Great Lakes Navigation System Update

Similar documents
Great Lakes Navigation System

Harbor Maintenance Operations and Funding: Opportunities and Challenges for the Great Lakes Region

Great Lakes Navigation System

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation System Buffalo District

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation System Dreding Update

Great Lakes Navigation System Dredging Update

2011 Great Lakes Waterways Conference

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation System Buffalo District

Great Lakes Navigation System Dredging Update

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Great Lakes Navigation Update

STATUS OF THE COALITION. Chuck May, Chair Pro Tem

Great Lakes Navigation Program Update

Great Lakes Navigation

Great Lakes Navigation Stakeholder Meeting

Great Lakes Navigation Stakeholder Meeting

Great Lakes Navigation System

Great Lakes Waterways Conference

Great Lakes Dredged Material Management

Water Levels and Maintaining Access to the Great Lakes and Connecting Channels

Great Lakes Navigation System

Coastal Structures Risk Communication. Army Corps of Engineers. US Army Corps of Engineers BUILDING STRONG

Cleveland Harbor Dredged Material Management

Split Rock 100th anniversary. Superior Point Light. Eagle Harbor Lighthouse. Marquette Harbor Lightouse. Grand Island Lighthouse(before)

Collection number: TBRC -1 through 18 [TBRC-5 = PORTS]

2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION

NONMETROPOLITAN COUNTIES

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

TOTAL DOMESTIC TRADE RANK TOTAL FOREIGN TRADE

Buffalo District Navigation Program Overview

, 8:30 to 4:30 Monday - Friday 2375 Gordon Road Alpena Service Agency. 706 Chippewa Square, Suite

Operations and Maintenance Funding Allocation via Navigation Systems Optimization

Ohio Freight Conference Great Lakes Commercial Navigation

Kiwanis International

The Corps of Engineers Dredges on the West Coast

GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY

1 PERSON 2 PERSON 3 PERSON 4 PERSON 5 PERSON 6 PERSON 7 PERSON 8 PERSON

U.S. DEPARTMENT OF HUD 04/11/2017 STATE: WISCONSIN ADJUSTED HOME INCOME LIMITS

U.S. Army Corps of Engineers Wilmington District

James J. Flannery Aerial Photograph Collection Finding Aid

Inner Harbor Navigation Canal Lock. Victor A. Landry III Operations Manager, GIWW New Orleans District U.S. Army Corps of Engineers

Waterways Council November 10, 2017

Summer 2018 WI SUMMER FAIR GUIDE BROUGHT TO YOU BY WISCONSIN BUSY KIDS

USACE GALVESTON DISTRICT PROJECT UPDATE

Photography Guide U.P. of Michigan

Water Resources Update after NCGA Long Session

West Shore Sail Club 2016 CRUISING AWARDS

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

A new approach to evaluating the fiscal health of Michigan local governments: Comparing fiscal performance relative to available resources

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

MEDIA KIT 2017

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

Field Inspection Clients

Kentucky Lock Project Update Inland Waterways Users Board Meeting No. 84

Timesheets Clients. Fayette County GA. Carroll County AR. Gwinnett County GA. Pulaski County AR. Cook County IL. Brevard County FL.

Funding for Inland Waterways

INGHAM COUNTY TRAILS AND PARKS TASK FORCE MEETING 2

Grand Trunk Railway of Canada (United States Trackage Only)

7. Thrifty Outlet, MI 4677 Alpine Ave NW, Comstock Park, MI Norton Shores, MI 700 W Norton Ave, Muskegon, MI 49441

Wisconsin Genealogy Project

Chapter 8.0 Implementation Plan

Potomac River Commuter Ferry Feasibility Study & RPE Results

The Panama Canal: A Challenge to Efficiency in the 21st Century

Baltimore Harbor & Channels, Maryland and Virginia

Timesheets Clients. Carroll County AR. Bartow County GA. Pulaski County AR. Fayette County GA. Gwinnett County GA. Brevard County FL.

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

The St. Lawrence Seaway Traffic Report

Body Type. Body of Water. County State Determination Determination Source. Determination Reference

Timesheets Clients. Carroll County AR. Bartow County GA. Pulaski County AR. Fayette County GA. Gwinnett County GA. Brevard County FL.

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

Great Lakes Navigation System Buffalo District

30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG

State of Michigan Local Government FY 2011 Financial Data (by Population Category)

New Soo lock could leave drawing board

Structural List # Concrete Page 1 of 5 Hydraulic Cements and Supplementary Cementing Materials

MEDIA KIT 2018 GREAT LAKES SCUTTLEBUTT IS A COMPANY OF KYLEMEDIA

Presented to: City of Petaluma City Council

Crossing the Keweenaw Waterway in an Emergency with a U.S Army Floating Bridge

THE ST. LAWRENCE SEAWAY TRAFFIC REPORT 2011 NAVIGATION SEASON

AN AMERICAN SUMMER IDYLL

The St. Lawrence Seaway

Structural List # Concrete Page 1 of 5 Hydraulic Cements and Supplementary Cementing Materials

BS&A Online - Employee Self Service Clients

State of the Waterway 2017

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

MOBILE DISTRICT 2018 DREDGING PROGRAM

State of the Waterway 2017

Selection of State Energy Optimization Plan Administrator Case No. U-15800

Panama Canal Stakeholder Working Group Meeting

Port MacKenzie Rail Extension

GALVESTON DISTRICT Dredging Schedules

Human Resources Clients

Port Everglades Master/Vision Plan Update

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

Indoor Waterpark Resorts Expand Nationwide

Silver Line Operating Plan

Port MacKenzie Rail Extension

Transcription:

Great Lakes Navigation System Update Marie Strum U.S. Army Corps of Engineers Great Lakes Navigation Team November 12, 2015 US Army Corps of Engineers

Water Resources Reform & Development Act (WRRDA) 2014 WRRDA14 is an authorization bill; it provides authority or direction to the Corps, it does not provide funding Funding comes from Congressional Appropriations We are awaiting implementation guidance from HQ http://www.usace.army.mil/missions/civilworks/projectplanning/ LegislativeLinks/wrrda2014/wrrda2014_impguide.aspx 2

Great Lakes Commercial Harbors Two Harbors Lake Superior >10M Ton Harbor (13) 1-10M Ton Harbor (17) Duluth- Superior Keweenaw Waterway <1M Ton Harbor (30) Presque Isle Soo Locks MI Marquette Channels in Straits of Mackinac St. Marys River Little Bay de noc Grays Reef CANADA Cheboygan Washington WI Menominee Island Charlevoix Alpena Ogdensburg Sturgeon Bay Green Bay Kewaunee Frankfort Two Rivers Manitowoc Manistee Ludington Sheboygan Harbor Beach Oswego Port Washington Muskegon Saginaw MI Milwaukee Grand Haven St. Clair River Kenosha Holland Lake St. Clair NY IL Waukegan St. Joseph Rouge River Detroit River Monroe Chicago Harbor Michigan City PA IN OH 3

FY15 Additional Fund Allocations Additional Funding for Ongoing Work - Navigation Maintenance $45M - Deep-draft harbor and channel $165M - Small, remote, or subsistence nav $42.5M - Inland waterways $42M - Other authorized purposes $35M Criteria established by Congress for allocation of national O&M funding: Complete ongoing work to maintain authorized widths and depths Particular emphasis on places with a Coast Guard presence Enhance national, regional, or local economic development Promote job growth or international competitiveness National defense; public health and safety 4

FY15 Projects Funded from Additional Funds for Ongoing Work $6.0M Dredging - Rouge River, MI - Burns Harbor, IN - Sturgeon Bay, WI - St. Joseph Harbor, MI - Holland Harbor, MI - Waukegan Harbor, IL $3.3M Soo Asset Renewal $0.59M Chicago Lock Electrical Repair $2.122M Fox Locks Transfer Payment $1.2M Calumet Harbor dredged material management and shoreline protection 5

FY 15 Great Lakes Navigation Program $115.7M Great Lakes Navigation Operations & Maintenance Key Items $46.2M in Dredging (21 projects 3.1M cubic yards) $10.3M in Dredged Material Management $8.65M in Soo Asset Renewal $3.1M Emergency Funding Oct 31, 2014 Storm Dredging Muskegon, MI Pier Repair Grand Haven, MI - deferred Total FY15 Program $118.8M 6

FY15 Dredging Funding and Dredging Requirements Chippewa Harbor Silver Bay Grand Marais Taconite Lake Superior Two Harbors Eagle Harbor Lac La Belle Knife River Cornucopia Duluth- Superior Port Wing La Pointe Bayfield Keweenaw Waterway Grand Traverse Bay Big Bay Little Lake Whitefish Point Harbor MI Presque Isle Marquette Grand Marais Manistique Channels in Straits of Mackinac Grays Reef Soo Locks St. Marys River Detour Les Cheneaux Island Mackinac Island Little Bay de noc St. James Mackinac City Cheboygan WI Cedar River Menominee Oconto Pensaukee Big Suamico Green Bay Two Rivers Washington Island Sturgeon Bay Algoma Kewaunee Hammond Bay Petoskey Inland Route Charlevoix Leland Alpena Black River Harbor Greilickville Frankfort Harrisville Arcadia Au Sable Harbor Portage Lake Tawas Bay CANADA Ogdensburg Morristown Cape Vincent Sackets Harbor Manitowoc Manistee Point Lookout Port Austin Sheboygan Ludington Pentwater Saginaw Harbor Beach Port Ontario Oswego Port Washington White Lake Muskegon Grand River MI Black River Port Sanilac Lexington Milwaukee Grand Haven St. Clair River Commercial Recreational IL Kenosha Waukegan Holland Saugatuck South Haven Pine River Clinton River Lake St. Clair Rouge River Belle River NY St. Joseph Detroit River FY15 Funded Dredging FY15 Unbudgeted Dredging Need Chicago Harbor Chicago River Calumet IN St. Joseph River New Buffalo Michigan City OH Monroe Bolles Harbor PA 7

FY16 Corps Funding Status Awaiting FY16 Appropriation Funding based on FY16 President s Budget at this time 8

FY 16 Great Lakes Navigation $111.6M Great Lakes Navigation Operations & Maintenance Key Items $49M in Dredging (25 projects 3.4M cubic yards) $8.4M in Dredged Material Management $3.7M in Soo Asset Renewal 9

FY16 President s Budget Dredging Projects Beaver Bay Grand Marais Chippewa Harbor Lake Superior Two Harbors Eagle Harbor Lac La Belle Knife River Cornucopia Duluth- Superior Port Wing La Pointe Bayfield Keweenaw Waterway Grand Traverse Bay Big Bay Little Lake Whitefish Point Harbor MI Presque Isle Marquette Gladstone Grand Marais Manistique Channels in Straits of Mackinac Grays Reef Soo Locks St. Marys River Detour Les Cheneaux Island Mackinac Island WI Little Bay de noc Washington Cedar River Island Menominee Oconto Pensaukee Sturgeon Bay Big Suamico Algoma Green Bay Kewaunee Two Rivers St. James Mackinac City Cheboygan Cross Village Hammond Bay Petoskey Inland Route Charlevoix Leland Alpena Black River Harbor Greilickville Frankfort Harrisville Arcadia Au Sable Harbor Portage Lake Tawas Bay CANADA Ogdensburg Morristown Cape Vincent Sackets Harbor Manitowoc Manistee Point Lookout Port Austin Sheboygan Ludington Pentwater Saginaw Harbor Beach Port Ontario Oswego Commercial Recreational Port Washington Milwaukee Kenosha White Lake Muskegon Grand River Grand Haven Holland Saugatuck MI Black River Pine River Clinton River Lake St. Clair Port Sanilac Lexington St. Clair River Belle River NY President s Budget IL Waukegan Chicago Harbor Chicago River Calumet IN South Haven St. Joseph St. Joseph River New Buffalo Michigan City OH Rouge River Detroit River Monroe Bolles Harbor PA 10

Quantity Dredged (millions of cubic yards) Dredging Funding Trends 2007 2016 6.0 5.0 4.0 Appropriation - Add'l Funds for Ongoing Work ARRA (Stimulus) 3.0 2.0 1.0 3.3M Annual Reqm t L. Superior Regional Provisions Michigan Regional Provisions Commercial Regional Provisions Energy & Water Adds President's Budget 0.0 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16

Today 12

The Soo Locks Lynch Pin of the Great Lakes Navigation System 70% of the commercial commodities transiting the Soo Locks are limited by size to the Poe Lock Aging and deteriorating infrastructure; unscheduled outages increasing There is currently no redundancy for the Poe Lock The alternate transportation cost of a 30-day unscheduled closure of the Soo Locks = $160M 13

Reliability Improvement Paths Asset Renewal Maximize reliability and reduce the risk of catastrophic failure through 2035 Work began in 2007 and would be complete in 2019 with optimal funding Critical issues O&M funded as needed Current major reliability concerns on both Poe and MacArthur Locks Major Rehabilitation Preparation of a Poe Lock Major Rehab Report (MRR) underway Feasibility study requiring 3 years and $2M to complete $500k received in FY14; $1.0M in FY15; $500k scheduled for FY16 Ultimately funded through Construction General (CG) if approved Construction of a Poe-Sized Redundant Lock Originally authorized in 1986 2005 Limited Reevaluation Report (LRR) resulted in BCR of 0.73 Economic Reevaluation Report will reanalyze benefits and costs 14

Funding, $M Soo Locks Asset Renewal Long-Term Plan Asset Renewal Plan will maximize reliability and reduce risk through 2035 $47.2M funded to date through FY14 New hydraulics, stop logs, utilities Compressed Air System Gate Anchorage Replacement Mac Lock Controls Replacement Remaining key priorities Poe Miter and Quoin Block Replacement Poe Electrical Rehabilitation Poe Lock Gate 1 Replacement Pier rehabilitation 30 25 20 15 10 5 Funded Requirements 0 FY08 FY10 FY12 FY14 FY16 FY18

Major Rehabilitation Report Efforts First step was an SQRA (Semi Quantitative Risk Assessment), conducted in summer 2014 with a report completed in 2015 - Used for portfolio ranking and determination of whether further and more detailed analysis is necessary Purpose is to identify Probable Failure Modes that warrant further analysis Four primary concerns were identified: West Center Pier Embedded Anchorages Mis-mitering of gates Gas line leak or break in deep service tunnel 16

New Poe-Size Lock WRDA 2007: Construction at 100% federal expense Inconsistent with Administration policy due to BCR of 0.73 Conducted a partial benefits reanalysis to determine if some benefit categories were not captured or if insufficient information was used. Completed in Dec 2014. 17

2005 New Lock BCR Issues Reliability and unmet demand were not considered in the 2005 BCR calculation Assumption that 100% of commodities would be delivered in an extended outage is not possible Rail lines, rail cars, locomotive capacity were all assumed as sufficient, which is not true according to rail industry Most steel mills cannot even receive iron ore by rail There would be a significant unmet demand in an extended outage Assumption of Poe Lock major overhaul in 2017 not accurate due to constrained funding Probabilities of component failures have increased; and we have better risk assessment tools through Asset Management Assumption of new vessels being Mac Lock sized is no longer true; new vessels will be Poe-restricted 18

Economic Reevaluation Report The outcome of Partial Benefits Analysis in 2014 was that a level 3 Economic Reevaluation Report (ERR) is warranted as described in Civil Works Policy Memorandum 12-001 Economic data is > 5 yrs old A reprogramming request was submitted to HQ in May 2015 for $1.3M to fund the ERR Specialists from several Districts will be involved along with the Planning Center of Expertise for Inland Navigation (Huntington) and the Civil Works Cost Engineering MCX (Walla Walla) The entire ERR process is expected to take 24 months from the receipt of funds 19

Asset Renewal Path Forward Summary Continue to fund asset renewal through normal O&M budget procedures Major Rehabilitation Report (MRR) Complete necessary further refinement of reliability of critical components and continued economic modeling with FY15/16 funding New Lock - Economic Reevaluation Report (ERR) Will take a fresh look at Benefits as well as Costs Will utilize all information prepared during the first two years of MRR work including information summarized in the SQRA 24 months to complete report and all reviews from receipt of funding; looking for ways to gain efficiencies. 20

Questions 21