NORFOLK INTERNATIONAL AIRPORT

Similar documents
PBN Route Structure Alaska Sub-Committee AACA Co-Chair Dennis Parrish

Aviation Business Development Program. Economic Development Committee May 18, 2015

CHAPTER 1: INTRODUCTION

Runway Expansion Impact Assessment Oshawa Municipal Airport. Presentation To Development Services Committee City of Oshawa May 30, 2011

DOT 3 Hour Rule GoJet SOC Master Plan

Community Noise Consortium Meeting (CNC)

BACKGROUNDER Vancouver International Airport - Economic Generator for British Columbia

CHAPTER 1.0 INTRODUCTION

ATM Network Performance Report

Attachments: Sample letter and addresses of Iowa s congressional delegation Airports United Airport Financing Priorities in 2015

Camp BUCKO 2018 Volunteer Application

Posting Open Date: 08/20/2018 Posting Close Date: 10/08/2018 (Please note the posting will close at 11:59pm)

DIRECTORS GENERAL OF CIVIL AVIATION-MIDDLE EAST REGION. First Meeting (DGCA-MID/1) (Abu Dhabi, UAE, March 2011)

StART SEA-TAC STAKEHOLDER ADVISORY ROUND TABLE

What You Must Know About Your Immigration Status. Presented by the Office of International Affairs (OIA)

8950 Cal Center Drive Bldg.3, Suite 300 Sacramento, CA phone fax

ASISA STANDARD ON UNCLAIMED ASSETS

Ski & Snowboard Group Guide. Wilmot Mountain, a Vail Resorts Company Fox River Rd. Wilmot, WI 53192

Servas International - Nominations Committee Candidate Application Form -

English Version ATC BRIEFING GUIDE. GR IVAO [COMPANY NAME] [Company address]

National Search and Rescue Committee (NSARC) Secretariat Issue Paper

committee report Network Rail: Route Utilisation Strategy: Stations Draft for Consultation

Meeting Minutes NORTHWEST FLORIDA REGION CFASPP STEERING COMMITTEE MEETING June 18, Tallahassee Regional Airport

Revenue up 4.8% in the first nine months of Quarterly financial information for the first nine months of

Manresa Island Reuse and Economic Impact Analysis Study Public Involvement Process & Summary June 2017

I-95/GIR FACT SHEET. Interstate 95 Section GIR - Girard Avenue Interchange Improvement Project City of Philadelphia

ERA AIR SAFETY GROUP REPORT FOR 2016

Access control and (pre-)registration

PORTER AIRLINES INC. GENERAL CONDITIONS OF CARRIAGE

Runway 35 South and West (Jet) Departure Flight Path Amendment

Three new ways to fly Agency how to guide

QUT Digital Repository:

DENVER INTERNATIONAL STANDARD OPERATING PROCEDURES

Shuttles are scheduled ONLY when there is a reservation. Without reservations we DO NOT travel.

Forest and Prairie Protection Act and Regulations Parts I and II - Legislative Review and Regulatory Reform Discussion Paper

!!!!!! Vision & Strategy!!

1 - OVERVIEW ACTIONS Andy Wright and Phil Holder welcomed the group. The intention is for the Consultative Committee to meet twice yearly.

FLIGHTS OF FANCY How Wing Shape Affects Flight

Meeting Minutes NORTHEAST FLORIDA METRO AREA CFASPP STEERING COMMITTEE MEETING March 3, 2015 Jacksonville International Airport

This section outlines travel policies and procedures for international and in-country travel and related meals and incidental expenses payments.

Summer Camp Employment Information

Facilities Worker. Job Information Pack. Employment Conditions. This information package includes:

Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA) Overview Kurt Edwards Director General, IBAC NBAA BACE October 2018

PACKING A SUITCASE MINI COURSE

Strand 3- Transportation: Airlines

Concur Travel Tips and Tricks

SAN DIEGO ROTARY CLUB 33 CAMP ENTERPRISE 2018 PROGRAM INFORMATION FOR

New York Action Team SWAP Federal Aviation Administration. Teterboro User Group Brief. Leo Prusak, Manager of Tactical Operations.

NEW HAVEN DOWNTOWN CROSSING CONSTRUCTION IMPACTS

SMSF Professionals webinar July 2016 update

BCHA Volunteer Hours Reporting Guide

All Requests for Stamping, Banners, and Space Reservations must be done through TitanLink. Complete the form at:

2013 Lewis and Clark Cub Camp June 3 rd -7 th Hitchcock Pack Galactic Trek

Concern Worldwide Haiti

NATIONAL MINORITY AFFORDBLE HOME BUILDERS SUMMIT PRESENTERS SPONSORSHIP PACKAGES

Tips for attending the 11 th World IFYE Conference 8-16 September 2018 Cruisin with IFYE

ALI ZAGHARI Deputy District Director Caltrans, District 7 Division of Traffic Operations

IRELAND. AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY CONTROL TOWER SHANNON AIRPORT CO. CLARE Tel Fax

CCI Resource and Construction Conference And Construction Industry Dinner 28 June 2018

REFUND INFORMATION FOR TRAVEL AGENTS

Alien Flight Student Program

Camp Scholarship Application

Report to the Minister for Planning

2018 Launch Mini-Grant Guidelines Page 1

Parks and Recreation. Goals

Skidmore College Guidelines on UAS - Unmanned Aircraft Systems (drones)

Draft Evaluation Criteria for the Tonto National Forest Wilderness Recommendation Process

High Hopes for Colorado

CAC AmeriCorps Position Description

Meeting 2 Workshop Summary

National Business Ethics Survey 2013 Summary - US

Camp Caillet Crisis Response Plan

Cherokee Flight Presolo Written Exam (PA28-181)

Mangawhai Village and Kaipara District Council Working in Partnership

APPENDIX D Safety Performance Review

o o o þ þ o o Short title of the project: VILLAGE DEVELOPMENT IN KAUNISSAARI I. BASIC INFORMATION I.1 Short title of the Pilot Action

White Paper Network Video Management System Ensuring end-to-end protection of video integrity

Comprehensive Plan. Executive Summary

Reforming the ATC System to Promote Economic Efficiency

CO 675 Group Counseling Theories and Techniques

Camp John J. Barnhardt December 9- December 11, Leader s Guide STANLY COUNTY BURNING BAN! NO CAMPFIRES

Athens International Airport. Airport Terminal Operator Liability Stamatis Varsamos

SPCI & Friends 2018 is organised by SPCI and produced by Svensk Papperstidning

Virtual Royal Air Force

Waukegan Park District Special Meeting of the Board of Commissioners Cultural Arts Advisory Committee Meeting September 29, :00pm meeting

VILLAGE OF LINCOLNWOOD PRESIDENT AND BOARD OF TRUSTEES COMMITTEE OF THE WHOLE MEETING VILLAGE HALL COUNCIL CHAMBERS DECEMBER 18, 2018

Optional Practical Training - STEM Extension

2014 National Corvette Caravan

EDUCATIONAL PROGRAM AviationCV. The Better Way. to Fly

Attachment: Example of I-9 with I-94 information Good afternoon,

Greater Tampa Bay Area Council. Zombie Apocalypse

COCKERMOUTH ANGLING ASSOCIATION A.G.M CHAIRMAN S REPORT

ATR72 LTC/TRI/TRE. Vietnam.

Airspace: AIM Chapter 3:

Dog Hiking Behavior Volunteer Training Manual - Buddy Center

PISTOL SHOOTING QUEENSLAND. MONTHLY UPDATE April For PSQ Members

INTERIM MANAGEMENT STATEMENT FOR THE PERIOD FROM 1 JANUARY TO 25 APRIL 2012


Accessibility Guide. Page 1 of 10 12/9/2017. Figure 1 Giraffe

Cathay Pacific Airways (CX) and Dragonair (KA) will launch the first Ancillary selling through Travel Agency Channel

Transcription:

Prject Meeting Lcatin Nrflk Internatinal Airprt (ORF) Prject Kick-Off Meeting: Technical Advisry and Cmmunity Advisry Cmmittees (TAC and CAC) Nrflk Internatinal Airprt Date Wednesday, January 24, 2018 Meeting Attendees See Attached Sign-In Sheet The first Nrflk Internatinal Airprt (ORF) Technical Advisry Cmmittee (TAC) meeting and Cmmunity Advisry Cmmittee (CAC) were held n Wednesday, January 24th, 2018. The TAC meeting was held at 10:00 a.m. and the CAC at 2:00 p.m. Bth meetings kicked ff with welcming and pening remarks by Anthny Rndeau, Deputy Executive Directr - Engineering and Facilities, and Paul Puckli, CHA Cnsultant s Prject Manager. Paul Puckli intrduced the CHA study team and then attendees were asked t intrduce themselves and t identify the agency r rganizatin they were representing. We were pleased with the diverse and dynamic cnversatin and the insight it prvided. As a result, we feel it will be a wise use f everyne s time and cntribute t even better dialg nce we blend the grups. The TAC and CAC will be cmbined int the Planning Advisry Cmmittee (PAC). Pint f Cntact fr the study: Fr any questins r cmments, the team encurages yu t reach ut t Anthny Rndeau, r t use the study website cmment frm nce it is live. Anthny Rndeau Nrflk Airprt Authrity 757-857-3351 arndeau@nrflkairprt.cm The technical presentatin was given by bth Paul Puckli, and Paul McDnnell, Deputy Prject Manager als with CHA. Attendees were invited t ask any questins thrughut the presentatin. The presentatin fcus was t ffer an initiatin t the study, including: purpse, prcess, schedule, and initial Airprt Inventry, as summarized belw. The rle and purpse f the advisry cmmittees was discussed. Mving frward the purpse and rle f the cmbined Planning Advisry Cmmittee is t prvide input, review, and cmments frm a technical perspective as well as representing a brad range f airprt stakehlders, hst cmmunities, and airprt tenants. Master Plan Stakehlders include: Nrflk Airprt Authrity (NAA) Federal Aviatin Administratin (FAA), Washingtn Airprts District Office FAA Air Traffic Cntrl Twer (ATCT) Virginia Department f Aviatin Airlines & Carg peratrs General & Crprate Aviatin Fixed-Base Operatr (FBO) (Signature) Rental Cars & Cncessinaires TSA, Dept. f Hmeland Security & U.S. Custms and Barder Prtectin Airprt Master Plan & Airprt Layut Plan Update ǀ Nrflk Internatinal Airprt ǀ Page 1

U.S. Navy Lcal Cmmunities Definitin and rle f an Airprt Master Plan was prvided. The study is a cmprehensive 20-year plan, with the last ne being cmpleted in 2008. A master plan prvides the verall visin and facility needs fr an airprt, including a general schedule and budgeted csts. Hwever, prject details, funding, and any required apprval/permits are separate, and fllw the study prcess as needed. The master plan is the first step in identifying, planning, and evaluating future airprt imprvement. Master plans are generally updated every 10 years. A PDF f the 2008 update executive summary is prvided thrugh this link: www.nrflkairprt.cm/sites/default/files/orfmasterplanupdate2008.pdf The prject schedule was utlined with the gal t cmplete the study prcess within a 20-mnth perid. The team is currently cmpleting inventries and frecasting. It is anticipated that up t five TAC meetings may be scheduled thrughut the study prcess, as well as tw public infrmatin meetings. The study fcus areas were identified, including: future airfield imprvements, new mapping and bstructin surveys required by FAA, evaluatin f airfield gemetry and the nging rental car facility expansin already under way. ORF is currently served by five airlines, with daily, nn-stp service t 22 dmestic destinatins The airprt is served by tw active runways: Runway 5-23 and Runway 14-32 A brief histry f the airprt was discussed alng with key features and service area f the airprt, industry and airline trends, reginal changes and lcal cnsideratins fr the airfield and terminal area. Paul Puckli explained several changes since the last MPU: Hw the airline industry has cnslidated. As f Octber 2017, ORF has a new carrier, Allegiant. This type f carrier is different frm ther cmmercial carriers and a different apprach may be required t accmmdate and plan fr their style f business. General aviatin has nt grwn, while crprate aviatin has. With increases in mail rder shpping via Amazn type businesses, carg has changed and will cntinue t grw. Carg peratins include the airlines, plus UPS and FedEx. Things have changed ecnmically and plitically. Changes in military peratins influences ORF. FAA s NextGen prgram impacts include transitining frm radi-based navigatin t satellite nav. A general inventry f airprt facilities and evaluatin requirements was presented. This included discussin abut the peratins f ORF with ne cmmercial use runway 5-23. Issues were presented abut hw t manage rehabilitatin and maintenance f the runway withut anther cmmercial use alternative. Additinally, airline trends away frm turbprp and tward larger aircraft and fewer peratins has implicatins t the runway and terminal area discussin. Ptential airfield ptins t be evaluated include: Need fr secndary and/r crsswind runways Evaluatin f Runway 14-32 t serve as an Airprt Reference Cde (ARC) C-III r a B-II runway. The letter cde signifies the aircraft s apprach speed categry, in this case, C relates t Airprt Master Plan & Airprt Layut Plan Update ǀ Nrflk Internatinal Airprt ǀ Page 2

121-140 knts and B t 91-120 knts. The rman numeral indicates the wingspan, in this case, III is 79-118 feet and II is 49-79 feet. (Learn mre abut ARC categries here: www.faa.gv/air_traffic/flight_inf/aernav/acf/media/rds/14-02- 288_airprt_ref_cdes_in_afd.pdf) Recnstructin vs. Clsing Runway 14-32 Lng-term recnstructin f Runway 5-23 Imprvements t airfield gemetry t meet FAA guidelines and all FAA design standards Impact f FAA NextGen n aircraft peratins and prcedures. (Learn mre abut NextGen here: www.faa.gv/nextgen). Evaluatin f taxiway and aprn demands prpsed relcatin f VORTAC. (A VORTAC is a navigatinal aid fr aircraft pilts cnsisting f a c-lcated VHF mnidirectinal range (VOR) beacn and a tactical air navigatin system (TACAN) beacn.) Evaluatins f passenger terminal space usage based n frecasted passenger vlumes was discussed cnsidering airline trends t larger aircraft and fewer peratins leading t heavier vlumes f passengers at departure and arrival times. Plans will incrprate future technlgical imprvements with sustainability in mind. Overall, the team feels ORF is in a better situatin than a lt f airprts. Nrflk has kept up their passenger terminal. We will be lking alternative terminal space prgrams t maximize use f the space. Parking and access alternatives include planning fr a ptential cnslidated rental car facility, future Light Rail access and a curbside management plan taking int cnsideratin increased passenger use f Transprtatin Netwrk Cmpanies (TNCs), such as Uber and Lyft. Land Use Planning is a large part f the study and will identify any existing and prpsed land use regulatins and any deficiencies r surpluses in the amunt f develpable land, general feasibility and ptential benefits f alternative grund access, curbside parking and rental car ptins. The study website was intrduced as a way f keeping infrmed. Members will be advised when the site is live. Infrmatin abut the study, white papers and meeting agendas and minutes will be included n the site. The presentatin cncluded with an verview f next steps including finalizing Wrking Paper #1 (Inventry) and submitting it fr review and cmment t the TAC. The next TAC meeting alng with a Public Infrmatin Meeting will be scheduled fr spring 2018. The fllwing questins/cmments were raised during the TAC and CAC meetings. 1. Questin: My questin is abut the study prcess. What is it yu want frm ur respective fields? A: As stakehlders f the airprt, we are lking fr yu t review plans and dcuments with an eye tward yur expertise and knwledge yu may have fr new and emerging techniques we are unaware f; fr example: as a representative f wildlife, yu may have a plan fr placement f bird cannns t avid bird strikes r animal incursins yu may have ideas t add t and imprve upn ur ideas. Additinally, dn t feel yu have t cnfine yur cmments t yur specific field. We want yur input frm a technical standpint as a tenant, custmer, etc. n any subject that may imprve the MPU in a psitive way. We want yu t ask questins, prvide cmments. Our jb is t listen and Airprt Master Plan & Airprt Layut Plan Update ǀ Nrflk Internatinal Airprt ǀ Page 3

make prfessinal judgements in cmpliance with FAA standards. We can t prmise we will answer r reslve every issue, but we will try. 2. Questin: Has the MPO been invited t participate? A. Yes, we have invited them t participate as an advisry cmmittee member. 3. Questin: Have yu decided what yu will use fr aerial surveys and mapping? A. Yes, in fact ur aerial survey has been cmpleted t FAA standards using a prgram FAA is using fr all airprts t upgrade their GIS prgrams. In particular we will be lking at bstructins. We are hping that airprt tenants will use this mapping system when planning new facilities, s all infrmatin will be develped using the same system vs. several. 4. Questin: Did yu just d a ne-day aerial capture? Nrflk Naval Statin has ship peratins that may be bstructins. A. We will need t wrk with the Navy n ships and height requirements. 5. Questin: Have yu talked with airlines abut their plans? Are yu talking t airlines abut changes in airplanes? A. Yes, we have talked with them. Unfrtunately, it is difficult t btain infrmatin abut future planning, even a year r tw ut. We will have t use ur prfessinal judgement. 6. Questin: Hw are yu capturing cmmunity htspts in the area? A. We will be ding a land use study that will include n and ff airprt land use. 7. Questin: Hw d yu clse the runway fr 6 mnths while under cnstructin? A. Sme airprts build temprary runways, while thers bus custmers t nearby alternate airprts (thugh we dn t see that wrking here). The wrst-case scenari fr ORF is clsing the airprt fr the time it takes fr rehabilitatin and maintenance. This practice is acceptable t FAA if there is an airprt a reasnable distance away. Building an additinal runway has always been the ultimate plan, but we need t wrk with FAA. The team will explre all these ptins during the master plan. 8. Questin: What is the prjected timeframe fr Runway 5-23 recnstructin (f the cmmercial runway)? A. The airprt plans t d sme rehabilitatin f the runway with a mill and verlay in the next year r tw. Full recnstructin f the runway may be needed in abut 10-15 years after that. 9. Questin: Will there be any interruptin f service fr the upcming rehab prject? Hw d ther single runway airprts deal with this? A. Yes, we will clse the runway every mrning frm 0:15 and 05:15 each day during rehab. We are wrking with airlines nw t plan fr this during the rehab mnths. This is nt smething ut f the rdinary. We clse the runways fr shrt terms fr ther rutine maintenance issues and we always wrk with the airlines t minimize impacts t their schedules. The impact at ORF will include Airprt Master Plan & Airprt Layut Plan Update ǀ Nrflk Internatinal Airprt ǀ Page 4

sme minr changes in flight schedules. There are ther single runway airprts that face this issue. Asheville built a parallel taxiway t help them thrugh the rehab prcess, and then were able t use the taxiway afterwards in additin t the rehabilitated runway. Myrtle Beach recently did a 15-year runway verlay and adjusted airline schedules t make it wrk. 10. Questin: In 10-15 years, hw will airprt peratins be maintained? A. That has yet t be determined, but it is intended that the master plan identifies a wrkable plan t build a secnd r parallel runway that can be used when the main runway is clsed. B. A parallel taxiway wuld ptentially be built and used fr this purpse, with advanced planning. 11. Questin: Des the parallel taxiway affect peratins? A. Parallel taxiway is nt wide enugh t perate as temprary fix. The airprt may need t frtify shulders and mve lights t make it wrkable temprarily. 12. Questin: Has anybdy had t clse an airprt f this size? A. N, we cannt think f any airprt that has had t clse peratins cmpletely fr a perid f 6 mnths r mre fr recnstructin. Sme have clsed ver the weekend, but that wn t wrk here. 13. Questin: Yu said FAA is k clsing it and they are primary funding surce, right? A. The FAA has stated that a several mnths clsure wuld be acceptable t FAA if needed fr runway recnstructin. FAA is the funding surce, but NAA is spnsr, and NAA is nt entertaining an extended airprt clsure as a reasnable alternative. 14. Questin: Yu want the runway pen, but if it is t difficult t make recnstructin happen, wuld they clse the airprt cmpletely? A. N, the airprt wuld nt be clsed cmpletely fr a regin f this size. We will lk at a lt f ptins fr a secndary runway (temprary r permanent). 15. Questin: The emphasis n passenger vlume, but yu have als talked abut UPS and FedEx, d yu see this industry grwing? A. Almst 90% f the freight/package business lies with these tw carriers. It is great that they are bth here at ORF and they will want t stay here. The big questin is what kind f space d they need? Usually, their demands are relatively minr (carg lading) and even with strng grwth, they typically dn t need mre that anther aircraft parking psitin r tw and building space fr package prcessing. 16. Questin: On previus slide, the future Light Rail Transit(LRT) access was nt addressed. Will yu plan fr that? A. Yes, we will have a plan fr a rail crridr, shuld LRT be built t the airprt. We may identify the easement r crridr fr it, and reserve ther necessary space. Currently, Hamptn Rads Transit Airprt Master Plan & Airprt Layut Plan Update ǀ Nrflk Internatinal Airprt ǀ Page 5

is planning t lk next at the eastern access rute vs. the western rute. Bth will be cmpared and then the team shuld knw mre abut transprtatin access and land use needs. 17. Questin: Will yu circulate the cmmittee member names? A. Yes, they will be n website and they will be prvided as part f the meeting minutes package. 18. Questin: What is the ther cmmittee? A. The ther cmmittee is the Technical Advisry Cmmittee (TAC), charged with reviewing and ffering input n technical issues related t the MPU. The TAC cnsists primarily f airprt tenants. If yu have any further questins r cmments after reading these minutes, please cntact Anthny Rndeau. Airprt Master Plan & Airprt Layut Plan Update ǀ Nrflk Internatinal Airprt ǀ Page 6