Construction of 2x2 Lane Bridge with footpath across river Ganga between Sultanganj 17177. 1 (Bhagalpur ) and 2.46 Aguwani Ghat (Khagaria 2.3 2.21 8797 (S) 38.95 ) including 84.11 6.29 dated RCC / (Main 845.65 navigational span of cable 2/5/15 1/11/219 (Main (Main _ 14.11.13 316 432.87 stayed and approaches Bridge Bridge Bridg (Connecting NH31 and ) ) Amount e) NH8) in the state of 859. Bihar. S.P.Singla Constructions Pvt. Ltd. Khagaria Khagaria & Bhagalpur Bihar Rajya Pul Nirman Nigam Ltd, Details of Mega Progress Report 28.2.218 1/11/219 Bridge and work in Progress : (i) Bhagalpur :- L.A. Proposal - 1.3553 Acre (All 6 Moza Notified in section 11 by the DM, Bhagalpur and Rest 1 Moza under Ganga river) (ii) Khagaria:- L.A. Proposal - 298.835 Acre Aguwani - (All 17 Moza Notified in section 11 by the DM, Khagaria) Cost of L.A. Rs. 86,15,75,775/- Deposited to DLAO Khagaria. (iii) Munger :- L.A. Proposal - 6.715 Acre 2 Gaya Construction of 4- Lane H.L.R.C.C Bridge (58x5) in between Daudnagar- Nasriganj over Son river. M/s. Hindustan Construction Co. Ltd. Aurangabad & Rohtash 61928.95 8794 (S) dt. 14.11.213 of RCD, 43269. Revised A/A Rs.- 1656. 11 (S) dt. 15-12-216 of R.C.D.,. 58 x 5 M 4.3.14 3.3.17 31.3.18 (Proposed) 1 1 95 2 154.28 76326.58 31.3.218 Bridge and work in Progress. Aurangabad : - L.A. Proposal 58.18 Acres. (34.14 acre Land Registered under Perpetual lease). 2.88 acre Government Land. 26.25 acre Bakast Land (out of which 19.63 acre declared Private Land, 6.623 acre declared Govt. Land but proposal under consideration for Raiyatikaran on level) L.A filed for balance 12.4 acre is being awarded by DLAO office, Aurangabad. Sasaram :- L.A. Proposal 44.3 Acres. (18.61 acre Land Registered under Perpetual lease). Government Land : - 2.5 acre. L.A filed for balance 22.93 acre. Notice issued and payment to land owners in last stage. 1 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1
Construction of 3- Lane H.L. RCC bridge in Bangra Ghat conecting SH- 74 (Muzafarpur ) & SH- 9 (Saran ) over river Gandak including Rs.5897.9 approach road. 5 / RCD S.p Singla Let No-.95 5.45 3.3. 721.266 3 8795(s) dt- 11.4.214 1.4.217 31.12.18 Contrucation, 11-156 85.45 52.45 23.2 21.4 17934.14 14.11.213 42143697, 29951. Ph- 951688799 Gopalganj Muzaffarpur, Gopalganj, Saran Bridge and work in Progress : - Muzafarpur : - 45.9715 Acres. Permission for Perputual lease granted vide RCD office order 12 dated 11.7.216. Till date 26.9673 acre out of 45.9715 acre land has been registered and verification of rest records is being done. Saran :- 35.528 Acres Rs. 12,41,52,426. transferred to D.L.A.O Saran vide letter no. 1347 (E) dt. 3-9-216 for L.A. SIA : - Final SIA Report submitted by CIMP on 18-8-217. Expert Commitee Report also submitted. Gopalganj : - 56.95 Acres SIA : - SIA final report sumitted. Expert committee report also submitted. Against demand of Rs. 21,67,15,524/- Vide letter 387 of D.L.A.O Goplaganj dt. 1-8-217, Rs. 11,,,/- vide letter no. 67 (E) Dt. 1-1-217 & Rs. 1,67,15,524/- vide letter no. 813 (E) dt, 18-12-217 transferred to D.L.A.O Gopalganj. Unsurveyed land :- 24.75 Acres (21.66 Acres In Mauza Sonaut and 3.9 Acres in Khirodhan Patti). Department of Revenue has notified for Survey of above mauza vide letter 196 dt. 31.1.216. 4 Darbhanga Construction of 13.Km(Approx) long extended portion of Approach road of Baluaha Ghat Kosi Bridge between Baluahaghat to Gandaul upto Biraul (Hanti Kothi) in Saharsa/Darbhanga district of Bihar GAMMON INDIA LIMITED Saharsa & Darbhanga Revised 44. vide letter No 174 (S) dated 24.1.216 5 12.3.13 11.3.216 3.6.17 1 1.5 98. 74. 253.5 2883. 6/218 Bridge and work in Progress : Bridge work completed (95%), work in Progress (from KM 1. to 12.65KM) and KM. to 1. KM is under Objection by Land Owner Darbhanga : L.A. proposal - 168.896 acre Saharsa : L.A. proposal - 2.55 acre SIA completed, section 11, 16, 17 and 18 done and section, 19 is in progress for land acquisition. 2 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1
Lohiya Path Chakra Project (Construction of Swap and grade separated U- turn based multi sectional interchange at Bailey road, (In between Lalit Bhawan &Vidyut Bhawan) with multiple underpasses, Flyover, elevated 39147.7 section using U girders 7192 (S) 5 & extra dosed cable 1 671.46 32M 19.12.15 18.12.17 _ Stayed structures with Dated- 64 17 6346.59 3.6.219 State of art, Pavement 5.8.215 finished road 38159.16 appurtenances, pedestrian crossing, Software controlled solar lighting, Landscaping, and integrated drainage system etc.) External Foundation Work (Pile, Pile Cap) & Sub-structure Work (Pier/Abutment Shaft) is in Progress. Designs & Drawings of components of this project have been delivered by FITT, IIT Delhi and is in continuation. 6 Chakiya Construction of H.L. RCC bridge (24x6m span) in the 27th KM of chakiya kesaria sattarghat road over river Gandak. M/S Vasishta Construction Pvt Ltd. Ph- 9849767222 Chakiya 26347.89 4156 (s) 13/4/212 2918.3 144 2.1.12 19.4.16 3.6.17 1 93 1 72 3 43 1 51 387.34 17834.74 3.6.218 These two mauja are surveyed land. These land is being aquired by land aquistion by the order of D.M. Gopalganj. SIA Report has been submitted to D.M Gopalganj by Chandragupta management insitute,. Expert committee has been formed. These four mauja are unsurveyed land. G.P.S survey of these land has been carried out and sent to C.O, Baikunthpur for veryfication. Notification for survey has been published by the principal secretary, Revenue and land reforms, Bihar, vide memo no 17 [stha] (Notification) 21/211-196, patna dated 31/1/16. D.M Gopalganj has written a letter to director land and measurement, Bihar, for special survey vide letter no 81 dated 25/5/17. These lands are being acquired by land acquisition. Social Impact assesment report has been given to D.M East Champaran. Expert committee report has been received. Section 11 is in progress. DLO East Champaran has assured in the meeting with formers to start the payment by end of March'218. 3 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1
Construction of Flyover connecting Mithapur flyover to Bhikhari Thakur (Yarpur) 7 Flyover via R.Block Rs. Juction including 16615.2 approach road, retaining Lac wall, service road, L.N. 719 1 1 159.96 12.11.15 11.11.18 - (S) 127 7 39 464.87 elevated rotary & dt. 31-7- electrification etc in 215 Town. 1421. (Rachna Construction 11.11.18 Co. Bharuch Gujrat-16) 8 Spl. Works Construction of Flyover Connecting Mithapur flyover to chiraiyatand Flyover via karbigahiya including approach road,service road & side drain etc in patna Town. (Rachna Construction Co. Bharuch Gujrat-16) Rs. 12186.25 Lac L.N.-6976 (S) dt. 29-7- 215 1175. 1128 12.11.15 11.11.18.5 39 _ 364.91 225.88 11.11.18 (i) Drawing released after re-design issued to contractor vide letter no.-184 (En) dated-26.9.217 and work has been started. (ii) Progress- 32% (iii) 1 Nos of Pile cap, 9 Nos Shaft works at R.Block Golamber and 5 nos Pile cap & 1 Nos shaft work at Arm-2 with re-design are completed (i) Drawing after redesign issued to contractor vide letter no.-198 (En) dated-4.1.217 (ii).5736 acre land acquired by land acquisition office, and written possession given to RCD, New Capital,. Actual possession and demarcation is under process. (iii) Progress-16%, 42 nos of pile and 8 nos Pile cap completed after redesign work. 9 West Champaran Construction of 2 - Lane Connectivity to Newly Constructed H.L. Bridge (42x44M) Over River Gandak between Dhanha Ghat to Ratwal Ghat (Approx Length 15 Km in the of West Champaran, Bettiah (Bihar). UJJAIN ENGICON INDIA PVT. LTD. West Champaran 7722(s) 18.8.215 12524. 9399.869 Length of Approach Road - 15.183 (km) & 3 Nos Bridge - (1) RCC 28.8.215 27.8.217 25.11.217 Bridge 4x 24.m (2) RCC Bridge 3 x 18.m (3) RCC Bridge 3 x 21.m 85 6 2 7 15 5 437.34 4953.51 5/218 Dhanha-Ratwal Bridge Inaugurated on 26.11.213 work in Progress : West Champaran (Bettiah) :- L.A. Proposal - 65.937 acre. (Approx) Proposal for L.A. has been submitted to D.M. West Champaran. SIA - ADRI (Rs. 18.54 Lacs deposited to DLAO Bettiah vide SPE Letter 1352 dated 4.11.216. ADRI has allready visited the site and SIA. report submitted by ADRI to D.M. Bettiah. Export Committee has submitted Report on 29.4.217. Verified Report has been received by Civil S.D.O., Bagha Vide Letter - 19 Dt. 13.1.217. Notification is preparing under section 11(1). L.A. office for L.A. work. Rs. 12,22,8,466. demanded by D. L.O., Bettiah. to pay the compensation of Land. by the Letter 28 Dt. 15.1.218. The departmental has paid the demanded to D.L.O. Bettiah vide cheque 2438 dt. 13.2.218 of ICICI Bank by letter no. 155 (WE) dt. 13.2.218 4 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1
1 Construction of Northern Approach (Sonpur Side) of Rail cum Road Bridge over river Ganga near Digha Ghat. Saran Rs. 24498.95 L 7175 (S) dt. 5.8.15 Ph-I 7548.63 Lakh/ Ph-II 11729.51 Lakh Ph-I 2.56 Km/ Ph-II 3.143 Km Ph-I 12.12.215/ Ph-II 16.2.218 Ph-I 11.12.216/ Ph-II 15.2.22-3.6 19175.23 - Inagurated on 11.6.217 & opened to traffic. Work under process. L.A. under process for 46.11521 Acre Land. Section-11 Notified Vide DM Saran letter 1156 dated-11.9.217 notification under section- 19 (in process). Work awarded to S.P. Singla Construction Pvt. Ltd., Panchkula Haryana. Time line Land likly tobe made available upto March 218. Approach road upto NH-19 (old alignment) likly tobe completed by December 218. Approach road including RoB (Complete Project) upto NH-19 (new alignment) likly to be completed by February 22 11-1 Construction of Flyover (2+2 lane of Carriage way 5.5 m) from Mithapur ROB to Chiraiuatand Flyover via station Road (854m eleveted 27m ramp) and extension of Chiraiyatand Flyover (1+2 lane Carriageway 7.5m) upto Gandhi Maidan in exhihition road (612 elevated + 147m field up) in town in the state of Bihar. S.P. Singla Construction, 11-42143697, 951688799 ACA+ Rs.16785. Lac L.N.-1 (S) dt. 8.2.13 Rs. 971.12 Fly over Bridge 28.6.13 27.12.215 3.4.216 1 1 1 1 28.72 1445.41 6/17 12/17 Inagurated on 26.12.217 and opened to traffic. 12 Construction of Pontoon Bridge in U/S & D/S parallel to Mahtma Gandhi Setu under district. Length- 2x15 m Length Approach- 5 m 711 (S) 31-7-215 8947.24 Pontoon Bridge 29.12.215 28.6.217 _ Barell- 676 Nos 492 Nos. Set - 338 Sets 246 Sets 5 5. 998.7 6/17 12/17 172 Sets of Pontoon installed in one lane and opened to traffic on 6.12.217. Rest 166 sets ready for use of another places. Revised Estimate submitted for approval. 5 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1
Khagaria Construction of 4-lane high level RCC bridge 1.84km & Approach Road 1.87Km & Guide Bunds at VijayGhat, Naugachia over river Kosi in the district of 13 Bhagalpur, Bihar. S.P.Singla Constructions 3/6/.. 1/7/21 1/1/214 Pvt. Ltd. 184 217 1 1 1 92. 43342.89 3.4.218 Bhagalpur 46784.87 vide letter No 963 (S) dated 7.2.217 2892. (i) Bhagalpur :- L.A. Proposal for (South end) - 129.125 acre (Land acquired) (ii) Bhagalpur :- L.A. Proposal for approach road (North end) - 4.45 acre. (Notified in section 21 by the DM vide letter no. 1 to 88 dt 5.6.217) Rs. 21.96 Crore has been payment made by check, dt - 13.2.217 for Rehabilitation work Rs. 6,9,49,5. has been paid to DLAO Bhagalpur. Permission has been shought by DM, Bhagalpur from Principal Secretory, RCD for transfer of compansation money from P.D. Account of Bhagalpur to SDO, Naugachhia. (iii) Bhagalpur : L.A. proposal for guide bund A1-39.795 acre (Land acquired) (iv) Bhagalpur : L.A. proposal for guide bund A2-25.92 acre SIA - ADRI, Rs. 12.8 Lakh deposited to DLAO for SIA, ADRI submitted report to DM, Bhagalpur on dt. 14.2.217 (v) Madhepura :- L.A. Proposal for approach road - 46.54 acre (Land acquired) 14 Gopalganj Construction of H.L. RCC bridge in Vishnupur Panchayat of Gopalganj of the river Gandak M/S Vasishta Construction Pvt Ltd. Ph- 9849767222 Connectivity Gopalganj 192 (3x6 Revised + 3x4) A/A including connectivity with NH- 28 & SH-54 82583.3 54857.7 (main bridge with approach) Approac h Road 1.6.29 3.11.213 15.12.217 1 1 1 99 Bridge inaugrated on 13.3.216 by Honble Chief Minister. West Champaran : - For 3m balance approach road L.A. is being done under Perpetual Lease. Out of 15 Raiyat (3.52 Acre) registry completed for 13 Raiyat (2.59 Acre). 2 Raiyat approached Honble High Court. Registry for rest 1 Raiyat could not done due to absent of Raiyat. Balance work of approach road complete. Some rectification is to be done. Gopalganj :- Out of land acquisition required in 13 villages for 135.7475 Acre, Land has already been acquired in 1 villages (92.675 Acre) and transferred to BRPNNL. Fresh LRPs under new LA Act for 3 villages (43.68 Acre) is yet to be submitted.. 52155.597 15.3.218 West Champaran : - L.A. Proposal for all the 9 Mauza submitted for 67.453 Acres to DLAO West Champaran. After verification by DLAO office LA proposal for 3 Mauza Re-submitted. Rest proposal is under verificaton. Gopalganj : - As per direction of RCD vide letter 741 (E) dated 1.2.217 Collector Gopalganj has been requested to acquire the Land under LA act, 213. L.A. proposal for 3 Mauza under New L.A. Act, 213 has been submitted vide letter no-526(e), 527(E), 528(E), dt.31-7-217. SIA study is under process by A.N. Sinha Institute of Social Studies,. Amount for SIA study has already been deposited to A.N. Sinha Institute of Social Studies,. 6 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1
15 Arah Construction of H.L. R.C.C Bridge in between Ara of NH- 3 & Chapra of NH- 19 Via Babura Doriganj S.D.B./S.P.S. (J.V.) 93862481 Chapra Rs.676. / RCD Let No- 4714(s) dt-31.3.1 62578. 4 2x5+ 35x6+ 15x12 5/7/21 4/7/214 3.5.217 1 1 1 2 75 253.8 73243.29 Remaining 4 Lane Arah side & Guide bund likely to be completed June, 218 Inaugrated and opened for traffic Bridge and 4 Lane on Chapra side and 2 Lane on Arah side Inaugurated on 11.6.217 other 2 Lane on Arah side & Guide bund likely to be completed June, 218 work in progress:- BHOJPUR :- Total L.A proposal = 189.96 Acre. 43.88 Acre acquired out of 53.766 acre old notification. 29.52 Acre acquired from 39.77 acre perpetual lease proposal. Expert group report for 62.8135 acre land submitted to D.M. Bhojpur for Sec-11 on 17.3.217. Notification for 2.188 Acre land in Manachak Mauza has been published. R&R report has been approved by six men committee at level. Expert group reviewed the final SIA report and recommend for Sec-11 to Collector, Bhojpur for 63.37 Acre.Inspection of Plots for R&R report has been approved by six men committee at level. SARAN :- Total L.A Proposal = 35.489 acre 22.95 acre acquired out of 23.489 acre for approach road. For construction Main Guide Bund for 12.4 Acre of land for verification of proposal has been sent to D.M. Saran vide dated-16.9.216 & reminder on 17.1.217 16 Darbhanga Construction of HL RCC Bridge on Kosi River between Baluaha Ghat and Gandaul under RIDF- XV S.P.Singla Constructions Pvt. Ltd. Saharsa (i) Saharsa :- L.A. Proposal - 5.2741 acre The Land owner of Nagra & Khirho Villages has objected the type / rate of the Land. D.M. Saharsa has been requested to resolve the issue for 2.4 acre of Land. 7 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1
8 C:\Users\SKGUPTA\Desktop\February, 218 Progress Report English\English Mega Bridge Main file 28.2.218 Final Above 1