PT Kawasan Industri Jababeka Tbk.

Similar documents
PT Kawasan Industri Jababeka Tbk. Investor Presentation

PT Jababeka Tbk. Nomura Asian High Yield Corporate Day November 10 Hong Kong

PT Kawasan Industri Jababeka Tbk. Investor Presentation

PT Kawasan Industri Jababeka Tbk. Investor Presentation

Leading township developer & infrastructure powerhouse

Leading township developer & infrastructure powerhouse

KARAWANG NEW INDUSTRY CITY

AMATA VN Public Company Limited

Special Economic Zone (SEZ) Cape Kelayang

AMATA VN Public Company Limited

Centurion Corporation Limited

Thailand --- A Preferred FDI Destination. Thailand. Political stability. Skilled workforce. Business friendly. Sustained economic growth

1H 2017 RESULTS PRESENTATION. Pearls across the Orient

Oxley Delivers Stellar Growth of 58% in PATMI to. S$130.9 million for HY2017

Crown Resorts Limited

Welcome to Opportunity Day Financial Performance Result for the 9 months period ended Sep 30, 2018

SET Opportunity Day #3/2011

Indonesia. Market overview. Opportunities and challenges. Jakarta. Austrade in Indonesia

WEST JAVA- SHIZUOKA REPUBLIK INDONESIA THE PROVINCE OF WEST JAVA

Lippo Malls Indonesia Retail Trust 4Q 2016 Results Presentation

KERRIE MATHER MANAGING DIRECTOR AND CHIEF EXECUTIVE OFFICER. Macquarie Conference 4 MAY 2016

INDONESIA TOURISM INVESTMENT INVITATION

Euroz Rottnest Investor Briefing

Citigroup Investor Conference October 2010

PRESS ANNOUNCEMENT JULY 28, 1999 For Immediate Release STAR CRUISES REPORTS RECORD SECOND QUARTER EARNINGS

Presentation to Investors as of 8 November 2018

HATTEN LAND LIMITED. Shaping the Future, Melaka and Beyond. FY2017 Results. Corporate Presentation 17 August 2017

Centurion Corporation Limited Presentation. January 2015

Aspen Achieves Record Net Profit of RM85.4 Million in FY2017

HATTEN LAND LIMITED. Shaping the Future, Melaka and Beyond. Corporate Presentation 12 October 2017

Presentation to Investors as of 12 September 2018

Investor Briefings First-Half FY2016 Financial Results

IMPROVEMENT OF URBAN TRANSPORT SYSTEM IN GREATER JAKARTA (LRT and MRT Progress)

(Incorporated in the Republic of Singapore) (Company Registration No H)

PAN PACIFIC HOTELS GROUP LIMITED 2010 FULL YEAR RESULTS BRIEFING 22 FEB 2011

Forward-Looking Statements Statements in this presentation that are not historical facts are "forward-looking" statements and "safe harbor

Répliquer le modèle de Bali en développant dix autres spots touristiques, le plan du président Jokowi

Results Presentation 27 May 2008

Peppers Docklands, Melbourne

The Ascott Limited. Scales up lodging business with US$26-million investment in Indonesia s leading hotel operator TAUZIA

Crown Resorts Limited

GALAXY ENTERTAINMENT GROUP SELECTED UNAUDITED Q FINANCIAL DATA

Executive Directors Review

PETROSEA RESULTS FOR THE PERIOD ENDED 30 SEPTEMBER 2017

Centurion Corporation Limited 4Q and FY 2015 Financial Results. 23 February 2016

JOIN s Investment for Urban Development Projects in Indonesia

DISCLAIMER Forward-Looking Statements

Management Presentation. May 2013

Investor Meeting Presentation. 4 June 2014

Helloworld Travel Limited results announcement Half year ended 31 December 2017

1 Nov 2018 SPECIAL ECONOMIC ZONE MOROTAI

Strategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)

Investor Presentation. Third Quarter 2018

Cairo, May 21, TMG Holding reports EGP BN consolidated revenue, EGP 161 MN consolidated net profit

Corporate Presentation 2012/13 Interim Results

FIRST QUARTER 2017 RESULTS. 4 May 2017

METRO HOLDINGS REGISTERS REVENUE OF S$46.3 MILLION AND PROFIT AFTER TAX OF S$13.0 MILLION FOR 2QFY2019

Thank you for participating in the financial results for fiscal 2014.

2007/08 Full Year Results Investor Briefing

A-HTRUST to deepen presence in Japan with the acquisition of a portfolio of hotels

China Lodging Group (HTHT.US) Q4 and full year 2017 Earnings Call March 13, 2018

Investment Opportunity

2016 Half-Yearly Results

USA Acquisition Summary. December 2010

Quarterly Meeting# 1/2018

SUTL ENTERPRISE LIMITED. 4Q2016 and FY2016 Results Presentation

Positive rental reversions in Hong Kong portfolio. Rising contribution from Singapore office portfolio. Strong performance from Residential business

Not all collagen is the same, it s time to choose the right one Analyst Gathering

Talaat Moustafa Group Holding 1Q08 Results Earnings Release

Fourth Quarter and Full Year 2009

JAPAN AIRLINES Co., Ltd. Financial Results 1 st Quarter Mar/2017(FY2016) July 29, 2016

Minor International Public Company Limited

ANA HOLDINGS Financial Results for the Three Months Ended June 30, 2018

Investment Opportunities DMIC UP Region

Air Arabia Investor Presentation Q2 2016

The Proposed Joint Ventures with The Straits Trading Company Limited And Toga Pty Ltd

RESULTS RELEASE 20 August GENTING HONG KONG GROUP ANNOUNCES FIRST HALF RESULTS FOR 2015 Highlights

DISCLAIMER Forward-Looking Statements

Tasty way to reduce cholesterol Analyst Gathering

Price: $5,250,000 ($23.38 PSF) NOI: $475,109 CAP: 9.05%

Annual General Meeting

AIR FRANCE-KLM RESULTS PRESENTATION

LOCATED AT THE GATEWAY OF THE TROPICAL PROVINCE, RIDING ON THE GROWTH MOMENTUM OF THE COUNTRY, WE ARE ON THE RIGHT TRACK OF TAKING OFF.

Number 1 Gross Regional Product per capita in Queensland

ANALYST MEETING PT GARUDA INDONESIA (PERSERO) Tbk. 9M2015 Result Announcement Jakarta, 23 October 2015

Management Presentation. March 2016

Information meeting. Third quarter results. March 2011

For personal use only

The success story continues

2008 INTERIM ANNOUNCEMENT

Air Arabia. Investor Presentation. Sharjah, UAE: September 2013

JOINTLY ANNOUNCES 2017/18 INTERIM RESULTS * * * RENTAL INCOME SURGES 25% STRENGTHS RECURRING INCOME STREAMS FOR SUSTAINABLE GROWTH

Tat Hong Reports 13% Decline in FY2017 Revenue

BANYAN TREE HOLDINGS LIMITED (Company Registration Number: H) 1H07 Results Snapshot (in S$million) : 2Q07 Results Snapshot (in S$million) :

Saudi Aramco and LANXESS to form a global synthetic rubber powerhouse. Matthias Zachert, CEO Michael Pontzen, CFO

Australian Property Growth Fund

1H2017 Financial Results. 4 August 2017

Investment Highlights

H A L C Y O N A G R I

Air Arabia. Investor Presentation. 1 st Quarter 2015

Transcription:

PT Kawasan Industri Jababeka Tbk. Investor Presentation March 2019 0

Leading township developer & infrastructure powerhouse PT Kawasan Industri Jababeka Tbk. ("KIJA") is a leading township developer with an established track record in industrybased townships supported by residential & commercial components... KIJA overview Real Estate PT Kawasan Industri Jababeka Tbk Infrastructure Business segments FY17 Revenue Breakdown (%) (Rp 2,995 billion) Infrastructure & Port, 14% Industrial Power Real Estate & Others, 41% Residential Infrastructure Commercial Dry Port Power Plant, 45% Established in 1989 and became the first publicly listed industrial estate developer in Indonesia in 1994 Kota Jababeka, KIJA's flagship development, is a mature industrybased integrated township in Cikarang with on-site power plant and dry port Diversification projects: Kendal Industrial Park Park by the Bay in Central Java, tourism-based township in Tanjung Lesung, Banten and a tourism development project in Morotai Large and strategically located land bank of 3,883 hectares as of 30 September 2018 Vision: To Create Modern Self Sustained Cities in Every Province in Indonesia and Provide Jobs for Better Life FY17 Gross Profit Breakdown (%) (Rp 1,137 billion 38% GPM) Infrastructure & Port, 17% Power Plant, 20% Real Estate & Others, 63% with world class infrastructure to support its development 1

Milestones & Awards More than 25 years track record in township development Selected awards #1 #1 Investor Magazine - 2012 Top 10 Best performing listed companies and Best listed company in property Indonesia Property Watch- 2015 The best township development concept Fortune Indonesia - 2015 Best Company award SWA Magazine - 2016 Top 25 Most Creative Companies in Indonesia 2016 1989 #1 Frontier Consulting Group Award 2014 #1 Corporate Image Industrial Estate Jababeka Group established and started development of the industrial estate 1994 IPO on Jakarta and Surabaya Stock Exchange Supply Chain Asia Awards 2014 Asia Logistics Centre/Park of the Year 1996 Acquisition of Menara Batavia in Jakarta CBD 2001 2003 Inauguration of Education Park, including President University #1 Ministry of Industry - 2015 Best Industrial Estate Infrastructure & Facilities Commenced development of Jababeka CBD 2010 Cikarang Dry Port begins operations 2011 Acquisition of 1,500 ha land in Tanjung Lesung, Banten 2013 2014 Bekasi Power Plant commenced operations D Khayangan Senior Living Launched Groundbreaking Kendal Industrial Park Park by the Bay 2

Sizeable land bank in strategic locations with upside potential Kota Jababeka Cikarang Master plan: 5,600 hectares 35km east of Jakarta Land Bank: 1,239ha (1) Fully integrated and matured city development 35km east of Jakarta, 45mins from Jakarta s CBD Most established industrial area in Greater Jakarta, home to >2,000 local and multinational companies INDONESIA Tanjung Lesung Kota Jababeka Cikarang Kendal, Central Java Semarang Surabaya Karawang Designated as a Special Economic Zone Located 180km southwest of Jakarta and covers 1,500 ha of untouched peninsula facing the Indian Ocean Envisaged to become a first-class integrated resort destination for both domestic and international tourists Note: 1 Land bank as at 30 September 2018 Tanjung Lesung Master plan: 1,551 hectares 170km southwest of Jakarta Land Bank: 1,537ha (1) Kendal, Central Java Master plan: 2,700 hectares 450km east of Jakarta Land Bank: 587ha (1) Offers a deep pool of young and skilled labour at a competitive cost Designated strategic estate status under presidential decree Strategically located along the Jakarta-Semarang- Surabaya Economic Corridor 3

1 Kota Jababeka Flagship industry-based integrated township Kota Jababeka is a mature industry-based township strategically located in close proximity to Jakarta CBD, sea port and airport Excellent accessibility and connectivity with 3 Exit Toll Accesses to Kota Jababeka and development of Major Transportation Infrastructure along Jakarta Eastern Corridor to Kota Jababeka. 1.5 hours Proposed MRT Station JAKARTA KOTA JABABEKA KM 29 KM 31 6 lane Highway of Jakarta Inner Ring Road 35 KM from Jakarta City Close to International Airport & Seaport Accessible by toll road and railway Tranportation infrastructure (Proposed / Under Construction) LRT Track High Speed Train Elevated Toll Road MRT Track Double-double track Railway KM 34 and is home to over 2,000 local and multinational customers from over 20 countries 4

1 Kota Jababeka Anchored by a blue-chip customer base The portfolio of high quality multinational and domestic customers at Kota Jababeka is a testament to the township's strategic location and superior infrastructure facilities Diverse mix of occupants across sectors (breakdown by number of occupants) As of 30 Sept 2018 Portfolio of high quality customers 11% Electronics Machinery 7% Customer Goods 45% 6% Chemicals Automotive 6% Plastics Foods 6% Building 2% 4% 4% 4% 5% Metal Fabrication Tekstile Others 5

1 Jababeka Residence A City for Your World Residential & Commercial Developments Oscar Townhouse Cluster Sudirman Boulevard Commercial Center Mixed-Use Developments KM 29 KM 31 Hollywood Junction, Monroe & Elvis Tower KM 34 Facilities International Hotels Hospitals President University & Reputable Schools Jababeka Golf & Country Club Senior Living D Khayangan Jababeka Convention Center Jababeka Stadium 6

1 Kota Jababeka Enhancing value through Joint Venture projects PT PP Properti (Persero) Tbk PT Plaza Indonesia Realty Tbk JV 1 51% 49% Riverview Residence JV 1 30% 70% MAYFAIR Estate & Park Land 4 apartment towers strategically located near the toll exit Catering to the lower end of the market Tower 1 Mahakam Tower 90% sold out & topped off, hand-over started - Tower 2 Bengawan Tower > 199 units sold, piling completed Mixed use superblock on a 12-ha site right next to the golf course Groundbreaking happened in June 2015; piling completed JV 2 47.4% 52.6% 70% Mixed use superblock on a 4.6-ha site With 6 apartment towers and Japanese style mall JV 2 30% To be developed on 4-ha site adjacent to JV 1 Concept to be decided on at a later stage to support / complement JV 1 7

1 Kota Jababeka Kawana Golf Residence Kawana Golf Residence The One & Only Golf Residence in Indonesia Kawana Golf Residence is a JV between KIJA s Jababeka Residence (60%) and Creed Group (40%) from Japan High-end golf view apartment tower with 234 units Total 100% sold in 2 phases delivery scheduled in 2020 Kawana 2 planned to be launched later in 2019 8

2 Enhancing Kota Jababeka's value proposition: Jababeka Infrastruktur PT Jababeka Infrastruktur provides top notch to infrastructure and services, including clean water provision, waste water treatment, estate management, and other services such in-house fire brigade, 24 hour security, fiber optics, natural gas and others WTP 1 Capacity 400 L/sec WTP 2 Capacity 200 L/sec WWTP 1 Capacity 208 L/sec WWTP 2 Capacity 125 L/sec Waste Water Treatment Plan Water Treatment Plan Telco Natural Gas which meet the international standards and operate in accordance with environmentally friendly policies in integrated city Kota Jababeka in Cikarang 9

2 Enhancing Kota Jababeka's value proposition: Bekasi Power Plant KIJA is the only industrial estate developer in Indonesia with its own power plant located within its estate Integrated Power Generation & Distribution Process Financial Highlights IDR billion 1,600 1,400 1,200 1,000 800 600 400 200-1,062 7.7% 82 1,267 12.2% 155 1 2 3 100% output to PLN 1,499 Buy back from PLN (+16% margin) Direct sale to factories (+ margin) 14.3% 215 1,310 12.5% 164 1,360 17.1% 26.7% 774 232 207 2013 2014 2015 2016 2017 9M18 Revenue Gross Profit Gross Profit Margin PLN Factories 30.0% 25.0% 20.0% 15.0% 10.0% 5.0% 0.0% 130MW gas fired combined cycle plant 20 year 100% off-take agreement from Perusahaan Listrik Negara ( PLN ) Rate per KWH: ~US$11 cents Average gas cost / MMBTU: ~US$9.0 Fuel costs borne by PLN on a pass-through basis Fully contracted gas supply Flexibility to buy back power and resell it at a premium During the repair of a leakage in one of the boilers the power plant operated at about 50% of the usual capacity for about 3 months in 2016 The power plant was in full reserve shutdown for most of 1Q18 and has operated intermittently since then, since 3Q18 on 5 days full capacity during the week and half capacity on weekends Operational Highlights Description 2014 2015 2016 2017 9M18 Net Dependable Capacity 118.8MW 120MW 120MW 121MW 119MW Load Factor 108MW 110MW 93MW 109.1MW 112MW Capacity factor 90.01% 90.01% 81.85% 87.95% 92% Equivalent Availability Factor 90.34% 96.39% 82.85% 94.53% 99% Planned Outage Factor 7.88% 3.09% 15.15% 5.00% 0% Equivalent Forced Outage Rate 1.78% 0.52% 2.00% 0.47% 0.19% Providing a significant marketing advantage over its competitors as access to reliable electricity supply is one of the primary concerns for industrial clients in Indonesia 10

2 Enhancing Kota Jababeka's value proposition: Cikarang Dry Port Strategic location in the heart of the largest manufacturing zone along the Bekasi-Cikampek industrial corridor Airport JABABEKA MM 2100 EJIP LIPPO 62% 1 HYUNDAI GIIC SURYA CIPTA Enhanced Accessibility with New Toll Gate KM 29 Railway Connectivity to the Sea Port KIIC KIM KIKC KBI Cikarang Utama Toll Gate New Toll Gate KM 29 Flyover to Jakarta Highway Exit KM 29 International Port Code: IDJBK Surrounded by 11 Industrial Estates and more than 3,000 manufacturing companiee Notes: 1 Estimated % of total throughput at Tanjung Priok Port originating from this area 11

2 Enhancing Kota Jababeka's value proposition: Cikarang Dry Port Facilities & services offered at Cikarang Dry Port New Office & Warehouse New Customs Office To Surabaya Bonded Logistics Center Office: CDP, Quarantine, Banking Gate CFS Reefer Physical Inspection Railway Emplacement Mobile X-Ray To Jakarta / Tanjung Priok 12

2 Enhancing Kota Jababeka's value proposition: Cikarang Dry Port Smart Port Solution Mobile Application Auto Gate System 13 Next: E - Payment

2 Enhancing Kota Jababeka's value proposition: Cikarang Dry Port Bonded Logistics Center 14

2 Enhancing Kota Jababeka's value proposition: Cikarang Dry Port Cikarang Dry Port (CDP) is the first and only integrated customs, quarantine and logistics facility in Indonesia Overview Strong momentum in CDP operations Since 2012, Cikarang Dry Port is an official port of origin and Revenue (IDR billion) destination with international port code IDJBK now connected with 25 major shipping lines 180 Integrated port and logistics facilities with multi modal transportation services Smart Port Solution to streamline the business process Besides export/import, CDP also serves domestic distribution via main railway line that runs from west Java to east Java and also combining it with domestics shipping lines services Bonded Logistics Centre (FTZ facilities) for Cotton & minerals/metals Selected customer & partner profile at Cikarang Dry Port Shipping Lines: Third Party Logistics Provider (3PL): Shippers / Consignees: 160 140 120 100 80 60 40 20-62 Throughput (TEU) 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 78 120 2013 2014 2015 2016 2017 9M18 25,808 37,507 50,844 151 65,250 171 73,946 162 69,128-2013 2014 2015 2016 2017 9M18 allowing customers to more efficiently manage their imports and exports and benefit from cost savings 15

3 Sizeable and stable USD-denominated recurring income base The provision of these infrastructure services has enabled the progressive build out of a significant recurring revenue base Total Revenue & Breakdown Recurring revenue (IDR billion) Recurring (1) Real Estate (2) 2017 2,000 1,800 1,600 1,592 1,868 1,723 1,774 30.7% 35.0% 30.0% 43% 2014 57% 41% 59% IDR 2,994 billion 1,400 1,200 1,000 800 1,349 15.5% 21.6% 22.2% 24.6% 23.6% 1,115 25.0% 20.0% 15.0% 600 10.0% 400 2012 83% 17% IDR 2,799 billion 200 0 210 344 415 424 419 342 2013 2014 2015 2016 2017 9M18 Recurring EBITDA Recurring Revenue EBITDA Margin 5.0% 0.0% IDR 1,401 billion based on USD pricing terms (power & water), further enhancing stability and visibility of cash flows for Jababeka and also providing a natural hedge for its USD-denominated interest expenses Furthermore, US$ 200 million notional is hedged by means of call spreads with an average lower strike of 13,021 Rupiah and an average upper strike of 15,997 Rupiah Notes: 1 Recurring revenue/ebitda includes contribution from power plant, dry port and service & maintenance fees 2 Comprises real estate, golf and other non-infrastructure segments 16

4 Diversified land bank A geographically diversified land bank allows KIJA to capture different market segments and enhances earnings resilience Diversified by geography, positioning and segment Land Bank Total (1) : 3,362ha Kota Jababeka Kendal Industrial Park Park by the Bay Tanjung Lesung Positioning Established MNCs and domestic companies willing to pay a premium for strategic location and mature township with top notch infrastructure in place 1,239ha 586ha 1,537ha More cost-conscious customers looking for an alternative to Greater Jakarta industrial estates that still provides top notch infrastructure Tourism, leisure and hospitality focused integrated township to tap into entertainment/leisure spending by rising middle class in Indonesia Well diversified across multiple segments (Breakdown of segments by 2017 revenue contribution) Real Estate (2) : 41% Recurring (3) : 59% 19.7% 5.0% 5.5% 4.2% 1.6% 2.6% 2.2% 45.4% 13.8% 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% Land Industrial Commercial Residential Tourism Golf Others Power Plant Service & Maintenance in addition to benefiting from future infrastructure developments across its land bank locations Notes: 1 As per 30 September 2018 and excluding Morotai with 521 hectares of land bank 2 Comprises real estate, golf and other non-infrastructure segments 3 Recurring revenue includes contribution from power plant, dry port and service & maintenance fees 17

4 Diversified projects: Kendal Industrial Park Park by the Bay Kendal Industrial Park Park by the Bay benefits from Sembcorp's expertise in developing and marketing industrial zones across Asia (China, Vietnam, Batam, Bintan, etc) Kendal Industrial Park Park by the Bay is a JV between KIJA and Sembcorp Excellent connectivity to major infrastructure in Central Java 49% 51% Kendal Port Tanjung Emas Seaport Ahmad Yani Int'l Airport Semarang Total planned area: 2,700 hectares Phase 1: 860 ha (586 hectares as per 30 September 2018) Distance to Kendal Industrial Park Park by the Bay Tanjung Emas International Seaport (Indonesia's 3 rd largest) Ahmad Yani International Airport Semarang (Central Java capital) 25 km 20 km 21 km and complemented by KIJA s long track record and experience in Indonesia industrial estate developments and infrastructure operations 18

4 Diversified projects: Kendal Industrial Park Park by the Bay Our Kendal Industrial Park Park by the Bay development in Central Java is well-positioned to benefit from growing demand for relatively low cost industrial estates with good connectivity and competitive labor costs Key Highlights Kendal Industrial Park Park by the Bay offers customers an affordable product with top notch infrastructure Low labour costs in Central Java makes Kendal Industrial Park Park by the Bay particularly interesting for labor intensive industries Kendal Industrial Park Park by the Bay is situated along the Jakarta-Semarang-Surabaya Economic Corridor Increasing traffic congestion at Tanjung Priok Port in Jakarta has led to growing interest in alternative sites with good connectivity via air and sea Diverse mix of occupants across sectors (breakdown by number of occupants) As of August 2018 Others, 8% F&B, 10% Furniture & Wood Processing, 10% Manufacturing, 36% Official opening ceremony on November 14 th 2016 by the President of Indonesia, Mr Joko Widodo, and the Prime Minister of Singapore, Mr Lee Hsien Loong Logistics & Warehousing, 15% Building & Related Industries, 21% 19

4 Diversified projects: Kendal Industrial Park Park by the Bay 20

4 Diversified projects: Tanjung Lesung Malaysia Tanjung Lesung overview Singapore Indonesia Tanjung Lesung Location Concept ~ 180 km southwest of Jakarta in Banten Tourism-based integrated township apartments, sailing, diving & beach clubs) (hotels, Australia Access Currently accessible by toll road from Jakarta in ~ 3.5 hours Merak SOEKARNO HATTA International Airport Krakatau Mountain Anyer Serang Jakarta Tanjung Lesung Panaitan Island Labuan Panimbang Pandeglang Future Toll road Jakarta-Merak Toll Road Ujung Kulon National Park President Joko Widodo speaking on Tanjung Lesung s designation as Special Economic Zone for Tourism 21

4 Diversified projects: Tanjung Lesung Strong government support for Tanjung Lesung's development as a tourism zone... Facilities and infrastructure at Tanjung Lesung Existing infrastructure includes access roads, a water treatment plant, wastewater treatment plant, electricity supply and telecommunication links Visitors currently have access to ~ 300 rooms spread out over two hotels/resorts, a bed and breakfast and several cottages Other facilities: restaurant and bar, golf course, a swimming pool, a spa, a beach club, a sailing club, private air strip, school, mosque, residential housing units, and a medical clinic Golf course Strong government support for development of Tanjung Lesung One of 10 New Tourism Destinations in Indonesia that the Indonesian Government is promoting New toll road from Serang Timur to Panimbang: A consortium led by PT Wijaya Karya Tbk (Persero) won the tender for this project, land acquisition is ongoing and construction has commenced Aerial view Tanjung Lesung has been designated as Special Economic Zone for Tourism Villa with private pool at Tanjung Lesung is expected to increase interest from potential investors/partners for the project 22

4 Diversified projects: Tanjung Lesung Current property products KALICAA VILLA 23

4 Diversified projects: Morotai Future tourism and logistics hub strategically located in the heart of Pacific Asia with natural tropical beauty and World War 2 historic sites and relics Morotai Strategically located in the Halmahera group of eastern Indonesia s Maluku islands, in the heart of Pacific Asia in between Asia and Australia 3 hours flight from Singapore and Taipei Great potential for tourism, agricultural and fishing industries and as a logistics hub Morotai is a Special Economic Zone for tourism and 1 of 10 new tourism destinations promoted by the government Beach view at Morotai PT Jababeka Morotai has been appointed as the implementing entity of the Morotai development project by the Coordinating Ministry of Economic Affairs of the Republic of Indonesia Evening view at Morotai 24

5 Clear strategic focus KIJA's existing pipeline provides visible opportunities over different time frames Continue to develop and capitalize on Kota Jababeka Township Development of Tanjung Lesung tourism-based township Short Term Further development of Kendal Industrial Park in partnership with Sembcorp in Central Java Medium Term Development of Morotai, initially as a tourism-based township Long Term Vision Replicate Kota Jababeka's industry-based integrated township model throughout Indonesia Build out an infrastructure facility portfolio (power, water, ports, etc.) to support these new townships 25

6 Financial Highlights Revenue breakdown (IDR billion) Gross profit (IDR billion) and Gross profit margin (%) 3,500 3,000 2,500 2,000 1,500 1,000 500-2,799 1,207 1,592 3,140 1,272 2,931 2,995 1,208 1,221 1,868 1,723 1,774 1,580 465 1,115 2014 2015 2016 2017 9M18 Recurring revenue Real estate & other revenue 1,600 1,400 1,200 1,000 800 600 400 200 0 1,252 1,389 45% 44% 1,243 42% 1,137 38% 38% 597 2014 2015 2016 2017 9M18 Gross profit Gross profit margin 60% 55% 50% 45% 40% 35% 30% 25% 20% EBITDA (IDR billion) and EBITDA margin (%) 1,400 1,200 1,000 800 600 400 200 0 1,130 37% 1,167 40% 1,025 37% 914 35% 31% 470 2014 2015 2016 2017 9M18 EBITDA EBITDA margin Net income (IDR billion) 500 400 300 200 100 0 (100) (200) (300) (400) (500) 399 331 427 150 2014 2015 2016 2017 9M18 Notes: 1 Approximate unrealized foreign exchange loss (non cash) for FY14: IDR 65 billion, FY15: IDR 156 billion, 9M18: IDR 408 billion 2 Approximate unrealized foreign exchange gain (non cash) for FY16: IDR 135 billion, FY17: IDR 59 billion and in FY17 additional 1-off expenses of Rp 175bn as a result of redemption of 2019 senior notes 60% 50% 40% 30% 20% 10% (1) (1) (2) (2) (379) (1) 26

6 Balance Sheet Highlights Assets and cash (IDR billion) 14,000 12,000 10,000 10,734 11,226 11,543 9,741 8,505 8,000 6,000 4,000 2,000 0 595 827 792 895 723 2014 2015 2016 2017 9M18 Cash and cash equivalents Total assets Debt, Equity (IDR billion) and Debt/Equity (x) 6,000 5,638 5,900 5,570 5,000 4,662 4,978 4,525 4,041 4,000 3,510 3,565 0.81 3,000 2,705 0.71 2,000 0.68 0.63 1,000 0.58 0 2014 2015 2016 2017 9M18 Total debt Total equity Debt/Equity 1.00 0.95 0.90 0.85 0.80 0.75 0.70 0.65 0.60 0.55 0.50 EBITDA/Interest expense (x) 1 4.5 Net debt/ebitda (x) 6.0 4.0 3.5 3.8 5.0 5.0 3.0 2.5 2.0 1.5 1.0 0.5 3.4 3.1 2.3 1.8 4.0 3.0 2.0 1.0 1.9 2.3 2.7 3.4 0.0 2014 2015 2016 2017 9M18 0.0 2014 2015 2016 2017 9M18 Notes: 1 Includes capitalized interest + Hedging Fees 27

7 Experienced management team Average of more than 25 years of industrial township development experience Board of Commissioners Setyono Djuandi Darmono Bacelius Ruru Hadi Rahardja Gan Michael President Commissioner Vice President Commissioner Commissioner Commissioner (Founder) Independent Commissioner (Founder) Board of Directors Budianto Liman Hyanto Wihadhi Sutedja Sidarta Darmono Tjahjadi Rahardja Setiawan Mardjuki Basuri Tjahaja Purnama President Director Director Director Director Director Director 28

7 KIJA NAV As per 30 September 2018 Land bank Size (ha) ASP (Rp million) NAV (Rp bn) Cikarang Inventory 167 4.00 6,663 Land for Development* 1,072 0.55 5,896 Kendal Inventory 1 1.50 14 Land for Development* 585 0.35 2,048 Tanjung Lesung Inventory 23 1.00 231 Land for Development* 1,514 0.25 3,785 Morotai Inventory 475 0.20 951 Land for Development 46 0.02 9 Subtotal land bank 19,598 Infrastructure & Others (DCF) 2,717 Add (cash, advances, investments in associates, deposits, etc) 1,940 Deduct (loans, customer advances, etc) (5,038) Total NAV 19,218 Nmber of shares (billion): 20.82 NAV per share 923 Current Share Price 214 Discount to NAV 77% * Replacement value Disclaimer: The purpose of this section is to provide shareholders, bondholders, analysts, brokers/dealers, potential investors and other capital market participants with a general overview of the Company s internal net asset value (NAV) calculation. The information is provided for quick reference only. The information provided is not an offer to sell securities or the solicitation of an offer to buy securities. The information has been compiled from sources believed to be reliable. The information contained in this section is subject to change without notice, its accuracy is not guaranteed and it may not contain all material information concerning the Company. The Company makes no representation regarding, or assumes any responsibility or liability for, the accuracy or completeness of, or any errors in or omissions from, any information contained herein. 29

Thank You www.jababeka.com 30