that should benefit the community for years to come. We are always on the look out for ways to continually improve our recreation areas. Exciting new projects are on the horizon, so stay tuned for updates! As always if you have any feedback, please call our Recreation team on 1800 737 928 or email recreation@seqwater.com.au. Search for the Safey Star Seqwater s Search for a Safey Star competition concluded on Sunday 5 March 2017 with a massive 782 eligible entries received. This year, entrants had the opportunity to vote for their favourite #safey. Entries with the most votes were shortlisted, and were in the running to win a $5,000 BCF gift voucher, be crowned our ultimate Safey Star, and the face of our Easter safety campaign. On 14 March 2017, young Jakob was declared our 2017 Safey Star winner, with more than 2,800 votes. Keep an eye out for Jakob in our Easter safety campaign! The competition encouraged visitors to our recreation dams, lakes and parks to take a safey a selfie of them playing it safe and upload it to our competition website, to be in the running to win Go Pros and BCF gift cards. We had lots of great entries, with visitors demonstrating they know sun protection, life jackets and close supervision of kids are all important ways to play it safe. Remember to play it safe at our dams, lakes and parks over the Easter long weekend. It s one of the busiest times of year at our lakes, and we want everyone to have fun and go home safely. Good news for paddlers at Lake Samsonvale The results are in from the 2014 Quantitative Microbial Risk Assessment (QMRA) at Lake Samsonvale, which

was an Australian-first study and took two years to complete. The study determined the lake is able to support the introduction of public paddling without impacting drinking water quality. This is fantastic news for the community and paddle craft enthusiasts looking to access Lake Samsonvale. Seqwater will be working with local recreation clubs, neighbours and the Moreton Bay Regional Council over the coming months to carefully plan these changes. The location for the new public access launch point has yet to be finalised, and the timing of these changes relies heavily on the outcome of community consultation as well as securing funding to construct the new launch point. Swimming will remain a prohibited activity for Lake Samsonvale, and the restricted access zone between the overhead power lines and the dam wall will remain in place, with water based activities prohibited in this area. If you would like more information about this project or would like to provide feedback, please contact the Seqwater Community Relations team on (07) 3035 5500 or email communications@seqwater.com.au. Borumba boat ramp upgrade - Stage 2 The falling water level at Lake Borumba is not all bad news for boaties! The lower water levels have allowed Seqwater to prepare for the construction of stage 2 of the Borumba boat ramp upgrade. Stage 2 will extend the boat ramp by approximately 10 metres, allowing recreation users to launch vessels for longer as the water level drops. It is expected that construction will commence around late April or early May, and should be completed by mid year without any unforeseen delays or weather events. Remember to always check the recreation and safety notices on our website before planning a trip to one of our recreation areas. You can access the recreation and safety notices web page here. Changes to camping at Lake Wyaralong Families and visitors to the Meebun day use area will have noticed the absence of backpackers and campers frequenting Meebun since the 8 free campsites were closed at the end of January. The sites were the cause of numerous compliance and hygiene issues including the misuse of toilet facilities, environmental damage, illegal activity and vandalism. The closure of this site as a camping area has made the Meebun day use area cleaner, safer and more family friendly. It is also the first step in the implementation of a master plan for recreation at Lake Wyaralong. For any campers looking for other camp grounds around Lake Wyaralong, there is the Ngumbi remote camping area which can be accessed via the multi-use trails (no vehicles), as well as the Lilybrook Recreation Area which can be accessed via Beaudesert-Boonah Road. Camping at Lilybrook is for event use only and requires a booking. For any enquiries or to make a booking for an event, please contact the recreation team on 1800 737 928 or email recreation@seqwater.com.au. Playground upgrade at Meebun Last month the playground at Meebun day use area was upgraded with a new rubber soft fall product. The standard bark mulch that was installed previously required significant upkeep, as it was frequently washed away by stormwater and could potentially conceal hazards such as broken glass and the edging could present a trip hazard. The new state-of-the-art rubber soft fall is a safe and low maintenance solution, and should keep this family friendly recreation area safe for many years to come!

New campground management at Wivenhoe and Somerset Three of our more popular campgrounds, Somerset Park, Captain Logan Camp and Lumley Hill, are under new management. Parks and Resorts Operational Management will assume management from Wednesday 29 March 2017. The existing pricing structure will remain in place until 1 July 2017, at which point they will be subject to change. In preparation for the changeover, the Captain Logan and Lumley Hill campgrounds have been revamped, with updated signage to be installed prior to the Easter holiday period. Campsite locations at Lumley Hill have changed, with new campsites opening up around the amenities block, and others along the foreshore being removed. Issues with erosion and damage to the natural area motivated the change, and it is hoped that by removing the campsites situated along the sloping foreshore that we can rehabilitate the area to its former glory. The reduction in the number of campsites also brings the campground capacity back in-line within the facilities limitations. You can access an information fact sheet with maps of the campsites on our website. For bookings or enquiries at Captain Logan and Lumley Hill campgrounds, please phone 0428 310 740 or email Wivenhoe.camping@seqwater.com.au. For bookings or enquiries at Somerset Park campground, please phone 0428 180 450 or (07) 5426 0186, or email Somerset.parkcamping@seqwater.com.au. New amenities block for mountain bike riders The new toilet block at Ewen Maddock s Ornamental Wetland is expected to be finished and operational in the next 3-4 months. The Ornamental Wetlands serves as a launching point for Mountain Bike Riders heading to the Ferny Forest Trails in Beerwah State Forest, and though there is ample parking available there were previously no amenities. It is hoped that this new facility will make the trails more accessible to the community. This project was made possible through funding from the Department of National Parks, Sport and Racing. If you would like more information about this project, please contact 1800 737 928 or email recreation@seqwater.com.au. Planned burns season has begun During the cooler months, Seqwater will be conducting planned burns around our dams, lakes and parks. The

planned burn program began in March and will continue until September. During this time, we may close trails and other recreation areas in the interest of public safety. Please be aware of the following important information: Smoke may drift and can stay around for up to one week after the burn, subject to weather conditions If you have a respiratory health condition, please follow the advice of your health practitioner and, if applicable, carry reliever medication with you at all times during the burn period During the burn, in case of an emergency, please call triple zero (000). Each burn is conducted in accordance with a Queensland Fire and Emergency Services (QFES) burn permit, which outlines the ideal temperature, wind speed and direction, and humidity conditions to conduct the burn. As these conditions can change at very short notice, the decision to proceed with a burn can often only be made the day before a burn. For this reason, Seqwater will deliver a notice card to neighboring properties the day before a planned burn, once pre-burn checks have confirmed the burn can go ahead. Please remember to check the recreation and safety notices on our website for information about upcoming planned burns and any changes to recreation when visiting our dams, lakes and parks. For more information about the planned burn program, email communications@seqwater.com.au or phone 1800 771 497. Alternatively, a full list of proposed burns and their scheduled start date can be found at www.seqwater.com.au/water-supply/catchments/fire-management If you wish to unsubscribe, please email recreationreview@seqwater.com.au with unsubscribe in the subject line.