REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia

Similar documents
REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures

Open Questions & Collecting Lessons Learned

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Status of PBN implementation in France

AIRAC AIP SUPPLEMENT 02/16 26 th MAY 2016

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

DSNA NAVIGATION STRATEGY

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

Flight Operations Inspector Manual

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

Título ponencia: Introduction to the PBN concept

TERPS vs PANS-Ops Procedure Design and Operational Differences

APAC PBN UPDATE Slide 1 of xx

EASA RNP (AR) Workshop The Landscape Working Together

Implementation of PBN in Armenian airspace

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

AIP AD SEYCHELLES 03 APR 14

A Pilot s perspective

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Regulations & Obligations

Development and validation of procedures

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Validation & Implementation Considerations Module 14 Activities 11 to 17

AERODROME CHART ATIS CLNC DEL

Final Approach Operations Symposium

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Learning Objectives. By the end of this presentation you should understand:

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

EXPLANATION OF TPP TERMS AND SYMBOLS

AREA NAVIGATION RNAV

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

GEORGIA. Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION SERVICE. TBILISI/Tbilisi Airport, 0158 Tbilisi, Georgia

UDSG Gyumri. UDSG AD 2.1 Aerodrome location indicator and name. UDSG AD 2.2 Aerodrome geographical and administrative data N E

AREA NAVIGATION RNAV- MANAGEMENT

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Approach Specifications

Lecture Minimum safe flight altitude

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

PHILIPPINES ATC EXPERIENCE ON PBN 6/15/ CIVIL AVIATION AUTHORITY OF THE PHILIPPINES

Honeywell.com PBN Concepts Krakow, Poland

Implementation challenges for Flight Procedures

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

LPV implementation to non-instrument runways

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

Civil Aviation Authority INFORMATION NOTICE. Number: IN 2017/034. Implementation of Performance Based Navigation Guidance for Pilots

Challenges in Complex Procedure Design Validation

SKUKUZA OPERATIONAL BRIEFING

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

GBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit

PBN Implementation in the UK

Contextual note SESAR Solution description form for deployment planning

Advisory Circular. Required Navigation Performance Approach (RNP APCH)

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

ICAO framework for LPV

European Aviation Safety Agency

Evolving and improving landing networks with EGNOS

EGNOS SERVICE PROVISION WORKSHOP DFS: EGNOS vertical guidance for Baro-VNAV procedures German history and background information

PBN and Procedure Design training

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

V3 SPR. Abstract. Document information

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

FLIGHT OPERATIONS PANEL

(RN R A N V A V & & RN R P N

Airservices Australia 2016

PBN Implementation inside Italian Airspace Status update Summer 2013

Aircraft Systems and 4D Trajectory Management

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

3. The proposed amendments to Annexes 4, 11, 15 and the PANS-OPS, Volumes I and II are in Attachments B through F, respectively.

Think the solution, experience the change

SBAS as a solution for safe approaches in New Zealand and Australia

TABLE OF CONTENTS 1.0 INTRODUCTION...

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

UK Performance-based Navigation (PBN) Implementation Status

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Safety and Airspace Regulation Group

Report for instrument rating - IR(A) skill test

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Intentionally left blank

Flight Safety Division Case Nr. Page 1 of 11

E-GNSS systems for GA

SPREADING THE USE OF EGNSS

LPV implementation to non instrument runways

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

TWELFTH AIR NAVIGATION CONFERENCE

Jeppesen NavData and Charts

Transcription:

REPUBLIC OF CROATIA NonAIRAC Phone: +385 1 6259 373 +385 1 6259 589 +385 1 6259 372 Fax: +385 1 6259 374 AFS: LDZAYOYX Email: aip@crocontrol.hr URL: http://www.crocontrol.hr Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira 2 10410 Velika Gorica, POBox 103 Croatia AIP SUP 007/2018 Effective Date: 13Sep2018 End Date: UFN Publication Date: 02Aug2018 LDDU DUBROVNIK/Cilipi Airport Temporary suspension of IAP RNAV (GNSS) RWY12 and trial PBN instrument flight procedures With this AIP SUP instrument flight procedure RNAV(GNSS) RWY12 (LDDU AD 2.24.12 IAC RNAV(GNSS) RWY12, effective date 21 JUN 2018) is temporarily suspended. While this AIP SUP is in force, RNAV (GNSS) RWY12 is temporarily replaced with RNAV (GNSS) Z RWY12, which is attached to this AIP SUP. With this AIP SUP a trial satellite based PBN STAR (LDDU AD 2.24.10 STAR RNAV RWY30) and PBN APCH (LDDU AD 2.24.12 IAC RNAV (GNSS) Y RWY12) instrument flight procedures are available for testing purposes only at DUBROVNIK/ Cilipi Airport. The instrument flight procedures STAR RNAV RWY30 and RNAV(GNSS) Y RWY12 are available and shall be used for flight validation purposes only, by approved operators only and according to Dubrovnik ATC clearance only. The satellite instrument flight procedures are GNSS based and contain STAR and APCH flight procedures, as follows: Standard arrivals (STAR) from ATS routes to the initial approach fix (IAF) NonPrecision Approach (NPA) down to LNAV minima APV approach procedure with Barometric vertical guidance (APV BaroVNAV) down to LNAV/VNAV minima APV SBAS approach procedures with vertical guidance based on European Geostationary Navigation Overlay Service (EGNOS) system down to LPV minima (SBAS APVI). The instrument flight procedures are based on existing ICAO criteria prescribed by ICAO Doc 8168 OPS/611 Vol II (ICAO PANS OPS Vol II). Integral parts of this AIP SUP are: LDDU STAR RNAV RWY30 ICAO Chart, RNAV coding tables (waypoint list), LDDU RNAV(GNSS) Y RWY12 ICAO Chart, SBAS FAS Data Block, RNAV coding tables (waypoint list), LDDU RNAV(GNSS) Z RWY12 ICAO Chart, SBAS FAS Data Block, RNAV coding tables (waypoint list). Record entry of AIP SUP 007/2018 in GEN 0.3. Ref AIP: LDDU AD 2 Croatia Control Ltd. 1/2

AIP SUP 007/2018 THIS PAGE INTENTIONALLY LEFT BLANK 2/2 Croatia Control Ltd.

Serial Number Route Path Descriptor LDDU RNAV STANDARD ARRIVAL RWY 30 Proposed tabular description for navigation database coding Waypoint Identifier 010 NERRA 1Y IF NERRA Course/Track Magnetic Flyover M ( T) Variation Distance (NM) Turn direction Altitude (ft) Speed (kt) +5000 NAV SPEC 020 030 040 050 060 DU705 DU704 DU702 DU701 OLEGU 202 (204.5 T) (117.6 T) (117.8 T) 025 (027.9 T) (118.0 T) 18.8 12.1 12.1 8.7 9.5 +4000 4000 4000 250 230 IAF 010 SIPAL 1Y IF SIPAL 020 030 040 050 060 070 DU706 DU705 DU704 DU702 DU701 OLEGU 154 (157.2 T) 154 (157.3 T) (117.6 T) (117.8 T) 025 (027.9 T) (118.0 T) 20.4 13.2 12.1 12.1 8.7 9.5 +8000 +4000 4000 4000 250 230 IAF 010 MOKUN 1Y IF MOKUN 020 030 040 050 060 DU708 DU703 DU702 DU701 OLEGU 237 (240.2 T) 237 (240.1 T) 295 (298.1 T) 025 (027.9 T) (118.0 T) 7.0 9.7 15.4 8.7 9.5 +8500 4000 4000 250 230 IAF RNAV HOLDING tabular description Waypoint Identifier Path Descriptor Inbound course Leg time/ distance Minimum altitude Maximum altitude Turn direction M ( T) (NM) (ft) (ft) Speed limit MAX IAS (kt) Magnetic variation NAV SPEC 1MIN / OLEGU HM R 4000 230 (118.0 T) HLDG above 4000 on ATC authorization only

Waypoint coordinates Waypoint name wgs84 latitude wgs84 longitude MOKUN 422701N 0182848E NERRA 425419N 0173236E SIPAL 430812N 0170425E OLEGU 422906.1N 0180754.0E DU701 423335.4N 0175631.1E DU702 422554.6N 0175100.4E DU703 421841.2N 0180917.9E DU704 423134.0N 0173632.9E DU705 423711.6N 0172202.7E DU706 424923.3N 0171508.9E DU708 422331.2N 0182035.3E

11 DEC 2014 LDDU AD 2.24.10 STAR RNAV RWY 30 4 Validity: 13 SEP 2018 UFN AIP HRVATSKA AIP CROATIA OVA STRANICA JE NAMJERNO OSTAVLJENA PRAZNA THIS PAGE INTENTIONALLY LEFT BLANK AIP SUP 007/2018 Hrvatska kontrola zračne plovidbe d.o.o. Croatia Control Ltd.

OCA (H) A B C D LNAV 2.5% * 2380 (1853) LNAV 4.0% * 2130 (1603) Straightin LNAV/VNAV 1930 (1403) approach LPV 2.5% * 1690 (1163) LPV 4.0% * 840 (313) Note: * Minimum missed approach climb gradient Timing not authorized for defining the MAPt GS kt 90 110 130 150 170 190 FAF DU397 (6.67NM) min:sec 4:27 3:38 3:05 2:40 2:21 2:06 Rate of descent (5.24%) ft/min 478 584 690 796 902 1008

Serial Number Fix LDDU RNAV (GNSS) Y RWY12 Proposed tabular description for navigation database coding APPROACH TRANSITION Course Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Flyover descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) NAV SPEC 010 IAF IF ERASO +5000 020 IF DU402 025 (028.0 T) 010 IAF IF PILAP 7.0 +4000 +5000 020 IF DU402 7.0 +4000 (118.0 T) Proposed tabular description for navigation database coding FINAL TRANSITION Course Serial Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Fix Flyover Number descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) RNP APCH RNP APCH NAV SPEC 010 IF IF DU402 +4000 020 FAF DU396 (118.0 T) 6.2 +2700 030 MAPt DU397 Y (118.1 T) 6.7 150 3.0 / 50.0 040 DU398 Y (118.1 T) 1.9 MAX IAS 150KT FOR LNAV only RNP APCH 060 MAHF DF DU900 R +4000 185 003 070 MAHF HM DU900 (005.7 T) 1MIN L +4000 210 Holding above 4000t on ATC clearance only RNAV HOLDING tabular description Waypoint name Path Terminator Inbound course Leg time/ distance Minimum altitude Maximum altitude Turn Speed limit M ( T) NM direction FT FT MAX IAS Magnetic variation NAV SPEC 098 1MIN / PILAP HM R 5000 210 (101.3 T) 3 E 003 1MIN / DU900 HM L 4000 (005.7 T) 210 3 E Waypoint coordinates Waypoint name wgs84 latitude wgs84 longitude ERASO 423345.7N 0175547.1E PILAP 424313.8N 0175151.5E DU396 423702.0N 0180737.4E DU397 423353.12N 0181534.81E DU398 423259.4N 0181750.8E DU402 423956.6N 0180014.4E DU900 421817.9N 0181438.3E

11 DEC 2014 LDDU AD 2.24.12 IAC RNAV (GNSS) Y RWY 12 4 Validity: 13 SEP 2018 UFN AIP HRVATSKA AIP CROATIA OVA STRANICA JE NAMJERNO OSTAVLJENA PRAZNA THIS PAGE INTENTIONALLY LEFT BLANK AIP SUP 007/2018 Hrvatska kontrola zračne plovidbe d.o.o. Croatia Control Ltd.

Serial Number Fix LDDU RNAV (GNSS) Z RWY12 Proposed tabular description for navigation database coding APPROACH TRANSITION Course Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Flyover descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) NAV SPEC 010 IAF IF ERASO +5000 020 010 IF IAF IF DU402 PILAP 025 (028.0 T) 7.0 +4000 +5000 020 IF DU402 (118.0 T) 7.0 +4000 Proposed tabular description for navigation database coding FINAL TRANSITION Course Serial Path Waypoint Magnetic Distance Turn Altitude Speed VPA/TCH Fix Flyover Number descriptor name M Variation (NM) direction (ft) (kt) ( /ft) ( T) RNP APCH RNP APCH NAV SPEC 010 IF IF DU402 +4000 020 FAF DU400 (118.0 T) 5.9 +2600 030 MAPt RW12 Y (118.1 T) 6.4 3.0 / 52.0 040 DU399 Y (118.2 T) 2.1 RNP APCH 060 MAHF DF DU900 R +4000 185 003 070 MAHF HM DU900 (005.7 T) 1MIN L +4000 210 Holding above 4000t on ATC clearance only RNAV HOLDING tabular description Waypoint name Path Terminator Inbound course Leg time/ distance Minimum altitude Maximum altitude Turn Speed limit M ( T) NM direction FT FT MAX IAS Magnetic variation NAV SPEC 098 1MIN / PILAP HM R 5000 210 (101.3 T) 3 E 003 1MIN / DU900 HM L 4000 (005.7 T) 210 3 E Waypoint coordinates Waypoint name wgs84 latitude wgs84 longitude ERASO 423345.7N 0175547.1E PILAP 424313.8N 0175151.5E RW12 423409.21N 0181454.24E DU399 423310.7N 0181721.6E DU400 423709.7N 0180717.9E DU402 423956.6N 0180014.4E DU900 421817.9N 0181438.3E

11 DEC 2014 LDDU AD 2.24.12 IAC RNAV (GNSS) Z RWY 12 4 Validity: 13 SEP 2018 UFN AIP HRVATSKA AIP CROATIA OVA STRANICA JE NAMJERNO OSTAVLJENA PRAZNA THIS PAGE INTENTIONALLY LEFT BLANK AIP SUP 007/2018 Hrvatska kontrola zračne plovidbe d.o.o. Croatia Control Ltd.