Similar documents
L&T WESTERN ANDHRA TOLLWAYS LTD (A SUBSIDIARY OF L&T IDPL)

Development of Road Infrastructure in India

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

S. No. State Name of the Field Office Nodal Office I. Uttar Pradesh 1) Agra Kanpur. II. Uttarakhand 9) Dehradun Dehradun

ROAD DEVELOPMENT IN INDIA 2015

ROADS April Contents. Advantage India. Market overview. Investments. Regulatory framework. Opportunities. Industry associations

CORPORATE PRESENTATION MARCH

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

JULY - SEPTEMBER, 2015 satya VOICE A QUARTERLY UPDATE OF SATYA GROUP

COMPANY PROFILE RESOTECH CONSULTANCY SERVICES PVT. LTD.

VOLLEYBALL FEDERATION OF INDIA

GMR Infrastructure Limited, Q1-FY 11 Performance Highlights. Financial Highlights for Q (Rs. Cr.)

ICT LIBRARY UPDATE. Contents. Prepared by : Neeru Saini Librarian. Bi-monthly July Oct Vol. X : No. 4 & 5

Phasing & Cost Estimates

2 AGATTI Airports Authority of India, Agatti Airport Controller

A QUARTERLY UPDATE OF SATYA GROUP

PPP Days 2010 PPPs Lessons from the Last 18 Months

GENSOL S SOLAR PV EPC PORTFOLIO

One Under-rated achievement of the Delhi Master Plan MPD 2021 wins the ISOCARP award 2008 for Urban planning.

ICT LIBRARY UPDATE. Bi-monthly Sept. Dec Vol. 14 : No Contents

THE ASSET BUILDERS CORPORATE PROFILE

6rKL+tv. Ref: As per Schedule-P, Volume-ll of Concession Agreement.

ROADS For updated information, please visit March 2019

Puri Pratham Project Highlights

List of Life members of IWP as on 4 th July 2016.

Own a Property Nr. Airport

BOOKLET NO. ITEWS/NWAY1/LZ...

Table-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.

Presentation on City Gas Distribution (CGD) Pipeline Network Projects in Smart Cities

Capital Mall. The best of retail, entertainment and hospitality under one roof!

ICT LIBRARY UPDATE. Bi-monthly March June 2016 Vol. 14 : No. 2 & 3. Contents

DELHI MANESAR INDORE GURGAON JAMMU

DETAIL OF THE PROJECT

COMPANY PROFILE RESOTECH CONSULTANCY SERVICES PVT.LTD.

BESTECH GROUP. BESTECH has an envious portfolio to its credit, with a formidable in-house construction arm engaged across the four verticals.

Intercontinental Consultants and Technocrats Private Limited

AIRPORT AT JEWAR An international airport with a capacity to handle million passengers per year will come up at Jewar in Greater Noida in the ne

GMR GROUP PROFILE. GMR Group is a global infrastructure major with interests in Infrastructure. Founded in 1978, the

Network Size and Growth

Domestic Tourism Statistics in India

BESTECH GROUP. BESTECH has an envious portfolio to its credit, with a formidable in-house construction arm engaged across the four verticals.

Route Survey Photo Album

DETAILS OF COCO OUTLETS- UPDATED AS ON 03 APR 2017

BRINGING IT ALL TOGETHER S E C T O R , G U R G A O N

Approved Master (layout) Plan (as on ) S. No. State Name of the Zoo Category. 3. Pillalamarri Deer Park, Mahabubnagar, Andhra Pradesh

Pedro B. Ortiz MEGA-MUMBAI / MAHARASHTRA SOUTH ASIA S CAPITAL REGION

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement

LIST OF ESIC HOLIDAY HOME

2. Alpha Test House, New Delhi Delhi Private Suspension revoked w.e.f

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly


AIRPORTS. November 2010

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

PUNJAB NATIONAL BANK HUMAN RESOURCES DEVELOPMENT DIVISION HEAD OFFICE : NEW DELHI LIST OF CIRCLE HEADS

New Faridabad One of the most planned and fast developing areas in Delhi NCR. Faridabad At the epicentre of Delhi NCR AMANVILAS.

Information for Investors

Multimodal Logistics Professionals

SECTOR 89, FARIDABAD. Lavender Floors A T A M A N V I L A S, F A R I D A B A D

SBIBRCODE CIRCLE BRANCH CITY 847 HYDERABAD HYDERABAD MAIN HYDERABAD 3257 HYDERABAD YELLAREDDYGUDA HYDERABAD 4031 HYDERABAD CB SECUNDERABAD HYDERABAD

Contact and other details of SEZs established/notified prior to SEZ Act, 2005

AMANVILAS PLOTS A T A M A N V I L A S, F A R I D A B A D

IL&FS Transportation Networks Limited Analyst Presentation November 2013

IL&FS Transportation Networks Limited Analyst Presentation December 2016 CIN - L45203MH2000PLC129790

GOLDMINE FROM EARTH. In Sec.88, Gurgaon

UNIFYING DIVERSIFICATION

Investment Opportunities DMIC UP Region

National Biodiversity Strategy and Action Plan, India

IL&FS Transportation Networks Limited Analyst Presentation February 2014

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

CORPORATE PROFILE 2017

IL&FS Transportation Networks Limited Analyst Presentation November 2014

India - State-wise Wastelands Distribution (Percentage to total geographical area)

expect faridabad's finest

DAINIK EXPRESS. Largest, Highest and Biggest in India. Team of DAINIK EXPRESS

Road Development in India Weekly Newsletter June 24 June 30,

IL&FS Transportation Networks Limited Analyst Presentation August 2015 CIN - L45203MH2000PLC129790

SN State City Exam Centre Name and Address Phone

Article 13, clause no of the Concession Agreement states that:

2. Wages and Earnings

IL&FS Transportation Networks Limited Analyst Presentation September 2016 CIN - L45203MH2000PLC129790

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

POYSHA INDUSTRIAL ESTATE. N.I.T. Faridabad

Sub. Rev Eng. Ad. Rev Hin. Ad. Rev Ver. Ad. Rev.

Q1 FY18 Earnings Presentation 17 July 2017

MUMBAI 4 6 Sept member of. Show Report

CARLSON REZIDOR ACCELERATES GROWTH MOMENTUM WITH 12 NEW HOTEL SIGNINGS IN 2017

Public Private Partnership (PPP) in Airport Infrastructure

WESTERN INDIA REGIONAL COUNCIL OF THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA

DIRECT PUBLIC INVESTMENT

TENTATIVE VACANCIES OF S.S.O. IN ALL OFFICES 1st October, 2017

Sample Size and Allocation (ICE 360 o Survey, 2016)

LIST OF FINAL TEST REPORT(S)

DELHI MASTER PLAN INSIGHTS

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

Issue 10. micrometer. data as of 30 th June 2014

Issue 10. micrometer. data as of 30 th June 2014

SECTOR 89, FARIDABAD PLOTS A T A M A N V I L A S, F A R I D A B A D

Transcription:

RelevantWorkExperience Engineering Design Consulting Services for 4 laning of Nagpur-Betul Section of NH-69 (Total Kms 176) in the state of Madhya Pradesh and Maharashtra under NHDP Phase IV on DBFOT (Annuity) basis BillofQuantities ConstructionMethodandPlaningServices CostEstimate DetailedProjectReport DrainageDesign FeasibilityStudy GeometricDesign FinancialModeling HighwayDesign PavementDesign PretenderEngineering ProjectManagement/ConstructionSupervision ProofChecking/IndependentDesign/DesignReview QualityAssuranceandQualityControl SiteInvestigations Structural/BridgeDesign TrafficSurvey,analysisandProjectionandRoadSafety UtilitiesDesign ManagementConsultancy DPR for improvement operation and maintenance including strengthening and widening of existing 2 lane road to 4 lane dual carriageway from 50.000km to 100.000 km of NH-6 (Kondhali-Talegoan section) in the State of Maharashrta on BOT basis DPR for Kotdwar-Kalagarh-Ramnagar Motor Road. Length 88 Kms DPR ffor 7 nos. Bypasses of 2 lane/2-lane with paved shoulders configuration in Jharkhand of Package no. DPR/ Bypass-03 for Bypasses at Chaibasa, Lohardaga & Khunti Construction Method and Planning Services (CMPS) for structures on Indore Khalghat Section on NH-3 Detailed Design of Bridges for Himalayan Highway from Himachal Pradesh / Uttranchal Border to Mussoorie via. Tuni and Chakrata Consultancy Services for Preparation of Feasibility- Cum-Preliminary Design for 4/6 Laning of Ludhiana- Talwandi NH-95 Length (84 km) Stretch of National Highways to be executed as BOT (TOLL) Project on DBFO Pattern under NHDP Phase-III for Group B(NHAI/ DBFO II/DPR/06) Consultancy Service for survey, Investigation and Preparation of Detailed Project report for construction of Bridges in Km 163 (Bahela River), Km 173 (Naina River), Km 202 (Bhakra River) of NH-74 and Km 10 (Khakra River) of NH-125 Consultancy for Design / Drawings of staging for ROB at KM.83.250 on Chinna-Salem Bypass (RTN Project) Consultancy services for design modification of Bogibil bridge across the Brahamputra River in Assam Consultancy for Cargo Road to IGI Airport, New Delhi Modification of T-2 Access Road at IGI Airport, New Delhi Review of detailed design for 4-laning from Km 50 to Km 100.0of NH-6 (Kondhali-Talegaon section) on BOT basis for Oriental Pathways (Indore) Pvt. Ltd. Page1of4

RelevantWorkExperience Design review of 4-laning from Km 17.566 to Km 62.295 of NH-11 (Agra-Bharatpur Section) on BOT basis for Oriental Pathways (Agra) Pvt. Ltd. Review of detailed design for 4-laning from Km 12.26 to Km 84.7 of NH-3 (Indore-Khalghat section ) on BOT basis for Oriental Pathways (Indore) Pvt. Ltd. Proof Checking and Design of Azadpur flyover at Delhi Proof Checking of Underpass at Rotary near domestic airport along road connecting to Dwarka Proof Checking of Design & Drawing of Seven Nos. of underpasses of KMP Expressway. Design Proof Checking of Design & Drawing of Major items (irrigation structures) at Kundli camp of Kundli Manesar Palwal of KMP Expressway Development of access controlled 4/6 lane Kundli- Manesar-Palwal Expressway in the state of Haryana on BOT basis - Proof checking of Minor Bridges BillofQuantities ConstructionMethodandPlaningServices CostEstimate DetailedProjectReport DrainageDesign FeasibilityStudy GeometricDesign FinancialModeling HighwayDesign PavementDesign PretenderEngineering ProjectManagement/ConstructionSupervision ProofChecking/IndependentDesign/DesignReview QualityAssuranceandQualityControl SiteInvestigations Structural/BridgeDesign TrafficSurvey,analysisandProjectionandRoadSafety UtilitiesDesign ManagementConsultancy Proof Checking of Design & Drawing of Via-duct for trumpet of Kundli Manesar Palwal of KMP Expressway. Proof Checking of Design & Drawing of Bridges over BWS and Bahadurgarh Minor at NH-10 crossing KMP and trumpet at junction of NH-10 and KMP Exit /Entry toll plaza of Kundli Manesar Palwal of KMP Expressway Proof Checking of Design & Drawing of Canal Bridge with Pile Foundation of KMP Expressway Pre-tender engineering for four laning of Patna- Bakhtiyarpur Section of NH-30 from km. 181.300 to Km 231. 950 in the State of Bihar under NHDP Phase III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis Pre-tender engineering for four laning of Belgaum- Khanapur Section (Km0.000 to Km 30.000) and Two laning with paved shoulder of Khanapur-Karnataka/Goa border section (Km 30.000 to Km 84.120) of NH-4A in the state of Karnataka under NHDP Phase III through PPP on DBFOT (Toll) basis Pre-tender Survey and Preparation of BOQ for Eastern Peripheral Expressway Pre-tender engineering for 24 Border Check Post Project in Madhya Pradesh Pre Tender Engineering for 4-laning of Beawar Udaipur Road from Km.58.245 to Km.177.000 of NH-8 in Rajasthan Page2of4

RelevantWorkExperience Pre Bid Advisory Four Laning of Bareilly-Sitapur Section of NH-24 Pre Bid Advisory for Six Laning of Samakhiali Gandhidham Section NH-8A Pre-tender engineering services for improvement, operation and maintenance including strengthening and widening of existing 2-lane road to 4-lane dual carriageway from KM 100.0 to KM 152.0 of NH-16 (Talegaon Amrawati Bypass) Pre-tender engineering for rehabilitation and upgrading 4/6 lane divided carriageway of Khalghat MP/ Maharashtra Border Section of NH-3 Traffic Survey, analysis and projection for Surat- Dahisar section of NH-8 for OSE-LCI JV BillofQuantities ConstructionMethodandPlaningServices CostEstimate DetailedProjectReport DrainageDesign FeasibilityStudy GeometricDesign FinancialModeling HighwayDesign PavementDesign PretenderEngineering ProjectManagement/ConstructionSupervision ProofChecking/IndependentDesign/DesignReview QualityAssuranceandQualityControl SiteInvestigations Structural/BridgeDesign TrafficSurvey,analysisandProjectionandRoadSafety UtilitiesDesign ManagementConsultancy Project Management Consultancy Services for 4 Laning of Madhya Pradesh / Maharashtra Border Nagpur Section of NH-7 from Km.652.000 to Km. 729.000 including Construction of Kamptee-Kanhan and Nagpur Bypasses in the state of Maharashtra under NHDP Phase- II on Design, Built, Finance, Operate and Transfer (DBFOT basis) [Nagpur Bypass] PMC of Three major river bridges near Tirukkovilur, Vriddhachalam and Chidambaram (TNRSP-01) PMC for Improvement, operation and maintenance including strengthening and widening of existing 2 lane road to 4 lane dual carriageway from km 12.6000 to Km 84.7000 of NH-3 (Indore-Khalghat Section) PMC for Improvement, operation and maintenance including strengthening and widening of existing 2 lane road to 4 lane dual carriageway from Km. 50.000 to Km 100.000 of NH-6 (Kondhali-Talegaon Section) in the state of Maharashtra PMC for Strengthening and widening of existing 2-lane road to 4 lane Dual carriageway from Km 17.756 Km 62.295 of NH-11 (Agra-Bharatpur Section) Supervision Consultancy for the work of Strengthening and paving of shoulders from Sarkhej to Viramgram of SH-17. Length 48 Kms Supervision Consultancy for construction of New Airport at Lengpui Sub-consultancy on preparation of Design & Drawings for Balanced Cantilever bridge on Jagashri Kait Kalanaur Road over WJC in Yamunanagar Distt. Consultancy services for the rehabilitation of Airfield Pavements at Takoradi, Ghana Page3of4

RelevantWorkExperience Material testing, mix designs and construction supervision of major -bridge over Vena River (Nagpur- Adilabad section of NH-7) for Oriental Structural Engineers Pvt. Ltd. Working Procedure Manual for Agra-Bharatpur BOT Project [Management Consulting Services] BillofQuantities ConstructionMethodandPlaningServices CostEstimate DetailedProjectReport DrainageDesign FeasibilityStudy GeometricDesign FinancialModeling HighwayDesign PavementDesign PretenderEngineering ProjectManagement/ConstructionSupervision ProofChecking/IndependentDesign/DesignReview QualityAssuranceandQualityControl SiteInvestigations Structural/BridgeDesign TrafficSurvey,analysisandProjectionandRoadSafety UtilitiesDesign ManagementConsultancy Working Procedure Manual for Indore-Khalghat BOT Project [Management Consulting Services] Working Procedure Manual for Kondhali-Talegaon BOT Project [Management Consulting Services] Financial and Technical Audit of Toll Plaza on 4-lane dual Carriageway from km 50.000- km 100.000 of NH-6 (Kondhali Talegaon Section) in the State of Maharashtra on Build, Operate and Transfer (BOT) basis Conduct Road Safety Audit for 4 laning of Tondapalli (Km 22.300) to Jadcherla (Km 80.00) section of NH-7 in the state of Andhra Pradesh Conduct Road Safety Audit for 4 laning of Adloor Yellareddy (Km 367.00) to Gundla Pochanpalli (Km 464.00) section of NH-7 in the state of Andhra Pradesh Conduct Road Safety Audit for 4 laning of Tinidivanam to Ulundurpet from Km 121 to Km.192.250 on NH-7 in Tamilnadu Conduct Road Safety Audit for 4/6 Laning of Kothakota to Kurnool Section of NH-7 from Km 135/400 to 211 Km.AP-05 Project Project planning and structural design of 12 Towers each of 13 floors comprising of super deluxe apartment complex in 11.50 lac Sq.Ft. in Central Park-I in Sector - 42, Gurgaon Engineering Design and Project Management Consultant of 1600 apartments and penthouses, 220 serviced apartments and 320 room hotel in 50 Acre residential project in Central Park-II in Sector -48, Gurgaon Page4of4