Yuba Creek Natural Area TF00-162 $1,576,021.00 in fee simple of 403 acres of critical wetls upl habitat with over 5,000 feet of frontage on Yuba Creek, a tributary to the east arm of Bay. 2000 Petobago Natural Area TF00-319 $680,048.00 in fee simple of 240 acres including riparian wetls upls with one mile frontage on Tobeco 2000 Creek. is for the protection of significant natural resources, hunting, new public access. Meyer Addition to Nature Education Reserve Gr e County TF00-356 $786,509.00 in fee simple of 94 acres of l with 1,950 feet of frontage on Sabin Pond that will be added to the 420-acre 2000 Nature Education Reserve. The additional acres would be used as an addition to the current active recreation area Maple Bay Natural Area Gr e County TF01-227 $6,816,920.00 of 400 acres, including 2,583 feet of Great Lakes shoreline as a county park/natural area. Property is adjacent to Petobego SGA protects dunes, wetls, wildlife habitat provides new access for hunting other recreational activiti 2001 Nature Education Reserve Expansion TF02-220 $505,000.00 in fee simple of approximately 80 acres of l 2002 with 7,275 linear feet frontage on the River.
Battle Creek Natural Area TF03-206 $1,860,600.00 in fee simple of 500 acres, with 2,300 feet of Elk Lake shoreline 2 miles of Battle Creek, a designated 2003 trout stream, for protection of critical natural resources provision of public recreation. Cedar Run Creek Natural Area Betsie River Consolidation Cedar Run Creek Natural Area Addition Grant Long Lake Townshi p Grant Townshi p TF06-051 $999,500.00 of 212 acres, including over 6,200 feet on Cedar Run Creek over 1,500 feet on Cedar Lake for hunting, fishing, hiking, nature observation, education. 2006 TF07-120 of 307 acres (3 parcels) within the Pere Marquette State Forest to maintain the quality of the Betsie River. The parcels $1,300,000.00 include 7,600 feet of river frontage, 140 acres of wetl, deer yard, waterfowl habitat a cool water fishery. 2007 Acquisiton of a 90-acre parcel immediately adjacent to the future Cedar Run Creek Natural Area, with 2,500 feet TF07-162 $554,900.00 of frontage on Cedar Run 2007 Creek 32 acres of forested wetl, for hunting, fishing, nature observation.
Jaxon Creek Corridor Waterfront Park - Phase I Paradise TF07-168 of 376 acres with 5,500 ft of frontage on Jaxon Creek, a state designated natural river. Property $1,050,000.00 includes upls, wetls, winter deer yard, will consolidate state ownership in the Pere Marquette State Forest. in three phases of 11.5 acres 2,000 feet of lake frontage as an addition to Bayside Park along the east TF08-095 $3,006,200.00 arm of Bay. al opportunities will include fishing, wildlife viewing, picnicking, swimming. 2007 2008 Mitchell Creek L TF08-129 $1,000,000.00 of 28.79 acres of l adjacent to State Park provides recreation fishing access to Mitchell Creek. 2008 Waterfront Park-Phase II Williams burg TF09-171 $2,266,500.00 Phase II of a three phase project to acquire a 2.11-acre addition to the township's public waterfront park. 2009 Lake Trail Nature Reserve Expansion Killingsworth/K elly Parks Expansion TF09-173 of 61 acres for expansion of the township nature reserve acquisition $1,231,800.00 2009 of easements for the Lake Trail along the River. of 70.91 acres for TF10-145 expansion of the existing 55- $487,500.00 acre Killingsworth Kelly 2010 Parks.
Waterfront Park TF11-082 $862,500.00 of approximately 337 feet of frontage on East Bay in two parcels. 2011 Timbers Area TF12-071 $2,073,000.00 to include 265 acres in fee simple of northern hardwood forest wetls, 2012 8,900 feet of frontage on three inl lakes, including 2,000 feet on. State Park State Park TF269 $800,000.00 TF361 $400,000.00 To acquire 3 acres with 900 feet of frontage on East Gr e Bay. of 2.71 acres with 363 feet of frontage on Gr e Bay. 1979 1980 River Tract DNR - Fisheries TF634 $160,000.00 of 80 acres on the Rier within one mile 1983 of the limits. Fife Lake Access West Gr e Bay Village of Fife Lake TF697 To acquire a parcel of l on Fife Lake that will link the existing Village Park a Department of Natural $55,000.00 Waterways Public Access Site..48 acres with 100 feet of Fife Lake frontage acquired. 1983 To acquire parcels of l with West Bay TF704 frontage within the city liits of $300,000.00, located 1983 between Clinch Park Marina Veteran's Park Beach.
Park Haserot Beach Park Expansion TF858 To acquire about 2.5 acres in a highly developed stripof l lying between U.S. 31 $200,000.00 East Bay. Parcel contains 250 feet of sy shorelne. 1984 To acquire one lot on the shore of the East arm of TF87-273 $28,000.00 Bay to 1987 exp the existing Haserot Beach Park. Murray Farms, Inc. TF88-311 $1,060,400.00 To acquire approximatelyl 507 acres located on the northely tip of Old Mission with 8,000 feet of Gr e Bay frontage. 1988 Ellis Lake Bayfront Parkl Riverfront Property Gr e County Green Lake TF884 of 170 acres encompassing most of Ellis $445,000.00 Lake with 5,000 feet of frontage. 1984 Acquire.61 acre parcel with TF92-106 100 feet of frontage on Gr $202,500.00 1992 e Bay for passive park.. of 70 acres with TF92-199 2500 feet of River $228,500.00 frontage to add to Brown 1992 Bridge Quiet Area. of two parcels, a unique 45-acre conifer swamp with over 3,000 feet of TF93-405 shoreline a 24.8 acres $321,000.00 open rangel with over 1993 2,000 feet on the River. (45-acre parcel deleted from project.)
Purchase of Development Rights Easement TF95-149 $1,000,000.00 Preserve up to 500 acres of farml to provide significant scenic views of Lake Michigan Bay by purchasing development rights. Targeted farml is in the viewshed of a scenic tournout to be constructed by MDOT. 1995 Deepwater Point Natural Area TF96-110 $1,968,000.00 The acquisition of 14acres of undeveloped, forested shoreline property providing 1,075.46 feet of Lake Michigan frontage along the east arm of Bay. 1996 Bullhead Lake Natural Area TF97-204 $108,800.00 of 28 acres with 1,100 feet of Bullhead Lake shoreline to preserve 1997 protect the undisturbed natural area to be used for education passive recreation. Henri Sons Property TF98-300 $400,000.00 Acquire key 300-acre parcel surrounded by State l in heavy recreation use area 5 1998 miles from 3 miles from Bay. Frost Property TF99-294 $1,560,000.00 in fee simple of about 539 acres of mostly forest l to add to the State Forest system for resource protection/management 1999 public outdoor recreation. The site in includes the headwaters of Creek, which is a designated trout stream a
Total $36,294,198.00 Taylor Park Development TF00-055 Development $25,175.00 Construction of a barrier-free walkway other amenities at Taylor Park on. 2000 Gen's Park Improvement Project TF01-166 Development $121,360.00 Development of an exisiting.61 parcel with 100 feet of frontage on East Arm of Gr e Bay into a day use 2001 park for swimming fishing, including a bathhouse, paved parking lot, wood walkway deck. Lake Trail - East Travere City TF02-151 Development $500,000.00 Project will construct a 2.3- mile 10-foot non-motorized multi-use recreational trail linking the TART Trail at Hull 2002 Park () to the trail head at Medalie Park ( ) runs along the east side of Lake. Civic Center South Village of Kingsley Village of Kingsley TF03-079 Development $125,000.00 Constructf a multi-use recreational complex that includes an archery range, tennis basketball courts, restroom concessions building, driveway parking lot, a hiking path through a nature area. 2003 Lake Trail West TF05-104 Development $500,000.00 Development of a 1,980 linear foot hard-surfaced nonmotorized multi-use recreation trail, which will provide a linkage to Hull Park. 2005
Clinch Park Bayfront Revitalization TF10-062 Development $450,800.00 Development to include universal beach water access, kayak/small boat launch, trails/promenades, splash pad, natural playground, enhanced shaded picnic area, site furniture, lscaping lighting. 2010 Lake Trail West TF11-060 Development $210,000.00 Development to include 2900 LF of 10' wide non-motorized multi-use trail with recreation area to include picnic areas, shelter, seating, fishing pier, kayak/canoe launch bike racks. 2011 Historic Barns Park Garden Development TF11-109 Development $300,000.00 Development to include universal access paved trails, picnic grove, interpretive center site amentities. 2011 Buffalo Ridge Trail Development West Bay Beach VASA Trail Project Gr e County TF12-141 Development Development to include continued construction of the 4.5-mile Buffalo Ridge Trail $199,000.00 connecting west southwest areas of the urban area. 2012 to develop a 1/2 mile long lscaped waterfornt park on Bay to include TF88-184 Development $280,950.00 lscaping, walkways, 1988 lighting, construction of a swimming beach parking lots. Development of a road TF90-310 Development improvements parking, $95,500.00 1990 maintenance building trail improvements.
Old Mission Park Site TF96-266 Development $275,000.00 Improvements to park area including site preparation, fencing, three small parking lots, vault toilets, trail development, viewing deck, gates. 1996 Hull Park Waterfront TF99-160 Development $365,730.00 Development of city parkl on Lake with boardwalks, fishing, decks, a picnic shelter, multi-use restroom building, bike trails, parking lscaping. 1999 Total Development $3,448,515.00 Total $39,942,713.00