Marymount University Ballston Center Redevelopment

Similar documents
Marymount University Ballston Center Redevelopment

ARLINGTON COUNTY, VIRGINIA

San Francisco International Terminal 3 /Boarding Area E San Francisco International Airport Civic Design Review Informational Package.

2600 COLORADO ENTRY DESIGN

±700,000 sf. 3 Building Campus AVAILABLE FOR LEASE. KEVIN CUNNINGHAM SARAH BOHANNON

Best Western Site Plan

ARLINGTON COUNTY, VIRGINIA

Cambridge Avenue. Cleveland Avenue. Chicago Avenue. Chicago Avenue. Curbed planters with groundcover,

hospitality passionate principals + committed professionals + unparalleled service

AUGUST 5, 2010 UPDATE # 3 AMTRAK/FEC PROJECT: STATION LOCATIONS AND CONCEPTUAL DRAWINGS

MARINE BIOTECH RESEARCH PARK FOR THE SALEM HARBOR POWER STATION SITE

ARLINGTON COUNTY, VIRGINIA

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

11th and Vermont Streets Special General Land Use Plan (GLUP) Study

1 TP-08 3 TP-08 TP-06 EX.RL SPRINKLER STORAGE TANKS SPRINKLER PUMP ROOM RETAINING WALL WITH HANDRAIL TOW

TORONTO TRANSIT COMMISSION REPORT NO.

St. Patrick s Street Development Brief

The Palm Tower/Mall - Architecture. Prabhanjan Kambadur, Director MENA, RSP Architects, Planners & Engineers (MENA)

FULL FLOOR OR LARGER ONLY VIRTUAL TOUR

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

ARLINGTON COUNTY, VIRGINIA

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

Orlando Loch Haven Park (Conditional Use Permit) Project Overview (updated 5/31/2018)

SONY CENTRE FOR THE PERFORMING ARTS WEST SIDE PLAZA

places Mooloolaba s heart five

MOSCONE EXPANSION AND IMPROVEMENT PROJECT

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

MINUTES DESIGN & REVIEW BOARD. September 8, 2015

TORONTO TRANSIT COMMISSION REPORT NO.

SK 1.0 SITE STATISTICS PRELIMINARY DOCUMENTS. PROPOSED APARTMENT BUILDING 115 & 117 ERB STREET EAST Waterloo, Ontario PROJECT: DATE: REFERENCE: -

Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava

ABINGDON v ELEMENTARY SCHOOL

COCONUT GROVE WATERFRONT MASTER PLAN. ERA / Curtis Rogers / ConsulTech / Paul George Ph.D.

MOSCONE EXPANSION PROJECT PUBLIC MEETING 2 OCTOBER 16, 2013

BOSTON, MA 171 TREMONT IMPACT ADVISORY GROUP 5/19/16

TREASURE ISLAND PUBLIC RESTROOM DEVELOPMENT DESIGN PHASE 2. Arts Commission Civic Design Review OCTOBER 17, 2016

TREASURE ISLAND PUBLIC RESTROOM DESIGN DEVELOPMENT PHASE TIDA ITC OCTOBER 19, 2016

TRAFALGAR FLATS TRAFALGAR FLATS

635 Wilmer Ave. Orlando, Fl Ph Fx

ARLINGTON COUNTY, VIRGINIA

Ballston Common Mall 4238 Wilson Blvd., # 3104 Arlington, Virginia 22203

A A A A MEN'S ROOM EQUIPMENT 117 EXISTING HOTEL TOWER WOMEN'S ROOM 115 EXISTING HOTEL TOWER AREA APPROX 23 STORIES

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

ALBANY WATERFRONT STRUCTURE PLAN REPORT. Submitted by Hames Sharley on behalf of LandCorp February 2006

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

Kaufland, Chirnside Park

The Royal Atlantis. Hotel + Residences. Dubai, UAE

Southwest Sector. Site 6 Site 7 Site 9a/b Site B Site C Site D

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

THEATER. TOWN CENTRE ONE 10 STORY 256, ,489 Net Rentable sqft. PHASE II: TOWN CENTRE TWO 65 STORY - 100,000 sf QUEENSBURY LN

VOGELMORN PRECINCT. collaboration, architecture and design

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Village of Skokie Downtown Area Sign Guidelines. for CX Core Mixed Use Zoning District

Introductions and Agenda

SHOPS ON PALM CANYON DOWNTOWN PALM SPRINGS, CA PROJECT DESCRIPTION MARKET HIGHLIGHTS PROJECT HIGHLIGHTS

ULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011

ILKLEY PARISH COUNCIL

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

ABOUT THE DEVELOPER ASIAN HOTELS (WEST) LIMITED

Public Realm & Landscape

omgeving madrid.projects 4

Exhibit 18A ANDERSON STREET DETAIL LECOUNT SQUARE New Rochelle, New York

Retail Open Air Powercenter Experience

KING CONDOMINIUM RESIDENCES (REZONING)

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

Transportation Supporting Dulles Airport

Aspen Planning Zoning Commission Minutes March Aspen Valley Hospital Phase II 401 Castle Creek Final PUD and associated

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

200 Liberty Street 225 Liberty Street 200 Vesey Street 250 Vesey Street 300 Vesey Street

Concept Curtin Precinct Map and Code

Welcome to our exhibition

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Master Commercial Developer Industry Forum

Binational Reception ULI Spring Meeting 2013

Pre-application submission for Committee: Phase 4 development at West Hendon

Shadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario

Concept Gungahlin Precinct Map and Code Includes Gungahlin Town Centre

the music factory las colinas newest entertainment destination For Retail Leasing Information Call Noah Lazes

Leidesdorff Village D&S Developement 2277 Fair Oaks Boulevard, Studio 220 Sacramento, California

Crystal City Block Plan #CCBP-G-1 Long Range Planning Committee. January 29, 2018

4,662 SF SECOND GENERATION RESTAURANT SPACE AVAILABLE 998 FLEX RETAIL/OFFICE SPACE AVAILABLE

The Site. Raeburn Place. Raeburn House Hotel Limited and Edinburgh Academical Club. Hotel & Edinburgh Academical Club House. Map of area

AMBIENCE IMPROVEMENT PROJECT O.R TAMBO INTERNATIONAL AIRPORT CONCEPT DESIGN

Sampson Veterans Memorial Cemetery: Administration Building A001.01

A brand new retail destination with unrivaled presence in the heart of Ballston BALLSTONEXCHANGE.COM

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

YOUR NEW LIFE IN STYLE STARTS HERE

Digital Signage & Advertising Opportunities

FOR LEASE. OFFICE & RETAIL Street, Edmonton, AB AVAILABLE NOW! RENTS STARTING AT $12/SF. Completed showsuites, move in ready!

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

Rebecca Henson RID, IIDA, LEED AP

Asia News. November 2012

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB

TWO BALLSTON PLAZA AVAILABLE SPACE AMENITIES. Leasing Information: 1110 N. Glebe Road, Arlington, VA 22201

Transcription:

Marymount University Ballston Center Redevelopment October 28, 2013 SPRC #5

Team Owners: Academic Office Architect: Residential Architect: Land Use Counsel: Civil Engineer: Landscape Architect: Traffic Consultant: Marymount University The Shooshan Company Gensler SK&I Design Group Walsh, Colucci, Lubeley, Emrich & Walsh, PC Bowman Consulting Studio 39 Wells & Associates MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 2

Agenda 01. Architectural Updates 02. Open Space 03. Questions + Answers MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 3

1. Architectural Updates MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 4

Perspective: Previous Southeast Corner MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 5

Perspective: Southeast Corner MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 I SPRC #5 I 6

Perspective: Southeast Corner Penthouse Moved Back 3 Feet Architecture Penthouse Features Relate to Each Other Shared Corner Plaza MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 7

Perspective: Southeast Corner at Night MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 8

Detailed Perspective: Southeast Corner MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 9

Terracotta: Material References MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 10

Material Detail: Perforated Metal Panel Perforated Metal Panel Detailed View MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 11

Penthouse Option: Facade Module Articulation MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 12

Perspective: Existing View From Fairfax Drive ( J I J MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 13

Perspective: Proposed View From Fairfax Drive MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 14

Material and Design Precedent Images MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 15

Street View of Marymount: For Rhythm of Façade and Retail (Fairfax) MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 16

Detailed Perspective: Academic Office Retail MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 17

Detailed Perspective: Street Level View from Glebe Road MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 18

Terracotta Detail: Street Level View from Glebe Road Detail Showing Natural Variations in Terracotta MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 19

Perspective: Existing View From Glebe Road MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 20

Residential Rendering: View From Glebe Road MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 I SPRC #5 I 21

Perspective: Residential Retail on Glebe Road MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 22

Residential Building: Detail View MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 23

Residential Building: Detail View MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 24

Detailed Courtyard View of Residential Building: To Address Facade Materials. '?1 l 1 j MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 25

Updated Courtyard View: To Address Ground Floor Articulation (Louvers) MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 26

Academic Office Facade: Updates and Material References (Baggettes) Baggette - Reference Image Baggette - Reference Image MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 27

2. Open Space MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 28

Proposed Landscape Plan: Academic Office and Residential Not to Scale RESIDENTIAL N. Glebe Road North Wakefield [NEEDS TO UPDATE] ACADEMIC OFFICE Fairfax Drive N MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 29

North Wakefield Current Landscape Plan: Academic Office and Residential Not to Scale RESIDENTIAL N. Glebe Road ACADEMIC OFFICE Fairfax Drive MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 30

Landscape Design: Precedent Images Not to Scale MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 31

Previous Landscape: Detailed Plaza Plan N. Glebe Road N MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 32

Current Landscape: Detailed Plaza Plan N. Glebe Road N MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 33

Previous Landscape: Detailed Courtyard Plan MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 34

Current Landscape: Detailed Courtyard Plan MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 35

Detailed Section: Courtyard Residential Academic Office Courtyard MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 36

Detailed Sections: Courtyard Part A Part B Overall Courtyard Section Courtyard Section - Part A Courtyard Section - Part B MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 37

Previous Courtyard View: Courtyard Perspective MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 I SPRC #5 I 38

Updated Courtyard View: To Address Ground Floor Articulation (Louvers) MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 39

North Wakefield Street Systems: Cycle Track Concept Not to Scale RESIDENTIAL N. Glebe Road ACADEMIC OFFICE Fairfax Drive N MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 40

North Wakefield Current Street Systems: Cycle Track Concept Not to Scale RESIDENTIAL N. Glebe Road ACADEMIC OFFICE Fairfax Drive N MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 41

Public Access Easement: Site Plan Not to Scale MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 42

Overall Site: A Tour Around the Site RESIDENTIAL N. Glebe Road North Wakefield ACADEMIC OFFICE Fairfax Drive MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 43

SPRC: Changes Made to Date - Overview Architecture Academic Office Revised the roof top element to incorporate a perforated metal panel sunshade and metal canopy that overhangs the penthouse and down the south façade. Added blue accent lighting in roof top canopy Moved penthouse back an additional 3 from south façade (5 total set-back) Revised design of west façade to incorporate elements from the east façade and to recall elements of the original Blue Goose building west facade Added articulation to north façade at garage exhaust shaft and louver to incorporate Terra Cotta baguettes Revised the first floor plan to get retail space at the SE corner and a service corridor connecting it to the loading dock. Created new retail entry on Fairfax Drive with blue metal façade panels and canopy for the Blue Goose Café Shared concept for the Blue Goose Café interior. Added blue spandrel glass band at second floor slab. Residential Moved Vehicular entry from N. Glebe to Wakefield (thus losing parking spaces) Added Retail (thus having to move residential lobby entry and reducing number of dwelling units) Moved building 5-0 west to open view corridor to corner (thus reducing courtyard space for residents) MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 44

SPRC: Changes Made to Date - Overview (Continued) Landscape Corner plaza re-conceptualized from a series of modular bioretention planters with seat walls (SPRC 1) to landscape panels (SPRC 2). Corner plaza refinement of landscape panels, including introduction of landforms (SPRC 3). Corner plaza re-conceptualized to include alternate pedestrian flow with diffused hardscape edge treatments (post-sprc 4). Relocation of residential garage entry from Glebe to Wakefield. Added parking spaces on Wakefield Street Introduction of Blue Goose Café seating in corner plaza. Refinement of bus shelter location (SPRC 4) and interface with shuttle stop (post-sprc 4). Refinement of grade change relative to stairs and ramps. Refinement to Pedestrian Realm definition on streetscapes. Introduction of cycle track. Incorporating additional street trees: +2 on Fairfax, +1 on Glebe (possibly an additional after yesterday), +1 on Wakefield Additional trees within site: +2 at corner of Wakefield & Fairfax, +2 at interior courtyard, +4 at corner plaza (currently). MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 45

Community Benefits Public Art Contribution Certification at LEED Gold level rating On Site Affordable Housing + Affordable Housing Contribution associated with the Office Building Open Space Contribution Public and County Use and Access to Auditorium MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 46

3. SPRC Discussion MARYMOUNT UNIVERSITY BALLSTON CENTER 28 October 2013 SPRC #5 47

Thank You! Marymount University Ballston Center Marymount University The Shooshan Company Avison Young 09.7308.000