Headquarters 10. Ion Ionescu de la Brad Blvd., PO Box 1890 013813 Bucharest, Romania phone: (+4021) 208 31 00 fax: (+4021) 230 24 42 AFTN: LRBBRTYD email: romatsa.office@romatsa.ro www.romatsa.ro AIM Unit Phone: +40.21.232.56.99; Fax: +40.21.208.99.16; AFS: LRBBYOYX Web: www.aisro.ro; Email: ais@aisro.ro; ais@romatsa.ro A I R A C A I P S U P AIRAC AIP SUPPLEMENT 01/14 01 29 MAY 2014 Work in progress at ORADEA/Oradea airport Phase I Effective date 29 th of MAY 2014 the first phase of movement surface refurbishment works will be carried at ORADEA/Oradea Airport. In this phase, 01 THRESHOLD and 19 END will be displaced with 500m to the north end. Accordingly to the shortening of the runway 01/19, the following modifications are to be operated: displaced THERESOLD 01 and 19 END coordinates: 470118.42N/0215405.00E; ILS LOC 19, ILS GP 19 unserviceable; PAPI 01 unserviceable; 01 authorized conditions of operation: noninstrumental approach (VFR); 19 authorized conditions of operation: nonprecision approach (NDB procedure); markings modified accordingly (see AD 2.1120/29 MAY 2014); change of coordinates of INS checkpoints as follow: LROD AD 2.8 APRONS, TAXIWAYS AND CHECK LOCATIONS DATA 1 Apron designation, surface and strength Surface: Strength: 13/R/C/W/T 2 Taxiway designation, width, surface and strength Designation: Width: Surface: Strength: A 18 M 14/R/C/W/T 3 ACL location and elevation 4 VOR checkpoints 5 INS checkpoints INS 01: 470131,34N 0215357,10E / 448 FT INS 02: 470132,95N 0215357,56E / 448 FT INS 03: 470133,79N 0215357,78E / 448 FT 6 Remarks turning bay: Location: THR 19 Surface: Dimensions: 100 M x 15 M Strength: 14/R/D/W/T surface movement guidance and control system and markings: LROD AD 2.9 SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM AND MARKINGS 1 Use of aircraft stand ID signs, TWY guide lines and visual docking/parking guidance system of aircraft stands Taxiing guidance signs at intersection with TWY, guide lines on the apron. Mandatory instructions markings. 2 and TWY markings : TWY: Nosein guidance at aircraft stands. 3 Stop bars Red stop bar on TWY A 4 Remarks Designation, THR, TDZ, centre line, edges, aiming point; Centre line, holding position at TWY/ intersection, edges marked. ROMATSA AIRAC AIP SUP 01/14
page 2 AIP 29 MAY 2014 ROMANIA Lucr ri de repara ii la pista Aeroportului ORADEA/Oradea Faza a Ia Începând cu data de 29 mai 2014,se va desf ura faza I a lucr rilor de modernizare a suprafe elor de mi care la Aeroportul ORADEA. În aceast etap, pragul pistei pe direc ia 01 i sfâr itul pistei pe direc ia 19 se vor deplasa cu 500m spre nord. Corespunz tor reducerii lungimii pistei de decolare/aterizare, se produc urm toarele modific ri: coordonatele noului prag al pistei pe direc ia 01, identice cu coordonatele sfâr itului pistei pe direc ia 19, sunt urm toarele: 470118.42N/0215405.00E; ILS LOC 19, ILS GP 19 scoase din func iune; PAPI 01, scos din func iune; condi iile de operare pe pista 01: apropiere neinstrumental (VFR); condi iile de operare pe pista 19: apropiere instrumental de neprecizie (procedura NDB); se modific marcajele de zi corespunz tor scurt rii pistei de decolare/aterizare (vezi harta AD 2.1120/29 MAY 2014); modificarea coordonatelor punctelor INS dup cum urmeaz : LROD AD 2.8 APRONS, TAXIWAYS AND CHECK LOCATIONS DATA 1 Apron designation, surface and strength Surface: Strength: 13/R/C/W/T 2 Taxiway designation, width, surface and strength Designation: Width: Surface: Strength: A 18 M 14/R/C/W/T 3 ACL location and elevation 4 VOR checkpoints 5 INS checkpoints INS 01: 470131,34N 0215357,10E / 448 FT INS 02: 470132,95N 0215357,56E / 448 FT INS 03: 470133,79N 0215357,78E / 448 FT 6 Remarks turning bay: Location: THR 19 Surface: Dimensions: 100 M x 15 M Strength: 14/R/D/W/T sistem de control i marcaje pentru ghidare pe suprafa a de mi care: LROD AD 2.9 SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM AND MARKINGS 1 Use of aircraft stand ID signs, TWY guide lines and visual docking/parking guidance system of aircraft stands Taxiing guidance signs at intersection with TWY, guide lines on the apron. Mandatory instructions markings. 2 and TWY markings : TWY: Nosein guidance at aircraft stands. 3 Stop bars Red stop bar on TWY A 4 Remarks Designation, THR, TDZ, centre line, edges, aiming point; Centre line, holding position at TWY/ intersection, edges marked. AIRAC AIP SUP 01/14 ROMATSA
AIP page 3 ROMANIA 29 MAY 2014 physical characteristics: Designations NR LROD AD 2.12 RUNWAY PHYSICAL CHARACTERISTICS THR elevation and highest elevation of TDZ of precision APP TRUE BRG Dimensions of Strength (PCN) and surface of and SWY THR coordinates end coordinates THR geoid ondulation 1 2 3 4 5 6 THR 450 FT 19 191.17 1300 x 30 14/R/D/W/T 470159.53N 0215416.86E 470118.42N 0215405.00E GUND 134 FT 01 011.16 1300 x 30 14/R/D/W/T 470118.42N 0215405.00E 470159.72N 0215416.92E GUND 134 FT THR 454 FT Slope of SWY SWY CWY Strip OFZ Remarks 7 8 9 10 11 12 0% (900 M) 60 x 300 1420 x 250 0.4% (400 M) 0.4% (400 M) 500 x 300 1420 x 250 0% (900 M) declared distances: designator TORA LROD AD 2.13 DECLARED DISTANCES TODA ASDA LDA Remarks 1 2 3 4 5 6 19 1300 1360 1300 1300 01 1300 1800 1300 1300 Approach and lighting available as follows: LROD AD 2.14 APPROACH AND LIGHTING APCH LGT edge LGT type THR LGT VASIS Centre Line LGT LEN, spacing, End LGT SWY LGT LEN colour (MEHT) TDZ, LGT, Length,spacing, colour, colour LEN Designator INTST WBAR PAPI LEN colour, INTST INTST WBAR colour Remarks 1 2 3 4 5 6 7 8 9 10 19 Cat. I 900 M LIH Green 01 Green PAPI Left/3 (453 FT) 840M, 60M, white,lih 460M, 60M, yellow, LIH 820M, 60M, white,lih 480M, 60M, yellow, LIH the following charts are suspended: AD 2.1120/07 MAR 2013, AD 2.1125/25 AUG 2011, AD 2.1151/25 AUG 2011, AD 2.1152/25 AUG 2011; the following charts are temporarily available: AD 2.1120/29 MAY 2014, AD 2.1122/29 MAY 2014, AD 2.11 25/29 MAY 2014; Red Red ROMATSA AIRAC AIP SUP 01/14
page 4 AIP 29 MAY 2014 ROMANIA caracteristicile fizice ale pistei: Designations NR LROD AD 2.12 RUNWAY PHYSICAL CHARACTERISTICS THR elevation and highest elevation of TDZ of precision APP TRUE BRG Dimensions of Strength (PCN) and surface of and SWY THR coordinates end coordinates THR geoid ondulation 1 2 3 4 5 6 THR 450 FT 19 191.17 1300 x 30 14/R/D/W/T 470159.53N 0215416.86E 470118.42N 0215405.00E GUND 134 FT 01 011.16 1300 x 30 14/R/D/W/T 470118.42N 0215405.00E 470159.72N 0215416.92E GUND 134 FT THR 454 FT Slope of SWY SWY CWY Strip OFZ Remarks 7 8 9 10 11 12 0% (900 M) 60 x 300 1420 x 250 0.4% (400 M) 0.4% (400 M) 500 x 300 1420 x 250 0% (900 M) distan ele declarate ale pistei designator TORA LROD AD 2.13 DECLARED DISTANCES TODA ASDA LDA Remarks 1 2 3 4 5 6 19 1300 1360 1300 1300 01 1300 1800 1300 1300 luminile de apropiere i balizajul corespunz tor scurt rii pistei de decolare/aterizare sunt disponibile dup cum urmeaz : LROD AD 2.14 APPROACH AND LIGHTING APCH LGT edge LGT type THR LGT VASIS Centre Line LGT LEN, spacing, End LGT SWY LGT LEN colour (MEHT) TDZ, LGT, Length,spacing, colour, colour LEN Designator INTST WBAR PAPI LEN colour, INTST INTST WBAR colour Remarks 1 2 3 4 5 6 7 8 9 10 19 Cat. I 900 M LIH Green 01 Green PAPI Left/3 (453 FT) 840M, 60M, white,lih 460M, 60M, yellow, LIH 820M, 60M, white,lih 480M, 60M, yellow, LIH se suspend urm toarele h r i: AD 2.1120/07 MAR 2013, AD 2.1125/25 AUG 2011, AD 2.1151/25 AUG 2011, AD 2.1152/25 AUG 2011; sunt temporar disponibile urm toarele h r i: AD 2.1120/29 MAY 2014, AD 2.1122/29 MAY 2014, AD 2.11 25/29 MAY 2014; Red Red AIRAC AIP SUP 01/14 ROMATSA
AIP page 5 ROMANIA 29 MAY 2014 before landing, aircraft will be informed by TWR on the displacement of 01 THRESOLD and 19 END by 500m, during the work period on first phase, using the following terminology: CAUTION, WORK IN PROGRESS. DISPLACED 01 THRESHOLD AND 19 END WITH 500M. the length of working area will be 350m; between operational runway (1300m) and working area (350m) will be a safety area of 150m, free of obstacles; estimated work period is about 6 months. END ROMATSA AIRAC AIP SUP 01/14
page 6 AIP 29 MAY 2014 ROMANIA înainte de aterizare, aeronavele vor fi informate prin TWR despre deplasarea pragului pistei pe direc ia 01 i a sfâr itului pistei pe direc ia 19 cu 500m, pe întreaga perioad a lucr rilor din faza I, utilizând urm toarea frazeologie: CAUTION, WORK IN PROGRESS. DISPLACED 01 THRESHOLD AND 19 END WITH 500M. zona de lucru are o lungime de 350m; între pista opera ional (1300m) i zona de lucru (350m) va exista o zona de siguran de 150m, liber de obstacole; durata estimat a lucr rilor este de 6 luni. SFÂR IT AIRAC AIP SUP 01/14 ROMATSA