HS11/HS12 Mk2 Route Loadings

Similar documents
Pritlewell Station - Mobile Catering Opportunity

Connecting local communities

Penalty Fares Scheme. Comments by Transport Focus. Abellio East Anglia Ltd. 16 October Abellio East Anglia Operating Route October 2016

Anglia Winter Key Route Strategy (KRS) 2017/18

Suffolk Chamber Transport Board Greater Anglia. 16 January 2018

To provide the best possible service during the Thameslink construction work at London Bridge;

Current Contents of Website, and Version History V5.17

Coach Routes

Cross-London Inter-Regional Connections

Stakeholder News. // 4m service. Welcome from MD, Jamie Burles. improvements. Issue 11 September 2015

May 2019 Timetable. Highlights and Response to Feedback

Stakeholder News. //Class 321. Welcome from MD, Jamie Burles. refurbishment. Issue 12 November 2015

Southeastern contingency timetable Issue 1

PROPOSALS FOR MEDIUM AND LONG TERM DEVELOPMENT

HS8/HS9 Mk2 Route Loadings

The case for a local rail station. At Great Blakenham, Suffolk.

Version 1.3. Last updated 11th November NB All cup slots are TBC until the first round and subsequent draws are made

Media Information WIN WIN. Sweet Septembers Take a spin down Memory Lane. Thetford Grammar School celebrates 450 years

Kingsnorth Commercial Park

NETWORK RAIL Anglia Route AR 9

45,000 SQ FT HEADQUARTERS BUILDING AVAILABLE TO PRE-LET

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

45,000 sq ft headquarters building available to pre-let

Railfuture East Anglia Seamless Public Transport in East Anglia How well integrated are trains and buses?

SEASIDE & COUNTRY HOMES AREAS AND PROPERTIES GUIDE

Early May Bank Holiday Travel Summary 2012

YOUR SPACE COLCHESTER

Railfuture East Anglia Autumn 2018 Public Meeting

DC240 TO LET. 10,515 sq ft (980 sq m) high quality offices with exceptional car parking. high quality offices

Phase II provides a further 45 acres for industrial and distribution space (B1/B2/B8); 25,000 sq ft 850,000 sq ft

Edition 150: June 2011

September 2018 July 2019

Cycle Tendring. Great Bicycle rides around the Clacton and Great Bentley area

EAST SUFFOLK LINES. Stations Investment Plan. Produced by the East Suffolk Lines Community Rail Partnership

Traditionally designed 2, 3 & 4 bedroom homes

IMPORTANT. Anyway, here is the list of the sections of routes on which passes may be used: 007 Deal Canterbury Bluewater Eltham Eltham VCS

Bus Passenger News April 2016

Woodbridge School Bus Routes

NEW BUSINESS AND LOGISTICS PARK. suffolk-park.uk SUFFOLK PARK BURY ST EDMUNDS IP32 7QB

Freedom of Information request Re: paragraph 3.19 and Figure 11 of the NAO s July 2005 report on Maintaining and improving Britain s railway stations

NEW INDUSTRIAL AND LOGISTICS PARK SUFFOLK PARK BURY ST EDMUNDS IP32 7QB. 50, ,000 sq ft (4,745-69,667 sq m).

TENDRING DISTRICT COUNCIL. Planning Department

SCIENTIFIC RESEARCH AND DEVELOPMENT

COMMUNITY TRAVEL GUIDE

A superbly positioned new development comprising eighteen high specification three, four and five bedroom family homes.

25/27 Tavern Street, Ipswich, IP1 3AD LET TO THE 5A1 COVENANT OF VODAFONE LTD PRIME RETAIL HIGH STREET INVESTMENT

Archived News & Gen Week commencing 18/03/12

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB

TWO NEW LOGISTICS /WAREHOUSE UNITS TO LET/FOR SALE. suffolk-park.uk SUFFOLK PARK. SP ,241 sq ft (13,679 sq m) SP ,491 sq ft (19,183 sq m)

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

NEW GRADE A INDUSTRIAL / DISTRIBUTION BUILDING 47,060 SQ FT TO LET

Services to Colchester schools

Arriva Rail London. Arriva Trains Wales. Chiltern Railways. Abellio ScotRail. CrossCountry. Alliance Rail. Colas Rail. ESG No. c2c.

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff

Stansted, Cambridge, Leicester & Nottingham to Birmingham & Cardiff

OBJECTION BY THE ESSEX LOCAL ACCESS FORUM (ELAF) see also OBJ/142

95,000 sq ft of easy access

NEW ENTERPRISE ZONE DEVELOPMENT SUFFOLK PARK BURY ST EDMUNDS IP32 7QB. HIGH QUALITY BUSINESS SPACE DESIGNED FOR YOU FROM 2,000 to 75,000 sq ft

Technical specification: BS 4449:2005 GRADE B500B BAR AND COIL

Making rail accessible. Helping older and disabled passengers

EAST WEST RAIL EASTERN SECTION. prospectus for growth

Focused on partnership

TWO NEW LOGISTICS /WAREHOUSE UNITS TO LET/FOR SALE. suffolk-park.uk SUFFOLK PARK. SP ,241 sq ft (13,679 sq m) SP ,491 sq ft (19,183 sq m)

5-7 NORTH STREET, SUDBURY, SUFFOLK, CO10 1RB

London Medway Commercial Park

Bus Passenger News September/October 2016

Leicester & Nottingham to Birmingham & Cardiff

Capital Project Business Case Colchester to Clacton Route Based Strategy

Leicester. Leicester. Commercial Park. 95,978 sq ft of warehouse / distribution space

UNITS 4 & 5 AVAILABLE TO LET CV35 9JY TWO NEW INDUSTRIAL / WAREHOUSE OPPORTUNITIES ON AN ESTABLISHED PARK

City employment: An overview from the Business Register & Employment Survey (BRES)

83 85 FORNHAM ROAD BURY ST EDMUNDS

SUFFOLK CO10 1RB. Well Secured Prime High Street Retail Investment

A12 Chelmsford to A120 widening Have your say

Northampton Commercial Park

Opportunity for up to 2 million sq ft for Offices, Research & Development, Warehousing, Production and sustainable uses

Oakley Hay, Corby RANGE OF AREAS BETWEEN 3.17 ACRES (1.28 HECTARES) ACRES (7.16 HECTARES) SAT NAV: NN18 8HS

Northampton Commercial Park

PHASE 2 UNDER CONSTRUCTION


RUGBY GATEWAY RG-2 290,000 SQ FT SPECULATIVE UNIT TO LET JUNCTION 1 M6 CV23 0XF OCCUPATION FROM SEPTEMBER

Stage Colchester Tendring Braintree Call for Sites On going Completed August- October December 2016 December February 2017

commercial office retail WITHAM ESSEX CM8 1FR

Adapting to the future. Southeastern Sustainability Report 2018

LONDON MEDWAY COMMERCIAL PARK+ PLOT 8

Derby Commercial Park

News & Gen Report for week commencing 4 th July 2010

SUFFOLK PARK BURY ST EDMUNDS IP32 7QB NEW INDUSTRIAL AND LOGISTICS PARK. BUILD-TO-SUIT OPTIONS FROM 50, ,000 sq ft suffolk-park.

YouGov PlaceIndex results

PHASE 3 UNDER CONSTRUCTION

Bigfoot s Back! Royal Oak Distribution Centre Daventry, East Midlands, NN11 8QL

Census 2011: City snapshot

RAILFUTURE. campaigning by the Railway Development Society. A I R P O R T L I N K S

Derby Commercial Park

Centrum Logistics Park Burton-Upon-Trent DE14 2SY

Passenger requirements during resignalling disruption. Report of research findings

TIMETABLES ETC in the collection of John Hinson

Archived News & Gen Report Week Commencing 25/12/16

Cabinet. South Western Railway Timetable Consultation Response. Date of Meeting 6 December 2017

Rochford Road

Transcription:

HS11/HS12 Mk2 Route Loadings Introduction Deriving the route loadings for a given service plan can be a difficult and tedious matter, and very prone to error. Furthermore, understanding what a given loading consists of can be problematic at a later time, requiring effectively as much effort to interpret as it originally took to produce (the only way reliably to work it out is effectively to regenerate it). For my own convenience as much as anything else, the present article elucidates the route loadings corresponding to service plans 3 and 4. Service Plan 3 is the full service plan for HS11/HS12 Mk1A, and SP4 for Mk2. The changes at Mk2 (and indeed from Mk1 to Mk1A) are slight, probably the least significant of any of the proposed routes. The present article, though really of no interest to anyone but myself, will nonetheless be published on the website, just in case anyone feels moved to challenge my figures, in which case they will be able to see how I derived them, without having to challenge me personally. The service plans are given in full, since otherwise the information would not be self-contained, and would require consulting the original Route and Service Plans article also. HS11/HS12 Mk2 Route Loadings v1.0 Page 1 of 12

Service Plan 3 HS11 (all HS Metro): 2tphH [HS4 Cardiff Airport >] Euston Cross Stratford HS South Shenfield HS Southend Airport Southend HS Grain Sheerness Faversham Canterbury East Dover Priory. 2tphH [HS7/HS4 Bristol Temple Meads BT >] Euston Cross Stratford HS South Shenfield HS Southend Airport Southend HS Grain Sheerness Faversham Canterbury East Dover Priory. Regional Metro: 4tphRS Liverpool Street Stratford Shenfield Wickford Rayleigh Hockley Rochford Southend Airport Prittlewell Southend Victoria 2tphR Charing Cross Waterloo East London Bridge Ebbsfleet Rochester Chatham Gillingham Rainham Newington Sittingbourne Teynham Faversham (split/join) : Whitstable Chestfield and Swalecliffe Herne Bay Birchington on Sea Westgate on Sea Margate Broadstairs Dumpton Park Ramsgate Selling Canterbury East Bekesbourne Adisham Aylesham Snowdown Shepherd s Well Kearsney Dover Priory 2tphR Victoria Bromley South Strood Rochester Chatham Gillingham Rainham Newington Sittingbourne Teynham Faversham (split/join) : Whitstable Chestfield and Swalecliffe Herne Bay Birchington on Sea Westgate on Sea Margate Broadstairs Dumpton Park Ramsgate Selling Canterbury East Bekesbourne Adisham Aylesham Snowdown Shepherd s Well Kearsney Dover Priory Representative Hourly Cross-Platform Connections at Southend Airport: 00H [HS4 Cardiff HS >] Euston Cross Dover Priory RS Liverpool Street Southend Victoria 15H [HS7/HS4 Bristol Temple Meads BT >] Euston Cross Dover Priory RS Liverpool Street Southend Victoria repeating at 30 and 45 minutes past. Representative Hourly Cross-Platform Connections at Faversham: 00H R 15H R [HS4 Cardiff HS >] Euston Cross Dover Priory Charing Cross Ramsgate / Dover Priory [HS7/HS4 Bristol Temple Meads BT ->] Euston Cross Dover Priory Victoria Ramsgate / Dover Priory repeating at 30 and 45 minutes past. HS11/HS12 Mk2 Route Loadings v1.0 Page 2 of 12

HS12: UHS: 2tphH [HS4 Swansea >] Euston Cross Stratford HS South Shenfield HS Chelmsford Colchester Ipswich HS Beccles Norwich 2tphH [HS7/HS4 Cornwall > Plymouth >] Euston Cross Stratford HS South Shenfield HS Chelmsford Colchester Ipswich Diss Norwich 2tphH [HS4 Weymouth >] Euston Cross Stratford HS South Shenfield HS Chelmsford Colchester Ipswich HS Woodbridge Wickham Market Saxmundham Darsham Halesworth Brampton Beccles (split/join) : Oulton Broad South Lowestoft Reedham South Berney Arms Yarmouth 2tphH [HS4 Bournemouth West >] Euston Cross Stratford HS South Shenfield HS Chelmsford Colchester Manningtree Mistley Wrabness Harwich Parkeston Quay Dovercourt Harwich Town HS Metro: 2tphH [HS4 Plymouth via Salisbury >] Euston Cross Stratford HS South Shenfield HS Chelmsford Witham Kelvedon Marks Tey Colchester Wivenhoe Thorp-le-Soken (splits/joins) : Clacton Frinton Walton 2tphH [HS4 Salisbury >] Euston Cross Stratford HS South Shenfield HS Chelmsford Witham White Notley Cressing Braintree Freeport Braintree Regional Metro: 2tphR Liverpool St. Shenfield GEML Ingatestone Chelmsford Hatfield Peverel Witham Kelvedon Marks Tey Colchester Wivenhoe Thorp-le-Soken (splits/joins) : Clacton Frinton Walton 2tphR Liverpool St. Shenfield GEML Ingatestone Chelmsford Hatfield Peverel Witham White Notley Cressing Braintree Freeport Braintree 4tphRS (Colne Valley Metro) Sudbury Bures Chappel & Wakes Colne Marks Tey Colchester Colchester Town (reverse) Hythe Wivenhoe Alresford Great Bentley Weeley Thorpe-le-Soken (splits/joins) Clacton Kirby Cross Frinton Walton on-naze 2tphRS (Felixstowe Metro) Ipswich Westerfield Derby Road Trimley Felixstowe 2tphR Harwich Town Harwich International Ipswich Bury St. Edmunds Ely March Peterborough Stamford Oakham Melton Mowbray Leicester Hinckley Nuneaton Coleshill Parkway Birmingham New Street 2tphRS (Bury St. Edmunds Metro) Ipswich Needham Market Stowmarket Elmswell Thurston Bury St. Edmunds (split/join) : HS11/HS12 Mk2 Route Loadings v1.0 Page 3 of 12

Kennett Newmarket Dullingham Cambridge Kennett Soham Ely Manea March Whittlesey Peterborough It is worth explaining the thinking behind the service pattern on HS12. It is split into logically separate categories, the UHS services and the HS Metro and associated RM(S) services. The four UHS services serve the major cities and larger towns of East Anglia, and have an identical calling pattern between Euston Cross and Ipswich, except of course for the Harwich service, which calls at Manningtree rather than Ipswich, then all stations to Harwich Town. The service to Norwich via Diss calls at Ipswich GEML station (as does an associated RM service from Harwich to Worcester, and the local Bury St. Edmunds and Felixstowe Metros). The services to Norwich via Beccles and Lowestoft / Yarmouth via the East Suffolk line call at Ipswich HS station. The Norwich service connects crossplatform at Beccles with the Lowestoft and Yarmouth portions of the East Suffolk line service, which split / re-join there, thus providing a significantly faster service between London and Lowestoft / Yarmouth than the through service, whose primary purpose is to provide a through service between London and the East Suffolk line stations, and the above connecting service to Lowestoft and Yarmouth. The two HS Metro services, together with the two RM services between Liverpool St. and Clacton / Walton and between Liverpool St. and Braintree, are intimately linked in with the Colne Valley Metro service, and together they provide the GEML stopping services between Shenfield and Colchester, of 4tph in total, and the service between London and the Colne Valley stations Sudbury, Bures and Chappel & Wakes Colne, by cross-platform connections at Marks Tey. Appendix C gives a suggested layout at Marks Tey to enable this contra-flow arrangement. Marks Tey is the hub of this group of services. The HS Metro and RM Clacton / Walton services provide an equal-interval stopping service of 4tph between Witham and Clacton / Walton, semi-fast between Colchester and Clacton / Walton. The Colne Valley Metro Sudbury Clacton / Walton service is interspersed with these, and provides an all-stations service. The HS Metro and RM Braintree services provide an equal-interval stopping service between Shenfield and Witham. The HS Metro Clacton / Walton service connects cross-platform with the RM Braintree service at Witham, and the RM Clacton / Walton service connects with the HS Braintree service. The station at Witham already has two island platforms, thus two platform faces in each direction. A new flyover will be required to connect trains from Braintree to the outer London line, but, other than that, the existing infrastructure should suffice. A schematic timetable is proposed, below. This is admittedly approximate, illustrative of the salient features of the plan, rather than exact timings. The timings are, however, reasonable, on the basis of calculations later, in the present article, and of existing timings in the current timetable. Station \ Service HS Clacton RM Clacton HS Braintree RM Braintree HS Clacton Shenfield 00 13 15 28 30 Ingatestone 18 33 Chelmsford 10 23 25 38 40 Hatfield Peverel 29 44 Witham 20 35 35 50 50 Kelvedon 25 40 55 Marks Tey 30 45 60 Colchester 35 50 65 White Notley 40 55 HS11/HS12 Mk2 Route Loadings v1.0 Page 4 of 12

Cressing 43 58 Braintree FP 46 61 Braintree 50 65 The Representative Hourly Cross-Platform Interchange Pattern at Witham (see above table): 00H R 15H R [HS4 Plymouth via Salisbury >] Euston Cross Clacton / Walton Liverpool St. Braintree [HS4 Salisbury >] Euston Cross Braintree Liverpool St. Clacton / Walton repeating at 30 and 45 minutes past. The Representative Hourly Cross-Platform Interchange Pattern at Marks Tey is given below. Note that this is for both directions, since everything interconnects there: 00H [HS4 Plymouth via Salisbury >] Euston Cross Clacton / Walton RS Clacton / Walton Sudbury 07H Clacton / Walton Euston Cross [ > Plymouth via Salisbury HS4] RS Sudbury Clacton / Walton 15R Liverpool St. Clacton / Walton RS Clacton / Walton Sudbury 23R Clacton / Walton Liverpool St. RS Sudbury Clacton / Walton repeating at 30, 37, 45 and 53 minutes past. The existing layout at Colchester includes (i.e.it has a few more, but not relevant to the present argument) two island platforms, thus two platform faces in each direction. The outer faces are for services to and from Clacton / Walton there is a dive-under east of the station for Clacton / Walton bound services. This very conveniently allows for the following Representative Hourly Cross-Platform Interchange Pattern at Colchester: 00H H [HS4 Swansea >] Euston Cross Norwich via Beccles [HS4 Plymouth vis Salisbury >] Euston Cross Clacton / Walton 07H [HS4 Bournemouth West >] Euston Cross Harwich RS Sudbury Clacton / Walton 15H R [HS7/HS4 Connwall > Plymouth >] Euston Cross Norwich via Diss Liverpool St. Clacton / Walton 23H [HS4 Weymouth >] Euston Cross Lowestoft / Yarmouth RS Sudbury Clacton / Walton repeating at 30, 37, 45 and 53 minutes past. HS11/HS12 Mk2 Route Loadings v1.0 Page 5 of 12

At Ipswich, the Norwich via Beccles and Lowestoft / Yarmouth services use the (underground) HS station, while the Norwich via Diss and other services use the GEML station. On calculations presented later in this article, the Norwich service takes 16.5 minutes from Ipswich to Beccles, while the Lowestoft / Yarmouth service takes 62.5 minutes (with 7 stops). These calculsations include the standard 3 minutes wait per stop, which is certainly more than actually needed for small stations like many of those on the East Suffolk line. By reducing station wait times and other measures, it should easily be possible to reduce this time by 9 minutes to 53.5minutes. Thus, timing the Norwich train to depart Ipswich at 00 minutes and the Lowestoft / Yarmouth train at 23 minutes, then the Norwich train reaches Beccles at 16.5 minutes, and the Lowestoft / Yarmouth train reached Beccles at 76.5minutes, thus 60 minutes later. Thus timing departures from Ipswich at 00 and 23 minutes, the Lowestoft / Yarmouth train reaches Beccles at the same time at the Norwich train leaving Ipswich 60 minutes later, i.e. the second following train. (Hence it is surely unimaginable that Lowestoft and Yarmouth passengers will do other than take a Norwich train and change at Beccles. Only holidaymakers enjoying a deliberately leisurely journey, for whom, indeed, (like me,) the journey is an integral part of the holiday, would think of travelin to those destinations via the through service.) Representative Hourly Non-Cross-Platform Interchange Pattern at Ipswich: 00H [HS4 Swansea >] Euston Cross Ipswich HS Norwich via Beccles (no connection) 15H [HS7/HS4 Connwall > Plymouth >] Euston Cross Ipswich GEML Norwich via Diss R Harwich Town Worcester Shrub Hill RS Ipswich Felixstowe RS Ipswich Cambridge / Peterborough 23H [HS4 Weymouth >] Euston Cross Lowestoft / Yarmouth (no connection repeating at 30, 45 and 53 minutes past (see Appendix D for elucidation of this interchange pattern of the Norwich via Diss service, as there is much hidden detail). Representative Hourly Non-Cross-Platform Interchange Pattern at Beccles: 00H H [HS4 Swansea >] Euston Cross Norwich [HS4 Weymouth >] Euston Cross Lowestoft / Yarmouth repeating at 30 minutes past. HS11/HS12 Mk2 Route Loadings v1.0 Page 6 of 12

Elucidation of the loadings: 1. Euston Cross Shenfield HS Junction (HS11/HS12 services only) 2tphH Cardiff Airport Dover 2tphH Bristol Templs Meads BT - Dover 2tphH Salisbury - Braintree = 16tph [32tph including 16tph HS2/HS1] 2. Liverpool St. Shenfield GEML 4tphR Liverpool St. Southend Victoria 2tphR Liverpool St. Braintree 3. Shenfield GEML Shenfield North Junction 2tphR Liverpool St. Braintree 4. Shenfield HS Junction Faversham 2tphH Cardiff Airport Dover 2tphH Bristol Templs Meads BT - Dover 5. Faversham Dover Priory 2tphH Cardiff Airport Dover 2tphH Bristol Templs Meads BT - Dover 2tphR Charing Cross Dover (portion) via Ebbsfleet and Faversham 2tphR Victoria Dover (portion) via Bromley South and Faversham 6. Shenfield HS Junction Shenfield North Junction 2tphH Salisbury - Braintree = 12tph HS11/HS12 Mk2 Route Loadings v1.0 Page 7 of 12

7. Shenfield North Junction Witham 2tphH Salisbury - Braintree 2tphR Liverpool St. Braintree = 16tph 8. Witham Marks Tey = 12tph 9. Marks Tey Colchester Junction 4tphRS Sudbury Clacton / Walton = 16tph 10. Colchester Junction Manningtree South Junction 11. Manningtree South Junction Manningtree North Junction = 6tph HS11/HS12 Mk2 Route Loadings v1.0 Page 8 of 12

12. Manningtree North Junction Pinewood Junction 2tphR Harwich Worcester Shrub Hill 13. Pinewood Junction Woodbridge Junctioon 14. Woodbridge Junction Bell Grove Junction HS12 =2tph 15. Woodbridge Junction Bell Grove Junction East Suffolk =2tph 16. Bell Grove Junction Beccles Junction 17. Beccles Junction Reedham South Junction 2tphH Weymouth Yarmouth (portion) 18. Reedham South Junction Norwich HS 2tphH Swansea Norwich via Beccles =2tph HS11/HS12 Mk2 Route Loadings v1.0 Page 9 of 12

Service Plan 4 Service Plan 4 is essentially unchanged from SP3. The only difference is that new HS (300kph) infrastructure is provided between Shenfield North and Colchester HS junctions. Even this affects the timings only minimally. The true benefit and junstification is to separate UHS from HS Metro and RM traffic, which both then constitute exactly and very-nearly same-speed groupings. Elucidation of the loadings: HS12 Main Line 1. Euston Cross Shenfield HS Junction (HS11/HS12 services only) 2tphH Cardiff Airport Dover 2tphH Bristol Templs Meads BT - Dover 2tphH Salisbury - Braintree = 16tph [32tph including 16tph HS2/HS1] 2. Shenfield HS Junction Faversham 2tphH Cardiff Airport Dover 2tphH Bristol Templs Meads BT - Dover 3. Faversham Dover Priory 2tphH Cardiff Airport Dover 2tphH Bristol Templs Meads BT - Dover 2tphR Charing Cross Dover (portion) via Ebbsfleet and Faversham 2tphR Victoria Dover (portion) via Bromley South and Faversham 4. Shenfield HS Junction Shenfield North Junction 2tphH Salisbury - Braintree = 12tph HS11/HS12 Mk2 Route Loadings v1.0 Page 10 of 12

5. Shenfield North Junction Colchester HS Junction 6. Colchester HS Junction Colchester (East) Junction, central (HS) tracks 7. Colchester (East) Junction Manningtree South Junction 8. Manningtree South Junction Manningtree North Junction = 6tph 9. Manningtree North Junction Pinewood Junction 2tphR Harwich Worcester Shrub Hill 10. Pinewood Junction Woodbridge Junctioon 11. Woodbridge Junction Bell Grove Junction HS12 =2tph 12. Woodbridge Junction Bell Grove Junction East Suffolk =2tph HS11/HS12 Mk2 Route Loadings v1.0 Page 11 of 12

13. Bell Grove Junction Beccles Junction 14. Beccles Junction Reedham South Junction 2tphH Weymouth Yarmouth (portion) 15. Reedham South Junction Norwich HS 2tphH Swansea Norwich via Beccles =2tph Classic Tracks (Shenfield North Junction Colchester HS Junction) 1. Shenfield North Junction Witham 2tphH Salisbury - Braintree 2tphR Liverpool St. Braintree 2. Witham Marks Tey 3. Marks Tey Colchester HS Junction 4tphRS Sudbury Clacton / Walton 10. Colchester HS Junction Colchester (East) Junction, outer (classic) tracks 4tphRS Sudbury Clacton / Walton HS11/HS12 Mk2 Route Loadings v1.0 Page 12 of 12