Corporate Presentation (FY2016) February 28, 2017

Similar documents
Corporate Presentation (1H FY2018)

Corporate Presentation (1H FY2017) August 14, 2017

YONGNAM HOLDINGS LIMITED. Corporate Presentation (FY2017)

YONGNAM HOLDINGS LIMITED. 1H FY2015 Results Presentation

YONGNAM HOLDINGS LIMITED. Corporate Presentation (FY2018)

YONGNAM HOLDINGS LIMITED. FY2014 Full Year Results Presentation

Yongnam Holdings Limited. 1HFY2010 Results Presentation

Yongnam Holdings Limited. FY2009 Results Presentation

Yongnam Holdings Limited

Yongnam Holdings Limited. 1HFY2009 Results Presentation

1H FY2013 Results Presentation

YONGNAM HOLDINGS LIMITED. FY2011 Results Presentation

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

1HFY2015 Results: Media & Analyst Briefing 12 March 2015 T T J HOLDINGS LIMITED STRUCTURES THAT SHAPE THE FUTURE 1HFY2015 RESULTS BRIEFING

Presentation to The HK Institute of Certified Public Accountants. New Railways to Sustain Hong Kong s Momentum

Building Connections to SUPPORT LIFE S JOURNEYS

Macao's aviation strategy and partnership approach

BBR Holdings reports significant increase in both revenue and net profit for nine months ended 30 September 2013

BBR wins S$ $153.1 m contract to design and constructt a mixed-use development at Fusionopolis Place

A New World-Class Destination at Hong Kong International Airport

HALF YEAR REPORT February Leighton Holdings Limited

A Review on the Recent Large Scale Infrastructure Projects in Hong Kong

FY2015 2nd Quarter Business Results

2007/08 Interim Results

Six Months of 3% Rebate from 30 June 2018 when New MTR Fares Take Effect No Actual Fare Increase for Octopus Passengers in 2018

For personal use only

BBR Holdings First Half 2014 Net Profit Surges 110% to S$10.2 million

Click to edit Master title style. Job Opportunities at Architecture and Engineering Firms: You can work with us

Business Opportunities in Malaysia. World Trade Expo 29th October 2018

Hock Lian Seng Holdings Limited

NEWS RELEASE KINGSMEN REPORTS NET PROFIT OF S$19.1 MILLION

Investor Meeting Presentation. 4 June 2014

Corporate Presentation 2012/13 Interim Results

BBR Holdings reported S$33.1 million revenue for its first quarter ended 31 March 2017

MTR Corporation Annual Results 11 March 2016

Singapore Property Market

Corporate Presentation 2015/16 Interim Results

Hong Kong International Airport (Chek-Lap Kok Airport)

Thailand --- A Preferred FDI Destination. Thailand. Political stability. Skilled workforce. Business friendly. Sustained economic growth

Austrade Supporting Australian Rail Industry s Global Focus. Rail Sector Lead and Trade Manager, Infrastructure

Sales increased and income will be on a recovery track in the second half of the fiscal year.

Changi Airport Group releases FY2011/12 Annual Report

Indonesia. Market overview. Opportunities and challenges. Jakarta. Austrade in Indonesia

MTR Corporation Annual Results 16 March 2015

MTR Corporation Annual Results 11 March 2014

Tat Hong Reports 13% Decline in FY2017 Revenue

CHINA HOTEL MARKET OUTLOOK

NATURAL COOL ACHIEVES TURNAROUND IN NET PROFIT TO S$6.8 MILLION IN FY Proposes final dividend of 2.0 cents per share for FY2010

Shun Tak Announces Interim Results for Year 2017

Global Mega-trends Urbanisation a key driver of growth. Steve McCann Group CEO and Managing Director Lend Lease

Centurion Corporation Limited

PUFFING BILLY RAILWAY

GALAXY ENTERTAINMENT GROUP

Hong Kong s Role in the Guangdong - Hong Kong - Macao Greater Bay Area

2006 INTERIM ANNOUNCEMENT

Growth. Helping Asian aviation grow

Department of Infrastructure, Planning and Logistics

Changi Airport Group and CapitaMalls Asia to jointly develop Project Jewel at Changi Airport

JOINTLY ANNOUNCES 2018/19 INTERIM RESULTS * * * EMPEROR INTERNATIONAL S RENTAL INCOME GROWS 10% TO HK$600M NET PROFIT SURGES 57% TO HK$2.

METRO HOLDINGS GROWS ITS PRESENCE IN CHINA BY ACQUIRING A MIXED-USED DEVELOPMENT IN SHANGHAI

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

Presentation to Hong Kong-Canada Business Association Vancouver 31 October Yuen Pau Woo President & CEO Asia Pacific Foundation of Canada

Tasmanian Budget

KSH HOLDINGS LIMITED. Corporate Presentation May 27, 2014

HOPEWELL HOLDINGS LIMITED ANNOUNCES FY 2018/19 INTERIM RESULTS

Investment Summary. Yeo Keng Huat 1. PRICE S$1.81 BUY (Fair Value: S$2.01)

International Rail Opportunities

Suzhou Cultural & Tourism Development, China

Abstract. 1 Introduction

Air China Limited Interim Results. August Under IFRS

20 Annual Report 2015/16 Mapletree Commercial Trust

Mitsubishi Estate and Landmark Project in a nutshell. Jo Kato Deputy President

HOTELIER MIDDLE EAST. General Manager Debate Market Presentation September Christopher Hewett Director TRI Consulting

2006 Preliminary Results. 7 March 2007

Auckland International Airport FY19 Interim Results: Positive start to year as airport progresses anchor infrastructure projects

PAN PACIFIC HOTELS GROUP LIMITED 2010 FULL YEAR RESULTS BRIEFING 22 FEB 2011

CENTURION CORP ACHIEVES RECORD NET PROFIT OF S$31.1 MILLION FROM ITS CORE BUSINESS OPERATIONS FOR FY2014

JOINTLY ANNOUNCES 2017/18 INTERIM RESULTS * * * RENTAL INCOME SURGES 25% STRENGTHS RECURRING INCOME STREAMS FOR SUSTAINABLE GROWTH

LOCAL EXPERTISE, INTERNATIONAL PERSPECTIVE

Corporate Presentation

III. TRADE IN COMMERCIAL SERVICES BY CATEGORY

Land area 1.73 million km 2 Queensland population (as at 31 December 2017) Brisbane population* (preliminary estimate as at 30 June 2017)

Australia s. The Northern Territory is experiencing solid growth in visitor numbers driven by a strong economy. Northern Territory

BBR Holdings delivers S$425.5 million revenue for the full year ended 31 December 2015

Convenience Retail Asia maintains growth momentum in turnover and profit for first half

Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments

Queensland Tourism Aviation Blueprint to 2016

GUOCO MIDTOWN SET TO REDEFINE AND REJUVENATE BEACH ROAD

June TEQ Marketing Strategy 2025 Executive Summary

2008/09 Interim Results For the six months ended 31 December 2008

Recruitment Talk 7 March 2008

Improving quality of life in. Singapore

Building procurement capability through transformation. Jane Harley, Chief Procurement Officer Qantas Group

South Australian Budget June 2014

2008 INTERIM ANNOUNCEMENT

MICE (Meetings, Incentives, Conventions and Exhibitions)

Executive Directors Review

A n n u a l R e s u l t s

Transcription:

YONGNAM HOLDINGS LIMITED Corporate Presentation (FY2016) February 28, 2017

Business Overview 2

Yongnam Holdings Limited Excels in adding value to steel construction Multi-disciplinary Engineering and Construction Group Structural Steelwork Design & Build Specialist Civil Engineering Mechanical Engineering Well-established structural steel contractor and specialist civil engineering solutions provider with more than 40 years of experience Two production facilities in Singapore and Nusajaya, Johor, Malaysia with a total annual production capacity of 84,000 tons of steel fabrication 3

Yongnam Holdings Limited Excels in adding value to steel construction Long established relationships with major reputable contractors Takenaka Corporation Taisei Corporation Obayashi Corporation Penta Ocean Shimizu Corporation Dragages Singapore Sembcorp Design & Construction Pte Ltd Samsung Corporation Ssangyong E&C Co. Ltd Hyundai E&C Ltd Daelim Industrial Co. Ltd Woh Hup Pte Ltd Larsen & Toubro Ltd 4

Wide Geographical Footprint Regional Presence, Global Reach Wide network of subsidiaries and project offices in the region Middle East India Hong Kong Thailand Malaysia Singapore Projects Undertaken Across the Region Singapore Malaysia Middle East China Norway Brunei Philippines Thailand Japan Korea Hong Kong Pakistan India 5

Structural Steelworks Adding structural and aesthetic value to buildings Leading steel specialist contractor with unparalleled track record of iconic projects One of the largest steel fabrication facilities in Southeast Asia On-time delivery and with quality A1 Grade in General Building from BCA Singapore S1 category accreditation from Singapore Structural Steel Society 6

Specialist Civil Engineering A frontrunner of the times Design, fabrication, supply and erection of steel temporary support for deep basement and tunnel excavations Yongnam s modular strutting system meets increasingly stringent design and project requirements Owns approximately 200,000 tonnes of strutting assets and pipe piles Strong track record and high replacement cost of struts creates a significant barrier to entry A1 Grade in Civil Engineering from BCA Singapore 7

Mechanical Engineering Strong expertise of over forty years Three key activity areas: a. Installation of mechanical equipment and plant b. Supply, fabrication and installation of mechanical components; and c. Plant maintenance Able to undertake more complex mechanical and plant installation projects Projects and involvement include: Power stations, chemical plants, refineries, shipyard facilities, incineration plants and other infrastructure-related projects 8

Design & Build Emerging as a new growth driver Yongnam aims to be a one-stop solutions provider of conceptual design, construction, project management and final delivery Leverages Yongnam s experience in project and construction management Focused on pursuing opportunities in industrial and commercial projects 9

Production Capabilities Well-equipped, state-of-art facilities Singapore Mega complex in Tuas occupying a land area of 76,000 sq m Covered workshop measuring 20,250 sq m with production capacity of 3,000 tonnes per month Malaysia Facility in Nusajaya, Johor, sited on a land area of 109, 103 sq m Operational since 2009, with a covered workshop measuring 38,600 sq m and production capacity of 4,000 tonnes per month 10

Our Experience Unparalleled Track Record Airports Brunei, Royal Pavilion Hangars Malaysia, Kuala Lumpur International Airport Singapore, Changi International Airport Thailand, Suvarnabhumi International Airport India, Indira Gandhi International Airport India, Chhatrapati Shivaji International Airport Sports & Recreation Complex Kranji Race Course Bishan Sports Stadium Singapore Sports Hub Transport Infrastructure Singapore, Kallang-Paya Lebar Expressway Singapore, Marina Coastal Expressway Singapore, MRT Thomson-East Coast Line Singapore, MRT Downtown Line Singapore, MRT Circle Line Singapore, MRT Northeast Line Singapore, MRT East-west Line Singapore, MRT North-south Line Singapore, MRT North-south Line Extension Hong Kong, Mass Transit Rail Hong Kong, Express Rail Link Middle-east, Dubai Metro High Rise Buildings & Iconic Structures Marina Bay Sands Integrated Resort Suntec City Exhibition & Convention Centre Singapore Post Centre Capital Tower Singapore MRT Expo Station National Library Board Fusionopolis One Raffles Quay Ion Orchard Integrated Civic, Cultural, Retail and Entertainment Hub Gardens by the Bay NUH Medical Centre Power Plants & Mechanical Installations Singapore, Senoko Power Station Singapore, Seraya Power Station (Stage II development) Singapore, Mandai Quarry Plant Singapore, Senoko Incineration Plant Singapore, Tuas Incineration Plant Singapore, Wind Tunnel Malaysia, Kenyir Power Station (Hydroelectric power plant) Malaysia, Paka/Pasir Gudang YTL Power Station Malaysia, Panglima Power Station Malaysia, Tanjung Bin Power Plant Malaysia, Naphtha Cracker Plant Cracking Furnace 11

Our Experience Showcase Marina Bays Integrated Resort, Gardens by the Bay, CCRC and Sports Hub Yongnam was involved in the development of multiple iconic structures at the iconic Marina Bay Sands Integrated Resort: Skypark Gardens by the Bay ArtScience Museum CCRC Crystal Pavilions Sports Hub 12

Our Experience Mass Rapid Transit Rail Infrastructure (Singapore) Since the mid 1980s, Yongnam has been extensively involved in the development of Singapore s railway network 13

Current Portfolio Key On-Going Projects Marina One Project Value: S$174 million Date of Award: December 2013 Completion Date: Expected 1Q2017 Scope of Work: Supply and erect structural steelworks for 2 blocks of 30-Storey Office, 2 blocks of 34 Storey Residential Building, 3-Storey Commercial Podium and 4-Level Basement Carparks with Underground Pedestrian/Shopping Mall 14

Current Portfolio Key On-Going Projects Jewel Changi Airport Project Value: S$79 million Date of Award: November 2014 Completion Date: Expected 3Q2017 Scope of Work: Supply, fabricate and erect structural framing system of main buildings, associated structures and pedestrian bridges to Terminals 2 and 3 15

Current Portfolio Key On-Going Projects Jewel Changi Airport Crown Project Value: S$35 million Date of Award: January 2016 Completion Date: Expected 4Q2017 Scope of Work: Supply, fabricate and erect structural steelwork for glass dome 16

Current Portfolio Key On-Going Projects Senoko Food Hub Project Value: S$165 million Date of Award: March 2015, JV project Completion Date: Expected 2Q2017 Scope of Work: Construction of a new 7-storey ramp-up development comprising 50 modular factory units in Senoko Food Zone 17

Current Portfolio Key On-Going Projects Outram Community Hospital Project Value: S$41 million Date of Award: January 2016 Completion Date: Expected 2Q2018 Scope of Work: Supply, fabricate and erect structural steelwork for the building structure, link bridges, roof crown structure, trellis supports and other structural components for a new 19-storey mixed-use development housing the Outram Community Hospital 18

Current Portfolio Key On-Going Projects MRT Thomson Line Project Value: S$109 million (5 contracts) Key Projects Description C217 (3Q2018): Installation and removal of steel struts for Napier Station C227 (4Q2018): Installation and removal of pipe pile cofferdam, steel struts and decking for Marina South Station 19

Current Portfolio Key On-Going Projects HK MTR Extension, Express Rail Link, Wan Chai Bypass Tunnel, NSL Cross Harbour Tunnel, Kai Tak Development Stage 3 Project Value: HK$559 million (6 contracts) Completion Date: 2016 to 2018 Project Description: MTR Extension : Shatin-Central Link Express Rail Link : Part of 26-km long HK section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link running from West Kowloon to Shenzhen Wan Chai Bypass Tunnel : 4 km Trunk Road Tunnel NSL Cross Harbour Tunnels Kai Tak Development Stage 3 Scope of work: Design, supply, installation and removal of strut and walers Cofferdam excavation of cut and cover tunnels Construction of steel temporary bridge 20

Financial Performance (FY2016) 21

Key Financial Highlights FY2016 Financial Performance FY2016 FY2015 Change (%) Revenue (S$ m) 321.4 269.6 19.2 Gross (Loss)/Profit (S$ m) (13.8) 19.7 (169.9) Gross Margin (%) (4.3) 7.3 n.m. Loss after Tax (S$ m) (32.8) (2.7) (1,116.8) EPS (Basic) (Singapore cents)(1) (6.90) (0.85) (711.8) NAV per Share (Singapore cents)(2) 62.94 93.89 (33.0) (1) EPS per share was computed based on the weighted average number of shares of 475,102,931 for FY2016 (FY2015: 316,735,383) (2) NAV per share as at December 31, 2016 and December 31, 2015 respectively 22

Key Financial Highlights FY2016 Financial Performance FY2016 FY2015 Change (%) Net Work-In-Progress (S$ m) 91.6 112.8 (18.8) Debtors (S$ m) 36.0 31.0 15.9 Cash (S$ m) 15.9 8.1 96.6 Borrowings (S$ m) 114.1 142.4 (19.9) Net Borrowings (S$ m) 98.2 134.3 (26.9) Gearing (times) 0.33 0.45 (27.3) Shareholders Funds (S$ m) 299.0 297.4 0.6 23

Key Financial Highlights FY2016 Financial Performance Revenue Analysis FY2016 Revenue up 19.2% mainly due to higher contribution from Structural Steelwork and Mechanical Engineering projects Structural Steelworks S$ m Revenue contributions increased from S$177.1 million in FY2015 to S$215.6 million in FY2016 350.00 Key contributing projects include: Marina One, Senoko Food Hub, Jewel Changi Airport Mechanical Engineering 300.00 Revenue contributions increased from S$5.8 million in FY2015 to S$32.1 million in FY2016 250.00 269.6 321.4 Key contributing project: Supply and fabrication of HRSG for power plants in Qatar and Egypt Specialist Civil Engineering 200.00 FY2015 FY2016 Revenue contributions decreased from S$86.0 million in FY2015 to S$66.2 million in FY2016 Key contributing projects include: MRT Thomson Line, Hong Kong projects 24

Key Financial Highlights FY2016 Financial Performance Breakdown by Business Segment FY2015 Specialist Civil Engineering 31.9% Mechanical Engineering 2.1% Building 0.3% Structural Steelworks 65.7% FY2016 Specialist Civil Engineering 20.6% Mechanical Engineering 10.0% Building 2.3% Structural Steelworks 67.1% 25

Key Financial Highlights FY2016 Financial Performance Gross Profit Gross loss of S$13.8 million for FY2016 Gross Profit / (Loss) (S$ m) Gross Loss Gross Loss of S$13.8 million for FY2016 due to: Lower margins from Senoko Food Hub project Provisions in anticipation of lower negotiated variation orders Under-recovery of overheads from lower level of strutting and other activities 25.0 20.0 15.0 10.0 19.7 5.0 FY2015 FY2016 (5.0) (10.0) (13.8) (15.0) (20.0) 26

Key Financial Highlights FY2016 Financial Performance Profit after Tax Loss after Tax of S$32.8 million for FY2016 (S$ m) (5.0) (10.0) FY2015 FY2016 (2.7) (32.8) Loss after Tax Loss after tax of S$32.8m for FY2016 due to: Gross loss of $13.8m Marginally higher General & Admin expenses arising from rights issue and tendering expenses, offset by lower staff costs (15.0) (20.0) (25.0) (30.0) (35.0) 27

Key Financial Highlights Order Book As of 31 December 2016, the Group s order book stands at approximately S$274.2 million Structural Steelworks: 59.2% Specialist Civil Engineering: 32.2% Others (M&E, Building): 8.6% Approximately 83% of the Group s order book is slated for completion within FY2017 28

Growth Strategies and Plans 29

Strategies and Plans To enhance cost competitiveness and operational efficiency, the Group will be relocating some of its factory operations in Singapore to a new site in Johor, Malaysia, in 2018 the Group stands to benefit from reductions in manpower costs, fabrication costs and ancillary staff costs Continuous review the Group s cost structure to further manage costs and achieve better efficiencies Remain focused on the two core businesses Structural Steel and Specialist Civil Engineering Leverage on established brand name and strong foothold in the Singapore market Continue to explore projects in Hong Kong, Thailand, Malaysia, Indonesia, Myanmar, India and GCC countries Selectively pursue Civil and Building projects as main contractor on JV basis Newly established Design & Build Division to pursue industrial and commercial projects 30

Prospects and Market Outlook 31

Market Prospects Singapore Construction industry gets a boost from Public Sector Jobs(1): For 2017, public sector demand for construction projects is projected to grow between S$20 billion and S$24 billion - an increase from about S$15.8 billion in 2016 Upcoming public sector infrastructure projects this year include various major contracts for the Deep Tunnel Sewerage System (DTSS phase 2), North-South Corridor and Circle Line 6. Expected growth in construction demand from 2018 to 2021(1): For 2018 and 2021, the average construction demand is projected to be a robust $26-35 billion per annum Public sector construction demand to be between $16 billion and $20 billion annually from 2017 to 2020, with about 60% of the total demand coming from building projects and the remaining from civil engineering projects Public sector demand is expected to be further supported by various upcoming mega infrastructure projects such as the Jurong Regional Line, Cross Island Line, and various infrastructure developments for Changi Airport Terminal 5. Source: (1) BCA Estimates S$27 Billion to S$34 Billion Worth of Construction Contracts to be Awarded this Year, Building and Construction Authority, 15 Jan 2016 (Link) 32

Market Prospects Singapore Government Enabling Growth and Innovation(1) : $700 million worth of public sector infrastructure projects to start in FY2017 and FY2018 - include the upgrading of community clubs and sports facilities The government plans to continue making significant investments in critical economic infrastructure such as the new Changi Airport Terminal 5, the Kuala Lumpur-Singapore High Speed Rail and the Tuas Terminal Public transport infrastructure will continue being enhanced, with plans for almost doubling the MRT network by 2030, including Public Sector Construction Productivity Fund, with about $150 million in budget, that will allow Government agencies to procure innovative and productive construction solutions Source: (1) Singapore Budget 2017, 20 Feb 2017 (Link) 33

Market Prospects Regional Hong Kong / Macau (1,2,3): China s recently launched 13th Five-Year plan (for 2017 2021), includes plans for infrastructure upgrades in Hong Kong, including trans-regional railways and highways systems In the 2017-18 Budget, the Hong Kong government announced that capital expenditure is forecast to be $107.2 billion for 201718, including $86.8 billion for capital works, allowing the construction industry to contribute 4.7% to Hong Kong s GDP Capital expenditure and construction activity is expected to remain high with a number of major transportation infrastructure projects at their construction peaks More railway property development projects will be under planning, such as the development at the Siu Ho Wan Depot site, the Tung Chung new town extension, as well as for new development areas at Kwu Tung North, Fanling North, Hung Shui Kiu and Yuen Long South The Macau S.A.R. Government also released on April 26, 2016 a draft five-year development plan (2016 2020), which articulated its vision of building Macau into a world tourism and leisure center Sources: (1) Commission on Strategic Development The National Five Year Plan Opportunities for Hong Kong Special Administrative Region (Link) (2) 2017-18 Budget, Hong Kong Gov (Link) (3) Development Plan is opened to public consultation, Macau SAR Gov, 26 Apr 2016 (Link) 34

Market Prospects Regional Hong Kong / Macau(1,2,3,4,5): Major infrastructure projects: Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link Hong Kong-Zhuhai-Macau Bridge Development of the East Lantau Metropolis to be Hong Kong s third CBD HK$141.5 billion project expansion of HKIA to a threerunway system Central-Wan Chai Bypass and Island Eastern Corridor Link (HK$36 billion) Environmentally Friendly Linkage System: Rail link connecting Kai Tak with Kowloon Bay, Kwun Tong and Sha Tin to Central Link (HK$12 billion) HK$25 billion Kai Tak Sports Hub project Tseung Kwan O Lam Tin Tunnel Cross Bay Link, Tseung Kwan O Central Kowloon Route Kai Tak West Development Sources: (1) Infrastructure boosts HK dev t, HK Gov, 1 Jan 2016 (Link) (2) East Lantau Metropolis as Long-Term Strategic Growth Area, Lantau Development Advisory Committee (Link) (3) Central-Highway Department (Link) (4) Construction of Kai Tak complex top of HK new sports chief s priorities, SCMP, Feb 6, 2016(Link) (5) HK Civil Engineering and Development Department (Link) 35

Market Prospects Regional India(1,2): The Indian government targets US$376.53 billion worth of investment in infrastructure over a period of three years (2015 2017), which will include US$120.5 billion for development of 27 industrial clusters and an additional US$75.3 billion for road, railway and port connectivity projects India announced record spending of 3.96 trillion rupees (US$59 billion) to build and modernize its railways, airports and roads as Prime Minister Narendra Modi aims to upgrade the strained infrastructure in Asia s third-largest economy. The government will build airports in smaller cities in partnership with private companies More suburban railways will come up across the country and Indian Railways India will announce a new Metro Rail Policy, which will ensure implementation and funding Increased budget allocation for highways and 2,000 kms of coastal connectivity roads have been identified for construction and development Sources: (1) Infrastructure Sector in India, IBEF, July 2016 (Link) (2) Modi to Spend $59 Billion to Upgrade India's Infrastructure, Bloomberg, Feb 1, 2017 (Link) (3) India Union Budget, 2017-18 (Link) 36

Market Prospects Regional Middle East: Spending on infrastructure in key Middle East countries to remain elevated notwithstanding a low oil price environment Qatar(1,2,3): Qatar's Minister of Finance announced that the Gulf state will invest up to US$13 billion in major infrastructure projects in 2017 despite a slump in revenues resulting from low energy prices Qatar is in the second year of a US$200 billion infrastructure upgrade ahead of hosting the World Cup, which should support activity, particularly in construction, transport and services. The 2022 World Cup host had already spent almost US$98 billion dollars on large-scale projects. Kuwait(4): Kuwait s Ministry of Public Works has announced plans to develop 30 infrastructure projects worth KD3.43 billion ($11.3bn) under its current development plan Six major development projects including the Jaber causeway, the Kuwait International Airport expansion and Mubarak al-kabeer port will be implemented in 2017 Dubai(5): Expo 2020 Dubai will award 47 construction contracts worth $3 billion in 2017, as preparations for the mega-event continues to build momentum The emirate is extending its metro system, expanding its airports and road network, and building other infrastructure as it gears up to host the Expo 2020 world s fair. Sources: (1) Qatar to spend $13bn on mega projects in 2017, Al Arabiya, 7 December 2016 (Link) (2) Qatar s Economic Outlook- Fall 2016, The World Bank (Link) (3) Qatar Economic Outlook 2016 2018, Qatar Ministry of Planning Development and Statistics (Link) (4) Kuwait reveals $11.3bn plan for infrastructure projects, Arabian Business, 23 March 2017 (Link) (5) Expo 2020 Dubai announces 47 construction contracts for 2017, CPI Financial, 30 Jan 2017 (Link) 37

Market Prospects Regional Myanmar(1,2,3): According to the IMF and World Bank, growth for Myanmar in the next three years is projected to ease at 7.1%, as compared to 8.6% in 2016. Myanmar faces domestic and macro-economic risks to growth including: concerns over policy clarity financial sector vulnerability on the back of rapid credit growth in recent years weak commodity prices and slow export demand global financial market volatility natural disasters Myanmar s construction sector experienced a gloomy 2016, with a political transition, a lack of financing in real estate and construction, a clampdown on high-rise construction in Yangon imposed by the new regional government and a slowing economy. This resulted in the number of new construction projects to fall by half in 2016 However, new legislations to be introduced in 2017 could spell well for the construction industry. Along with the introduction of the Investment Law, the ruling National League for Democracy ( NLD ) released a 12 point economic plan outlining the new regime s reform agenda which includes measure enhancing education and infrastructure The increased presence of international organisations such as the World Bank, IMF and ADB in Myanmar is also expected to contribute significantly to the country s development, as strategic guidance and technical expertise are introduced to put in place the necessary infrastructure Sources: (1) Myanmar Growth Projected to Recover Following a Slowing Economy in 2016, World Bank (Link) (2) Investing in Myanmar: Recent Developments and Future Outlook, Asean Briefing (Link) (3) Construction and real estate sectors pin 2017 hopes on new legislation, Myanmar Times (Link) 38

Market Prospects Potential Projects Structural Steel: 79 Robinson Road Revelopment Dubai Metro Route 2020 Golden Shoe Carpark Development Methionline Manufacturing Facility Other commercial developments and Industrial plants 39

Market Prospects Potential Projects Specialist Civil Engineering: MRT Thomson-East Coast Line MRT Circle Line 6 North-South Corridor HK MTR Tuen Mun Chek Lap Kok Link 40

Market Prospects Potential Projects Expected Commencement Government S$ mil Non-Government S$ mil Total S$ mil 2017 111.3 169.3 280.6 2018 146.5-146.5 2017 114.0 136.4 250.4 2018 - - - 371.8 305.7 677.5 2017 147.0 4.5 151.5 2018 365.8-365.8 2017 60.9-60.9 2018 - - - 573.7 4.5 578.2 2017-31.0 31.0 2018 - - - 2017-198.6 198.6 2018 - - - - 229.6 229.6 945.5 539.8 1,485.3 Structural Steelwork Singapore Overseas Total Specialist Civil Engineering Singapore Overseas Total Mechanical Engineering, Design & Build Singapore Overseas Total Grand Total 41

Thank You! 42